batch_test_result.json 21 KB

123456789101112131415161718192021222324252627282930313233343536373839404142434445464748495051525354555657585960616263646566676869707172737475767778798081828384858687888990919293949596979899100101102103104105106107108109110111112113114115116117118119120121122123124125126127128129130131132133134135136137138139140141142143144145146147148149150151152153154155156157158159160161162163164165166167168169170171172173174175176177178179180181182183184185186187188189190191192193194195196197198199200201202203204205206207208209210211212213214215216217218219220221222223224225226227228229230231232233234235236237238239240241242243244245246247248249250251252253254255256257258259260261262263264265266267268269270271272273274275276277278279280281282283284285286287288289290291292293294295296297298299300301302303304305306307308309310311312313314315316317318319320321322323324325326327328329330331332333334335336337338339340341342343344345346347348349350351352353354355356357358359360361362363364365366367368369370371372373374375376377378379380381382383384385386387388389390391392393394395396397398399400401402403404405406407
  1. {
  2. "timestamp": "2026-03-30T11:16:31.610898",
  3. "reports": [
  4. {
  5. "filename": "标准结构测试文件.pdf",
  6. "total_chunks": 65,
  7. "total_level1": 10,
  8. "last_level1_title": "第十章其他资料",
  9. "last_level1_page": "131",
  10. "last_chapter_found": true,
  11. "last_chapter_label": "第十章其他资料",
  12. "page_reasonable": true,
  13. "toc_page": 1,
  14. "leak_detected": false,
  15. "leak_details": [],
  16. "section_labels": [
  17. "第一章编制依据->一、法律法规",
  18. "第一章编制依据->三、文件制度",
  19. "第一章编制依据->二、标准规范",
  20. "第一章编制依据->五、编制范围",
  21. "第一章编制依据->四、编制原则",
  22. "第七章环境保证措施->一、环境保证体系",
  23. "第七章环境保证措施->三、环境保护及文明施工措施",
  24. "第七章环境保证措施->二、环境保护组织机构",
  25. "第三章施工计划->一、施工进度计划",
  26. "第三章施工计划->三、施工设备计划",
  27. "第三章施工计划->二、施工材料计划",
  28. "第三章施工计划->五、安全生产费用使用计划",
  29. "第三章施工计划->四、劳动力计划",
  30. "第九章验收要求->一、验收标准",
  31. "第九章验收要求->三、验收内容",
  32. "第九章验收要求->二、验收程序",
  33. "第九章验收要求->五、验收人员",
  34. "第九章验收要求->四、验收时间",
  35. "第二章工程概况->一、设计概况",
  36. "第二章工程概况->七、参建各方责任主体单位",
  37. "第二章工程概况->三、周边环境",
  38. "第二章工程概况->二、工程地质与水文气象",
  39. "第二章工程概况->五、施工要求和技术保证条件",
