| 1234567891011121314151617181920212223242526272829303132333435363738394041424344454647484950515253545556575859606162636465666768697071727374757677787980818283848586878889909192939495969798991001011021031041051061071081091101111121131141151161171181191201211221231241251261271281291301311321331341351361371381391401411421431441451461471481491501511521531541551561571581591601611621631641651661671681691701711721731741751761771781791801811821831841851861871881891901911921931941951961971981992002012022032042052062072082092102112122132142152162172182192202212222232242252262272282292302312322332342352362372382392402412422432442452462472482492502512522532542552562572582592602612622632642652662672682692702712722732742752762772782792802812822832842852862872882892902912922932942952962972982993003013023033043053063073083093103113123133143153163173183193203213223233243253263273283293303313323333343353363373383393403413423433443453463473483493503513523533543553563573583593603613623633643653663673683693703713723733743753763773783793803813823833843853863873883893903913923933943953963973983994004014024034044054064074084094104114124134144154164174184194204214224234244254264274284294304314324334344354364374384394404414424434444454464474484494504514524534544554564574584594604614624634644654664674684694704714724734744754764774784794804814824834844854864874884894904914924934944954964974984995005015025035045055065075085095105115125135145155165175185195205215225235245255265275285295305315325335345355365375385395405415425435445455465475485495505515525535545555565575585595605615625635645655665675685695705715725735745755765775785795805815825835845855865875885895905915925935945955965975985996006016026036046056066076086096106116126136146156166176186196206216226236246256266276286296306316326336346356366376386396406416426436446456466476486496506516526536546556566576586596606616626636646656666676686696706716726736746756766776786796806816826836846856866876886896906916926936946956966976986997007017027037047057067077087097107117127137147157167177187197207217227237247257267277287297307317327337347357367377387397407417427437447457467477487497507517527537547557567577587597607617627637647657667677687697707717727737747757767777787797807817827837847857867877887897907917927937947957967977987998008018028038048058068078088098108118128138148158168178188198208218228238248258268278288298308318328338348358368378388398408418428438448458468478488498508518528538548558568578588598608618628638648658668678688698708718728738748758768778788798808818828838848858868878888898908918928938948958968978988999009019029039049059069079089099109119129139149159169179189199209219229239249259269279289299309319329339349359369379389399409419429439449459469479489499509519529539549559569579589599609619629639649659669679689699709719729739749759769779789799809819829839849859869879889899909919929939949959969979989991000100110021003100410051006100710081009101010111012101310141015101610171018101910201021102210231024102510261027102810291030103110321033103410351036103710381039104010411042104310441045104610471048104910501051105210531054105510561057105810591060106110621063106410651066106710681069107010711072107310741075107610771078107910801081108210831084108510861087108810891090109110921093109410951096109710981099110011011102110311041105110611071108110911101111111211131114111511161117111811191120112111221123112411251126112711281129113011311132113311341135113611371138113911401141114211431144114511461147114811491150115111521153115411551156115711581159116011611162116311641165116611671168116911701171117211731174117511761177117811791180118111821183118411851186118711881189119011911192119311941195119611971198119912001201120212031204120512061207120812091210121112121213121412151216121712181219122012211222122312241225122612271228122912301231123212331234123512361237123812391240124112421243124412451246124712481249125012511252125312541255125612571258125912601261126212631264126512661267126812691270127112721273127412751276127712781279128012811282128312841285128612871288128912901291129212931294129512961297129812991300130113021303130413051306130713081309131013111312131313141315131613171318131913201321132213231324132513261327132813291330133113321333133413351336133713381339134013411342134313441345134613471348134913501351135213531354135513561357135813591360136113621363136413651366136713681369137013711372137313741375137613771378137913801381138213831384138513861387138813891390139113921393139413951396139713981399140014011402140314041405140614071408140914101411141214131414141514161417141814191420142114221423142414251426142714281429143014311432143314341435143614371438143914401441144214431444144514461447144814491450145114521453145414551456145714581459146014611462146314641465146614671468146914701471147214731474147514761477147814791480148114821483148414851486148714881489149014911492149314941495149614971498149915001501150215031504150515061507150815091510151115121513151415151516151715181519152015211522152315241525152615271528152915301531153215331534153515361537153815391540154115421543154415451546154715481549155015511552155315541555155615571558155915601561156215631564156515661567156815691570157115721573157415751576157715781579158015811582158315841585158615871588158915901591159215931594159515961597159815991600160116021603160416051606160716081609161016111612161316141615161616171618161916201621162216231624162516261627162816291630163116321633163416351636163716381639164016411642164316441645164616471648164916501651165216531654165516561657165816591660166116621663166416651666166716681669167016711672167316741675167616771678167916801681168216831684168516861687168816891690169116921693169416951696169716981699170017011702170317041705170617071708170917101711171217131714171517161717171817191720172117221723172417251726172717281729173017311732173317341735173617371738173917401741174217431744174517461747174817491750175117521753175417551756175717581759176017611762176317641765176617671768176917701771177217731774177517761777177817791780178117821783178417851786178717881789179017911792179317941795179617971798179918001801180218031804180518061807180818091810181118121813181418151816181718181819182018211822182318241825182618271828182918301831183218331834183518361837183818391840184118421843184418451846184718481849185018511852185318541855185618571858185918601861186218631864186518661867186818691870187118721873187418751876187718781879188018811882188318841885188618871888188918901891189218931894189518961897189818991900190119021903190419051906190719081909191019111912191319141915191619171918191919201921192219231924192519261927192819291930193119321933193419351936193719381939194019411942194319441945194619471948194919501951195219531954195519561957195819591960196119621963196419651966196719681969197019711972197319741975197619771978197919801981198219831984198519861987198819891990199119921993199419951996199719981999200020012002200320042005200620072008200920102011201220132014201520162017201820192020202120222023202420252026202720282029203020312032203320342035203620372038203920402041204220432044204520462047204820492050205120522053205420552056205720582059206020612062206320642065206620672068206920702071207220732074207520762077207820792080208120822083208420852086208720882089209020912092209320942095209620972098209921002101210221032104210521062107210821092110211121122113211421152116211721182119212021212122212321242125212621272128212921302131213221332134213521362137213821392140214121422143214421452146214721482149215021512152215321542155215621572158215921602161216221632164216521662167216821692170217121722173217421752176217721782179218021812182218321842185218621872188218921902191219221932194219521962197219821992200220122022203220422052206220722082209221022112212221322142215221622172218221922202221222222232224222522262227222822292230223122322233223422352236223722382239224022412242224322442245224622472248224922502251225222532254225522562257225822592260226122622263226422652266226722682269227022712272227322742275227622772278227922802281228222832284228522862287228822892290229122922293229422952296229722982299230023012302230323042305230623072308230923102311231223132314231523162317231823192320232123222323232423252326232723282329233023312332233323342335233623372338233923402341234223432344234523462347234823492350235123522353235423552356235723582359236023612362236323642365236623672368236923702371237223732374237523762377237823792380238123822383238423852386238723882389239023912392239323942395239623972398239924002401240224032404240524062407240824092410241124122413241424152416241724182419242024212422242324242425242624272428242924302431243224332434243524362437243824392440244124422443244424452446244724482449245024512452245324542455245624572458245924602461246224632464246524662467246824692470247124722473247424752476247724782479248024812482248324842485248624872488248924902491249224932494249524962497249824992500250125022503250425052506250725082509251025112512251325142515251625172518251925202521252225232524252525262527252825292530253125322533253425352536253725382539254025412542254325442545254625472548254925502551255225532554255525562557255825592560256125622563256425652566256725682569257025712572257325742575257625772578257925802581258225832584258525862587258825892590259125922593259425952596259725982599260026012602260326042605260626072608260926102611261226132614261526162617261826192620262126222623262426252626262726282629263026312632263326342635263626372638263926402641264226432644264526462647264826492650265126522653265426552656265726582659266026612662266326642665266626672668266926702671267226732674267526762677267826792680268126822683268426852686268726882689269026912692269326942695269626972698269927002701270227032704270527062707270827092710271127122713271427152716271727182719272027212722272327242725272627272728272927302731273227332734273527362737273827392740274127422743274427452746274727482749275027512752275327542755275627572758275927602761276227632764276527662767276827692770277127722773277427752776277727782779278027812782278327842785278627872788278927902791279227932794279527962797279827992800280128022803280428052806280728082809281028112812281328142815281628172818281928202821282228232824282528262827282828292830283128322833283428352836283728382839284028412842284328442845284628472848284928502851285228532854285528562857285828592860286128622863286428652866286728682869287028712872287328742875287628772878287928802881288228832884288528862887288828892890289128922893289428952896289728982899290029012902290329042905290629072908290929102911291229132914291529162917291829192920292129222923292429252926292729282929293029312932293329342935293629372938293929402941294229432944294529462947294829492950295129522953295429552956295729582959296029612962296329642965296629672968296929702971297229732974297529762977297829792980298129822983298429852986298729882989299029912992299329942995299629972998299930003001300230033004300530063007300830093010301130123013301430153016301730183019302030213022302330243025302630273028302930303031303230333034303530363037303830393040304130423043304430453046304730483049305030513052305330543055305630573058305930603061306230633064306530663067306830693070307130723073307430753076307730783079308030813082308330843085308630873088308930903091309230933094309530963097309830993100310131023103310431053106310731083109311031113112311331143115311631173118311931203121312231233124312531263127312831293130313131323133313431353136313731383139314031413142314331443145314631473148314931503151315231533154315531563157315831593160316131623163316431653166316731683169317031713172317331743175317631773178317931803181318231833184318531863187318831893190319131923193319431953196319731983199320032013202320332043205320632073208320932103211321232133214321532163217321832193220322132223223322432253226322732283229323032313232323332343235323632373238323932403241324232433244324532463247324832493250325132523253325432553256325732583259326032613262326332643265326632673268326932703271327232733274327532763277327832793280328132823283328432853286328732883289329032913292329332943295329632973298329933003301330233033304330533063307330833093310331133123313331433153316331733183319332033213322332333243325332633273328332933303331333233333334333533363337333833393340334133423343334433453346334733483349335033513352335333543355335633573358335933603361336233633364336533663367336833693370337133723373337433753376337733783379338033813382338333843385338633873388338933903391339233933394339533963397339833993400340134023403340434053406340734083409341034113412341334143415341634173418341934203421342234233424342534263427342834293430343134323433343434353436343734383439344034413442344334443445344634473448344934503451345234533454345534563457345834593460346134623463346434653466346734683469347034713472347334743475347634773478347934803481348234833484348534863487348834893490349134923493349434953496349734983499350035013502350335043505350635073508350935103511351235133514351535163517351835193520352135223523352435253526352735283529353035313532353335343535353635373538353935403541354235433544354535463547354835493550355135523553355435553556355735583559356035613562356335643565356635673568356935703571357235733574357535763577357835793580358135823583358435853586358735883589359035913592359335943595359635973598359936003601360236033604360536063607360836093610361136123613361436153616361736183619362036213622362336243625362636273628362936303631363236333634363536363637363836393640364136423643364436453646364736483649365036513652365336543655365636573658365936603661 |
- {
- "callback_task_id": "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396",
- "file_name": "",
- "user_id": "user-001",
- "current": 100,
- "stage_name": "审查项检查结果",
- "status": "full_review_result",
- "message": "审查项检查完成,共发现52个问题",
- "overall_task_status": "completed",
- "updated_at": 1769389817,
- "issues": [
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-0": {
- "metadata": {
- "review_location_label": "第8页:第一章 编制依据与说明->一) 编制依据",
- "original_content": "一)编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021 年修订版\n2)《中华人民共和国环境保护法》2021 年修订版\n3)《建设工程安全生产管理条例》2023 年最新修正\n4)《中华人民共和国道路交通安全法》2021 年4 月29 日修订\n5)《中华人民共和国水土保持法》2010 年12 月25 日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2023)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019 年4 月23 日修订\n9)《建设工程安全生产管理条例》2023 年最新修正\n10)《四川省安全生产条例》2023 年5 月25 日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37 号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—2019\n14)《架桥机通用技术条件》GB/T 26470—2011\n14)《架桥机通用技术条件》GB/T 26470—20112\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n24)《电力高处作业防坠器》DL/T 1147-2009\n24)《建筑施工作业技术规范》JGJ 23—2016\n(2)项目文件\n1)《S81 线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段实施性施工组织设计》;\n3)《S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段T 梁预制、运输及安装专项\n施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环\n境等参考资料;3"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 5,
- "medium": 17,
- "low": 17
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "《中华人民共和国环境保护法》2021 年修订版",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国环境保护法》(主席令第9号(2014修订))",
- "reason": "与参考文件《中华人民共和国环境保护法》(主席令第9号(2014修订))编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《中华人民共和国道路交通安全法》2021 年4 月29 日修订",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《中华人民共和国道路交通安全法》(主席令第47号(2021修订))名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2023)",
- "suggestion": "建议核实并更正为参考库中的正确编号《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T1495-2024)",
- "reason": "与参考文件《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T1495-2024)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路水运工程临时用电技术规程》(JTT1499-2024)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "《建设工程质量管理条例》2019 年4 月23 日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《建设工程质量管理条例》(国务院令第279号)",
- "reason": "与参考文件《建设工程质量管理条例》(国务院令第279号)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "《四川省安全生产条例》2023 年5 月25 日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《四川省安全生产条例》(None)",
- "reason": "与参考文件《四川省安全生产条例》(None)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《危险性较大的分部分项工程安全管理规定》住建部令第37 号",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《危险性较大的分部分项工程安全管理规定》(住建部令第37号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑机械使用安全技术规程》(JGJ33-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《架桥机通用技术条件》(GB/T26470-2011)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《施工现场机械设备检查技术规范》(JGJ160-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《粗直径钢丝绳》(GB/T20067-2017)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《架桥机安全规程》GB 26469—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《架桥机安全规程》(GB26469-2011)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《架桥机安全规程》GB 26469—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《架桥机安全规程》(GB26469-2011)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《电气装置安装工程起重机电气装置施工及验收规范》(GB50256-2014)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重设备安装工程施工及验收规范》(GB50278-2010)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路工程施工安全技术规范》(JTGF90-2015)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工高处作业安全技术规范》(JGJ80-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "《电力高处作业防坠器》DL/T 1147-2009",
- "suggestion": "建议核实并更正为参考库中的正确编号《电力高处作业防坠器》(DL/T1147-2018)",
- "reason": "与参考文件《电力高处作业防坠器》(DL/T1147-2018)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《中华人民共和国环境保护法》2021 年修订版",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《中华人民共和国道路交通安全法》2021 年4 月29 日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式正确",
- "location": "《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2023)",
- "suggestion": "无",
- "reason": "规范名称和编号的标点符号使用规范",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式正确",
- "location": "《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "无",
- "reason": "规范名称和编号的标点符号使用规范",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《建设工程质量管理条例》2019 年4 月23 日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《四川省安全生产条例》2023 年5 月25 日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《危险性较大的分部分项工程安全管理规定》住建部令第37 号",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《架桥机安全规程》GB 26469—2011",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《架桥机安全规程》GB 26469—2011",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《电力高处作业防坠器》DL/T 1147-2009",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-1": {
- "metadata": {
- "review_location_label": "第8页:第一章 编制依据与说明",
- "original_content": "一)编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021 年修订版\n2)《中华人民共和国环境保护法》2021 年修订版\n3)《建设工程安全生产管理条例》2023 年最新修正\n4)《中华人民共和国道路交通安全法》2021 年4 月29 日修订\n5)《中华人民共和国水土保持法》2010 年12 月25 日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2023)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019 年4 月23 日修订\n9)《建设工程安全生产管理条例》2023 年最新修正\n10)《四川省安全生产条例》2023 年5 月25 日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37 号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—2019\n14)《架桥机通用技术条件》GB/T 26470—2011\n14)《架桥机通用技术条件》GB/T 26470—20112\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n24)《电力高处作业防坠器》DL/T 1147-2009\n24)《建筑施工作业技术规范》JGJ 23—2016\n(2)项目文件\n1)《S81 线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段实施性施工组织设计》;\n3)《S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段T 梁预制、运输及安装专项\n施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环\n境等参考资料;3\n\n二)编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度的避免安全事故造成\n的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n\n三)编制原则\n(1)严格执行合同中标文件中所规定的工程施工工期,根据工程的特点和轻重缓急,\n分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保\n工程质量标准的前提下,同时要求所有施工工艺和设备必须严格沿用既有成熟工艺,不得采\n用任何新技术、新工艺、新材料。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;\n正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保\n证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时\n工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动\n静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏4\n植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n\n四)编制范围\n本专项施工方案适用于S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段架桥机的\n安装与拆除施工。5"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_completeness_check",
- "check_result": "第一章 编制依据与说明下缺失编制依据中的【文件制度】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "建议补充:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第一章 编制依据与说明内容属于,专项施工方案内容要求中的 【编制依据】 板块,应包含文件制度包括:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件;",
- "review_references": "一、编制依据 本章包含法律法规、标准规范、文件制度、编制原则、编制范围等五个方面。 法律法规包括国家、工程所在地省级政府发布的法律法规、规章制度等; 标准规范包括行业标准、技术规程等; 文件制度包括四川路桥、路桥集团、桥梁公司、建设单位下发的文件制度和管 理程序文件等; 所采用的规范和标准应全面且在有效期内,并应与招投标文件及设计要求的规 范、标准对应。 编制原则应认真贯彻执行国家方针、政策、标准和设计文件,严格执行基本建 设程序,实现工程项目的全部功能;全面履行工程合同,满足建设单位要求,有效 地集中施工力量,按期完成;按照工序关系,合理安排施工顺序,统筹考虑。 编制范围应填写完整,涵盖本方案包含的所有工程,部分工程可简要说明采取 的施工工艺。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "文件制度缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "在待审查目录中未找到与'文件制度'对应的章节;当前章节仅涉及'第一章 编制依据与说明',未涵盖'文件制度'相关内容;整改建议:建议在本章或前序章节中增设'文件制度'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含法律法规、标准规范、文件制度、编制原则、编制范围等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-2": {
- "metadata": {
- "review_location_label": "第10页:第一章 编制依据与说明->二) 编制说明",
- "original_content": "二)编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度的避免安全事故造成\n的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-3": {
- "metadata": {
- "review_location_label": "第10页:第一章 编制依据与说明->三) 编制原则",
- "original_content": "三)编制原则\n(1)严格执行合同中标文件中所规定的工程施工工期,根据工程的特点和轻重缓急,\n分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保\n工程质量标准的前提下,同时要求所有施工工艺和设备必须严格沿用既有成熟工艺,不得采\n用任何新技术、新工艺、新材料。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;\n正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保\n证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时\n工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动\n静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏4\n植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-4": {
- "metadata": {
- "review_location_label": "第11页:第一章 编制依据与说明->四) 编制范围",
- "original_content": "四)编制范围\n本专项施工方案适用于S81 线会理至禄劝(四川境)高速公路ZCB1-3 标段架桥机的\n安装与拆除施工。5"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-52": {
- "metadata": {
- "review_location_label": "第12页:第二章 工程概况->一)工程简介",
- "original_content": "一)工程简介\nS81 线会理至禄劝(四川境)高速公路ZCB1-3 合同段位于会东县内,分部起点桩号\nK16+431,止点桩号K28+477,线路全长12046 米。共有主线桥梁五座、隧道1 座,\n分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、\n乌东德(四川)隧道、且沿线存在3 处深挖路堑高边坡地段,桥隧比为90.44%,预估建安\n费15 亿元,总工期为43 个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东\n德特长隧道。项目总体平面布置图见下图所示\n项目拟建梁场位于K17+035-K17+270 段路基上,该段落位于大柳树沟1#桥和2#\n桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预\n制T 梁716 片,其中25mT 梁199 片,40mT 梁517 片。6\n图2-1 项目总体平面布置图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-53": {
- "metadata": {
- "review_location_label": "第12页:第二章 工程概况",
- "original_content": "一)工程简介\nS81 线会理至禄劝(四川境)高速公路ZCB1-3 合同段位于会东县内,分部起点桩号\nK16+431,止点桩号K28+477,线路全长12046 米。共有主线桥梁五座、隧道1 座,\n分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、\n乌东德(四川)隧道、且沿线存在3 处深挖路堑高边坡地段,桥隧比为90.44%,预估建安\n费15 亿元,总工期为43 个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东\n德特长隧道。项目总体平面布置图见下图所示\n项目拟建梁场位于K17+035-K17+270 段路基上,该段落位于大柳树沟1#桥和2#\n桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预\n制T 梁716 片,其中25mT 梁199 片,40mT 梁517 片。6\n图2-1 项目总体平面布置图\n\n二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、\n小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有\nG353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分\n路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至\n施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北\n边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个\n地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡\n堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含\n碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上\n统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程\n性质较好。7\n\n三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集\n中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无酷暑,四季如春。同时,\n该区域全年高温酷暑频繁出现,冬季常年严寒并伴有大范围持续冻害。多年平均气温为\n16.2℃,累计年平均日照2306.4 小时,无霜期262 天,太阳辐射强,年辐射热平均总\n量为136.2 千卡/平方厘米,多年平均降水1095.5 毫米,但气候垂直变化大,高山积雪与\n峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山\n地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合\n及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区\n裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、\n岩性及裂隙发育程度控制。\n\n四)架桥机概况\n(1)总体性能\nJQG 系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T 型、\nI 字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、\n曲率半径大于450m 以上、0-45°斜交公路桥。8\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便\n于施工场地的转移、运输;该型架桥机边梁横移一次就位位,省去了前、后墩台人工移梁的\n麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安安全、高效作业。同时略\n微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、\n前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机\n构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系\n统组成。\n若需要对岩石进行开凿,可以使用汽车炸弹人、简易炸药进行开爆作业。9\n图2-2 架桥机方案总图10\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3 架桥机技术参数表111213\n\n五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板\n车进行。施工平面布置图如下所示\n图2-3 K17+035~K17+270 段路基\n(3)(1)K17+035~K17+270 段右侧,位于大柳树沟1 号桥与大柳树沟2 号桥之\n间,K17+035 ~K17+120 该段表层为5.7m 的崩坡积块碎石土,K17+120 ~\nK17+270 段表层为0~1.5m 碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。\n最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情\n况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管\n线。14\n图2-4 K17+847~K17+915 段路基\n(4)(2)K17+847~K17+915 段路基位于大柳树沟2 号大桥与大柳树沟3 号大桥\n之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的\n原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙\n和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490 段路基15\n(5)K18+300~K18+490 段右侧,位于大柳树沟2 号大桥与黄家庄大桥之间,该\n段表层为8~12m 的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。\n最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管\n线。\n图2-5 K18+300~K18+490 段路基\n(6)K19+100~K19+200 段右侧,位于黄家庄大桥与小村大桥之间,该段表层为\n0.5~4.1m 的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡\n高为57.2m。K19+314~K19+450 段右侧,位于黄家庄大桥与小村大桥之间,该段表层\n为0.5~4.1m 的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大\n坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。\n\n六)施工要求16\n(1)工期目标\n按业主单位、会禄高速ZCB1 总包部及总监办要求,结合本项目年度施工计划,本项\n目架桥机安装施工计划于2025 年5 月中上旬 开始施工,于2025 年4 月底完成施工。\n(2)质量要求\n适用于本项目高速公路桥梁架设,能够满足大坡度、小半径弯桥、斜桥架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到\n100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符\n合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符17\n合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修\n保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备\n的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。\n\n七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可\n能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空\n坠落和自然灾害等。表2-2 风险分析表\n<表格></表格><表格></表格>\n\n八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司\n(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司20\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有恨公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司21"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【设计概况】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:2.主要技术标准",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含设计概况包含:1.工程简介;2.主要技术标准;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【周边环境】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:2.与该工程有关的主要建(构)筑物、山体、边坡、河谷、深基坑、道路、高压电、地下管线的位置关系结构尺寸",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含周边环境主要包括:1.与该工程有关的主要建(构)筑物、山体、边坡、河谷、深基坑、道路、高压电、地下管线的位置关系;2.与该工程有关的主要建(构)筑物、山体、边坡、河谷、深基坑、道路、高压电、地下管线的位置关系结构尺寸;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【施工平面及立面布置】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含施工平面及立面布置包括:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离;2.施工作业平台(场站)的尺寸、地面形式以及施工便道的长度、宽度、路面形式、最小弯曲半径;3.临时用水的来源、管线布置、距离,变压器、配电箱的位置、大小、线路走向、敷设方式;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【参建各方责任主体单位】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:5.监控单位",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含参建各方责任主体单位主要包括:1.建设单位;2.设计单位;3.监理单位;4.施工单位;5.监控单位;6.专业分包单位;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-54": {
- "metadata": {
- "review_location_label": "第13页:第二章 工程概况->二)周边环境条件及工程地质",
- "original_content": "二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、\n小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有\nG353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分\n路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至\n施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北\n边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个\n地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡\n堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含\n碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上\n统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程\n性质较好。7"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-medium-55": {
- "metadata": {
- "review_location_label": "第14页:第二章 工程概况->三)气象水文",
- "original_content": "三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集\n中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无酷暑,四季如春。同时,\n该区域全年高温酷暑频繁出现,冬季常年严寒并伴有大范围持续冻害。多年平均气温为\n16.2℃,累计年平均日照2306.4 小时,无霜期262 天,太阳辐射强,年辐射热平均总\n量为136.2 千卡/平方厘米,多年平均降水1095.5 毫米,但气候垂直变化大,高山积雪与\n峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山\n地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合\n及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区\n裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、\n岩性及裂隙发育程度控制。"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "气候描述中存在矛盾表述,可能引发对气候特征的误解",
- "location": "本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无酷暑,四季如春。同时,该区域全年高温酷暑频繁出现,冬季常年严寒并伴有大范围持续冻害。",
- "suggestion": "建议根据实际气候特征进行统一表述,避免出现‘冬暖无严寒’与‘冬季常年严寒并伴有大范围持续冻害’的明显矛盾。可改为:‘该区域气候总体属中亚热带西部湿润季风气候,冬暖少严寒,但局部高海拔地区冬季可能出现持续低温及冻害现象’。",
- "reason": "原文中‘冬暖无严寒’与‘冬季常年严寒并伴有大范围持续冻害’存在明显逻辑矛盾,易造成对项目区域气候特征的误解,影响工程设计与施工安全评估,属于表述不当的中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-56": {
- "metadata": {
- "review_location_label": "第14页:第二章 工程概况->四)架桥机概况",
- "original_content": "四)架桥机概况\n(1)总体性能\nJQG 系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T 型、\nI 字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、\n曲率半径大于450m 以上、0-45°斜交公路桥。8\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便\n于施工场地的转移、运输;该型架桥机边梁横移一次就位位,省去了前、后墩台人工移梁的\n麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安安全、高效作业。同时略\n微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、\n前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机\n构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系\n统组成。\n若需要对岩石进行开凿,可以使用汽车炸弹人、简易炸药进行开爆作业。9\n图2-2 架桥机方案总图10\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3 架桥机技术参数表111213"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "提及不当的爆炸物使用方式,存在严重安全隐患和表述不当",
- "location": "若需要对岩石进行开凿,可以使用汽车炸弹人、简易炸药进行开爆作业。9",
- "suggestion": "删除或修改该表述,应明确使用合法合规的爆破作业方式,如‘根据相关安全规范,可采用专业爆破技术进行岩石开凿作业’,并强调必须由持证人员操作,遵守国家爆破安全条例。",
- "reason": "‘汽车炸弹人’为明显不当表述,具有严重安全隐患且易引发误解,可能被解读为鼓励或推荐非法危险行为;‘简易炸药’亦属敏感词,涉及非法物品和危险操作,违反安全生产和公共安全相关法律法规。该表述不符合工程安全规范和专业表达要求。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-57": {
- "metadata": {
- "review_location_label": "第20页:第二章 工程概况->五)施工平面布置",
- "original_content": "五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板\n车进行。施工平面布置图如下所示\n图2-3 K17+035~K17+270 段路基\n(3)(1)K17+035~K17+270 段右侧,位于大柳树沟1 号桥与大柳树沟2 号桥之\n间,K17+035 ~K17+120 该段表层为5.7m 的崩坡积块碎石土,K17+120 ~\nK17+270 段表层为0~1.5m 碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。\n最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情\n况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管\n线。14\n图2-4 K17+847~K17+915 段路基\n(4)(2)K17+847~K17+915 段路基位于大柳树沟2 号大桥与大柳树沟3 号大桥\n之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的\n原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙\n和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490 段路基15\n(5)K18+300~K18+490 段右侧,位于大柳树沟2 号大桥与黄家庄大桥之间,该\n段表层为8~12m 的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。\n最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管\n线。\n图2-5 K18+300~K18+490 段路基\n(6)K19+100~K19+200 段右侧,位于黄家庄大桥与小村大桥之间,该段表层为\n0.5~4.1m 的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡\n高为57.2m。K19+314~K19+450 段右侧,位于黄家庄大桥与小村大桥之间,该段表层\n为0.5~4.1m 的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大\n坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-58": {
- "metadata": {
- "review_location_label": "第22页:第二章 工程概况->六)施工要求",
- "original_content": "六)施工要求16\n(1)工期目标\n按业主单位、会禄高速ZCB1 总包部及总监办要求,结合本项目年度施工计划,本项\n目架桥机安装施工计划于2025 年5 月中上旬 开始施工,于2025 年4 月底完成施工。\n(2)质量要求\n适用于本项目高速公路桥梁架设,能够满足大坡度、小半径弯桥、斜桥架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到\n100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符\n合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符17\n合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修\n保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备\n的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "工期目标时间逻辑矛盾",
- "location": "(1)工期目标\n按业主单位、会禄高速ZCB1 总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025 年5 月中上旬开始施工,于2025 年4 月底完成施工。",
- "suggestion": "修改工期时间逻辑,确保开始时间早于结束时间。建议将开始时间调整为2025年4月底或更早,结束时间调整为2025年5月中上旬,或明确施工周期安排。",
- "reason": "原文中施工开始时间为2025年5月中上旬,而完工时间为2025年4月底,存在明显的时间逻辑矛盾,违反基本时间顺序,属于工程计划表述错误,可能影响项目管理与审查判断,属于实质性问题。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-medium-59": {
- "metadata": {
- "review_location_label": "第24页:第二章 工程概况->七)风险辨识与分级",
- "original_content": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可\n能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空\n坠落和自然灾害等。表2-2 风险分析表\n<表格></表格><表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "风险辨识与分级中存在表述不当问题",
- "location": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能導致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。",
- "suggestion": "将‘辩识’修改为‘识别’,并确保术语使用规范统一;同时建议删除‘自然灾害等’中的‘等’字,避免表述模糊或引发歧义。",
- "reason": "‘辩识’为错别字,正确应为‘识别’,属于表述不当问题;‘自然灾害等’中的‘等’字使用不严谨,可能引发对未列明风险的误解,存在中风险的表述不准确问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-medium-60": {
- "metadata": {
- "review_location_label": "第26页:第二章 工程概况->八)参建各方责任主体单位",
- "original_content": "八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司\n(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司20\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有恨公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司21"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "企业名称中的错别字问题",
- "location": "(5)项目监理单位:四川省亚通工程咨询有恨公司",
- "suggestion": "将“有恨公司”更正为“有限公司”",
- "reason": "‘有恨’为明显错别字,与正确企业名称‘有限公司’不符,属于表述错误,可能影响单位识别和法律效力,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-104": {
- "metadata": {
- "review_location_label": "第28页:第三章 施工计划->一)施工进度计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T 梁预制\n及安装均按2 片/d 计划,本项目共计预制T 梁716 片,其中25mT 梁199 片,40mT 梁\n517 片。计划总工期358 天,约12 个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2 号大桥→大柳树沟3 号大桥→黄家庄大桥→小村左线大桥→小村右线1 号中\n桥→小村右线2 号大桥→大柳树沟1 号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3 项目架桥机安拆计划\n根据现场的施工条件、施工环境及吊车的配合情况预计安装工期为7 天(从拼装开始至\n验收完成),如遇人力大风、大雨等人力不可抗拒因素工期顺延。架桥机首次组装施工计划\n如下图所示图3-1 架桥机首次安装施工计划横道图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-105": {
- "metadata": {
- "review_location_label": "第28页:第三章 施工计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T 梁预制\n及安装均按2 片/d 计划,本项目共计预制T 梁716 片,其中25mT 梁199 片,40mT 梁\n517 片。计划总工期358 天,约12 个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2 号大桥→大柳树沟3 号大桥→黄家庄大桥→小村左线大桥→小村右线1 号中\n桥→小村右线2 号大桥→大柳树沟1 号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3 项目架桥机安拆计划\n根据现场的施工条件、施工环境及吊车的配合情况预计安装工期为7 天(从拼装开始至\n验收完成),如遇人力大风、大雨等人力不可抗拒因素工期顺延。架桥机首次组装施工计划\n如下图所示图3-1 架桥机首次安装施工计划横道图\n\n二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼\n装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n<表格></表格><表格></表格>\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表<表格></表格><表格></表格>26"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【施工材料计划】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含施工材料计划包含:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【安全生产费用使用计划】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含安全生产费用使用计划包含:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工材料计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "在待审查目录中未找到与'施工材料计划'对应的章节;当前章节仅涉及'第三章 施工计划',未涵盖'施工材料计划'相关内容;整改建议:建议在本章或前序章节中增设'施工材料计划'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全生产费用使用计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "在待审查目录中未找到与'安全生产费用使用计划'对应的章节;当前章节仅涉及'第三章 施工计划',未涵盖'安全生产费用使用计划'相关内容;整改建议:建议在本章或前序章节中增设'安全生产费用使用计划'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-106": {
- "metadata": {
- "review_location_label": "第29页:第三章 施工计划->二)材料机械设备和人员计划",
- "original_content": "二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼\n装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n<表格></表格><表格></表格>\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表<表格></表格><表格></表格>26"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-156": {
- "metadata": {
- "review_location_label": "第33页:第四章 施工工艺技术->一)主要部件说明",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7 节,每节重10.87t,主梁为主要\n承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有\n反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过\n孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单\n元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n(1)更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料\n性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n(2)销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接27\n2、前临时支腿\n前临时支腿在导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功\n能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 \n0~45°斜交桥架设时的调整功能。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,\n各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰\n接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调\n整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机\n械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行\n走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功\n能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:28\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,\n各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫\n实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相\n同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道\n过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步\n前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者\n配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证29\n轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,\n方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫\n实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,\n并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J 型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊\n具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵\n移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载\n试验进行制动检测,试验方法与重载试验相同,动作3 次,检验制动\n器制动效果。\n(3)卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发\n现有窜动,要立即停止作业,加固好必须检验后使用。30\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承\n主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂\n直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 \n500mm。\n(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在\n预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必\n须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔\n离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、\n整机横移时要注意观察,并听从指挥人员的信号。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 4
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "主梁与导梁连接方式及受力描述与标准不符",
- "location": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7 节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。",
- "suggestion": "应明确主梁与导梁之间的连接是否为刚性连接或铰接连接,并根据实际受力状态判断销轴是否承担剪力或弯矩。若销轴仅用于定位或传递剪力,需说明其受力模式;若存在弯矩作用,应补充抗弯验算或改用刚性连接设计。建议依据《钢结构设计标准》(GB50017-2017)中关于连接件受剪承载力的相关规定进行校核,特别是涉及销轴连接时应满足抗剪与抗挤压要求。",
- "reason": "根据《钢结构设计标准》(GB50017-2017)中关于连接件受剪承载力的设计要求,如槽钢连接件的受剪承载力计算公式中涉及的参数(如厚度、长度、材料强度等)均需符合标准规定。本内容中主梁与导梁采用销轴连接,但未说明销轴是否承受剪力或弯矩,也未提供销轴的尺寸、材料、受力分析或承载力验算,存在连接件设计不明确的风险。此问题涉及结构安全,属于关键连接节点的设计合理性问题,依据标准要求应进行承载力校核,否则可能导致结构失效。",
- "risk_level": "高风险",
- "review_references": "2 槽钢连接件:$$ N _ { \\mathrm { v } } ^ { \\mathrm { c } } = 0 . 2 6 ( t + 0 . 5 t _ { \\mathrm { w } } ) l _ { \\mathrm { c } } \\sqrt { E _ { \\mathrm { c } } f _ { \\mathrm { c } } }\n【参考文档】\n【文件】108《钢结构设计标准含条文说明》(GB50017-2017).md\n【标题】2 槽钢连接件:\n2 槽钢连接件:$$\nN _ { \\mathrm { v } } ^ { \\mathrm { c } } = 0 . 2 6 ( t + 0 . 5 t _ { \\mathrm { w } } ) l _ { \\mathrm { c } } \\sqrt { E _ { \\mathrm { c } } f _ { \\mathrm { c } } }\n$$\n\n式中: $t$ —槽钢翼缘的平均厚度 $\\mathrm { ( m m ) }$ ;$\\pmb { t _ { \\mathrm { w } } }$ - -槽钢腹板的厚度 $\\mathrm { { ( m m ) } }$ ;$l _ { \\mathrm { c } }$ -槽钢的长度 $\\mathrm { { ( m m ) } }$ 。\n\n槽钢连接件通过肢尖肢背两条通长角焊缝与钢梁连接,角焊缝按承受该连接件的受剪承载力设计值 $N _ { \\mathbf { v } } ^ { \\mathbf { c } }$ 进行计算。\n\n## 14.3.2 对于用压型钢板混凝土组合板做翼板的组合梁(图14.3.2),其焊钉连接件的受剪承载力设计值应分别按以下两种情况予以降低:\n\n \n图14.3.2用压型钢板作混凝土翼板底模的组合梁\n\n### 1 当压型钢板肋平行于钢梁布置[图14.3.2(a)], $b _ { \\mathrm { w } } / h _ { \\mathrm { e } } <$ 1.5时,按本标准式(14.3.1-1)算得的 $N _ { \\mathbf { v } } ^ { \\mathrm { c } }$ 应乘以折减系数 $\\beta _ { \\mathrm { v } }$ 后取用。 $\\beta _ { \\mathrm { v } }$ 值按下式计算:\n\n$$\n\\beta _ { \\mathrm { v } } = 0 . 6 \\frac { b _ { \\mathrm { w } } } { h _ { \\mathrm { e } } } \\Big ( \\frac { h _ { \\mathrm { d } } - h _ { \\mathrm { e } } } { h _ { \\mathrm { e } } } \\Big ) \\leqslant 1\n$$\n\n式中: $b _ { \\mathbf { w } }$ -混凝土凸肋的平均宽度,当肋的上部宽度小于下部宽度时[图14.3.2(c)],改取上部宽度 $\\mathrm { { ( m m ) } }$ ;\n\n$h _ { \\mathrm { e } }$ -混凝土凸肋高度 $\\mathrm { { ( m m ) } }$ ; \n$h _ { \\mathrm { d } }$ - 焊钉高度 $\\mathrm { ( m m ) }$ 。\n\n### 2 当压型钢板肋垂直于钢梁布置时[图14.3.2(b)],焊钉连接件承载力设计值的折减系数按下式计算:\n\n$$\n\\beta _ { \\mathrm { v } } = \\frac { 0 . 8 5 } { \\sqrt { n _ { \\mathrm { 0 } } } } \\frac { b _ { \\mathrm { w } } } { h _ { \\mathrm { e } } } \\big ( \\frac { h _ { \\mathrm { d } } - h _ { \\mathrm { e } } } { h _ { \\mathrm { e } } } \\big ) \\leqslant 1\n$$\n\n式中: $\\pmb { n } _ { 0 }$ ——在梁某截面处一个肋中布置的焊钉数,当多于3个时,按3个计算。\n\n## 14.3.3 位于负弯矩区段的抗剪连接件,其受剪承载力设计值$N _ { \\mathbf { v } } ^ { \\mathbf { c } }$ 应乘以折减系数0.9。\n\n## 14.3.4 当采用柔性抗剪连接件时,抗剪连接件的计算应以弯矩绝对值最大点及支座为界限,划分为若干个区段(图14.3.4),逐段进行布置。每个剪跨区段内钢梁与混凝土翼板交界面的纵向剪力 $V _ { \\textrm { s } }$ 应按下列公式确定:\n\n \n图14.3.4连续梁剪跨区划分图\n\n### 1 正弯矩最大点到边支座区段,即 $m _ { 1 }$ 区段, $V _ { \\textrm { s } }$ 取 $A f$ 和$b _ { \\mathrm { e } } h _ { \\mathrm { c l } } f _ { \\mathrm { c } }$ 中的较小者。\n\n### 2 正弯矩最大点到中支座(负弯矩最大点)区段,即 $m _ { 2 }$ 和$m _ { 3 }$ 区段:\n\n$$\nV _ { \\mathrm { s } } = \\operatorname* { m i n } \\{ A f , b _ { \\mathrm { e } } h _ { \\mathrm { c l } } f _ { \\mathrm { c } } \\} + A _ { \\mathrm { s t } } f _ { \\mathrm { s t } }\n$$\n\n按完全抗剪连接设计时,每个剪跨区段内需要的连接件总数$n _ { \\mathrm { f } }$ ,按下式计算:\n\n$$\nn _ { \\mathrm { f } } = V _ { \\mathrm { s } } / N _ { \\mathrm { v } } ^ { \\mathrm { c } }\n$$\n\n部分抗剪连接组合梁,其连接件的实配个数不得少于 $n _ { \\mathrm { f } }$\n\n的 $50 \\%$\n\n按式(14.3.4-2)算得的连接件数量,可在对应的剪跨区段内均匀布置。当在此剪跨区段内有较大集中荷载作用时,应将连接件个数 $\\pmb { n } _ { \\mathrm { f } }$ 按剪力图面积比例分配后再各自均匀布置。\n",