  40. "第二章工程概况->六、风险辨识与分级",
  41. "第二章工程概况->四、施工平面及立面布置",
  42. "第五章安全保证措施->一、安全保证体系",
  43. "第五章安全保证措施->三、技术保障措施",
  44. "第五章安全保证措施->二、组织保证措施",
  45. "第五章安全保证措施->五、监测监控措施",
  46. "第五章安全保证措施->六、应急处置措施",
  47. "第五章安全保证措施->四、安全防护措施",
  48. "第八章施工管理及作业人员配备与分工->一、施工管理人员",
  49. "第八章施工管理及作业人员配备与分工->三、特种作业人员",
  50. "第八章施工管理及作业人员配备与分工->二、专职安全生产管理人员",
  51. "第八章施工管理及作业人员配备与分工->四、其他作业人员",
  52. "第六章质量保证措施->一、质量保证体系",
  53. "第六章质量保证措施->三、工程创优规划",
  54. "第六章质量保证措施->二、质量目标",
  55. "第六章质量保证措施->四、质量控制程序与具体措施",
  56. "第十章其他资料->一、计算书",
  57. "第十章其他资料->三、附图附表",
  58. "第十章其他资料->二、相关施工图纸",
  59. "第四章施工工艺技术->一、主要施工方法概述",
  60. "第四章施工工艺技术->三、工艺流程",
  61. "第四章施工工艺技术->二、技术参数",
  62. "第四章施工工艺技术->五、施工方案及操作要求",
  63. "第四章施工工艺技术->六、检查要求",
  64. "第四章施工工艺技术->四、施工准备"
  65. ],
  66. "return_code": 0,
  67. "reasons": []
  68. },
  69. {
  70. "filename": "测试模版-四川路桥专项施工方案框架以及编制说明(2025修订第三版)- v0.2.pdf",
  71. "total_chunks": 45,
  72. "total_level1": 10,
  73. "last_level1_title": "第十章 其他资料",
  74. "last_level1_page": "46",
  75. "last_chapter_found": true,
  76. "last_chapter_label": "第十章 其他资料",
  77. "page_reasonable": true,
  78. "toc_page": 1,
  79. "leak_detected": true,
  80. "leak_details": [
  81. {
  82. "chunk_id": "doc_chunk_第九章->五_1",
  83. "section_label": "第九章 验收要求->五、 验收人员",
  84. "keyword": "第十章"
  85. },
  86. {
  87. "chunk_id": "doc_chunk_第九章->五_1",
  88. "section_label": "第九章 验收要求->五、 验收人员",
  89. "keyword": "其他资料"
  90. }
  91. ],
  92. "section_labels": [
  93. "第一章 编制依据->一、 法律法规",
  94. "第一章 编制依据->三、 文件制度",
  95. "第一章 编制依据->二、 标准规范",
  96. "第一章 编制依据->五、 编制范围",
  97. "第一章 编制依据->四、 编制原则",
  98. "第七章 环境保证措施->一、 环境保证体系",
  99. "第七章 环境保证措施->三、 环境保护及文明施工措施",
  100. "第七章 环境保证措施->二、 环境保护组织机构",
  101. "第三章 施工计划->一、 施工进度计划",
  102. "第三章 施工计划->三、 施工设备计划",
  103. "第三章 施工计划->二、 施工材料计划",
  104. "第三章 施工计划->五、 安全生产费用使用计划",
  105. "第三章 施工计划->四、 劳动力计划",
  106. "第九章 验收要求->一、 验收标准",
  107. "第九章 验收要求->三、 验收内容",
  108. "第九章 验收要求->二、 验收程序",
  109. "第九章 验收要求->五、 验收人员",
  110. "第九章 验收要求->四、 验收时间",
  111. "第二章 工程概况->一、 设计概况",
  112. "第二章 工程概况->七、 参建各方责任主体单位",
  113. "第二章 工程概况->三、 周边环境",
  114. "第二章 工程概况->二、 工程地质与水文气象",
  115. "第二章 工程概况->五、 施工要求和技术保证条件",
  116. "第二章 工程概况->六、 风险辨识与分级",
  117. "第二章 工程概况->四、 施工平面及立面布置",
  118. "第五章 安全保证措施->一、 安全保证体系",
  119. "第五章 安全保证措施->三、 技术保障措施",
  120. "第五章 安全保证措施->二、 组织保证措施",
  121. "第五章 安全保证措施->五、 监测监控措施",
  122. "第五章 安全保证措施->六、 应急处置措施",
  123. "第五章 安全保证措施->四、 安全防护措施",
  124. "第八章 施工管理及作业人员配备与分工->一、 施工管理人员",
  125. "第八章 施工管理及作业人员配备与分工->三、 特种作业人员",
  126. "第八章 施工管理及作业人员配备与分工->二、 专职安全生产管理人员",
  127. "第六章 质量保证措施->一、 质量保证体系",
  128. "第六章 质量保证措施->三、 工程创优规划",
  129. "第六章 质量保证措施->二、 质量目标",
  130. "第六章 质量保证措施->四、 质量控制程序与具体措施",
  131. "第十章 其他资料",
  132. "第四章 施工工艺技术->一、 主要施工方法概述",
  133. "第四章 施工工艺技术->三、 工艺流程",
  134. "第四章 施工工艺技术->二、 技术参数",
  135. "第四章 施工工艺技术->五、 施工方法及操作要求",
  136. "第四章 施工工艺技术->六、 检查要求",
  137. "第四章 施工工艺技术->四、 施工准备"
  138. ],
  139. "return_code": 1,
  140. "reasons": [
  141. "发现跨章节内容泄漏"
  142. ]
  143. },
  144. {
  145. "filename": "成渝扩容桥梁下部结构专项施工方案(正式版)(1).pdf",
  146. "total_chunks": 59,
  147. "total_level1": 10,
  148. "last_level1_title": "第十章其他资料",
  149. "last_level1_page": "112",
  150. "last_chapter_found": true,
  151. "last_chapter_label": "第十章其他资料",
  152. "page_reasonable": true,
  153. "toc_page": 1,
  154. "leak_detected": false,
  155. "leak_details": [],
  156. "section_labels": [
  157. "第一章编制依据->一、法律法规",
  158. "第一章编制依据->三、文件制度",
  159. "第一章编制依据->二、标准规范",
  160. "第一章编制依据->五、编制范围",
  161. "第一章编制依据->四、编制原则",
  162. "第七章环境保证措施->一、环境保证体系",
  163. "第七章环境保证措施->三、环境保护及文明施工措施",
  164. "第七章环境保证措施->二、环境保护组织机构",
  165. "第三章施工计划->一、施工进度计划",
  166. "第三章施工计划->三、施工设备计划",
  167. "第三章施工计划->二、施工材料计划",
  168. "第三章施工计划->五、安全生产费用使用计划",
  169. "第三章施工计划->四、劳动力计划",
  170. "第九章验收要求->一、验收标准",
  171. "第九章验收要求->三、验收内容",
  172. "第九章验收要求->二、验收程序",
  173. "第九章验收要求->五、验收人员",
  174. "第九章验收要求->四、验收时间",
  175. "第二章工程概况->一、设计概况",
  176. "第二章工程概况->七、参建各方责任主体单位",
  177. "第二章工程概况->三、周边环境",
  178. "第二章工程概况->二、工程地质与水文气象",
  179. "第二章工程概况->五、施工要求和技术保证条件",
  180. "第二章工程概况->六、风险辨识与分级",
  181. "第二章工程概况->四、施工平面及立面布置",
  182. "第五章安全保证措施->一、安全保证体系",
  183. "第五章安全保证措施->三、技术保障措施",
  184. "第五章安全保证措施->二、组织保障措施",
  185. "第五章安全保证措施->五、监测监控措施",
  186. "第五章安全保证措施->六、应急处置措施",
  187. "第五章安全保证措施->四、安全防护措施",
  188. "第八章施工管理及作业人员配备和分工->一、施工管理人员",
  189. "第八章施工管理及作业人员配备和分工->三、特种作业人员",
  190. "第八章施工管理及作业人员配备和分工->二、专职安全生产管理人员",