- "reference_source": "108《钢结构设计标准含条文说明》(GB50017-2017).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-157": {
- "metadata": {
- "review_location_label": "第33页:第四章 施工工艺技术",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7 节,每节重10.87t,主梁为主要\n承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有\n反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过\n孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单\n元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n(1)更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料\n性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n(2)销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接27\n2、前临时支腿\n前临时支腿在导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功\n能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 \n0~45°斜交桥架设时的调整功能。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,\n各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰\n接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调\n整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机\n械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行\n走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功\n能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:28\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,\n各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫\n实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相\n同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道\n过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步\n前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者\n配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证29\n轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,\n方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫\n实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,\n并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J 型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊\n具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵\n移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载\n试验进行制动检测,试验方法与重载试验相同,动作3 次,检验制动\n器制动效果。\n(3)卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发\n现有窜动,要立即停止作业,加固好必须检验后使用。30\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承\n主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂\n直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 \n500mm。\n(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在\n预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必\n须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔\n离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、\n整机横移时要注意观察,并听从指挥人员的信号。\n\n二)架桥机安装施工\n1、安装准备\n(1)图纸审核31\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质\n量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟\n悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构\n的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作\n方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁\n施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专32\n业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同\n意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级\n有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如\n属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充\n修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,\n查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要\n求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。33\n(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、\n拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整\n修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、\n固定压板→安装三道上横梁及尾支腿3435\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4 级,视线良好的环境下进行安装。36\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊\n站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于\n10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用\n1770MPa 形式\n表4-2 钢丝绳破断拉力表37\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一\n节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支\n腿支点距应该满足安装需求(约为30m 左右),起重设备采用1 台80t 吊车进行起重安装\n(单机抬吊)38\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m 左右)、高度差,确定合理的前、\n中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承\n担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20 的钢丝绳,设置于支\n腿两侧。在硬化场地上预埋直径25mm 的U 型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n1)台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n2)枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm 以上,横轨横向应保持水\n平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16 或中120*6 以上\n圆管)5t 手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。39\n注意事项:\n1)台车跑轮须用木楔楔实,保证不能左右滑动。\n2)前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4 安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横\n轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1 台80t 汽车吊将单节主梁吊装\n安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及\n临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n1)拼装相应位置的三角桁架,高抗剪主梁不得错位\n2)安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n3)安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,\n并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n1)启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动40\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n1)缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n2)检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n1)布线要整齐,接头处必须做好防水、漏电事项。\n2)试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n\n四)架桥机拆除\n1、准备工作\n1.1 拆除场地检查、清理、平整\nA 拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障\n碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护\n措施\nB 清理场地和周围影响拆除作业的障碍物\nC 桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基\n上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设41\n移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m\n2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2 拆除人员组织及技术准备\nA 拆除人员按照施工专项方案安排到位,并持证上岗\nB 由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架\n桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行\n全面的安全质量技术交底\nC 制定各项防火、防雷击等预防措施\n1.3 架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵\n坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊42\n机、电缆等辅助材料的质量和数量是否满足要求。\n2、拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃\n圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则\n应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加\n固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指\n挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方\n能继续进行43\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止\n构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重\n天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施\n8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得\n赶进度在夜间或雷雨时间作业。44"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "technology",
- "check_item_code": "technology_completeness_check",
- "check_result": "第四章 施工工艺技术下缺失施工工艺技术中的【主要施工方法概述】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "建议补充:1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第四章 施工工艺技术内容属于,专项施工方案内容要求中的 【施工工艺技术】 板块,应包含主要施工方法概述包括:1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量;",
- "review_references": "四、施工工艺技术 本章包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操 作要求、检查要求等六个方面。 主要施工方法概述应简要说明采取的主要施工工艺和施工方法,以及模板等重 要材料的配置数量。 技术参数包含主要使用材料的类型、规格,以及主要设备的名称、型号、出厂 时间、性能参数、自重等。 施工准备包含测量放样、临时用水、临时用电、场地、人员、设备、安全防护 措施和人员上下通道等内容。 工艺流程包含整个方案的主要施工工序,按照施工的先后顺序,建议采用金山 软件流程图或微软Visio进行绘制,工艺流程图采用无颜色填充,字体为五号或小 五号。 施工方法及操作要求根据工艺流程中主要的施工工序依次进行描述其操作方法, 并说明施工要点,常见问题及预防、处理措施。 检查要求包含所用的材料,构配件进场质量检查、抽查,以及施工过程中各道 工序检查内容及标准。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "technology",
- "check_item_code": "technology_completeness_check",
- "check_result": "第四章 施工工艺技术下缺失施工工艺技术中的【技术参数】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "建议补充:1.主要使用材料的类型、规格;2.主要设备的名称、型号、出厂 时间、性能参数、自重等",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第四章 施工工艺技术内容属于,专项施工方案内容要求中的 【施工工艺技术】 板块,应包含技术参数包含:1.主要使用材料的类型、规格;2.主要设备的名称、型号、出厂 时间、性能参数、自重等;",
- "review_references": "四、施工工艺技术 本章包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操 作要求、检查要求等六个方面。 主要施工方法概述应简要说明采取的主要施工工艺和施工方法,以及模板等重 要材料的配置数量。 技术参数包含主要使用材料的类型、规格,以及主要设备的名称、型号、出厂 时间、性能参数、自重等。 施工准备包含测量放样、临时用水、临时用电、场地、人员、设备、安全防护 措施和人员上下通道等内容。 工艺流程包含整个方案的主要施工工序,按照施工的先后顺序,建议采用金山 软件流程图或微软Visio进行绘制,工艺流程图采用无颜色填充,字体为五号或小 五号。 施工方法及操作要求根据工艺流程中主要的施工工序依次进行描述其操作方法, 并说明施工要点,常见问题及预防、处理措施。 检查要求包含所用的材料,构配件进场质量检查、抽查,以及施工过程中各道 工序检查内容及标准。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "technology",
- "check_item_code": "technology_completeness_check",
- "check_result": "第四章 施工工艺技术下缺失施工工艺技术中的【工艺流程】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "建议补充:2.临时水电用量",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第四章 施工工艺技术内容属于,专项施工方案内容要求中的 【施工工艺技术】 板块,应包含施工准备包含:1.测量放样;2.临时水电用量;3.场地、人员、设备;4.安全防护 措施和人员上下通道;",
- "review_references": "四、施工工艺技术 本章包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操 作要求、检查要求等六个方面。 主要施工方法概述应简要说明采取的主要施工工艺和施工方法,以及模板等重 要材料的配置数量。 技术参数包含主要使用材料的类型、规格,以及主要设备的名称、型号、出厂 时间、性能参数、自重等。 施工准备包含测量放样、临时用水、临时用电、场地、人员、设备、安全防护 措施和人员上下通道等内容。 工艺流程包含整个方案的主要施工工序,按照施工的先后顺序,建议采用金山 软件流程图或微软Visio进行绘制,工艺流程图采用无颜色填充,字体为五号或小 五号。 施工方法及操作要求根据工艺流程中主要的施工工序依次进行描述其操作方法, 并说明施工要点,常见问题及预防、处理措施。 检查要求包含所用的材料,构配件进场质量检查、抽查,以及施工过程中各道 工序检查内容及标准。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "主要施工方法概述缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "在待审查目录中未找到与'主要施工方法概述'对应的章节;当前章节仅涉及'第四章 施工工艺技术',未涵盖'主要施工方法概述'相关内容;整改建议:建议在本章或前序章节中增设'主要施工方法概述'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求等6个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "技术参数缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "在待审查目录中未找到与'技术参数'对应的章节;当前章节仅涉及'第四章 施工工艺技术',未涵盖'技术参数'相关内容;整改建议:建议在本章或前序章节中增设'技术参数'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求等6个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-158": {
- "metadata": {
- "review_location_label": "第37页:第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "二)架桥机安装施工\n1、安装准备\n(1)图纸审核31\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质\n量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟\n悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构\n的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作\n方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁\n施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专32\n业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同\n意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级\n有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如\n属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充\n修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,\n查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要\n求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。33\n(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、\n拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整\n修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、\n固定压板→安装三道上横梁及尾支腿3435\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4 级,视线良好的环境下进行安装。36\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊\n站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于\n10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用\n1770MPa 形式\n表4-2 钢丝绳破断拉力表37\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一\n节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支\n腿支点距应该满足安装需求(约为30m 左右),起重设备采用1 台80t 吊车进行起重安装\n(单机抬吊)38\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m 左右)、高度差,确定合理的前、\n中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承\n担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20 的钢丝绳,设置于支\n腿两侧。在硬化场地上预埋直径25mm 的U 型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n1)台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n2)枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm 以上,横轨横向应保持水\n平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16 或中120*6 以上\n圆管)5t 手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。39\n注意事项:\n1)台车跑轮须用木楔楔实,保证不能左右滑动。\n2)前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4 安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横\n轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1 台80t 汽车吊将单节主梁吊装\n安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及\n临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n1)拼装相应位置的三角桁架,高抗剪主梁不得错位\n2)安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n3)安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,\n并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n1)启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动40\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n1)缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n2)检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n1)布线要整齐,接头处必须做好防水、漏电事项。\n2)试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-159": {
- "metadata": {
- "review_location_label": "第47页:第四章 施工工艺技术->四) 架桥机拆除",
- "original_content": "四)架桥机拆除\n1、准备工作\n1.1 拆除场地检查、清理、平整\nA 拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障\n碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护\n措施\nB 清理场地和周围影响拆除作业的障碍物\nC 桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基\n上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设41\n移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m\n2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2 拆除人员组织及技术准备\nA 拆除人员按照施工专项方案安排到位,并持证上岗\nB 由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架\n桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行\n全面的安全质量技术交底\nC 制定各项防火、防雷击等预防措施\n1.3 架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵\n坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊42\n机、电缆等辅助材料的质量和数量是否满足要求。\n2、拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃\n圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则\n应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加\n固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指\n挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方\n能继续进行43\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止\n构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重\n天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施\n8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得\n赶进度在夜间或雷雨时间作业。44"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 1,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "架桥机拆除作业前场地准备未明确拆除作业场地应由具备资质单位实施拆除的强制要求",
- "location": "四)架桥机拆除\n1、准备工作\n1.1 拆除场地检查、清理、平整\nC 桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设41\n移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m",
- "suggestion": "在拆除场地准备中应明确:架桥机拆除作业必须由具有安装、拆除资质的单位实施,且拆除前应确认该单位资质符合《公路工程预制梁架设施工标准化作业手册》第7.6条要求。",
- "reason": "根据《审查参考》文件第7.6条明确规定:‘当桥梁架设工程完工后,架桥机应交由具有安装、拆除资质的单位进行拆除。’本待审查内容虽提及场地准备要求,但未体现拆除作业单位资质这一强制性安全要求,属于违反非参数性强制标准的问题。该条款为安全相关非参数性强制条文,未落实即构成高风险安全隐患。",
- "risk_level": "高风险",
- "review_references": "## 7.6 架桥机拆除 当桥梁架设工程完工后,架桥机应交由具有安装、拆除资质的单位进行拆除。\n【参考文档】\n【文件】114《公路工程预制梁架设施工标准化作业手册》.md\n【标题】7 架梁作业\n7 架梁作业## 7.1 运梁\n\n### 7.1.1 运梁车装运梁施工技术条件\n\n(1)运梁台车在梁场停放后,采用梁场龙门吊或其他方式将梁体吊或\n\n移至运梁台车上方;\n\n(2)运梁车装梁时,梁体重心应落在台车纵向中心线上,偏差不得超过 20mm;\n\n(3)梁体落在运梁车上时,梁底支座预埋钢板与台车支撑横梁应对齐。如施工条件限制,可使梁前端适当超出台车支承横梁 $1 . 5 \\sim 2 { \\mathrm { m } }$ 。梁体与台车支承间应垫放硬木板或纤维层胶皮,以保护梁体砼;\n\n(4)运梁台车应设有可调节的刚性支撑杆用于运送时支撑梁体,同时每侧均采用 5t 链子滑车进行捆绑固定。运送梁体时,应在两台车上分别由专人护送,预防梁体支撑松动;\n\n\n\n### 预制梁支撑方式\n\n(5)运梁台车由专人操作控制动力。\n\n(6)运梁道路应坚实平整。道路横坡不宜超过 $2 \\%$ ,纵坡不宜超过 $4 \\%$ ,否则应采取特殊措施并组织专项论证。\n\n### 7.1.2 安全操作规程\n\n(1)运梁台车运梁时,应先试电机制动是否可靠,去掉止轮器后方可\n\n自行;\n\n(2)运梁台车停运时,应及时放置止轮器;\n\n(3)运梁时由专人指挥,专人操作,信号应果断、明确;\n\n(4)梁体支撑应确认可靠方可运梁,随车都应有专人分别看护支撑。\n\n## 7.2 捆梁、吊梁\n\n采用架桥机进行梁、板构件的安装作业时,架桥机抗倾覆稳定系数应不小于1.3。\n\n捆梁和吊梁作业是交叉进行的,主要包括以下过程:当运梁台车将梁体前端到达1#天车下方时,捆梁、吊梁使梁前端脱离前运梁台车状态下前进,待梁体后端送到2#天车下方时再捆梁,吊起梁体后端,梁体全悬吊状态下前进落位。\n\n### 7.2.1施工技术条件\n\n(1)梁体预制时,在捆梁点正上方的翼板上(梁肋两侧)分别预留长30cm,宽 15cm的吊装孔。吊装时,捆梁钢丝绳从一侧吊装孔穿入,兜住梁底后从另一侧吊装孔穿出,与吊点连接;\n\n \n捆梁方式\n\n(2)捆梁作业应在梁体底面转角与吊梁钢丝绳接触处,安放护梁铁瓦以免混凝土被挤碎,吊梁绳割伤;\n\n\n\n### 梁体底面转角与吊梁钢丝绳接触处设置钢瓦\n\n(3)应在编制的专项施工方案中进行受力计算后选择合适的捆梁绳及捆梁方式。按荷载与绳径选定单绕、双绕或三绕形式,其长度按断面大小计算确定;\n\n(4)吊梁时应保持梁体水平。\n\n### 7.2.2 安全操作规程:\n\n(1)捆梁时两边铁瓦要对正放牢,捆梁钢丝绳应垂直并置于钢瓦中间,无铰花和两股互压现象;\n\n(2)梁体起吊后,应将卷扬机作制动试验两次,确保良好后方可走梁;\n\n(3)每片梁吊装前均需检查捆梁钢丝绳和各部钢丝绳磨损情况,超过限制时应及时更换,不得凑合使用;\n\n(4)卷筒绕绳应随时注意,如发现钢丝绳掉槽、乱绳应马上停止作业,更正后进行;\n\n(5)操作人员应注意力集中,听从指挥人员指挥,指挥人员信号明确、果断。\n\n## 7.3 梁体落位\n\n### 7.3.1 架梁顺序\n\n梁体架设应由中梁 次中梁 边梁,由内向外的顺序逐片进行架设,运梁应根据架梁顺序进行。\n\n以标准横断面布置为5 片T 梁为例,其架设顺序如下:\n\n \n架梁顺序\n\n### 7.3.2 施工技术条件\n\n(1)架梁作业顺序应严格按要求进行,不得擅自改变作业要求。(2)横移档块应在满足架设情况下设置,不得有太多余量;(3)当第一片梁架设后,应及时在端部横隔板处采用枕木支垫,木楔楔紧,确保梁体稳定。\n(4)边梁架设后,应及时在端部横隔板处采用枕木支垫,木楔楔紧,同时在外侧采用型钢支撑翼缘, 木楔楔紧,确保梁体稳定。\n\n \n边梁架设后支撑方式\n\n### 7.3.3 安全操作规程\n\n(1)在梁体对孔后,应在降低梁体高度情况下作横移,增强架梁作业安全稳定性;\n\n(2)当梁体临时放置时,应在梁体与垫石间加垫面积大的硬木板或纤维胶板,保护梁体混凝土,同时梁体支护应牢固可靠;\n\n(3)在梁体下放过程中,应由专人看护卷筒放绳状态,如有夹绳、脱槽现象应立即停机处理;\n\n(4)梁体临时放置时,在重新吊起前应检查护瓦安放状态,使其符合要求;\n\n(5)在单片梁就位后,严禁非工作人员上梁走动,避免危险;\n\n(6)在两片梁相邻就位后,应及时对横隔板联接主筋施焊,保持梁体稳定;\n\n(7)梁间横隔板联接主筋施焊是高空作业,应在确认作业平台安全可靠情况下,做好安全防护措施后方可进行焊接作业;\n\n \n横隔板主筋焊接作业平台\n\n(8)应保证前支点、中支点横移机构安全、同步,如有故障,应及时排除,且制动性能应好;\n\n(9)在架设梁体时,应对施工现场设专人防护,禁止闲杂人进入施工\n\n现场,在桥上作业时,递送物品,应事先联络好,用绳捆牢递送,禁止自由丢落。\n\n## 7.4 支座安装\n\n梁体到达就位处支座上方后,应精细调整梁体和支座平面、立面上的位置,使之符合有关规定要求后落梁就位。\n\n## 7.5 架桥机转场\n\n### 7.5.1左右幅之间转场\n\n由于某些条件限制,导致梁体无法整幅架设,只能采用分幅架设,在其中一幅架设完成后,需进行左右幅之间的架桥机转场。此时需将架桥机后退至起点桥头路基上,再横移至另一幅进行架设作业。亦可按本节7.5.2相关条款进行架桥机转场。\n\n### 7.5.2桥与桥之间转场\n\n(1)当两桥位之间距离较远时,架桥机转场宜采用拆除架桥机后,转运至另一桥位后重新安装架桥机。\n\n(2)当两桥位之间距离较近时,可采用不拆除架桥机,将架桥机逐步行走至另一桥位。亦可将架桥机支承在运梁车上,通过运梁车将架桥机行走至另一桥位,如下图所示:\n\n\n\n\n\n## 7.6 架桥机拆除\n\n当桥梁架设工程完工后,架桥机应交由具有安装、拆除资质的单位进行拆除。\n\n一般情况下,宜在桥头路基上拆除架桥机。在场地受限的情况下,可在已架设桥梁上拆除架桥机。\n\n对架桥机拆除应按以下顺序进行:\n\n(1)先将前支点、中支点降至最低位,使架桥机主梁支撑在反托支架和中支点上;(2)解除动力电源,撤除机上动力、控制电缆及液压部件;(3)吊下天车,拆除前支点和前横联;(4)拆除主梁、后支点和后横联;(5)解体各部分能便于运输与存放即可。(6)将所有构件归类码放整齐,便于运输装车;(7)清点栓接、销接件及机电元件,不要造成损坏丢失。\n\n## 8 特殊条件下架梁\n\n### 8.1 一般规定\n\n架梁工作如遇有特殊桥型、特殊气候、特殊梁体、特殊工况等条件需采取措施时,称特殊条件下架梁。\n\n特殊条件下架梁应符合下列规定:\n(1)经过分析计算,应有足够的安全系数;(2)满足架桥机规定的各项参数要求;(3)情况复杂时,必须通过试运试吊;(4)制定的措施,不得违反安全操作和工作质量的规定;(5)由架桥机设计生产单位进行设计计算,对架桥机改造、结构变动,以满足要求。\n\n### 8.2 特殊桥型架梁\n\n#### 8.2.1 斜桥架梁\n\n可根据桥线与墩台夹角对架桥机前辅助支腿、前支点、中支点、主梁、天车横梁进行斜交组装,夹角符合斜桥条件。\n\n#### 8.2.2 纵坡桥架梁\n\n当桥梁纵坡大于 $\\pm \\ 2 . \\ 5$ 时,视为纵坡较大架梁。\n\n(1)在架桥机过孔时,应通过分阶段调整各支点的支垫高度,以使主梁始终保持水平状态;(2)在过孔就位后,应及时调平主梁,避免架梁发生安全事故;(3)吊梁纵移过程中应及时调整梁体水平;(4)在下坡架梁时,如梁高度及其它参数超出额定参数时,应采取其它措施。\n\n\n\n### 架桥机大纵坡过孔布置图\n\n桥面横坡大,为保证梁板运输架设过程中保持水平状态,采用在支腿下支撑专用型钢凳的方法保证架桥机处于水平稳定的状态。\n\n \n架桥机桥面横坡处置示意图\n\n#### 8.2.3 曲线桥架梁\n\n当曲线半径较小时,由于运梁轨道弯曲,若造成梁体通过空间紧张时,视为特殊情况。\n\n(1)注意运梁台车芯盘转动应灵活,梁体支撑应专人重点观察;\n\n(2)中支点、后支点空间紧张时,应进行验算,适当扩大空间尺寸;\n\n(3)如若空间扩大后,架梁稳定性较差时,应改造构件。\n\n\n\n### 8.3 特殊气候架梁\n\n#### 8.3.1 特殊气候条件下架梁主要包括:\n\n(1)风中架梁,架梁时风力为6~8 级;\n\n(2)雨后或雨季中架梁,在暴雨后或长期霪雨中架梁;\n\n#### 8.3.2 当风力超过5 级时不得进行架桥机过孔作业,当风力超过 8 级时不得架梁。在6~8 级风中架梁则应区别顺风、横向、经常或间歇有风等具体条件,考虑下列问题:\n\n(1)稳定问题\n\n为防止突发性大风侵袭,宜在架桥机对位后用枕木支垫桥机背风面。\n\n(2)梁体摆动问题\n\n为防止梁体受风时产生剧烈摆动和扭动,在落梁时宜用环链手拉葫芦拉住梁使之缓缓下落。\n\n(3)防护问题\n\n作业人员在风中架梁时必须有可靠的安全设施。墩台顶面宜加防护围栏或设置安全网。\n\n#### 8.3.3 雨季架梁应根据路基质量、连续下雨天数、总降雨量、排水等情况,采取措施,防止梁体或桥机发生事故。\n\n(1)如路基受雨水影响已开始软化或流失应禁止运梁作业。\n\n(2)如若雨水影响较小,需认真检查路基,确认无冲空、泡软现象方可运梁作业。\n\n(3)架桥机在雨中作业易发生漏电及电气短路等故障,宜严加防范。\n\n### 8.4 特殊梁体架设\n\n当梁体超出架桥机净空尺寸或额定参数后,为特殊梁体架设。在遇到特殊梁体时,应及时同设计单位联系,以便做设计检算或设计改造,在符合规定条件下方可进行施工作业。\n\n## 9 架桥机技术状况检查与维护\n\n### 9.1 架桥机技术状况检查\n\n架桥机在首次安装调试完成后,以及每完成一跨梁体架设,准备开始下一跨的过孔作业前,须对架桥机进行技术状况检查,并做好记录。检查中发现的故障和安全隐患必须排除后,才能继续进行各种作业。\n\n《技术状况检查记录表》详见附件2,本检查表在每次技术状况检查时填制,交项目物资设备部门、工程部门与安全部门存底。\n\n### 9.2 架桥机维护\n\n架桥机作业班组须进行架桥机日常维护。维护工作应每月进行一次,以最近的技术状况检查结果为依据,并做好记录,交项目物资设备部门存底。\n\n《架桥机维护记录表》详见附件3。\n\n## 10 安全监督检查\n\n### 10.1 特种设备安全监督检查\n\n本部分特种设备安全监督检查是指特种设备使用前、使用过程安全监督检查,不包含特种设备入场验收检查和班组(班前班中班后)安全检查,监督检查由物资设备管理部门和安全监督管理部门牵头,工程技术部门参与,按照国家政策法规和公司相关规章制度、标准执行。使用过程分为定期、不定期和日常监督检查,定期要求公司级每个季度至少开展一次专项监督检查,项目每个月至少开展一次专项监督检查;不定期包括特殊情况、节假日、临时安排等专项检查;日常监督检查由职能部门原则上每日开展安全监督巡查检查。\n\n#### 10.1.1 特种设备安全基本条件确认\n\n(1)按照特种设备目录,对特种设备名称、型号、内部编号(便于内部有序管理)、设备代码进行确认。\n\n(2)对特种设备安全管理人员、检测人员、作业人员数量、持证情况进行核实,确保数量、质量满足要求,证件与现场一致。\n\n(3)核实是否为国家明令淘汰和已经报废的特种设备。\n\n(4)核实特种设备使用登记证书是否在显著位置公示,操作规程、十不吊、风险告知、警示标志、应急处置告知、作业人员、应急救援电话和相关责任人等关键信息是否公示。\n\n(5)对特种设备各类安全附件行程限位、高度限位、重量限位、旋转限位、报警器、缓冲器、扫轨器、骑马卡、仪器仪表等及其有效性进行检查核实。\n\n(6)对特种设备安全技术档案如设计文件、质量合格证明、安装及使用维护保养说明、监督检验证明、定期检验和定期自检记录、日常使用状况记录、维护保养记录、运行故障和事故记录等进行核实。\n\n#### 10.1.2 特种设备安装、拆卸安全条件确认\n\n(1)对特种设备安装、拆卸单位及相应资质条件,维保单位和维保资质条件等进行确认。\n\n(2)对特种设备安装、拆卸专项施工方案编制单位、审核单位、审批单位进行核实,对方案的针对性和适用性、可操作性进行检查,确保方案现场执行到位、专人现场管理和专人现场安全监督到位。\n\n#### 10.1.3特种设备检验检测确认\n\n(1)对特种设备现场安装告知、检验检测单位、检验时间、检验结论、有效期、使用登记机关、使用登记证编号等信息有效性进行确认。\n\n(2)对特种设备设备设施台账、人员台账、管理台账等及其质量进行确认,确保台账管理完善。\n\n#### 10.1.4特种设备入场安全管理\n\n(1)物资设备管理部门是否组织特种设备入场安全验收进行确认,验收程序是否规范,验收是否如实记录和明确的验收结论。\n(2)检查是否具有针对性特种设备安全管理制度及节能制度。(3)检查特种设备安全管理人员、检测人员、作业人员安全教育培训 \n情况及效果,是否考核合格上岗。(4)检查工序作业前安全技术交底情况,交底是否具有针对性,是否 \n全面,签字是否完善。(5)检查岗位全员责任制是否明确及落实情况。(6)检查特种设备是否具有规定的安全距离及安全防护情况。(7)检查现场安全行为及安全状态。(8)检查现场突发事件应急处置告知、警示等是否明确。(9)检查特种设备桁架系统稳定性、各连接部位联接情况、螺栓、骑 \n马卡、法兰盘、附着系统、基础情况、配重系统、变形及开裂等异常情况。(10)检查特种设备行走系统、轨道系统、支垫系统、行程、高度、 \n重量、旋转限位系统等情况。(11)检查特种设备起重系统,含索具吊具系统,卷扬机、钢丝绳、 \n链子滑车、天车系统等情况。(12)检查特种设备起重吊装指挥、操作系统情况。(13)检查特种设备锚固、固定、锁定、防倾覆系统情况。(14)检查特种设备监控监测系统及有效性情况。(15)检查特种设备一机一档档案管理情况。\n\n### 10.2 起重吊装作业安全监督检查\n本部分起重吊装作业安全监督检查是起重吊装作业前、作业过程安全监督检查,不包括班组(班前班中班后)安全检查,监督检查由工程技术管理部门和安全监督管理部门牵头,物资设备部门参与,按照国家政策法规和公司相关规章制度、标准执行。使用过程分为定期、不定期和日常监督检查,定期要求公司级每个季度至少开展一次专项监督检查,项目每个月至少开展一次专项监督检查;不定期包括特殊情况、节假日、临时安排等专项检查;日常监督检查由职能部门原则上每日开展安全监督巡查检查。\n",