  191. "第八章施工管理及作业人员配备和分工->四、其他作业人员",
  192. "第六章质量保证措施->一、质量保证体系",
  193. "第六章质量保证措施->三、工程创优规划",
  194. "第六章质量保证措施->二、质量目标",
  195. "第六章质量保证措施->四、质量控制程序与具体措施",
  196. "第十章其他资料->一、计算书",
  197. "第十章其他资料->三、附图附表",
  198. "第十章其他资料->二、相关施工图纸",
  199. "第十章其他资料->四、编制及审核人员情况",
  200. "第四章施工工艺技术->一、主要施工方案概述",
  201. "第四章施工工艺技术->三、工艺流程",
  202. "第四章施工工艺技术->二、技术参数",
  203. "第四章施工工艺技术->五、施工方法及操作要求",
  204. "第四章施工工艺技术->六、检查要求",
  205. "第四章施工工艺技术->四、施工准备"
  206. ],
  207. "return_code": 0,
  208. "reasons": []
  209. },
  210. {
  211. "filename": "达州绕西高速西段RX2标段人工挖孔桩施工方案(2).pdf",
  212. "total_chunks": 19,
  213. "total_level1": 8,
  214. "last_level1_title": "八、应急救援预案",
  215. "last_level1_page": "39",
  216. "last_chapter_found": true,
  217. "last_chapter_label": "八、应急救援预案",
  218. "page_reasonable": true,
  219. "toc_page": 1,
  220. "leak_detected": false,
  221. "leak_details": [],
  222. "section_labels": [
  223. "一、工程概况",
  224. "七、危险因素分析->(一)危险源辨识",
  225. "七、危险因素分析->(三)危险源监测、监控措施",
  226. "七、危险因素分析->(二)危险源的监控和防治措施",
  227. "三、施工计划",
  228. "二、 编制依据",
  229. "五、质量控制->(一)质量措施",
  230. "五、质量控制->(二)质量保证体系",
  231. "八、应急救援预案->(一)目的",
  232. "八、应急救援预案->(三)应急救援预案组织机构",
  233. "八、应急救援预案->(二)工作原则",
  234. "八、应急救援预案->(五)现场应急措施",
  235. "八、应急救援预案->(六)施工安全事故应急响应",
  236. "八、应急救援预案->(四)现场急救措施",
  237. "六、安全及文明施工->(一)总体原则",
  238. "六、安全及文明施工->(二)文明施工及环水保措施",
  239. "四、施工工艺方法->(二)施工方法"
  240. ],
  241. "return_code": 0,
  242. "reasons": []
  243. },
  244. {
  245. "filename": "高处作业安全带、防坠器系挂方案.2026.1.5改.pdf",
  246. "total_chunks": 38,
  247. "total_level1": 9,
  248. "last_level1_title": "8.施工总体平面布置图",
  249. "last_level1_page": "58",
  250. "last_chapter_found": true,
  251. "last_chapter_label": "8.施工总体平面布置图",
  252. "page_reasonable": true,
  253. "toc_page": 1,
  254. "leak_detected": false,
  255. "leak_details": [],
  256. "section_labels": [
  257. "2. 编制依据->2.1. 编制说明",
  258. "2. 编制依据->2.2. 编制依据",
  259. "2. 编制依据->2.3. 编制范围",
  260. "2. 编制依据->2.4. 安全管理方针、目标",
  261. "3. 安全生产管理体系->3.1.安全管理机构",
  262. "3. 安全生产管理体系->3.2. 安全生产职责",
  263. "4. 高处作业定义和风险识别",
  264. "5. 高处作业前准备->5.1.1. 安全带",
  265. "5. 高处作业前准备->5.1.2. 爬梯",
  266. "6. 高处作业安全带系挂方案->6.1. 基坑、路基、桩基施工阶段",
  267. "6. 高处作业安全带系挂方案->6.2. 桥梁、隧道、挡墙等主体施工阶段",
  268. "7. 高处作业施工应急处置措施->7.1. 高处作业施工应急救援组织机构",
  269. "7. 高处作业施工应急处置措施->7.2. 应急领导小组及组员职责",
  270. "7. 高处作业施工应急处置措施->7.3. 应急响应",
  271. "7. 高处作业施工应急处置措施->7.4. 施工应急预案",
  272. "7. 高处作业施工应急处置措施->7.5. 触电事故应急措施",
  273. "7. 高处作业施工应急处置措施->7.6. 机械伤害事故应急措施",
  274. "7. 高处作业施工应急处置措施->7.7. 发生物体打击、高空坠落事故",
  275. "7. 高处作业施工应急处置措施->7.8. 构件倾倒,坍塌",
  276. "7. 高处作业施工应急处置措施->7.9. 应急救援路线",
  277. "8.施工总体平面布置图",
  278. "一般高处作业分级:->4.1.高空作业安全隐患",
  279. "一般高处作业分级:->4.2. 直接高空坠落形式",
  280. "一般高处作业分级:->4.3.直接高空坠落原因有:",
  281. "一般高处作业分级:->4.4.间接高空坠落表现方式:",
  282. "一般高处作业分级:->4.5.间接高空坠落原因:",
  283. "一般高处作业分级:->4.6.物体打击原因",
  284. "工程概况->1.2 主要技术标准",
  285. "工程概况->1.3 主要工程数量",
  286. "工程概况->1.4 地形、地貌",
  287. "工程概况->1.5 气象和水文",
  288. "工程概况->1.6 交通条件",
  289. "工程概况->1.7 用水、用电、网络和通讯条件",
  290. "工程概况->1.8 主要材料调查情况",
  291. "工程概况->1.9 工程主要重、难点及对策"
  292. ],
  293. "return_code": 0,
  294. "reasons": []
  295. },
  296. {
  297. "filename": "四川智能建造科技股份有限公司G999线大源至中和高速公路TJ5项目经理部龙泉山左线特大桥T梁安装专项施工方案.pdf",
  298. "total_chunks": 42,
  299. "total_level1": 9,
  300. "last_level1_title": "第九章计算书及附件",
  301. "last_level1_page": "84",
  302. "last_chapter_found": true,
  303. "last_chapter_label": "第九章计算书及附件",
  304. "page_reasonable": true,
  305. "toc_page": 1,
  306. "leak_detected": false,
  307. "leak_details": [],
  308. "section_labels": [
  309. "第一章编制依据->1.1 编制说明",
  310. "第一章编制依据->1.2 编制依据",
  311. "第一章编制依据->1.3 编制原则",
  312. "第七章验收要求->7.1 验收程序",
  313. "第七章验收要求->7.3 支座材料验收标准",
  314. "第七章验收要求->7.4 T 梁安装验收标准",
  315. "第七章验收要求->7.5 吊装设备检查验收表",
  316. "第七章验收要求->7.6 试吊检查验收",
  317. "第七章验收要求->7.7 起吊时的验收",
  318. "第七章验收要求->7.8 吊车基础地基承载力验收要求",
  319. "第三章施工组织及工期计划->3.1 施工组织",
  320. "第三章施工组织及工期计划->3.2 人员配备",
  321. "第三章施工组织及工期计划->3.3 设备组织",
  322. "第三章施工组织及工期计划->3.4 材料组织",
  323. "第三章施工组织及工期计划->3.5 工期计划",
  324. "第九章计算书及附件->9.1 履带吊配置计算",
  325. "第九章计算书及附件->9.2.钢丝绳选用计算",
  326. "第九章计算书及附件->9.3 卸扣配置计算",
  327. "第二章工程概况->2.1 工程概况",
  328. "第二章工程概况->2.2 沿线自然地理条件",
  329. "第二章工程概况->2.3 工程地质",
  330. "第二章工程概况->2.4 水文地质条件",
  331. "第二章工程概况->2.5 工程气象条件",
  332. "第二章工程概况->2.6 工程技术指标",
  333. "第二章工程概况->2.7 涉及桥梁及形象数量",
  334. "第二章工程概况->2.8 主要工程",