- "reference_source": "114《公路工程预制梁架设施工标准化作业手册》.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊装前检查要求未明确符合国家标准",
- "location": "3、架桥机拆除注意事项\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固",
- "suggestion": "应明确钢丝绳吊索应符合《一般用途钢丝绳吊索特性和技术条件》GB/T 16762 和《钢丝绳吊索 插编索扣》GB/T 16271 的规定,检查内容应包括外观、断丝、磨损、变形等,并确保无插编缺陷或损伤,必要时应按标准更换或加固。",
- "reason": "根据《审查参考》中4.4.1条明确规定:钢丝绳吊索应符合GB/T 16762和GB/T 16271的规定。待审查内容中‘检查钢丝绳质量’属于非参数性安全要求,但未引用或体现强制性国家标准,违反了安全技术规范的合规性要求,属于高风险问题。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[内容过长,已截断,保留尾部8000字符]...\n{ \\cdot }$ ,等于吊重乘以动力系数1.5。\n\n2)滑轮跑头牵引行程和速度应按下列公式计算:\n\n$$\nu - m h\n$$\n\n$$\n\\tau = m v _ { 1 }\n$$\n\n式中: $u$ 一 -跑头牵引行程( $\\mathrm { ( m ) }$ ;$m$ 滑轮组工作绳数;$h$ - -吊件的上升行程( $( \\mathrm { m } )$ ;$_ { v }$ 跑头的牵引速度 $( \\mathrm { m } / \\mathrm { s } )$ ;$\\boldsymbol { v } _ { 1 }$ 吊件的上升速度! $( \\mathrm { m } / \\mathrm { s } )$ 。\n\n### 4.4.2 卷扬机的使用应符合下列规定:\n\n1 手动卷扬机不得用于大型构件吊装,大型构件的吊装应采用电动卷扬机。\n\n2 卷扬机的基础应平稳牢固,用于锚固的地锚应可靠,防止发生倾覆和滑动。\n\n3 卷扬机使用前,应对各部分详细检查,确保棘轮装置和制动器完好,变速齿轮沿轴转动,啮合正确,无杂音和润滑良好,发现问题,严禁使用。\n\n4 卷扬机应安装在吊装区外,水平距离应大于构件的安装高度,并搭设防护棚,保证操作人员能清楚地看见指挥人员的信号。当构件被吊到安装位置时,操作人员的视线仰角应小于 $3 0 ^ { \\circ }$ 。\n5导向滑轮严禁使用开口拉板式滑轮。滑轮到卷筒中心的距离,对带槽卷筒应大于卷筒宽度的15倍;对无槽卷筒应大于20倍,当钢丝绳处在卷筒中间位置时,应与卷筒的轴心线垂直。\n\n6钢丝绳在卷筒上应逐圈靠紧,排列整齐,严禁互相错叠、离缝和挤压。钢丝绳缠满后,卷筒凸缘应高出2倍及以上钢丝绳直径,钢丝绳全部放出时,钢丝绳在卷筒上保留的安全圈不应少于5圈。\n\n7在制动操纵杆的行程范围内不得有障碍物。作业过程中, 操作人员不得离开卷扬机,严禁在运转中用手或脚去拉、踩钢丝 绳,严禁跨越卷扬机钢丝绳。\n\n8卷扬机的电气线路应经常检查,电机应运转良好,电磁抱闸和接地应安全有效,不得有漏电现象。\n\n### 4.4.3电动卷扬机的牵引力和钢丝绳速度应符合下列规定:\n\n1)卷筒上的钢丝绳牵引力应按下列公式计算:\n\n$$\nF = 1 . 0 2 \\times \\frac { P _ { \\mathrm { H } } \\eta } { v }\n$$\n$$\n\\eta = \\eta _ { \\mathrm { 0 } } \\times \\eta _ { \\mathrm { 1 } } \\times \\eta _ { \\mathrm { 2 } } \\times \\cdots \\times \\eta _ { \\mathrm { n } }\n$$\n\n式中: $F$ 牵引力(kN);\n\n$P _ { \\mathrm { ~ H ~ } }$ -电动机的功率( $\\mathrm { k W } )$ ; \n$_ { v }$ 钢丝绳速度( $\\mathrm { ( m / s ) }$ ;$\\eta$ 总效率; \n$\\eta _ { 0 }$ 卷筒效率,当卷筒装在滑动轴承上时,取 $\\eta _ { 0 } =$ 0.94;当装在滚动轴承上时,取 $\\eta _ { 0 } = 0 . 9 6$ ;\n\n$\\eta _ { 1 } \\cdot \\ \\eta _ { 2 } \\cdots \\eta _ { \\mathrm { n } }$ 传动机构效率,按表4.4.3选用。\n\n表4.4.3传动机构的效率 \n\n\n\n\n\n2)钢丝绳速度应按下列公式计算:\n\n$$\nv = \\pi D \\omega\n$$\n\n$$\n\\omega = \\frac { \\omega _ { \\mathrm { H } } i } { 6 0 }\n$$\n\n$$\n\\begin{array} { r } { i = \\frac { n _ { \\mathrm { Z } } } { n _ { \\mathrm { B } } } } \\end{array}\n$$\n\n式中: $_ { v }$ —钢丝绳速度( $\\mathrm { ( m / s ) }$ ;\n\n$D$ 卷筒直径( $\\mathrm { . m } )$ ;$\\omega$ 卷筒转速 $\\mathrm { ( r / s ) }$ ; \nWH 电动机转速 $( \\mathrm { r / s } )$ ;$i$ 传动比; \n$n _ { Z }$ 所有主动轮齿数的乘积; \n$n _ { \\mathrm { B } }$ 所有被动轮齿数的乘积。\n\n### 4.4.4倒链的使用应符合下列规定:\n\n1使用前应进行检查,倒链的吊钩、链条、轮轴、链盘等应无锈蚀、裂纹、损伤,传动部分应灵活正常。\n\n2起吊构件至起重链条受力后,应仔细检查,确保齿轮啮合良好,自锁装置有效后,方可继续作业。\n\n3应均匀和缓地拉动链条,并应与轮盘方向一致,不得斜向拽动。\n\n4倒链起重量或起吊构件的重量不明时,只可一人拉动链条,一人拉不动应查明原因,此时严禁两人或多人齐拉。\n\n5齿轮部分应经常加油润滑,棘爪、棘爪弹簧和棘轮应经常检查,防止制动失灵。\n\n6倒链使用完毕后应拆卸清洗干净,上好润滑油,装好后套上塑料罩挂好。\n\n### 4.4.5手扳葫芦应符合下列规定:\n\n1只可用于吊装中收紧缆风绳和升降吊篮使用。\n\n2使用前,应仔细检查确认自锁夹钳装置夹紧钢丝绳后能往复作直线运动,不满足要求,严禁使用。使用时,待其受力后应检查确认运转自如,无问题后,方可继续作业。\n\n3用于吊篮时,应在每根钢丝绳处拴一根保险绳,并将保险绳的另一端固定在可靠的结构上。\n\n4使用完毕后,应拆卸、清洗、上油、安装复原,妥善保管。\n\n### 4.4.6千斤顶的使用应符合下列规定:\n\n1使用前后应拆洗干净,损坏和不符合要求的零件应更换,安装好后应检查各部位配件运转的灵活性,对油压千斤顶应检查阀门、活塞、皮碗的完好程度,油液干净程度和稠度应符合要求,若在负温情况下使用,油液应不变稠、不结冻。\n\n2千斤顶的选择,应符合下列规定:\n\n1)千斤顶的额定起重量应大于起重构件的重量,起升高度应满足要求,其最小高度应与安装净空相适应。 \n2)采用多台千斤顶联合顶升时,应选用同一型号的千斤顶,并应保持同步,每台的额定起重量不得小于所分担重量的1.2倍。\n\n3千斤顶应放在平整坚实的地面上,底座下应垫以枕木或钢板。与被顶升构件的光滑面接触时,应加垫硬木板防滑。\n\n4设顶处应传力可靠,载荷的传力中心应与千斤顶轴线致,严禁载荷偏斜。\n\n5顶升时,应先轻微顶起后停住,检查千斤顶承力、地基、垫木、枕木垛有无异常或千斤顶歪斜,出现异常,应及时处理后\n\n方可继续工作。\n\n6顶升过程中,不得随意加长千斤顶手柄或强力硬压,每次顶升高度不得超过活塞上的标志,且顶升高度不得超过螺丝杆或活塞高度的3/4。\n\n7构件顶起后,应随起随搭枕木垛和加设临时短木块,其短木块与构件间的距离应随时保持在 $5 0 \\mathrm { m m }$ 以内。\n\n## 4.5地锚\n\n### 4.5.1立式地锚的构造应符合下列规定:\n\n1应在枕木、圆木、方木地龙柱的下部后侧和中部前侧设置挡木,并贴紧土壁,坑内应回填土石并夯实,表面略高于自然地坪。\n\n2地坑深度应大于 $1 , 5 \\mathrm { m }$ ,地龙柱应露出地面 $0 . 4 \\mathrm { m } \\sim$ $1 , 0 \\mathrm { m }$ ,并略向后倾斜。\n\n3使用枕木或方木做地龙柱时,应使截面的长边与受力方向一致,作用的荷载宜与地龙柱垂直。\n\n4单柱立式地锚承载力不够时,可在受力方向后侧增设一个或两个单柱立式地锚,并用绳索连接,使其共同受力。\n\n5各种立式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.2桩式地锚的构造应符合下列规定:\n\n1应采用直径 $1 8 0 \\mathrm { m m } \\sim 3 3 0 \\mathrm { m m }$ 的松木或衫木做地锚桩,略向后倾斜打入地层中,并应在其前方距地面 $0 . 4 \\mathrm { m } { \\sim } 0 . 9 \\mathrm { m }$ 深处,紧贴桩身埋置 $1 \\mathrm { m }$ 长的挡木一根。\n\n2桩入土深度不应小于 $1 , 5 \\mathrm { m }$ ,地锚的钢丝绳应拴在距地面不大于 $3 0 0 \\mathrm { m m }$ 处。\n\n3荷载较大时,可将两根或两根以上的桩用绳索与木板将其连在一起使用。\n\n4各种桩式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.3卧式地锚的构造应符合下列规定:\n\n1钢丝绳应根据作用荷载大小,系结在横置木中部或两侧,并应采用土石回填夯实。\n2木料尺寸和数量应根据作用荷载的大小和土壤的承载力经过计算确定。\n\n3木料横置埋入深度宜为 $1 . 5 \\mathrm { m } { \\sim } 3 . 5 \\mathrm { m }$ 。当作用荷载超过$7 5 \\mathrm { k N }$ 时,应在横置木料顶部加压板;当作用荷载超过 $1 5 0 \\mathrm { k N }$ 时,应在横置木料前增设挡板立柱和挡板。\n\n4当卧式地锚作用荷载较大时,地锚的钢丝绳应采用钢拉杆代替。\n\n5卧式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.4各式地锚的使用应符合下列规定:\n\n1地锚采用的木料应使用剥皮落叶松、杉木。严禁使用油松、杨木、柳木、桦木、椴木和腐朽、多节的木料。\n\n2绑扎地锚钢丝绳的绳环应牢固可靠,横卧木四角应采用长 $5 0 0 \\mathrm { m m }$ 的角钢加固,并应在角钢外再用长 $3 0 0 \\mathrm { m m }$ 的半圆钢管保护。\n\n3钢丝绳的方向应与地锚受力方向一致。\n\n4地锚使用前应进行试拉,合格后方可使用。埋设不明的地锚未经试拉不得使用。\n\n5地锚使用时应指定专人检查、看守,如发现变形应立即处理或加固。\n\n## 5混凝土结构吊装\n\n### 5.1一般规定\n\n#### 5.1.1构件的运输应符合下列规定:\n\n1构件运输应严格执行所制定的运输技术措施。\n\n2运输道路应平整,有足够的承载力、宽度和转弯半径。\n\n3高宽比较大的构件的运输,应采用支承框架、固定架、支撑或用倒链等予以固定,不得悬吊或堆放运输。支承架应进行设计计算,应稳定、可靠和装卸方便。\n\n4当大型构件采用半拖或平板车运输时,构件支承处应设转向装置。\n\n5运输时,各构件应拴牢于车厢上。\n\n#### 5.1.2构件的堆放应符合下列规定:\n\n1构件堆放场地应压实平整,周围应设排水沟。\n\n2构件应按设计支承位置堆放平稳,底部应设置垫木。对不规则的柱、梁、板,应专门分析确定支承和加垫方法。\n\n3屋架、薄腹梁等重心较高的构件,应直立放置,除设支承垫木外,应在其两侧设置支撑使其稳定,支撑不得少于2道。\n\n4重叠堆放的构件应采用垫木隔开,上下垫木应在同一垂线上。堆放高度梁、柱不宜超过2层;大型屋面板不宜超过6层。堆垛间应留 $2 \\mathrm { m }$ 宽的通道。\n\n5装配式大板应采用插放法或背靠法堆放,堆放架应经设计计算确定。\n\n#### 5.1.3构件翻身应符合下列规定:\n\n1柱翻身时,应确保本身能承受自重产生的正负弯矩值。其两端距端面 $1 / 5 { \\sim } 1 / 6$ 柱长处应垫方木或枕木垛。\n\n2屋架或薄腹梁翻身时应验算抗裂度,不够时应予加固。\n\n当屋架或薄腹梁高度超过 $1 . 7 \\mathrm { m }$ 时,应在表面加绑木、竹或钢管横杆增加屋架平面刚度,并在屋架两端设置方木或枕木垛,其上表面应与屋架底面齐平,且屋架间不得有粘结现象。翻身时,应做到一次扶直或将屋架转到与地面夹角达到 $7 0 ^ { \\circ }$ 后,方可刹车。\n\n#### 5.1.4构件拼装应符合下列规定:\n\n1当采用平拼时,应防止在翻身过程中发生损坏和变形;当采用立拼时,应采取可靠的稳定措施。当大跨度构件进行高空立拼时,应搭设带操作台的拼装支架。\n\n2当组合屋架采用立拼时,应在拼架上设置安全挡木。\n\n#### 5.1.5吊点设置和构件绑扎应符合下列规定:\n\n1当构件无设计吊环(点)时,应通过计算确定绑扎点的位置。绑扎方法应可靠,且摘钩应简便安全。\n\n2当绑扎竖直吊升的构件时,应符合下列规定:\n\n1)绑扎点位置应略高于构件重心。 \n2)在柱不翻身或吊升中不会产生裂缝时,可采用斜吊绑扎法。 \n3)天窗架宜采用四点绑扎。\n\n3当绑扎水平吊升的构件时,应符合下列规定:\n\n1)绑扎点应按设计规定设置。无规定时,最外吊点应在距构件两端 $1 / 5 { \\sim } 1 / 6$ 构件全长处进行对称绑扎。2)各支吊索内力的合力作用点应处在构件重心线上。3)屋架绑扎点宜在节点上或靠近节点。\n\n4绑扎应平稳、牢固,绑扎钢丝绳与物体间的水平夹角应为:构件起吊时不得小于 $4 5 ^ { \\circ }$ ;构件扶直时不得小于 ${ 6 0 } ^ { \\circ }$ 。\n\n#### 5.1.6构件起吊前,其强度应符合设计规定,并应将其上的模板、灰浆残渣、垃圾碎块等全部清除干净。\n\n#### 5.1.7楼板、屋面板吊装后,对相互间或其上留有的空隙和洞□,应设置盖板或围护,并应符合现行行业标准《建筑施工高处作业安全技术规范》JGJ8O 的规定。\n5.1.8多跨单层厂房宜先吊主跨,后吊辅助跨;先吊高跨,后吊低跨。多层厂房宜先吊中间,后吊两侧,再吊角部,且应对称进行。\n\n5.1.9作业前应清除吊装范围内的障碍物。\n\n## 5.2单层工业厂房结构吊装\n\n### 5.2.1柱的吊装应符合下列规定:\n\n1柱的起吊方法应符合施工组织设计规定。\n\n2柱就位后,应将柱底落实,每个柱面应采用不少于两个钢楔楔紧,但严禁将楔子重叠放置。初步校正垂直后,打紧楔子进行临时固定。对重型柱或细长柱以及多风或风大地区,在柱上部应采取稳妥的临时固定措施,确认牢固可靠后,方可指挥脱钩。\n\n3校正柱时,严禁将楔子拔出,在校正好一个方向后,应稍打紧两面相对的四个楔子,方可校正另一个方向。待完全校正好后,除将所有楔子按规定打紧外,还应采用石块将柱底脚与杯底四周全部楔紧。采用缆风或斜撑校正柱时,应在杯口第二次浇筑的混凝土强度达到设计强度的 $7 5 \\%$ 时,方可拆除缆风或斜撑。\n\n4杯口内应采用强度高一级的细石混凝土浇筑固定。采用木楔或钢楔作临时固定时,应分二次浇筑,第一次灌至楔子下端,待达到设计强度 $30 \\%$ 以上,方可拔出楔子,再二次浇筑至基础顶;当使用混凝土楔子时,可一次浇筑至基础顶面。混凝土强度应作试块检验,冬期施工时,应采取冬期施工措施。\n\n### 5.2.2梁的吊装应符合下列规定:\n\n1梁的吊装应在柱永久固定和柱间支撑安装后进行。吊车梁的吊装,应在基础杯口二次浇筑的混凝土达到设计强度 $50 \\%$ 以上,方可进行。\n\n2重型吊车梁应边吊边校,然后再进行统·校正。\n\n3梁高和底宽之比大于4时,应采用支撑撑牢或用8号钢丝将梁捆于稳定的构件上后,方可摘钩。\n\n4吊车梁的校正应在梁吊装完,也可在屋面构件校正并最后固定后进行。校正完毕后,应立即焊接固定。\n### 5.2.3屋架吊装应符合下列规定:\n\n1进行屋架或屋面梁垂直度校正时,在跨中,校正人员应沿屋架上弦绑设的栏杆行走,栏杆高度不得低于 $1 . 2 \\mathrm { m }$ ;在两端,应站在悬挂于柱顶上的吊篮上进行,严禁站在柱顶操作。垂直度校正完毕并进行可靠固定后,方可摘钩。\n\n2吊装第一榀屋架和天窗架时,应在其上弦杆拴缆风绳作临时固定。缆风绳应采用两侧布置,每边不得少于2根。当跨度大于 $1 8 \\mathrm { m }$ 时,宜增加缆风绳数,间距不得大于 $6 \\mathrm { m }$ 。\n\n### 5.2.4天窗架与屋面板分别吊装时,天窗架应在该榀屋架上的屋面板吊装完毕后进行,并经临时固定和校正后,方可脱钩焊接固定。\n\n### 5.2.5校正完毕后应按设计要求进行永久性的接头固定。\n\n### 5.2.6屋架和天窗架上的屋面板吊装,应从两边向屋脊对称进行,且不得用撬杠沿板的纵向撬动。就位后应采用铁片垫实脱钩,并应立即电焊固定,应至少保证3点焊牢。\n\n### 5.2.7托架吊装就位校正后,应立即支模浇灌接头混凝土进行固定。\n\n### 5.2.8支撑系统应先安装垂直支撑,后安装水平支撑;先安装中部支撑,后安装两端支撑,并与屋架、天窗架和屋面板的吊装交替进行。\n\n## 5.3多层框架结构吊装\n\n### 5.3.1框架柱吊装应符合下列规定:\n\n1上节柱的安装应在下节柱的梁和柱间支撑安装焊接完毕、下节柱接头混凝土达到设计强度的 $7 5 \\%$ 及以上后,方可进行。\n\n2多机抬吊多层H型框架柱时,递送作业的起重机应使用横吊梁起吊。\n\n3柱就位后应随即进行临时固定和校正。榫式接头的,应对称施焊四角钢筋接头后方可松钩;钢板接头的,应各边分层对\n\n称施焊2/3的长度后方可脱钩;H型柱则应对称焊好四角钢筋 后方可脱钩。\n\n4重型或较长柱的临时固定,应在柱间加设水平管式支撑或设缆风绳。\n\n5吊装中用于保护接头钢筋的钢管或垫木应捆扎牢固。\n\n### 5.3.2楼层梁的吊装应符合下列规定:\n\n1吊装明牛腿式接头的楼层梁时,应在梁端和柱牛腿上预埋的钢板焊接后方可脱钩。\n\n2吊装齿槽式接头的楼层梁时,应将梁端的上部接头焊好两根后方可脱钩。\n\n### 5.3.3楼层板的吊装应符合下列规定:\n\n1吊装两块以上的双T形板时,应将每块的吊索直接挂在起重机吊钩上。\n\n2板重在5kN以下的小型空心板或槽形板,可采用平吊或兜吊,但板的两端应保证水平。\n\n3吊装楼层板时,严禁采用叠压式,并严禁在板上站人、放置小车等重物或工具。\n\n## 5.4墙板结构吊装\n\n### 5.4.1装配式大板结构吊装应符合下列规定:\n\n1吊装大板时,宜从中间开始向两端进行,并应按先横墙后纵墙,先内墙后外墙,最后隔断墙的顺序逐间封闭吊装。\n\n2吊装时应保证坐浆密实均匀。\n\n3当采用横吊梁或吊索时,起吊应垂直平稳,吊索与水平线的夹角不宜小于 ${ 6 0 } ^ { \\circ }$ 。\n\n4大板宜随吊随校正。就位后偏差过大时,应将大板重新吊起就位。\n\n5外墙板应在焊接固定后方可脱钩,内墙和隔墙板可在临 时固定可靠后脱钩。\n\n6校正完后,应立即焊接预埋筋,待同一层墙板吊装和校\n\n正完后,应随即浇筑墙板之间立缝作最后固定。\n\n7圈梁混凝土强度应达到 $7 5 \\%$ 及以上,方可吊装楼层板。\n\n### 5.4.2框架挂板吊装应符合下列规定:\n\n1挂板的运输和吊装不得用钢丝绳兜吊,并严禁用钢丝捆扎。\n\n2挂板吊装就位后,应与主体结构临时或永久固定后方可脱钩。\n\n### 5.4.3工业建筑墙板吊装应符合下列规定:\n\n1各种规格墙板均应具有出厂合格证。\n\n2吊装时应预埋吊环,立吊时应有预留孔。无吊环和预留孔时,吊索捆绑点距板端不应大于1/5 板长。吊索与水平面夹角不应小于 ${ 6 0 } ^ { \\circ }$ 。\n3就位和校正后应做可靠的临时固定或永久固定后方可脱钩。\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "拆除平台纵坡要求与审查参考不符",
- "location": "1.1 拆除场地检查、清理、平整 C 桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设41 移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m",
- "suggestion": "将拆除平台最大纵坡由‘不得超过路基和桥面的设计指标’修改为‘不得超过2%’,并明确拆除平台纵坡应符合《公路工程预制梁架设施工标准化作业手册》中关于运梁道路纵坡不宜超过4%的规定,且在场地受限时可在已架设桥梁上拆除,但需确保架桥机稳定。",
- "reason": "根据《审查参考》7.6 架桥机拆除中明确指出:‘一般情况下,宜在桥头路基上拆除架桥机。在场地受限的情况下,可在已架设桥梁上拆除架桥机。’同时,7.1.1中规定运梁道路纵坡不宜超过4%,且在特殊情况下应组织专项论证。而待审查内容中‘场地纵横向坡度不得超过路基和桥面的设计指标’表述模糊,未明确具体数值,与标准中‘纵坡不宜超过4%’的限制不符,存在参数不明确、合理性不足的问题,属于中风险问题。",
- "risk_level": "中风险",
- "review_references": "## 7.6 架桥机拆除 当桥梁架设工程完工后,架桥机应交由具有安装、拆除资质的单位进行拆除。\n【参考文档】\n【文件】114《公路工程预制梁架设施工标准化作业手册》.md\n【标题】7 架梁作业\n7 架梁作业## 7.1 运梁\n\n### 7.1.1 运梁车装运梁施工技术条件\n\n(1)运梁台车在梁场停放后,采用梁场龙门吊或其他方式将梁体吊或\n\n移至运梁台车上方;\n\n(2)运梁车装梁时,梁体重心应落在台车纵向中心线上,偏差不得超过 20mm;\n\n(3)梁体落在运梁车上时,梁底支座预埋钢板与台车支撑横梁应对齐。如施工条件限制,可使梁前端适当超出台车支承横梁 $1 . 5 \\sim 2 { \\mathrm { m } }$ 。梁体与台车支承间应垫放硬木板或纤维层胶皮,以保护梁体砼;\n\n(4)运梁台车应设有可调节的刚性支撑杆用于运送时支撑梁体,同时每侧均采用 5t 链子滑车进行捆绑固定。运送梁体时,应在两台车上分别由专人护送,预防梁体支撑松动;\n\n\n\n### 预制梁支撑方式\n\n(5)运梁台车由专人操作控制动力。\n\n(6)运梁道路应坚实平整。道路横坡不宜超过 $2 \\%$ ,纵坡不宜超过 $4 \\%$ ,否则应采取特殊措施并组织专项论证。\n\n### 7.1.2 安全操作规程\n\n(1)运梁台车运梁时,应先试电机制动是否可靠,去掉止轮器后方可\n\n自行;\n\n(2)运梁台车停运时,应及时放置止轮器;\n\n(3)运梁时由专人指挥,专人操作,信号应果断、明确;\n\n(4)梁体支撑应确认可靠方可运梁,随车都应有专人分别看护支撑。\n\n## 7.2 捆梁、吊梁\n\n采用架桥机进行梁、板构件的安装作业时,架桥机抗倾覆稳定系数应不小于1.3。\n\n捆梁和吊梁作业是交叉进行的,主要包括以下过程:当运梁台车将梁体前端到达1#天车下方时,捆梁、吊梁使梁前端脱离前运梁台车状态下前进,待梁体后端送到2#天车下方时再捆梁,吊起梁体后端,梁体全悬吊状态下前进落位。\n\n### 7.2.1施工技术条件\n\n(1)梁体预制时,在捆梁点正上方的翼板上(梁肋两侧)分别预留长30cm,宽 15cm的吊装孔。吊装时,捆梁钢丝绳从一侧吊装孔穿入,兜住梁底后从另一侧吊装孔穿出,与吊点连接;\n\n \n捆梁方式\n\n(2)捆梁作业应在梁体底面转角与吊梁钢丝绳接触处,安放护梁铁瓦以免混凝土被挤碎,吊梁绳割伤;\n\n\n\n### 梁体底面转角与吊梁钢丝绳接触处设置钢瓦\n\n(3)应在编制的专项施工方案中进行受力计算后选择合适的捆梁绳及捆梁方式。按荷载与绳径选定单绕、双绕或三绕形式,其长度按断面大小计算确定;\n\n(4)吊梁时应保持梁体水平。\n\n### 7.2.2 安全操作规程:\n\n(1)捆梁时两边铁瓦要对正放牢,捆梁钢丝绳应垂直并置于钢瓦中间,无铰花和两股互压现象;\n\n(2)梁体起吊后,应将卷扬机作制动试验两次,确保良好后方可走梁;\n\n(3)每片梁吊装前均需检查捆梁钢丝绳和各部钢丝绳磨损情况,超过限制时应及时更换,不得凑合使用;\n\n(4)卷筒绕绳应随时注意,如发现钢丝绳掉槽、乱绳应马上停止作业,更正后进行;\n\n(5)操作人员应注意力集中,听从指挥人员指挥,指挥人员信号明确、果断。\n\n## 7.3 梁体落位\n\n### 7.3.1 架梁顺序\n\n梁体架设应由中梁 次中梁 边梁,由内向外的顺序逐片进行架设,运梁应根据架梁顺序进行。\n\n以标准横断面布置为5 片T 梁为例,其架设顺序如下:\n\n \n架梁顺序\n\n### 7.3.2 施工技术条件\n\n(1)架梁作业顺序应严格按要求进行,不得擅自改变作业要求。(2)横移档块应在满足架设情况下设置,不得有太多余量;(3)当第一片梁架设后,应及时在端部横隔板处采用枕木支垫,木楔楔紧,确保梁体稳定。\n(4)边梁架设后,应及时在端部横隔板处采用枕木支垫,木楔楔紧,同时在外侧采用型钢支撑翼缘, 木楔楔紧,确保梁体稳定。\n\n \n边梁架设后支撑方式\n\n### 7.3.3 安全操作规程\n\n(1)在梁体对孔后,应在降低梁体高度情况下作横移,增强架梁作业安全稳定性;\n\n(2)当梁体临时放置时,应在梁体与垫石间加垫面积大的硬木板或纤维胶板,保护梁体混凝土,同时梁体支护应牢固可靠;\n\n(3)在梁体下放过程中,应由专人看护卷筒放绳状态,如有夹绳、脱槽现象应立即停机处理;\n\n(4)梁体临时放置时,在重新吊起前应检查护瓦安放状态,使其符合要求;\n\n(5)在单片梁就位后,严禁非工作人员上梁走动,避免危险;\n\n(6)在两片梁相邻就位后,应及时对横隔板联接主筋施焊,保持梁体稳定;\n\n(7)梁间横隔板联接主筋施焊是高空作业,应在确认作业平台安全可靠情况下,做好安全防护措施后方可进行焊接作业;\n\n \n横隔板主筋焊接作业平台\n\n(8)应保证前支点、中支点横移机构安全、同步,如有故障,应及时排除,且制动性能应好;\n\n(9)在架设梁体时,应对施工现场设专人防护,禁止闲杂人进入施工\n\n现场,在桥上作业时,递送物品,应事先联络好,用绳捆牢递送,禁止自由丢落。\n\n## 7.4 支座安装\n\n梁体到达就位处支座上方后,应精细调整梁体和支座平面、立面上的位置,使之符合有关规定要求后落梁就位。\n\n## 7.5 架桥机转场\n\n### 7.5.1左右幅之间转场\n\n由于某些条件限制,导致梁体无法整幅架设,只能采用分幅架设,在其中一幅架设完成后,需进行左右幅之间的架桥机转场。此时需将架桥机后退至起点桥头路基上,再横移至另一幅进行架设作业。亦可按本节7.5.2相关条款进行架桥机转场。\n\n### 7.5.2桥与桥之间转场\n\n(1)当两桥位之间距离较远时,架桥机转场宜采用拆除架桥机后,转运至另一桥位后重新安装架桥机。\n\n(2)当两桥位之间距离较近时,可采用不拆除架桥机,将架桥机逐步行走至另一桥位。亦可将架桥机支承在运梁车上,通过运梁车将架桥机行走至另一桥位,如下图所示:\n\n\n\n\n\n## 7.6 架桥机拆除\n\n当桥梁架设工程完工后,架桥机应交由具有安装、拆除资质的单位进行拆除。\n\n一般情况下,宜在桥头路基上拆除架桥机。在场地受限的情况下,可在已架设桥梁上拆除架桥机。\n\n对架桥机拆除应按以下顺序进行:\n\n(1)先将前支点、中支点降至最低位,使架桥机主梁支撑在反托支架和中支点上;(2)解除动力电源,撤除机上动力、控制电缆及液压部件;(3)吊下天车,拆除前支点和前横联;(4)拆除主梁、后支点和后横联;(5)解体各部分能便于运输与存放即可。(6)将所有构件归类码放整齐,便于运输装车;(7)清点栓接、销接件及机电元件,不要造成损坏丢失。\n\n## 8 特殊条件下架梁\n\n### 8.1 一般规定\n\n架梁工作如遇有特殊桥型、特殊气候、特殊梁体、特殊工况等条件需采取措施时,称特殊条件下架梁。\n\n特殊条件下架梁应符合下列规定:\n(1)经过分析计算,应有足够的安全系数;(2)满足架桥机规定的各项参数要求;(3)情况复杂时,必须通过试运试吊;(4)制定的措施,不得违反安全操作和工作质量的规定;(5)由架桥机设计生产单位进行设计计算,对架桥机改造、结构变动,以满足要求。\n\n### 8.2 特殊桥型架梁\n\n#### 8.2.1 斜桥架梁\n\n可根据桥线与墩台夹角对架桥机前辅助支腿、前支点、中支点、主梁、天车横梁进行斜交组装,夹角符合斜桥条件。\n\n#### 8.2.2 纵坡桥架梁\n\n当桥梁纵坡大于 $\\pm \\ 2 . \\ 5$ 时,视为纵坡较大架梁。\n\n(1)在架桥机过孔时,应通过分阶段调整各支点的支垫高度,以使主梁始终保持水平状态;(2)在过孔就位后,应及时调平主梁,避免架梁发生安全事故;(3)吊梁纵移过程中应及时调整梁体水平;(4)在下坡架梁时,如梁高度及其它参数超出额定参数时,应采取其它措施。\n\n\n\n### 架桥机大纵坡过孔布置图\n\n桥面横坡大,为保证梁板运输架设过程中保持水平状态,采用在支腿下支撑专用型钢凳的方法保证架桥机处于水平稳定的状态。\n\n \n架桥机桥面横坡处置示意图\n\n#### 8.2.3 曲线桥架梁\n\n当曲线半径较小时,由于运梁轨道弯曲,若造成梁体通过空间紧张时,视为特殊情况。\n\n(1)注意运梁台车芯盘转动应灵活,梁体支撑应专人重点观察;\n\n(2)中支点、后支点空间紧张时,应进行验算,适当扩大空间尺寸;\n\n(3)如若空间扩大后,架梁稳定性较差时,应改造构件。\n\n\n\n### 8.3 特殊气候架梁\n\n#### 8.3.1 特殊气候条件下架梁主要包括:\n\n(1)风中架梁,架梁时风力为6~8 级;\n\n(2)雨后或雨季中架梁,在暴雨后或长期霪雨中架梁;\n\n#### 8.3.2 当风力超过5 级时不得进行架桥机过孔作业,当风力超过 8 级时不得架梁。在6~8 级风中架梁则应区别顺风、横向、经常或间歇有风等具体条件,考虑下列问题:\n\n(1)稳定问题\n\n为防止突发性大风侵袭,宜在架桥机对位后用枕木支垫桥机背风面。\n\n(2)梁体摆动问题\n\n为防止梁体受风时产生剧烈摆动和扭动,在落梁时宜用环链手拉葫芦拉住梁使之缓缓下落。\n\n(3)防护问题\n\n作业人员在风中架梁时必须有可靠的安全设施。墩台顶面宜加防护围栏或设置安全网。\n\n#### 8.3.3 雨季架梁应根据路基质量、连续下雨天数、总降雨量、排水等情况,采取措施,防止梁体或桥机发生事故。\n\n(1)如路基受雨水影响已开始软化或流失应禁止运梁作业。\n\n(2)如若雨水影响较小,需认真检查路基,确认无冲空、泡软现象方可运梁作业。\n\n(3)架桥机在雨中作业易发生漏电及电气短路等故障,宜严加防范。\n\n### 8.4 特殊梁体架设\n\n当梁体超出架桥机净空尺寸或额定参数后,为特殊梁体架设。在遇到特殊梁体时,应及时同设计单位联系,以便做设计检算或设计改造,在符合规定条件下方可进行施工作业。\n\n## 9 架桥机技术状况检查与维护\n\n### 9.1 架桥机技术状况检查\n\n架桥机在首次安装调试完成后,以及每完成一跨梁体架设,准备开始下一跨的过孔作业前,须对架桥机进行技术状况检查,并做好记录。检查中发现的故障和安全隐患必须排除后,才能继续进行各种作业。\n\n《技术状况检查记录表》详见附件2,本检查表在每次技术状况检查时填制,交项目物资设备部门、工程部门与安全部门存底。\n\n### 9.2 架桥机维护\n\n架桥机作业班组须进行架桥机日常维护。维护工作应每月进行一次,以最近的技术状况检查结果为依据,并做好记录,交项目物资设备部门存底。\n\n《架桥机维护记录表》详见附件3。\n\n## 10 安全监督检查\n\n### 10.1 特种设备安全监督检查\n\n本部分特种设备安全监督检查是指特种设备使用前、使用过程安全监督检查,不包含特种设备入场验收检查和班组(班前班中班后)安全检查,监督检查由物资设备管理部门和安全监督管理部门牵头,工程技术部门参与,按照国家政策法规和公司相关规章制度、标准执行。使用过程分为定期、不定期和日常监督检查,定期要求公司级每个季度至少开展一次专项监督检查,项目每个月至少开展一次专项监督检查;不定期包括特殊情况、节假日、临时安排等专项检查;日常监督检查由职能部门原则上每日开展安全监督巡查检查。\n\n#### 10.1.1 特种设备安全基本条件确认\n\n(1)按照特种设备目录,对特种设备名称、型号、内部编号(便于内部有序管理)、设备代码进行确认。\n\n(2)对特种设备安全管理人员、检测人员、作业人员数量、持证情况进行核实,确保数量、质量满足要求,证件与现场一致。\n\n(3)核实是否为国家明令淘汰和已经报废的特种设备。\n\n(4)核实特种设备使用登记证书是否在显著位置公示,操作规程、十不吊、风险告知、警示标志、应急处置告知、作业人员、应急救援电话和相关责任人等关键信息是否公示。\n\n(5)对特种设备各类安全附件行程限位、高度限位、重量限位、旋转限位、报警器、缓冲器、扫轨器、骑马卡、仪器仪表等及其有效性进行检查核实。\n\n(6)对特种设备安全技术档案如设计文件、质量合格证明、安装及使用维护保养说明、监督检验证明、定期检验和定期自检记录、日常使用状况记录、维护保养记录、运行故障和事故记录等进行核实。\n\n#### 10.1.2 特种设备安装、拆卸安全条件确认\n\n(1)对特种设备安装、拆卸单位及相应资质条件,维保单位和维保资质条件等进行确认。\n\n(2)对特种设备安装、拆卸专项施工方案编制单位、审核单位、审批单位进行核实,对方案的针对性和适用性、可操作性进行检查,确保方案现场执行到位、专人现场管理和专人现场安全监督到位。\n\n#### 10.1.3特种设备检验检测确认\n\n(1)对特种设备现场安装告知、检验检测单位、检验时间、检验结论、有效期、使用登记机关、使用登记证编号等信息有效性进行确认。\n\n(2)对特种设备设备设施台账、人员台账、管理台账等及其质量进行确认,确保台账管理完善。\n\n#### 10.1.4特种设备入场安全管理\n\n(1)物资设备管理部门是否组织特种设备入场安全验收进行确认,验收程序是否规范,验收是否如实记录和明确的验收结论。\n(2)检查是否具有针对性特种设备安全管理制度及节能制度。(3)检查特种设备安全管理人员、检测人员、作业人员安全教育培训 \n情况及效果,是否考核合格上岗。(4)检查工序作业前安全技术交底情况,交底是否具有针对性,是否 \n全面,签字是否完善。(5)检查岗位全员责任制是否明确及落实情况。(6)检查特种设备是否具有规定的安全距离及安全防护情况。(7)检查现场安全行为及安全状态。(8)检查现场突发事件应急处置告知、警示等是否明确。(9)检查特种设备桁架系统稳定性、各连接部位联接情况、螺栓、骑 \n马卡、法兰盘、附着系统、基础情况、配重系统、变形及开裂等异常情况。(10)检查特种设备行走系统、轨道系统、支垫系统、行程、高度、 \n重量、旋转限位系统等情况。(11)检查特种设备起重系统,含索具吊具系统,卷扬机、钢丝绳、 \n链子滑车、天车系统等情况。(12)检查特种设备起重吊装指挥、操作系统情况。(13)检查特种设备锚固、固定、锁定、防倾覆系统情况。(14)检查特种设备监控监测系统及有效性情况。(15)检查特种设备一机一档档案管理情况。\n\n### 10.2 起重吊装作业安全监督检查\n本部分起重吊装作业安全监督检查是起重吊装作业前、作业过程安全监督检查,不包括班组(班前班中班后)安全检查,监督检查由工程技术管理部门和安全监督管理部门牵头,物资设备部门参与,按照国家政策法规和公司相关规章制度、标准执行。使用过程分为定期、不定期和日常监督检查,定期要求公司级每个季度至少开展一次专项监督检查,项目每个月至少开展一次专项监督检查;不定期包括特殊情况、节假日、临时安排等专项检查;日常监督检查由职能部门原则上每日开展安全监督巡查检查。\n",
- "reference_source": "114《公路工程预制梁架设施工标准化作业手册》.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳使用要求与标准不符",
- "location": "3、架桥机拆除注意事项\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固",
- "suggestion": "应依据《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)第4.4.2条和第4.4.3条的规定,明确钢丝绳吊索应符合GB/T 16762《一般用途钢丝绳吊索 特性和技术条件》和GB/T 16271《钢丝绳吊索 插编索扣》的要求,检查其型号、规格、安全系数、插编长度、磨损与断丝情况,并确保钢丝绳在卷筒上排列整齐、不少于5圈安全圈,不得使用存在断丝、压扁、扭结、锈蚀等缺陷的钢丝绳。",
- "reason": "根据审查参考《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)第4.4.2条第6款规定:钢丝绳在卷筒上应逐圈靠紧,排列整齐,严禁互相错叠、离缝和挤压。钢丝绳缠满后,卷筒凸缘应高出2倍及以上钢丝绳直径,钢丝绳全部放出时,钢丝绳在卷筒上保留的安全圈不应少于5圈。同时,钢丝绳吊索应符合GB/T 16762和GB/T 16271的规定。待审查内容仅笼统要求‘检查质量,必要时更换或加固’,未明确技术参数和标准依据,违反了强制性标准对钢丝绳使用的技术要求,存在安全隐患,属于高风险问题。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[内容过长,已截断,保留尾部8000字符]...\n{ \\cdot }$ ,等于吊重乘以动力系数1.5。\n\n2)滑轮跑头牵引行程和速度应按下列公式计算:\n\n$$\nu - m h\n$$\n\n$$\n\\tau = m v _ { 1 }\n$$\n\n式中: $u$ 一 -跑头牵引行程( $\\mathrm { ( m ) }$ ;$m$ 滑轮组工作绳数;$h$ - -吊件的上升行程( $( \\mathrm { m } )$ ;$_ { v }$ 跑头的牵引速度 $( \\mathrm { m } / \\mathrm { s } )$ ;$\\boldsymbol { v } _ { 1 }$ 吊件的上升速度! $( \\mathrm { m } / \\mathrm { s } )$ 。\n\n### 4.4.2 卷扬机的使用应符合下列规定:\n\n1 手动卷扬机不得用于大型构件吊装,大型构件的吊装应采用电动卷扬机。\n\n2 卷扬机的基础应平稳牢固,用于锚固的地锚应可靠,防止发生倾覆和滑动。\n\n3 卷扬机使用前,应对各部分详细检查,确保棘轮装置和制动器完好,变速齿轮沿轴转动,啮合正确,无杂音和润滑良好,发现问题,严禁使用。\n\n4 卷扬机应安装在吊装区外,水平距离应大于构件的安装高度,并搭设防护棚,保证操作人员能清楚地看见指挥人员的信号。当构件被吊到安装位置时,操作人员的视线仰角应小于 $3 0 ^ { \\circ }$ 。\n5导向滑轮严禁使用开口拉板式滑轮。滑轮到卷筒中心的距离,对带槽卷筒应大于卷筒宽度的15倍;对无槽卷筒应大于20倍,当钢丝绳处在卷筒中间位置时,应与卷筒的轴心线垂直。\n\n6钢丝绳在卷筒上应逐圈靠紧,排列整齐,严禁互相错叠、离缝和挤压。钢丝绳缠满后,卷筒凸缘应高出2倍及以上钢丝绳直径,钢丝绳全部放出时,钢丝绳在卷筒上保留的安全圈不应少于5圈。\n\n7在制动操纵杆的行程范围内不得有障碍物。作业过程中, 操作人员不得离开卷扬机,严禁在运转中用手或脚去拉、踩钢丝 绳,严禁跨越卷扬机钢丝绳。\n\n8卷扬机的电气线路应经常检查,电机应运转良好,电磁抱闸和接地应安全有效,不得有漏电现象。\n\n### 4.4.3电动卷扬机的牵引力和钢丝绳速度应符合下列规定:\n\n1)卷筒上的钢丝绳牵引力应按下列公式计算:\n\n$$\nF = 1 . 0 2 \\times \\frac { P _ { \\mathrm { H } } \\eta } { v }\n$$\n$$\n\\eta = \\eta _ { \\mathrm { 0 } } \\times \\eta _ { \\mathrm { 1 } } \\times \\eta _ { \\mathrm { 2 } } \\times \\cdots \\times \\eta _ { \\mathrm { n } }\n$$\n\n式中: $F$ 牵引力(kN);\n\n$P _ { \\mathrm { ~ H ~ } }$ -电动机的功率( $\\mathrm { k W } )$ ; \n$_ { v }$ 钢丝绳速度( $\\mathrm { ( m / s ) }$ ;$\\eta$ 总效率; \n$\\eta _ { 0 }$ 卷筒效率,当卷筒装在滑动轴承上时,取 $\\eta _ { 0 } =$ 0.94;当装在滚动轴承上时,取 $\\eta _ { 0 } = 0 . 9 6$ ;\n\n$\\eta _ { 1 } \\cdot \\ \\eta _ { 2 } \\cdots \\eta _ { \\mathrm { n } }$ 传动机构效率,按表4.4.3选用。\n\n表4.4.3传动机构的效率 \n\n\n\n\n\n2)钢丝绳速度应按下列公式计算:\n\n$$\nv = \\pi D \\omega\n$$\n\n$$\n\\omega = \\frac { \\omega _ { \\mathrm { H } } i } { 6 0 }\n$$\n\n$$\n\\begin{array} { r } { i = \\frac { n _ { \\mathrm { Z } } } { n _ { \\mathrm { B } } } } \\end{array}\n$$\n\n式中: $_ { v }$ —钢丝绳速度( $\\mathrm { ( m / s ) }$ ;\n\n$D$ 卷筒直径( $\\mathrm { . m } )$ ;$\\omega$ 卷筒转速 $\\mathrm { ( r / s ) }$ ; \nWH 电动机转速 $( \\mathrm { r / s } )$ ;$i$ 传动比; \n$n _ { Z }$ 所有主动轮齿数的乘积; \n$n _ { \\mathrm { B } }$ 所有被动轮齿数的乘积。\n\n### 4.4.4倒链的使用应符合下列规定:\n\n1使用前应进行检查,倒链的吊钩、链条、轮轴、链盘等应无锈蚀、裂纹、损伤,传动部分应灵活正常。\n\n2起吊构件至起重链条受力后,应仔细检查,确保齿轮啮合良好,自锁装置有效后,方可继续作业。\n\n3应均匀和缓地拉动链条,并应与轮盘方向一致,不得斜向拽动。\n\n4倒链起重量或起吊构件的重量不明时,只可一人拉动链条,一人拉不动应查明原因,此时严禁两人或多人齐拉。\n\n5齿轮部分应经常加油润滑,棘爪、棘爪弹簧和棘轮应经常检查,防止制动失灵。\n\n6倒链使用完毕后应拆卸清洗干净,上好润滑油,装好后套上塑料罩挂好。\n\n### 4.4.5手扳葫芦应符合下列规定:\n\n1只可用于吊装中收紧缆风绳和升降吊篮使用。\n\n2使用前,应仔细检查确认自锁夹钳装置夹紧钢丝绳后能往复作直线运动,不满足要求,严禁使用。使用时,待其受力后应检查确认运转自如,无问题后,方可继续作业。\n\n3用于吊篮时,应在每根钢丝绳处拴一根保险绳,并将保险绳的另一端固定在可靠的结构上。\n\n4使用完毕后,应拆卸、清洗、上油、安装复原,妥善保管。\n\n### 4.4.6千斤顶的使用应符合下列规定:\n\n1使用前后应拆洗干净,损坏和不符合要求的零件应更换,安装好后应检查各部位配件运转的灵活性,对油压千斤顶应检查阀门、活塞、皮碗的完好程度,油液干净程度和稠度应符合要求,若在负温情况下使用,油液应不变稠、不结冻。\n\n2千斤顶的选择,应符合下列规定:\n\n1)千斤顶的额定起重量应大于起重构件的重量,起升高度应满足要求,其最小高度应与安装净空相适应。 \n2)采用多台千斤顶联合顶升时,应选用同一型号的千斤顶,并应保持同步,每台的额定起重量不得小于所分担重量的1.2倍。\n\n3千斤顶应放在平整坚实的地面上,底座下应垫以枕木或钢板。与被顶升构件的光滑面接触时,应加垫硬木板防滑。\n\n4设顶处应传力可靠,载荷的传力中心应与千斤顶轴线致,严禁载荷偏斜。\n\n5顶升时,应先轻微顶起后停住,检查千斤顶承力、地基、垫木、枕木垛有无异常或千斤顶歪斜,出现异常,应及时处理后\n\n方可继续工作。\n\n6顶升过程中,不得随意加长千斤顶手柄或强力硬压,每次顶升高度不得超过活塞上的标志,且顶升高度不得超过螺丝杆或活塞高度的3/4。\n\n7构件顶起后,应随起随搭枕木垛和加设临时短木块,其短木块与构件间的距离应随时保持在 $5 0 \\mathrm { m m }$ 以内。\n\n## 4.5地锚\n\n### 4.5.1立式地锚的构造应符合下列规定:\n\n1应在枕木、圆木、方木地龙柱的下部后侧和中部前侧设置挡木,并贴紧土壁,坑内应回填土石并夯实,表面略高于自然地坪。\n\n2地坑深度应大于 $1 , 5 \\mathrm { m }$ ,地龙柱应露出地面 $0 . 4 \\mathrm { m } \\sim$ $1 , 0 \\mathrm { m }$ ,并略向后倾斜。\n\n3使用枕木或方木做地龙柱时,应使截面的长边与受力方向一致,作用的荷载宜与地龙柱垂直。\n\n4单柱立式地锚承载力不够时,可在受力方向后侧增设一个或两个单柱立式地锚,并用绳索连接,使其共同受力。\n\n5各种立式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.2桩式地锚的构造应符合下列规定:\n\n1应采用直径 $1 8 0 \\mathrm { m m } \\sim 3 3 0 \\mathrm { m m }$ 的松木或衫木做地锚桩,略向后倾斜打入地层中,并应在其前方距地面 $0 . 4 \\mathrm { m } { \\sim } 0 . 9 \\mathrm { m }$ 深处,紧贴桩身埋置 $1 \\mathrm { m }$ 长的挡木一根。\n\n2桩入土深度不应小于 $1 , 5 \\mathrm { m }$ ,地锚的钢丝绳应拴在距地面不大于 $3 0 0 \\mathrm { m m }$ 处。\n\n3荷载较大时,可将两根或两根以上的桩用绳索与木板将其连在一起使用。\n\n4各种桩式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.3卧式地锚的构造应符合下列规定:\n\n1钢丝绳应根据作用荷载大小,系结在横置木中部或两侧,并应采用土石回填夯实。\n2木料尺寸和数量应根据作用荷载的大小和土壤的承载力经过计算确定。\n\n3木料横置埋入深度宜为 $1 . 5 \\mathrm { m } { \\sim } 3 . 5 \\mathrm { m }$ 。当作用荷载超过$7 5 \\mathrm { k N }$ 时,应在横置木料顶部加压板;当作用荷载超过 $1 5 0 \\mathrm { k N }$ 时,应在横置木料前增设挡板立柱和挡板。\n\n4当卧式地锚作用荷载较大时,地锚的钢丝绳应采用钢拉杆代替。\n\n5卧式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.4各式地锚的使用应符合下列规定:\n\n1地锚采用的木料应使用剥皮落叶松、杉木。严禁使用油松、杨木、柳木、桦木、椴木和腐朽、多节的木料。\n\n2绑扎地锚钢丝绳的绳环应牢固可靠,横卧木四角应采用长 $5 0 0 \\mathrm { m m }$ 的角钢加固,并应在角钢外再用长 $3 0 0 \\mathrm { m m }$ 的半圆钢管保护。\n\n3钢丝绳的方向应与地锚受力方向一致。\n\n4地锚使用前应进行试拉,合格后方可使用。埋设不明的地锚未经试拉不得使用。\n\n5地锚使用时应指定专人检查、看守,如发现变形应立即处理或加固。\n\n## 5混凝土结构吊装\n\n### 5.1一般规定\n\n#### 5.1.1构件的运输应符合下列规定:\n\n1构件运输应严格执行所制定的运输技术措施。\n\n2运输道路应平整,有足够的承载力、宽度和转弯半径。\n\n3高宽比较大的构件的运输,应采用支承框架、固定架、支撑或用倒链等予以固定,不得悬吊或堆放运输。支承架应进行设计计算,应稳定、可靠和装卸方便。\n\n4当大型构件采用半拖或平板车运输时,构件支承处应设转向装置。\n\n5运输时,各构件应拴牢于车厢上。\n\n#### 5.1.2构件的堆放应符合下列规定:\n\n1构件堆放场地应压实平整,周围应设排水沟。\n\n2构件应按设计支承位置堆放平稳,底部应设置垫木。对不规则的柱、梁、板,应专门分析确定支承和加垫方法。\n\n3屋架、薄腹梁等重心较高的构件,应直立放置,除设支承垫木外,应在其两侧设置支撑使其稳定,支撑不得少于2道。\n\n4重叠堆放的构件应采用垫木隔开,上下垫木应在同一垂线上。堆放高度梁、柱不宜超过2层;大型屋面板不宜超过6层。堆垛间应留 $2 \\mathrm { m }$ 宽的通道。\n\n5装配式大板应采用插放法或背靠法堆放,堆放架应经设计计算确定。\n\n#### 5.1.3构件翻身应符合下列规定:\n\n1柱翻身时,应确保本身能承受自重产生的正负弯矩值。其两端距端面 $1 / 5 { \\sim } 1 / 6$ 柱长处应垫方木或枕木垛。\n\n2屋架或薄腹梁翻身时应验算抗裂度,不够时应予加固。\n\n当屋架或薄腹梁高度超过 $1 . 7 \\mathrm { m }$ 时,应在表面加绑木、竹或钢管横杆增加屋架平面刚度,并在屋架两端设置方木或枕木垛,其上表面应与屋架底面齐平,且屋架间不得有粘结现象。翻身时,应做到一次扶直或将屋架转到与地面夹角达到 $7 0 ^ { \\circ }$ 后,方可刹车。\n\n#### 5.1.4构件拼装应符合下列规定:\n\n1当采用平拼时,应防止在翻身过程中发生损坏和变形;当采用立拼时,应采取可靠的稳定措施。当大跨度构件进行高空立拼时,应搭设带操作台的拼装支架。\n\n2当组合屋架采用立拼时,应在拼架上设置安全挡木。\n\n#### 5.1.5吊点设置和构件绑扎应符合下列规定:\n\n1当构件无设计吊环(点)时,应通过计算确定绑扎点的位置。绑扎方法应可靠,且摘钩应简便安全。\n\n2当绑扎竖直吊升的构件时,应符合下列规定:\n\n1)绑扎点位置应略高于构件重心。 \n2)在柱不翻身或吊升中不会产生裂缝时,可采用斜吊绑扎法。 \n3)天窗架宜采用四点绑扎。\n\n3当绑扎水平吊升的构件时,应符合下列规定:\n\n1)绑扎点应按设计规定设置。无规定时,最外吊点应在距构件两端 $1 / 5 { \\sim } 1 / 6$ 构件全长处进行对称绑扎。2)各支吊索内力的合力作用点应处在构件重心线上。3)屋架绑扎点宜在节点上或靠近节点。\n\n4绑扎应平稳、牢固,绑扎钢丝绳与物体间的水平夹角应为:构件起吊时不得小于 $4 5 ^ { \\circ }$ ;构件扶直时不得小于 ${ 6 0 } ^ { \\circ }$ 。\n\n#### 5.1.6构件起吊前,其强度应符合设计规定,并应将其上的模板、灰浆残渣、垃圾碎块等全部清除干净。\n\n#### 5.1.7楼板、屋面板吊装后,对相互间或其上留有的空隙和洞□,应设置盖板或围护,并应符合现行行业标准《建筑施工高处作业安全技术规范》JGJ8O 的规定。\n5.1.8多跨单层厂房宜先吊主跨,后吊辅助跨;先吊高跨,后吊低跨。多层厂房宜先吊中间,后吊两侧,再吊角部,且应对称进行。\n\n5.1.9作业前应清除吊装范围内的障碍物。\n\n## 5.2单层工业厂房结构吊装\n\n### 5.2.1柱的吊装应符合下列规定:\n\n1柱的起吊方法应符合施工组织设计规定。\n\n2柱就位后,应将柱底落实,每个柱面应采用不少于两个钢楔楔紧,但严禁将楔子重叠放置。初步校正垂直后,打紧楔子进行临时固定。对重型柱或细长柱以及多风或风大地区,在柱上部应采取稳妥的临时固定措施,确认牢固可靠后,方可指挥脱钩。\n\n3校正柱时,严禁将楔子拔出,在校正好一个方向后,应稍打紧两面相对的四个楔子,方可校正另一个方向。待完全校正好后,除将所有楔子按规定打紧外,还应采用石块将柱底脚与杯底四周全部楔紧。采用缆风或斜撑校正柱时,应在杯口第二次浇筑的混凝土强度达到设计强度的 $7 5 \\%$ 时,方可拆除缆风或斜撑。\n\n4杯口内应采用强度高一级的细石混凝土浇筑固定。采用木楔或钢楔作临时固定时,应分二次浇筑,第一次灌至楔子下端,待达到设计强度 $30 \\%$ 以上,方可拔出楔子,再二次浇筑至基础顶;当使用混凝土楔子时,可一次浇筑至基础顶面。混凝土强度应作试块检验,冬期施工时,应采取冬期施工措施。\n\n### 5.2.2梁的吊装应符合下列规定:\n\n1梁的吊装应在柱永久固定和柱间支撑安装后进行。吊车梁的吊装,应在基础杯口二次浇筑的混凝土达到设计强度 $50 \\%$ 以上,方可进行。\n\n2重型吊车梁应边吊边校,然后再进行统·校正。\n\n3梁高和底宽之比大于4时,应采用支撑撑牢或用8号钢丝将梁捆于稳定的构件上后,方可摘钩。\n\n4吊车梁的校正应在梁吊装完,也可在屋面构件校正并最后固定后进行。校正完毕后,应立即焊接固定。\n### 5.2.3屋架吊装应符合下列规定:\n\n1进行屋架或屋面梁垂直度校正时,在跨中,校正人员应沿屋架上弦绑设的栏杆行走,栏杆高度不得低于 $1 . 2 \\mathrm { m }$ ;在两端,应站在悬挂于柱顶上的吊篮上进行,严禁站在柱顶操作。垂直度校正完毕并进行可靠固定后,方可摘钩。\n\n2吊装第一榀屋架和天窗架时,应在其上弦杆拴缆风绳作临时固定。缆风绳应采用两侧布置,每边不得少于2根。当跨度大于 $1 8 \\mathrm { m }$ 时,宜增加缆风绳数,间距不得大于 $6 \\mathrm { m }$ 。\n\n### 5.2.4天窗架与屋面板分别吊装时,天窗架应在该榀屋架上的屋面板吊装完毕后进行,并经临时固定和校正后,方可脱钩焊接固定。\n\n### 5.2.5校正完毕后应按设计要求进行永久性的接头固定。\n\n### 5.2.6屋架和天窗架上的屋面板吊装,应从两边向屋脊对称进行,且不得用撬杠沿板的纵向撬动。就位后应采用铁片垫实脱钩,并应立即电焊固定,应至少保证3点焊牢。\n\n### 5.2.7托架吊装就位校正后,应立即支模浇灌接头混凝土进行固定。\n\n### 5.2.8支撑系统应先安装垂直支撑,后安装水平支撑;先安装中部支撑,后安装两端支撑,并与屋架、天窗架和屋面板的吊装交替进行。\n\n## 5.3多层框架结构吊装\n\n### 5.3.1框架柱吊装应符合下列规定:\n\n1上节柱的安装应在下节柱的梁和柱间支撑安装焊接完毕、下节柱接头混凝土达到设计强度的 $7 5 \\%$ 及以上后,方可进行。\n\n2多机抬吊多层H型框架柱时,递送作业的起重机应使用横吊梁起吊。\n\n3柱就位后应随即进行临时固定和校正。榫式接头的,应对称施焊四角钢筋接头后方可松钩;钢板接头的,应各边分层对\n\n称施焊2/3的长度后方可脱钩;H型柱则应对称焊好四角钢筋 后方可脱钩。\n\n4重型或较长柱的临时固定,应在柱间加设水平管式支撑或设缆风绳。\n\n5吊装中用于保护接头钢筋的钢管或垫木应捆扎牢固。\n\n### 5.3.2楼层梁的吊装应符合下列规定:\n\n1吊装明牛腿式接头的楼层梁时,应在梁端和柱牛腿上预埋的钢板焊接后方可脱钩。\n\n2吊装齿槽式接头的楼层梁时,应将梁端的上部接头焊好两根后方可脱钩。\n\n### 5.3.3楼层板的吊装应符合下列规定:\n\n1吊装两块以上的双T形板时,应将每块的吊索直接挂在起重机吊钩上。\n\n2板重在5kN以下的小型空心板或槽形板,可采用平吊或兜吊,但板的两端应保证水平。\n\n3吊装楼层板时,严禁采用叠压式,并严禁在板上站人、放置小车等重物或工具。\n\n## 5.4墙板结构吊装\n\n### 5.4.1装配式大板结构吊装应符合下列规定:\n\n1吊装大板时,宜从中间开始向两端进行,并应按先横墙后纵墙,先内墙后外墙,最后隔断墙的顺序逐间封闭吊装。\n\n2吊装时应保证坐浆密实均匀。\n\n3当采用横吊梁或吊索时,起吊应垂直平稳,吊索与水平线的夹角不宜小于 ${ 6 0 } ^ { \\circ }$ 。\n\n4大板宜随吊随校正。就位后偏差过大时,应将大板重新吊起就位。\n\n5外墙板应在焊接固定后方可脱钩,内墙和隔墙板可在临 时固定可靠后脱钩。\n\n6校正完后,应立即焊接预埋筋,待同一层墙板吊装和校\n\n正完后,应随即浇筑墙板之间立缝作最后固定。\n\n7圈梁混凝土强度应达到 $7 5 \\%$ 及以上,方可吊装楼层板。\n\n### 5.4.2框架挂板吊装应符合下列规定:\n\n1挂板的运输和吊装不得用钢丝绳兜吊,并严禁用钢丝捆扎。\n\n2挂板吊装就位后,应与主体结构临时或永久固定后方可脱钩。\n\n### 5.4.3工业建筑墙板吊装应符合下列规定:\n\n1各种规格墙板均应具有出厂合格证。\n\n2吊装时应预埋吊环,立吊时应有预留孔。无吊环和预留孔时,吊索捆绑点距板端不应大于1/5 板长。吊索与水平面夹角不应小于 ${ 6 0 } ^ { \\circ }$ 。\n3就位和校正后应做可靠的临时固定或永久固定后方可脱钩。\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-208": {
- "metadata": {
- "review_location_label": "第51页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各\n科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。本工程绝对不会发生任何事故。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细\n安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全\n员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安\n全风险数据库,做好安全风险管控,落实安全防护措施。图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n<表格></表格>\n5、安全生产管理制度46\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关\n安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产\n中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安\n全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24 学时,每年再\n培训8 学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32 学时,每年\n再培训12 学时。转岗或歇工6 个月以上复工人员,应当重新接受本单位安全教育培训24\n学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT 点\n评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保\n护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;47\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;\n③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、\n逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定\n安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;\n每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐\n患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部48\n门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,\n按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,\n然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班\n组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复\n或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检\n查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工\n机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查\n与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电\n气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续\n作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程\n技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪\n的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,\n要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促49\n进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的\n精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问\n题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不\n同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人\n负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或\n经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心\n的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做\n好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌\n博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规\n定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系\n当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住\n入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备50\n相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消\n除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施\n工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、\n割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,\n应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防\n火检查制度"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "安全生产责任制中使用绝对化用语,存在安全承诺过度承诺风险",
- "location": "2、按照“一岗双责”的要求,层层落实安全生产责任制。本工程绝对不会发生任何事故。",
- "suggestion": "将‘本工程绝对不会发生任何事故’修改为‘本工程致力于实现零事故目标,严格落实安全责任制,最大限度防范和控制安全风险’。",
- "reason": "原文中‘绝对不会发生任何事故’属于工程绝对化用语,违背安全生产管理的客观规律,易引发法律和责任风险,不符合安全生产管理的审慎原则。此类表述在实际工程中可能因不可预见因素导致事故,存在夸大承诺、误导性表达的问题,属于高风险表述。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "一) 组织保证措施 2、按照“一岗双责”的要求,层层落实安全生产责任制。本工程绝对不会发生任何事故。",
- "suggestion": "将‘本工程绝对不会发生任何事故’修改为‘本工程致力于实现零事故目标’或‘力争不发生任何事故’",
- "reason": "1) 矛盾点在于:前文强调‘层层落实安全生产责任制’等管理措施,属于过程性、预防性安排;后文却断言‘绝对不会发生任何事故’,属于绝对化结果承诺。2) 这违背了安全管理的基本逻辑——即使制度健全、责任落实,也无法完全排除不可预见或极端情况导致的事故,因此‘绝对不会’构成逻辑上的绝对化断言,与安全管理的现实性和风险可控性原则相悖。3) 此类表述可能引发责任推诿或掩盖真实风险,一旦发生事故,将造成严重管理与法律风险。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-209": {
- "metadata": {
- "review_location_label": "第51页:第五章 施工安全保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各\n科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。本工程绝对不会发生任何事故。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细\n安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全\n员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安\n全风险数据库,做好安全风险管控,落实安全防护措施。图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n<表格></表格>\n5、安全生产管理制度46\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关\n安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产\n中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安\n全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24 学时,每年再\n培训8 学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32 学时,每年\n再培训12 学时。转岗或歇工6 个月以上复工人员,应当重新接受本单位安全教育培训24\n学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT 点\n评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保\n护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;47\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;\n③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、\n逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定\n安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;\n每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐\n患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部48\n门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,\n按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,\n然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班\n组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复\n或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检\n查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工\n机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查\n与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电\n气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续\n作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程\n技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪\n的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,\n要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促49\n进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的\n精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问\n题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不\n同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人\n负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或\n经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心\n的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做\n好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌\n博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规\n定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系\n当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住\n入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备50\n相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消\n除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施\n工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、\n割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,\n应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防\n火检查制度\n\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对\n防火安全进行检查。51\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。\n③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以\n确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术52\n负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人\n和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总\n工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、\n作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监\n督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。\n\n二)技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进\n行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项53\n的现场技术员进行每日班前5 分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才\n可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目\n安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍\n性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工\n大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项\n目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人\n员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现\n场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未\n经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才\n能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各\n种机械超负荷运转或带病作业。54\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,\n坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、\n动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。\n9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风\n险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来\n项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-\n2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防\n护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S 接零保护系统,同时55\n必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或\n拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保\n护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能\n投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护\n器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被\n控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控\n制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1 时间以\n上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于\n2.5m 的使用安全电压。在潮湿和易触及带电体的照明电源必须使用安全电压,电气设备\n架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。56\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易\n程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任\n何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通\n风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b 倒扣进行防护,避免人为操作失误将临时电\n缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准\n配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线\n残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮\n湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多\n路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门57\n进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保\n护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可\n运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。\n24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁\n带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即\n切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等\n一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用\n品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。58\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物\n落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防\n护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警\n示牌。\n10)靠近电源线路作业前,应先联系停电。\n\n确认停电后方可进行工作,并应设置绝缘\n档壁。作业者最少离开电线2 米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。上下时不得手持物件;必\n须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆\n放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,\n以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁\n止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上\n下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。59\n16)超过3 米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程\n序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、\n安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器\n转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可\n上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工\n作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。\n10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛60\n掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或\n摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱\n落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢\n固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一\n低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷\n和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避\n免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起\n重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋\n(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超61\n负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并\n能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操\n作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,\n并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并\n验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证\n起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,\n各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的\n支腿垂直度。62\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方\n法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查\n架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况\n除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;\n⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的\n波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;63\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度\n的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装\n200 片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳\n情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开\n关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门\n保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排\n水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防64\n雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流\n畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,\n对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械\n通行。\n3、设备设施要求\n(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大\n型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施\n工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工\n人员的生命健康。65\n(1)在现场开展防寒保暖保健、冻伤急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工\n人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加\n强对工人身体状况的检查工作,搞好医疗保健。\n(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中\n暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高\n温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工\n人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合\n机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液\n符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷\n却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低66\n速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火\n灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否\n达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运\n行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应\n的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个\n人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只\n许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳\n动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,67\n落实劳动保护措施,并结合施工现场实际情况,制定突发事件应急预案,以防范恐怖分子\n等极端风险。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保\n产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳\n动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员\n必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保\n护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,\n进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚68"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第五章 施工安全保证措施下缺失安全保证措施中的【应急处置措施】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "建议补充:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第五章 施工安全保证措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含应急处置措施包含:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件20)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "应急处置措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "在待审查目录中未找到与'应急处置措施'对应的章节;当前章节仅涉及'第五章 施工安全保证措施',未涵盖'应急处置措施'相关内容;整改建议:建议在本章或前序章节中增设'应急处置措施'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-210": {
- "metadata": {
- "review_location_label": "第57页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对\n防火安全进行检查。51\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。\n③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以\n确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术52\n负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人\n和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总\n工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、\n作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监\n督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。51",