  335. "第五章履带吊起重机安拆->5.1 施工准备",
  336. "第五章履带吊起重机安拆->5.3 履带吊安拆计算书及相关图纸",
  337. "第八章施工质量保障措施->8.1 组织体系",
  338. "第八章施工质量保障措施->8.2 保障措施",
  339. "第六章施工安全保障措施->6.1 组织保障体系",
  340. "第六章施工安全保障措施->6.2 技术保障措施",
  341. "第六章施工安全保障措施->6.3 安全生产管理体系",
  342. "第六章施工安全保障措施->6.4 安全措施",
  343. "第四章预制T 梁安装方案->4.1 龙泉山左线特大桥桥型布置",
  344. "第四章预制T 梁安装方案->4.2 龙泉山左线特大桥预制T 梁安装组织",
  345. "第四章预制T 梁安装方案->4.3 技术参数",
  346. "第四章预制T 梁安装方案->4.5 施工方法",
  347. "第四章预制T 梁安装方案->4.6 梁板运输"
  348. ],
  349. "return_code": 0,
  350. "reasons": []
  351. },
  352. {
  353. "filename": "主线天桥现浇箱梁支模体系(满堂支架)安全专项施工方案(1).pdf",
  354. "total_chunks": 42,
  355. "total_level1": 9,
  356. "last_level1_title": "9、计算书及相关图纸",
  357. "last_level1_page": "80",
  358. "last_chapter_found": true,
  359. "last_chapter_label": "9、计算书及相关图纸",
  360. "page_reasonable": true,
  361. "toc_page": 1,
  362. "leak_detected": false,
  363. "leak_details": [],
  364. "section_labels": [
  365. "1 、工程概况->1.1 工程概况和特点",
  366. "1 、工程概况->1.2 施工平面布置",
  367. "1 、工程概况->1.3 施工要求和技术保证条件",
  368. "2、编制依据->2.1 施工组织设计及施工图设计文件",
  369. "2、编制依据->2.2 施工规范、验收标准",
  370. "3、施工计划->3.1 施工进度计划",
  371. "3、施工计划->3.2 主要资源配置计划",
  372. "4、施工工艺技术->4.1 技术参数",
  373. "4、施工工艺技术->4.2 工艺流程",
  374. "4、施工工艺技术->4.3 施工方法",
  375. "4、施工工艺技术->4.4 操作要求",
  376. "4、施工工艺技术->4.5 检查要求",
  377. "5、施工安全保证措施->5.1 组织保障措施",
  378. "5、施工安全保证措施->5.2 危险源辨识",
  379. "5、施工安全保证措施->5.3 技术保证措施",
  380. "5、施工安全保证措施->5.4 监测监控措施",
  381. "6、施工管理及作业人员配备和分工->6.1 施工管理人员配备",
  382. "6、施工管理及作业人员配备和分工->6.2专职安全生产管理人员",
  383. "6、施工管理及作业人员配备和分工->6.3 特种作业人员配备",
  384. "6、施工管理及作业人员配备和分工->6.4 施工作业人员配备",
  385. "7、验收要求->7.1 验收标准",
  386. "7、验收要求->7.2 验收程序",
  387. "7、验收要求->7.3 验收内容",
  388. "7、验收要求->7.4 验收人员",
  389. "8、应急处置措施->8.1 应急处置原则",
  390. "8、应急处置措施->8.10 应急救援设备、器材",
  391. "8、应急处置措施->8.11 紧急情况处置程序",
  392. "8、应急处置措施->8.2 应急处置机构及职责",
  393. "8、应急处置措施->8.3 应急计划与建立",
  394. "8、应急处置措施->8.4 应急处置工作流程",
  395. "8、应急处置措施->8.5 专项应急处置措施",
  396. "8、应急处置措施->8.6 应急响应",
  397. "8、应急处置措施->8.7 事故报告与处置",
  398. "8、应急处置措施->8.8 应急通讯联络系统",
  399. "8、应急处置措施->8.9 应急救援路线",
  400. "9、计算书及相关图纸->9.2 相关图纸及附表"
  401. ],
  402. "return_code": 0,
  403. "reasons": []
  404. }
  405. ],
  406. "errors": []
  407. }