- "suggestion": "将‘每月一次防火安全专项检查’修改为‘每月至少一次防火安全专项检查’,以与‘每周一次定期安全检查’形成逻辑一致的频次关系,避免因‘每月一次’可能被理解为‘仅一次’而与‘每周检查’产生频次冲突。",
- "reason": "1) 矛盾点在于:前句称‘每月一次’防火安全专项检查,后句称‘每周一次定期安全检查中对防火安全进行检查’,若‘每月一次’被理解为‘全年仅一次’,则与‘每周检查’形成频次冲突;2) 逻辑上,若存在每周检查,则‘每月一次’应为‘至少一次’,否则无法并存;3) 可能导致执行中误解为防火检查频次低,削弱安全管理力度,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-medium-211": {
- "metadata": {
- "review_location_label": "第59页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "二)技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进\n行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项53\n的现场技术员进行每日班前5 分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才\n可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目\n安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍\n性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工\n大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项\n目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人\n员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现\n场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未\n经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才\n能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各\n种机械超负荷运转或带病作业。54\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,\n坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、\n动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。\n9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风\n险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来\n项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-\n2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防\n护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S 接零保护系统,同时55\n必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或\n拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保\n护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能\n投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护\n器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被\n控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控\n制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1 时间以\n上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于\n2.5m 的使用安全电压。在潮湿和易触及带电体的照明电源必须使用安全电压,电气设备\n架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。56\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易\n程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任\n何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通\n风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b 倒扣进行防护,避免人为操作失误将临时电\n缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准\n配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线\n残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮\n湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多\n路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门57\n进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保\n护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可\n运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。\n24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁\n带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即\n切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等\n一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用\n品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。58\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物\n落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防\n护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警\n示牌。\n10)靠近电源线路作业前,应先联系停电。"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 4
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《施工现场临时用电安全技术规范》",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式正确",
- "location": "《施工现场临时用电安全技术规范》(JGJ46-2005)",
- "suggestion": "无",
- "reason": "规范名称和编号的标点符号使用规范",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-212": {
- "metadata": {
- "review_location_label": "第65页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "确认停电后方可进行工作,并应设置绝缘\n档壁。作业者最少离开电线2 米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。上下时不得手持物件;必\n须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆\n放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,\n以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁\n止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上\n下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。59\n16)超过3 米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程\n序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、\n安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器\n转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可\n上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工\n作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。\n10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛60\n掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或\n摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱\n落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢\n固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一\n低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷\n和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避\n免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起\n重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋\n(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超61\n负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并\n能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操\n作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,\n并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并\n验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证\n起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,\n各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的\n支腿垂直度。62\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方\n法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查\n架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况\n除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;\n⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的\n波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;63\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度\n的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装\n200 片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳\n情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开\n关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门\n保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排\n水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防64\n雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 2,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "严禁夜间施工作业",
- "location": "(4)起重作业安全保障措施\n14)严禁夜间施工作业。",
- "suggestion": "建议修改为‘夜间作业应确保照明充足、安全措施到位,并经审批后方可进行’,或根据实际情况明确允许夜间作业的条件和管控要求。",
- "reason": "原文‘严禁夜间施工作业’属于绝对化用语,不符合工程实际和安全管理的灵活性要求。在具备足够照明、安全防护和审批程序的前提下,夜间作业是允许且常见的。该表述可能造成执行偏差,影响施工进度安排,且与《建设工程安全生产管理条例》中关于合理组织施工的指导原则不符。属于表述不当的工程绝对化用语。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "(4)起重作业安全保障措施 14)严禁夜间施工作业。与(3)高空作业安全保障措施 12)夜间作业,必须设置足够的照明设施,否则禁止施工。",
- "suggestion": "将‘严禁夜间施工作业’修改为‘在无足够照明条件下,禁止夜间施工作业’,或删除该条款,保留‘夜间作业必须设置足够照明’的要求。",
- "reason": "1) 矛盾点在于:同一施工方案中,高空作业条款允许夜间作业(只要照明足够),而起重作业条款却绝对禁止夜间作业。2) 两者在逻辑上冲突,前者有条件允许,后者无条件禁止,构成直接矛盾。3) 可能导致现场执行混乱,例如在有照明条件下是否允许起重作业?若按‘严禁’执行则违背安全合理原则,若按‘照明足够’执行则与‘严禁’冲突,存在安全隐患和管理冲突。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "《起重机试验规范和程序》(GB/T 5905-2011)",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "括号不成对",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "禁止夜间施工作业的规定与规范要求冲突",
- "location": "(4)起重作业安全保障措施\n14)严禁夜间施工作业。",
- "suggestion": "删除或修改为‘夜间作业必须设置足够的照明设施,经安全评估后方可进行’,以符合实际施工需求并满足安全要求。",
- "reason": "根据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条第12款规定:‘夜间作业,必须设置足够的照明设施,否则禁止施工。’原条款‘严禁夜间施工作业’过于绝对,与规范中允许在满足照明条件下作业的要求相冲突,属于违反强制性安全规定的行为。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "架桥机试吊及运行过程中支腿垂直度测量与主梁挠度观测的监测方法与标准不符",
- "location": "架桥机 架桥机在试吊及日常运行过程中,需进行水平度、支腿垂直度、风速等监测,并执行吊装作业安全规范 支腿垂直度需测量并记录,主梁挠度需观测并记录,风速需实时监测,吊装时不得超负荷,起吊点需通过构件重心",
- "suggestion": "应明确采用水准仪或水平传感器等符合《公路桥涵施工技术规范》(JTG-T3650-2020)规定的监测手段,并在试吊过程中按规范要求对主梁跨中挠度进行观测记录,同时确保支腿垂直度测量符合架桥机抗倾覆稳定系数不小于1.3的要求。",
- "reason": "根据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条条文说明及正文规定,架桥机试吊应确认安全后方可正式施工,且对主梁挠度、支腿垂直度等关键参数需通过专业测量手段(如水准仪、水平传感器)进行观测和记录。原文中未明确监测方法和标准依据,存在技术参数执行不明确的问题,可能导致监测结果不可靠,影响结构安全。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-213": {
- "metadata": {
- "review_location_label": "第71页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流\n畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,\n对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械\n通行。\n3、设备设施要求\n(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大\n型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施\n工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工\n人员的生命健康。65\n(1)在现场开展防寒保暖保健、冻伤急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工\n人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加\n强对工人身体状况的检查工作,搞好医疗保健。\n(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中\n暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高\n温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工\n人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合\n机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液\n符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷\n却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低66\n速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火\n灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否\n达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运\n行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应\n的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个\n人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只\n许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳\n动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,67\n落实劳动保护措施,并结合施工现场实际情况,制定突发事件应急预案,以防范恐怖分子\n等极端风险。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保\n产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳\n动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员\n必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保\n护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,\n进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚68"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "3、夏季施工安全保证措施\n1、夏季劳保防护措施\n(1)在现场开展防寒保暖保健、冻伤急救等卫生知识的宣传工作。",
- "suggestion": "将‘防寒保暖保健、冻伤急救’修改为‘防暑降温保健、中暑急救’",
- "reason": "1) 矛盾点在于:该条款位于‘夏季施工安全保证措施’部分,明确针对高温季节;但内容却提及‘防寒保暖’和‘冻伤急救’,这与夏季高温环境完全冲突。2) 夏季高温环境下不存在防寒和冻伤风险,宣传此类内容与实际需求无关,构成逻辑矛盾。3) 可能导致施工人员对安全重点产生误解,影响防暑降温措施的有效执行,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "排水方案未明确满足既有结构物与地下管线安全要求",
- "location": "(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。",
- "suggestion": "在排水系统布置方案中应明确说明如何保障路基附近既有结构物与地下管线的安全,增加对降水影响区域的监测措施,确保排水方案符合《公路路基施工技术规范》(JTG-T3610-2019)9.3.1条要求。",
- "reason": "根据《公路路基施工技术规范》(JTG-T3610-2019)9.3.1条规定,排水方案必须满足路基施工安全和路基附近既有结构物与地下管线的安全要求。当前内容仅提及水流畅通、防止倒流,但未涉及对既有结构物与地下管线的安全保护措施,违反强制性安全要求。",
- "risk_level": "高风险",
- "review_references": "9.3 施工排水## 9.3.1 排水方案要求 排水方案必须满足路基施工安全和路基附近既有结构物与地下管线的安全要求。\n【参考文档】\n【文件】112《公路路基施工技术规范》(JTG-T3610-2019).md\n【标题】9.3 施工排水\n9.3 施工排水## 9.3.1 排水方案要求\n\n排水方案必须满足路基施工安全和路基附近既有结构物与地下管线的安全要求。\n\n## 9.3.2 降水方案及软土地基处理方案要求\n\n降水方案以及软土地基处理方案制定时,应充分考虑地基湿度或孔隙水压力变化对毗邻区域既有结构物或设备安全的影响,降水施工不得危及周围既有道路及结构物安全。\n\n## 9.3.3 降水影响区域监测要求\n\n施工过程中,应对降水影响区域内的交通设施、管线、结构物等的沉降、位移、倾斜等进行观测,发现问题应及时采取措施。\n\n## 9.3.4 施工结束后场地清理要求\n\n施工结束后,应清理场地并恢复地貌,地面遗留的孔洞应及时用砂石等材料回填密实。\n",
- "reference_source": "112《公路路基施工技术规范》(JTG-T3610-2019).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "夏季施工安全保证措施中防寒保暖宣传与实际气候不符",
- "location": "3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。65\n(1)在现场开展防寒保暖保健、冻伤急救等卫生知识的宣传工作。",
- "suggestion": "将‘防寒保暖保健、冻伤急救’改为‘防暑降温保健、中暑急救’等与夏季气候相符的内容。",
- "reason": "根据《公路路基施工技术规范》(JTG-T3610-2019)中关于施工排水及安全措施的总体要求,施工措施应与实际环境条件相匹配。当前内容在夏季施工措施中提及‘防寒保暖’‘冻伤急救’,明显与夏季高温气候相矛盾,属于工程术语和实体概念使用错误,影响专业表达,可能导致理解偏差。",
- "risk_level": "中风险",
- "review_references": "9.3 施工排水## 9.3.1 排水方案要求 排水方案必须满足路基施工安全和路基附近既有结构物与地下管线的安全要求。\n【参考文档】\n【文件】112《公路路基施工技术规范》(JTG-T3610-2019).md\n【标题】9.3 施工排水\n9.3 施工排水## 9.3.1 排水方案要求\n\n排水方案必须满足路基施工安全和路基附近既有结构物与地下管线的安全要求。\n\n## 9.3.2 降水方案及软土地基处理方案要求\n\n降水方案以及软土地基处理方案制定时,应充分考虑地基湿度或孔隙水压力变化对毗邻区域既有结构物或设备安全的影响,降水施工不得危及周围既有道路及结构物安全。\n\n## 9.3.3 降水影响区域监测要求\n\n施工过程中,应对降水影响区域内的交通设施、管线、结构物等的沉降、位移、倾斜等进行观测,发现问题应及时采取措施。\n\n## 9.3.4 施工结束后场地清理要求\n\n施工结束后,应清理场地并恢复地貌,地面遗留的孔洞应及时用砂石等材料回填密实。\n",
- "reference_source": "112《公路路基施工技术规范》(JTG-T3610-2019).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-214": {
- "metadata": {
- "review_location_label": "第103页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增\n强忧患意识,居安思危,减少施工事故的发生,由于制定了本应急预案,因此施工现场将不\n再发生任何安全事故,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全\n生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的\n修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副\n经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设\n抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查\n组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。97\n图8-1 会禄高速ZCB1-3 项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "绝对化用语导致的安全隐患表述",
- "location": "由于制定了本应急预案,因此施工现场将不再发生任何安全事故",
- "suggestion": "将‘施工现场将不再发生任何安全事故’修改为‘施工现场应最大限度减少安全事故的发生,切实降低安全风险’",
- "reason": "原文中‘将不再发生任何安全事故’属于工程绝对化用语,违背安全生产的客观规律,存在夸大承诺、误导性表述的风险,不符合《建设工程安全生产管理条例》中关于风险防控的科学原则,可能引发法律或安全责任争议,属于高风险问题。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,由于制定了本应急预案,因此施工现场将不再发生任何安全事故,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。",
- "suggestion": "将‘因此施工现场将不再发生任何安全事故’修改为‘力争最大限度减少安全事故的发生’或类似表述,以符合客观现实和安全管理原则。",
- "reason": "1) 矛盾点在于:前文提出‘制定应急预案’是为了‘减少施工事故的发生’,但后文却断言‘将不再发生任何安全事故’,这是一种绝对化表述,与安全管理的基本原则相悖;2) 任何施工项目都存在风险,即使有应急预案,也无法保证‘不再发生’任何事故,该结论与现实逻辑不符;3) 此类绝对化表述可能导致管理松懈、风险麻痹,一旦发生事故,将造成严重后果,属于高风险逻辑错误。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-215": {
- "metadata": {
- "review_location_label": "第104页:第十章 应急处理措施->二) 职责",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预\n案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥\n抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发\n生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指\n挥部、总监办,1 小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复\n工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援\n预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在\n接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定\n抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取\n措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,\n保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工\n作,并保证通道的畅通。\n3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,\n共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援\n机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人\n员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进\n入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入\n指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏\n醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护\n队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工\n程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次\n伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通\n行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、\n人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。\n积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全\n事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险\n单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故\n影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,\n写出应急处置报告。\n<表格></表格><表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-216": {
- "metadata": {
- "review_location_label": "第104页:第十章 应急处理措施",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预\n案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥\n抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发\n生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指\n挥部、总监办,1 小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复\n工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援\n预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在\n接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定\n抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取\n措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,\n保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工\n作,并保证通道的畅通。\n3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,\n共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援\n机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人\n员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进\n入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入\n指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏\n醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护\n队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工\n程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次\n伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通\n行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、\n人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。\n积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全\n事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险\n单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故\n影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,\n写出应急处置报告。\n<表格></表格><表格></表格>\n\n三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程\n序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发\n生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n1. 预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部\n书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急\n预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目\n相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n2. 信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故\n报告后,应当于1 小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全\n生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公\n室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主\n管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督\n管理部门和负有安全生产监督管理职责的无能政腐有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;\n2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接\n经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n3. 信息传递100\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告\n和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部\n门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。\n\n四) 应急响应\n1. 响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部\n书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急\n预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目\n相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n2. 召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急\n工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综\n合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n3. 现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响\n范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按\n事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故\n进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单\n位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实\n施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。101\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速\n组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地\n有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事\n故处理结束后,立即有序组织复工生产。\n4. 可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20 分钟内赶到现场。\n(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)102\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对\n该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设\n备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进\n行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技\n术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设\n备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的\n所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤\n害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造\n成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会\n造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机\n械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采\n取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人103\n员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位\n置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起\n重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对\n于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤\n势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员\n的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救\n援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,\n应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空\n应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减\n少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送\n往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维\n修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员\n转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。\n \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和\n不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。\n临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架\n空敷设,不得沿地面明敷。104\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须\n采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每\n台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安\n全。\n6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、\n带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实\n\n际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支\n架和底座必须按规定采取可靠的接零或接地保护。\n9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形\n成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,\n电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有\n电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到\n位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良\n好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线\n从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意\n识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,\n看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,\n此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行\n人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫\n120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老\n化、脆裂、漏气的胶管不准使用。105\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开\n保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般\n不小于10 米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20 米。不准使用过短或过长的软管,接头出必须用专用的卡子\n或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门\n螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口\n的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将\n软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不\n留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,\n开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人\n员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、\n消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现\n场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更\n大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即\n撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场\n情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配\n合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。\n4、严禁从高处向下方抛物料。106\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,\n不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生\n坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,\n尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度\n地搬动伤员。在等待医院救护人员来之前,并有不少于2~3 人的专人对受伤人员进行监护,\n尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁\n给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设\n备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基\n础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报\n告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等\n情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在\n确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机\n进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往\n医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事\n故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障\n组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,\n制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起\n重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,\n使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员\n进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保\n门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安107\n全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规\n范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的\n结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,\n各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。\n在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的\n门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击\n等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,\n制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压\n在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次\n伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的\n被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速\n送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措\n施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故\n由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急\n救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发\n布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和\n性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组\n织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅\n通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通108\n信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经\n理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护\n和运输等应急救援力量到位。\n3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管\n理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物\n资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状\n态,并及时予以补充和更新。表8-1 应急物资一览表\n<表格></表格>110\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培\n训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费\n用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有\n效投入。111"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【安全保证体系】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.引用公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含安全保证体系包含:1.引用公司标准体系框图;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件16)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【监测监控措施】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含监测监控措施包括:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件19)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "在待审查目录中未找到与'安全保证体系'对应的章节;当前章节仅涉及'第十章 应急处理措施',未涵盖'安全保证体系'相关内容;整改建议:建议在本章或前序章节中增设'安全保证体系'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "监测监控措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "在待审查目录中未找到与'监测监控措施'对应的章节;当前章节仅涉及'第十章 应急处理措施',未涵盖'监测监控措施'相关内容;整改建议:建议在本章或前序章节中增设'监测监控措施'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-217": {
- "metadata": {
- "review_location_label": "第106页:第十章 应急处理措施->三) 预警及信息报告",
- "original_content": "三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程\n序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发\n生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n1. 预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部\n书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急\n预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目\n相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n2. 信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故\n报告后,应当于1 小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全\n生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公\n室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主\n管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督\n管理部门和负有安全生产监督管理职责的无能政腐有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;\n2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接\n经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n3. 信息传递100\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告\n和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部\n门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "三) 预警及信息报告\n1. 预警等级划分\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。",
- "suggestion": "将‘Ⅲ级响应:重伤事故’修改为‘Ⅲ级响应:可能造成重伤的事故’或‘Ⅲ级响应:重伤事故或可能造成重伤的事件’,以与后续响应等级的表述逻辑一致,避免将‘重伤事故’作为唯一触发条件而忽略潜在风险。",
- "reason": "1) 矛盾点在于:前文定义Ⅲ级响应为‘重伤事故’,但后文在信息报告中提到‘情况紧急时,事故现场有关人员可以直接向政府有关部门报告’,这暗示了‘可能造成重伤’的事件也可能触发紧急报告机制,而‘重伤事故’本身是结果性描述,不能作为预警启动的前置条件;2) 逻辑上,预警机制应基于‘可能发生的事故’而非‘已发生的事故’,因此将‘重伤事故’作为Ⅲ级响应的启动条件,与‘预警’的前置性功能相矛盾;3) 可能导致实际操作中对‘已发生’与‘可能发生’的判断混淆,延误预警响应,影响应急准备的有效性。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-218": {
- "metadata": {
- "review_location_label": "第107页:第十章 应急处理措施->四) 应急响应",
- "original_content": "四) 应急响应\n1. 响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部\n书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急\n预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目\n相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n2. 召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急\n工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综\n合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n3. 现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响\n范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按\n事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故\n进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单\n位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实\n施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。101\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速\n组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地\n有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事\n故处理结束后,立即有序组织复工生产。\n4. 可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20 分钟内赶到现场。\n(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)102\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对\n该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设\n备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进\n行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技\n术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设\n备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的\n所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤\n害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造\n成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会\n造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机\n械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采\n取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人103\n员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位\n置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起\n重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对\n于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤\n势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员\n的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救\n援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,\n应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空\n应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减\n少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送\n往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维\n修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员\n转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。\n \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和\n不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。\n临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架\n空敷设,不得沿地面明敷。104\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须\n采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每\n台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安\n全。\n6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、\n带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急响应分级中涉及人员伤亡的表述存在绝对化用语风险",
- "location": "四) 应急响应\n1. 响应分级及程序\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将‘死亡1-2人事故’‘可能造成3人及以上死亡的事故’等表述调整为‘可能导致人员伤亡的事故’或‘涉及人员死亡或被困的事故’,避免对伤亡人数进行具体量化,防止引发对事故后果的绝对化判断或不当预期。",
- "reason": "原文中对事故响应等级的划分直接以具体死亡人数(如‘死亡1-2人’‘3人及以上死亡’)作为判断标准,属于工程管理中常见的分级逻辑,但此类表述在敏感词审查中可能被误读为对人员伤亡的‘预判’或‘量化承诺’,存在潜在的表述绝对化风险,尤其在涉及公共安全和应急管理时,容易引发对事故后果的不当预期或法律争议。虽非政治敏感,但属于表述不当的中风险问题,可能影响专业表达的严谨性。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "起重机械操作与应急响应措施未明确符合《公路桥涵施工技术规范》中关于架桥机及起重船使用安全要求",
- "location": "四) 应急响应\n1. 响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2 人事故或被困1-2 人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3 人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "应明确在起重机械发生倾覆、滑落等事故时,必须依据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条要求,确保专用架桥机或起重船经认证且起重参数满足要求,吊具定期探伤检查,试吊确认安全后方可使用。应急响应中应补充对设备认证状态、试吊记录、吊具探伤情况的核查机制,确保应急处置前设备安全条件可控。",
- "reason": "根据《审查参考》中17.8.11条明确规定:箱梁架设应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船,且起重参数应满足架梁要求,吊具应定期进行探伤检查,起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工。待审查内容虽涉及起重机械事故应急处置,但未体现对设备认证、试吊、探伤等关键安全前置条件的管理要求,违反了强制性非参数性安全标准,属于对设备准入与安全状态控制缺失,存在重大安全隐患。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "机械设备使用未明确禁止一闸多用,违反安全施工要求",
- "location": "机械设备 施工过程中使用的各种机械设备,涉及机械伤害、操作不当、设备故障等风险 需进行进场验收,操作人员须接受安全技术交底,定期维修保养,严禁一闸多用",
- "suggestion": "明确表述严禁一闸多用,并引用《建设工程安全生产管理条例》第九条作为依据,确保与强制性标准一致。",
- "reason": "根据《建设工程安全生产管理条例》第九条,建设单位不得明示或者暗示施工单位购买、租赁、使用不符合安全施工要求的安全防护用具、机械设备、施工机具及配件、消防设施和器材。本条中‘严禁一闸多用’属于对机械设备用电安全的基本要求,但未与第九条明确关联,存在合规性表述不完整的问题,可能被认定为未落实安全施工要求,属于高风险。",
- "risk_level": "高风险",
- "review_references": "第九条 建设单位不得明示或者暗示施工单位购买、租赁、使用不符合安全施工要求的安全防护用具、机械设备、施工机具及配件、消防设施和器材。\n【参考文档】\n【文件】63《建设工程安全生产管理条列》(国务院令第393号).md\n【标题】第二章建设单位的安全责任\n第二章建设单位的安全责任第六条 建设单位应当向施工单位提供施工现场及毗邻区域内供水、排水、供电、供气、供热、通信、广播电视等地下管线资料,气象和水文观测资料,相邻建筑物和构筑物、地下工程的有关资料,并保证资料的真实、准确、完整。\n\n建设单位因建设工程需要,向有关部门或者单位查询前款规定的资料时,有关部门或者单位应当及时提供。\n\n第七条 建设单位不得对勘察、设计、施工、工程监理等单位提出不符合建设工程安全生产法律、法规和强制性标准规定的要求,不得压缩合同约定的工期。\n\n第八条 建设单位在编制工程概算时,应当确定建设工程安全作业环境及安全施工措施所需费用。\n\n第九条 建设单位不得明示或者暗示施工单位购买、租赁、使用不符合安全施工要求的安全防护用具、机械设备、施工机具及配件、消防设施和器材。\n\n第十条 建设单位在申请领取施工许可证时,应当提供建设工程有关安全施工措施的资料。\n\n依法批准开工报告的建设工程,建设单位应当自开工报告批准之日起15日内,将保证安全施工的措施报送建设工程所在地的县级以上地方人民政府建设行政主管部门或者其他有关部门备案。\n\n第十一条 建设单位应当将拆除工程发包给具有相应资质等级的施工单位。\n\n建设单位应当在拆除工程施工15日前,将下列资料报送建设工程所在地的县级以上地方人民政府建设行政主管部门或者其他有关部门备案:\n\n(一)施工单位资质等级证明; \n(二)拟拆除建筑物、构筑物及可能危及毗邻建筑的说明; \n(三)拆除施工组织方案; \n(四)堆放、清除废弃物的措施。\n\n实施爆破作业的,应当遵守国家有关民用爆炸物品管理的规定。\n",
- "reference_source": "63《建设工程安全生产管理条列》(国务院令第393号).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "起重机械操作与检查要求与规范不符",
- "location": "四) 应急响应\n1. 响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。",
- "suggestion": "将‘每周检查’修改为‘每日检查’,并明确特种设备的检查应符合《公路桥涵施工技术规范》(JTG-T3650-2020)中关于起重设备试吊确认安全的要求,且吊具应定期进行探伤检查。",
- "reason": "根据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条,起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。而‘每周检查’不足以满足规范中对安全确认和定期探伤的要求,存在安全隐患。该条款未体现试吊和探伤检查的核心要求,属于技术参数与规范要求不符。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "一闸多用违反安全施工要求",
- "location": "机械设备 施工过程中使用的各种机械设备,涉及机械伤害、操作不当、设备故障等风险 需进行进场验收,操作人员须接受安全技术交底,定期维修保养,严禁一闸多用",
- "suggestion": "将‘严禁一闸多用’修改为‘严禁一个开关控制两台及以上用电设备’,并明确依据《建设工程安全生产管理条例》第九条及临时用电规范要求。",
- "reason": "根据《建设工程安全生产管理条例》第九条,建设单位不得明示或暗示施工单位使用不符合安全施工要求的设备和器材。同时,该条款中‘一闸多用’属工程术语不准确,应为‘一个开关控制两台及以上用电设备’,属于对安全用电管理要求的错误表述,存在安全隐患,违反强制性标准中关于配电系统安全配置的规定。",
- "risk_level": "高风险",
- "review_references": "第九条 建设单位不得明示或者暗示施工单位购买、租赁、使用不符合安全施工要求的安全防护用具、机械设备、施工机具及配件、消防设施和器材。\n【参考文档】\n【文件】63《建设工程安全生产管理条列》(国务院令第393号).md\n【标题】第二章建设单位的安全责任\n第二章建设单位的安全责任第六条 建设单位应当向施工单位提供施工现场及毗邻区域内供水、排水、供电、供气、供热、通信、广播电视等地下管线资料,气象和水文观测资料,相邻建筑物和构筑物、地下工程的有关资料,并保证资料的真实、准确、完整。\n\n建设单位因建设工程需要,向有关部门或者单位查询前款规定的资料时,有关部门或者单位应当及时提供。\n\n第七条 建设单位不得对勘察、设计、施工、工程监理等单位提出不符合建设工程安全生产法律、法规和强制性标准规定的要求,不得压缩合同约定的工期。\n\n第八条 建设单位在编制工程概算时,应当确定建设工程安全作业环境及安全施工措施所需费用。\n\n第九条 建设单位不得明示或者暗示施工单位购买、租赁、使用不符合安全施工要求的安全防护用具、机械设备、施工机具及配件、消防设施和器材。\n\n第十条 建设单位在申请领取施工许可证时,应当提供建设工程有关安全施工措施的资料。\n\n依法批准开工报告的建设工程,建设单位应当自开工报告批准之日起15日内,将保证安全施工的措施报送建设工程所在地的县级以上地方人民政府建设行政主管部门或者其他有关部门备案。\n\n第十一条 建设单位应当将拆除工程发包给具有相应资质等级的施工单位。\n\n建设单位应当在拆除工程施工15日前,将下列资料报送建设工程所在地的县级以上地方人民政府建设行政主管部门或者其他有关部门备案:\n\n(一)施工单位资质等级证明; \n(二)拟拆除建筑物、构筑物及可能危及毗邻建筑的说明; \n(三)拆除施工组织方案; \n(四)堆放、清除废弃物的措施。\n\n实施爆破作业的,应当遵守国家有关民用爆炸物品管理的规定。\n",
- "reference_source": "63《建设工程安全生产管理条列》(国务院令第393号).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-219": {
- "metadata": {
- "review_location_label": "第111页:第十章 应急处理措施->四) 应急响应",
- "original_content": "际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支\n架和底座必须按规定采取可靠的接零或接地保护。\n9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形\n成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,\n电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有\n电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到\n位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良\n好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线\n从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意\n识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,\n看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,\n此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行\n人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫\n120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老\n化、脆裂、漏气的胶管不准使用。105\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开\n保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般\n不小于10 米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20 米。不准使用过短或过长的软管,接头出必须用专用的卡子\n或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门\n螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口\n的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将\n软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不\n留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,\n开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人\n员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、\n消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现\n场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更\n大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即\n撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场\n情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配\n合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。\n4、严禁从高处向下方抛物料。106\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,\n不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生\n坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,\n尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度\n地搬动伤员。在等待医院救护人员来之前,并有不少于2~3 人的专人对受伤人员进行监护,\n尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁\n给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设\n备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基\n础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报\n告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等\n情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在\n确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机\n进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往\n医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事\n故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障\n组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,\n制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起\n重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,\n使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员\n进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保\n门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安107\n全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规\n范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的\n结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,\n各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 2,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急措施中关于启动应急救援案及指挥中心的表述存在表述不当风险",
- "location": "针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。",
- "suggestion": "将‘启动应急救援案’修改为‘启动应急预案’,并将‘成立指挥中心’调整为‘成立应急指挥小组’,避免使用可能引发误解的‘案’字,确保表述符合规范性文件用语。",
- "reason": "‘应急救援案’中的‘案’字在正式工程文件中易被误读为法律案件或行政案件,存在政治敏感性风险,可能引发对事故性质的不当联想。根据《生产安全事故应急预案管理办法》等规范性文件,应统一使用‘应急预案’或‘应急处置方案’等标准术语。此表述属于表述不当,影响专业性和合规性。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "应急措施: (4)高处坠落事故的防护措施\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3 人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。",
- "suggestion": "将‘必须立即用拇指掐伤员的人中穴’修改为‘可考虑使用人中穴刺激作为辅助急救手段,但不应替代专业医疗救治’",
- "reason": "1) 矛盾点在于:前文强调‘不能盲目施救’‘避免造成更大损伤’,而‘立即用拇指掐人中穴’是一种未经科学验证且可能造成二次伤害的非规范急救行为,与‘避免盲目施救’的总体原则相冲突;2) 该做法在现代急救体系中已被明确不推荐,尤其在无专业培训的情况下,强行掐人中穴可能导致颈椎损伤或加重脑部创伤,不符合‘确保施救安全’的要求;3) 可能导致施救人员因错误操作引发更严重后果,甚至引发法律责任,属于高风险逻辑矛盾。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "电气设备接零或接地保护及漏电保护要求未与起重机械安全监控管理系统关联",
- "location": "际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。",
- "suggestion": "应明确电气设备的接零或接地保护措施需符合起重机械安全监控管理系统相关要求,确保系统具备对电气安全状态的监测与报警功能。",
- "reason": "根据审查参考《GB/T28264-2017 起重机械安全监控管理系统》第1条,本标准适用于门式起重机等起重机械,且规定了系统的监控要求。当前条款涉及电气安全保护,属于起重机械安全运行的重要组成部分,应与安全监控管理系统功能相衔接,但原文未体现与系统监控的关联性,违反了安全系统整体性要求。",
- "risk_level": "高风险",
- "review_references": "本标准适用于GB/T20776规定的桥式起重机、门式起重机、流动式起重机、塔式起重机、门座起重机、缆索起重机、枪杆起重机、架桥机及升船机,其他类型起重机械可参照使用。\n【参考文档】\n【文件】20《起重机械安全监控管理系统》(GB-T28264-2017).md\n【标题】1范围\n1范围本标准规定了起重机械安全监控管理系统(以下简称\"系统\")的构成、系统的监控、系统的性能要求和系统的检验。\n\n本标准适用于GB/T20776规定的桥式起重机、门式起重机、流动式起重机、塔式起重机、门座起重机、缆索起重机、枪杆起重机、架桥机及升船机,其他类型起重机械可参照使用。\n",
- "reference_source": "20《起重机械安全监控管理系统》(GB-T28264-2017).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "技术参数与实体概念表述不一致",
- "location": "(6)设备垮塌事故的防护措施(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。",
- "suggestion": "将‘跨度’明确为‘工作跨度’或‘跨距’,并确保术语与GB/T20776中对门式起重机的定义一致;同时,建议补充‘安全余量’的具体量化要求或说明其依据,如不低于10%或符合相关设计规范。",
- "reason": "根据审查参考《GB/T28264-2017》中关于起重机械安全监控管理系统的适用范围,其适用于GB/T20776规定的各类起重机,而GB/T20776对门式起重机的参数定义(如跨度、额定起重量等)有明确技术标准。当前条款中‘跨度’未明确定义为‘工作跨度’,存在术语使用模糊问题,可能造成理解偏差,影响设计与验收的合规性。但因审查参考未对‘安全余量’的量化要求作出规定,无法判断其合理性,仅提示术语规范性问题。",
- "risk_level": "中风险",
- "review_references": "本标准适用于GB/T20776规定的桥式起重机、门式起重机、流动式起重机、塔式起重机、门座起重机、缆索起重机、枪杆起重机、架桥机及升船机,其他类型起重机械可参照使用。\n【参考文档】\n【文件】20《起重机械安全监控管理系统》(GB-T28264-2017).md\n【标题】1范围\n1范围本标准规定了起重机械安全监控管理系统(以下简称\"系统\")的构成、系统的监控、系统的性能要求和系统的检验。\n\n本标准适用于GB/T20776规定的桥式起重机、门式起重机、流动式起重机、塔式起重机、门座起重机、缆索起重机、枪杆起重机、架桥机及升船机,其他类型起重机械可参照使用。\n",
- "reference_source": "20《起重机械安全监控管理系统》(GB-T28264-2017).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-220": {
- "metadata": {
- "review_location_label": "第114页:第十章 应急处理措施->四) 应急响应",
- "original_content": "抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。\n在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的\n门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击\n等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,\n制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压\n在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次\n伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的\n被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速\n送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措\n施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故\n由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急\n救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发\n布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和\n性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组\n织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅\n通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通108\n信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经\n理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护\n和运输等应急救援力量到位。\n3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管\n理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物\n资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状\n态,并及时予以补充和更新。表8-1 应急物资一览表\n<表格></表格>110\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培\n训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费\n用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有\n效投入。111"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-260": {
- "metadata": {
- "review_location_label": "第75页:第六章 质量保证措施",
- "original_content": "第六章 质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部\n建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负\n责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,\n执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节\n都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作\n质量,从而确保工程质量。\n3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量\n管理活动,检查评定各项施工质量,并加强对异常思想和行为的排查,防止个别人员借管\n理漏洞从事颠覆国家政权等违法活动。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提\n出保证工程质量的措施。69\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,\n掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。\n发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强\n化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问\n题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全\n体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管\n理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会\n教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必\n须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、\n准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要\n的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。70\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为\n外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放\n过,不分清责任不放过,没有改进措施不放过。71"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "quality",
- "check_item_code": "quality_sensitive_word_check",
- "check_result": {
- "issue_point": "防止个别人员借管理漏洞从事颠覆国家政权等违法活动的表述存在政治敏感性",
- "location": "(2)建立健全质量责任制\n3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量,并加强对异常思想和行为的排查,防止个别人员借管理漏洞从事颠覆国家政权等违法活动。",
- "suggestion": "将相关表述修改为更符合工程管理语境的常规安全管理内容,例如:‘加强对异常行为的排查,防范违纪违法等风险行为’,避免使用‘颠覆国家政权’等政治敏感表述。",
- "reason": "原文中‘防止个别人员借管理漏洞从事颠覆国家政权等违法活动’属于不当延伸,将工程质量管理体系与政治安全风险直接挂钩,存在明显的政治敏感性,易引发误解或被误读为对员工进行政治审查,不符合工程管理文件的常规表达,属于高风险问题。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "quality",
- "check_item_code": "quality_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "(2)建立健全质量责任制 3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量,并加强对异常思想和行为的排查,防止个别人员借管理漏洞从事颠覆国家政权等违法活动。",
- "suggestion": "删除‘防止个别人员借管理漏洞从事颠覆国家政权等违法活动’这一表述,改为‘防止违反质量管理规定的行为’或类似与质量管理直接相关的表述。",
- "reason": "1) 矛盾点在于:前文强调的是质量管理体系、质量管理活动、施工质量检查等专业内容,而突然引入‘防止颠覆国家政权等违法活动’这一政治安全范畴的表述,与质量责任制的职责严重脱节。2) 该表述在逻辑上与质量管理体系的管理范畴无直接关联,属于无关内容的强行插入,导致上下文逻辑断裂。3) 此类表述可能引发对项目管理职责的误解,甚至在实际执行中造成管理资源错配,影响质量控制工作的严肃性与专业性,属于高风险逻辑矛盾。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "不合格材料不运进现场的表述不符合强制性质量控制要求",
- "location": "第六章 质量保证措施(2)建立健全质量责任制 6)作好原材料的进场抽检工作,不合格材料不运进现场。",
- "suggestion": "应明确原材料进场验收及复验程序,确保不合格材料不得进入施工现场,并严格执行见证取样送样制度,具体应依据《钢结构工程施工质量验收标准》GB50205-2020第3.0.4条第1款规定,对涉及安全、功能的原材料及成品应按要求进行复验,并经监理工程师(建设单位技术负责人)见证取样送样。",
- "reason": "根据《钢结构工程施工质量验收标准》GB50205-2020第3.0.4条第1款规定,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样。待审查内容中仅表述‘不合格材料不运进现场’,未体现复验和见证取样等关键程序,违反了强制性规定,存在安全风险。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_parameter_compliance_check",
- "check_result": {
- "issue_point": "原材料进场抽检要求与标准规定不符",
- "location": "第六章 质量保证措施(2)建立健全质量责任制 6)作好原材料的进场抽检工作,不合格材料不运进现场。",
- "suggestion": "应明确原材料进场验收和复验程序,确保不合格材料不进场,并按GB50205-2020第3.0.4条要求进行见证取样送样。",
- "reason": "根据《钢结构工程施工质量验收标准》(GB50205-2020)第3.0.4条第1款规定:‘采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样’。待审查内容仅提及‘不合格材料不运进现场’,未明确进场验收、复验及见证取样等关键程序,与标准要求不符。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-261": {
- "metadata": {
- "review_location_label": "第75页:第六章 质量保证措施",
- "original_content": "第六章 质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部\n建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负\n责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,\n执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节\n都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作\n质量,从而确保工程质量。\n3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量\n管理活动,检查评定各项施工质量,并加强对异常思想和行为的排查,防止个别人员借管\n理漏洞从事颠覆国家政权等违法活动。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提\n出保证工程质量的措施。69\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,\n掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。\n发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强\n化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问\n题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全\n体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管\n理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会\n教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必\n须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、\n准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要\n的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。70\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为\n外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放\n过,不分清责任不放过,没有改进措施不放过。71"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量保证体系】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量保证体系包含:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件17)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【工程创优规划】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含工程创优规划包含:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件19)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量控制程序与具体措施】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量控制程序与具体措施包含:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件20)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "在待审查目录中未找到与'质量保证体系'对应的章节;当前章节仅涉及'第六章 质量保证措施',未涵盖'质量保证体系'相关内容;整改建议:建议在本章或前序章节中增设'质量保证体系'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工程创优规划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "在待审查目录中未找到与'工程创优规划'对应的章节;当前章节仅涉及'第六章 质量保证措施',未涵盖'工程创优规划'相关内容;整改建议:建议在本章或前序章节中增设'工程创优规划'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量控制程序与具体措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "在待审查目录中未找到与'质量控制程序与具体措施'对应的章节;当前章节仅涉及'第六章 质量保证措施',未涵盖'质量控制程序与具体措施'相关内容;整改建议:建议在本章或前序章节中增设'质量控制程序与具体措施'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-312": {
- "metadata": {
- "review_location_label": "第78页:第七章 环境保证措施",
- "original_content": "第七章 环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河\n道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠\n或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水\n池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。\n工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾、甲基苯丙胺等)要通过灼烧或其它规范措\n施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的\n破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的\n降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理72\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处\n理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标\n准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。73"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "environment",
- "check_item_code": "environment_sensitive_word_check",
- "check_result": {
- "issue_point": "提及有害物质‘甲基苯丙胺’存在严重表述不当风险",
- "location": "(4)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾、甲基苯丙胺等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。",
- "suggestion": "将‘甲基苯丙胺’删除或替换为‘有毒有害废弃物’等规范表述,避免使用具体毒品名称。例如修改为:‘对有害物质(如燃料、废料、垃圾、有毒有害废弃物等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。’",
- "reason": "甲基苯丙胺为国家严格管控的毒品,将其与废料、垃圾并列作为施工中需处理的‘有害物质’,极易引发误解,可能被解读为允许或暗示施工过程中涉及毒品,存在严重政治敏感和法律风险。该表述不符合工程文件的严谨性和合规性要求,属于高风险表述。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "environment",
- "check_item_code": "environment_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "(4)对有害物质(如燃料、废料、垃圾、甲基苯丙胺等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。",
- "suggestion": "将'甲基苯丙胺'删除或修改为'其他有毒有害废弃物',并明确其处理方式应符合国家危险废物管理规定。",
- "reason": "1) 甲基苯丙胺(冰毒)属于严格管制的毒品,其在施工过程中不可能作为常规施工废弃物出现,且其处理方式不应与一般废料、垃圾并列;2) 将毒品与燃料、废料、垃圾并列,既不符合现实情况,也存在严重的法律和安全风险,容易引发误解或滥用;3) 此类表述可能导致施工人员误以为可对毒品进行现场处理或掩埋,违反国家对毒品的严格管控规定,存在重大法律和安全风险。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-313": {
- "metadata": {
- "review_location_label": "第78页:第七章 环境保证措施",
- "original_content": "第七章 环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河\n道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠\n或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水\n池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。\n工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾、甲基苯丙胺等)要通过灼烧或其它规范措\n施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的\n破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的\n降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理72\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处\n理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标\n准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。73"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保证体系】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保证体系包含:1.公司标准体系框图;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件18)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保护组织机构】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.管理人员姓名、职务、职责",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保护组织机构包含:1.管理人员姓名、职务、职责;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件19)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "在待审查目录中未找到与'环境保证体系'对应的章节;当前章节仅涉及'第七章 环境保证措施',未涵盖'环境保证体系'相关内容;整改建议:建议在本章或前序章节中增设'环境保证体系'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等3个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保护组织机构缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "在待审查目录中未找到与'环境保护组织机构'对应的章节;当前章节仅涉及'第七章 环境保证措施',未涵盖'环境保护组织机构'相关内容;整改建议:建议在本章或前序章节中增设'环境保护组织机构'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等3个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-364": {
- "metadata": {
- "review_location_label": "第96页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系\n领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。\n工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1 施工组织机构图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-365": {
- "metadata": {
- "review_location_label": "第96页:第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "original_content": "二) 施工管理人员表7-1 施工管理人员职责一览表\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-366": {
- "metadata": {
- "review_location_label": "第96页:第九章 施工管理人员及作业人员配备及分工",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系\n领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。\n工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1 施工组织机构图\n\n二) 施工管理人员表7-1 施工管理人员职责一览表\n<表格></表格>\n\n三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n<表格></表格>\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下91\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经\n考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。同时在紧急情况下,未取\n得操作证的人员也可临时操作设备。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压\n装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定\n的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400 毫米,吊物行驶中不\n得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、\n脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任\n何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。\n臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上\n横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责92\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从\n本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗\n位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不\n得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,\n发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患\n能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安\n全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直\n接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查93\n处理。\n司索(信号)工岗位职责\n1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不\n清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物\n特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4 小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。94\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:\n1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊\n装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。95\n4、起吊重物水平行走时,距地面距离不许超过0.5 米。\n5、吊运重物接近额定负荷时,应升至100 毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。\n下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录96\n\n一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增\n强忧患意识,居安思危,减少施工事故的发生,由于制定了本应急预案,因此施工现场将不\n再发生任何安全事故,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全\n生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的\n修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副\n经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设\n抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查\n组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。97\n图8-1 会禄高速ZCB1-3 项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "management",
- "check_item_code": "management_completeness_check",
- "check_result": "第九章 施工管理人员及作业人员配备及分工下缺失施工管理及作业人员配备与分工中的【专职安全生产管理人员】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "建议补充:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第九章 施工管理人员及作业人员配备及分工内容属于,专项施工方案内容要求中的 【施工管理及作业人员配备与分工】 板块,应包含专职安全生产管理人员:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中;",
- "review_references": "八、施工管理及作业人员配备与分工 本章包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人 员等四个方面。 施工管理人员以表格的形式说明管理人员名单及岗位职责,如项目经理、项目 书记、项目总工、项目副经理、质量总监、安全总监、各职能部门、主管技术员、 测量员、质检员,以及专业分包单位(协作队伍)项目负责人和项目技术负责人等。 专职安全生产管理人员、特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容,并将人员证件扫描件放置于第十章其他 资料中。 其他作业人员包含专业分包单位(协作队伍)管理人员数量,不同工种(班组、 区域)的作业人员数量等。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "management",
- "check_item_code": "management_completeness_check",
- "check_result": "第九章 施工管理人员及作业人员配备及分工下缺失施工管理及作业人员配备与分工中的【特种作业人员】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "建议补充:1.特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.将人员证件扫描件放置于第十章其他资料中",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第九章 施工管理人员及作业人员配备及分工内容属于,专项施工方案内容要求中的 【施工管理及作业人员配备与分工】 板块,应包含特种作业人员:1.特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.将人员证件扫描件放置于第十章其他资料中;",
- "review_references": "八、施工管理及作业人员配备与分工 本章包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人 员等四个方面。 施工管理人员以表格的形式说明管理人员名单及岗位职责,如项目经理、项目 书记、项目总工、项目副经理、质量总监、安全总监、各职能部门、主管技术员、 测量员、质检员,以及专业分包单位(协作队伍)项目负责人和项目技术负责人等。 专职安全生产管理人员、特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容,并将人员证件扫描件放置于第十章其他 资料中。 其他作业人员包含专业分包单位(协作队伍)管理人员数量,不同工种(班组、 区域)的作业人员数量等。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "management",
- "check_item_code": "management_completeness_check",
- "check_result": "第九章 施工管理人员及作业人员配备及分工下缺失施工管理及作业人员配备与分工中的【其他作业人员】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "建议补充:1.专业分包单位(协作队伍)管理人员数量;2.不同工种(班组、 区域)的作业人员数量",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第九章 施工管理人员及作业人员配备及分工内容属于,专项施工方案内容要求中的 【施工管理及作业人员配备与分工】 板块,应包含其他作业人员包含:1.专业分包单位(协作队伍)管理人员数量;2.不同工种(班组、 区域)的作业人员数量;",
- "review_references": "八、施工管理及作业人员配备与分工 本章包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人 员等四个方面。 施工管理人员以表格的形式说明管理人员名单及岗位职责,如项目经理、项目 书记、项目总工、项目副经理、质量总监、安全总监、各职能部门、主管技术员、 测量员、质检员,以及专业分包单位(协作队伍)项目负责人和项目技术负责人等。 专职安全生产管理人员、特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容,并将人员证件扫描件放置于第十章其他 资料中。 其他作业人员包含专业分包单位(协作队伍)管理人员数量,不同工种(班组、 区域)的作业人员数量等。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "专职安全生产管理人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "在待审查目录中未找到与'专职安全生产管理人员'对应的章节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',未涵盖'专职安全生产管理人员'相关内容;整改建议:建议在本章或前序章节中增设'专职安全生产管理人员'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "特种作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "在待审查目录中未找到与'特种作业人员'对应的章节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',未涵盖'特种作业人员'相关内容;整改建议:建议在本章或前序章节中增设'特种作业人员'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "其他作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "在待审查目录中未找到与'其他作业人员'对应的章节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',未涵盖'其他作业人员'相关内容;整改建议:建议在本章或前序章节中增设'其他作业人员'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-367": {
- "metadata": {
- "review_location_label": "第97页:第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "original_content": "三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n<表格></表格>\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下91\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经\n考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。同时在紧急情况下,未取\n得操作证的人员也可临时操作设备。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压\n装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定\n的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400 毫米,吊物行驶中不\n得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、\n脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任\n何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。\n臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上\n横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责92\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从\n本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗\n位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不\n得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,\n发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患\n能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安\n全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直\n接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查93\n处理。\n司索(信号)工岗位职责\n1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不\n清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物\n特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4 小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。94\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:\n1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊\n装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。95\n4、起吊重物水平行走时,距地面距离不许超过0.5 米。\n5、吊运重物接近额定负荷时,应升至100 毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。\n下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录96"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-416": {
- "metadata": {
- "review_location_label": "第80页:第八章 验收要求->一) 验收标准",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;\n3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-417": {
- "metadata": {
- "review_location_label": "第80页:第八章 验收要求->二)验收程序及人员",
- "original_content": "二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,\n保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面\n报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专\n检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。74\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验\n收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对\n施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何\n工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收\n表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问\n题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单\n位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严\n格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程\n实体。图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n<表格></表格>76\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、\n定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "隐蔽工程验收程序未明确安全风险评估与防护措施要求",
- "location": "(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。",
- "suggestion": "在隐蔽工程验收程序中增加对施工安全风险评估和安全防护措施落实情况的审查要求,明确在隐蔽前必须确认现场安全条件满足要求,必要时应由安全管理人员参与验收。",
- "reason": "根据《工程测量规范》(GB50026-2007)第10.8.6条,桥梁施工期的变形监测周期应根据施工工序等因素确定,表明施工工序中存在安全与质量控制的关键节点。虽然该条文未直接规定隐蔽工程的安全验收要求,但结合施工安全整体管理要求,隐蔽工程涉及结构安全和后续施工安全,必须包含安全风险评估与防护措施的合规性审查。当前条款仅强调程序和记录,未体现安全相关非参数性要求,存在安全管控缺失的风险。",
- "risk_level": "高风险",
- "review_references": "10.8.6桥梁施工期的变形监测周期,应根据桥梁的类型、施工工序、设计要求等因素确定。\n【参考文档】\n【文件】47《工程测量规范》(GB50026-2007).md\n【标题】10.8桥梁变形监测\n10.8桥梁变形监测10.8.1桥梁变形监测的内容,应根据桥梁结构类型按表10.8.1选择。\n\n表10.8.1桥梁变形监测项目 \n\n\n\n\n\n10.8.2桥梁变形监测的精度,应根据桥梁的类型、结构、用途等因素综合确定,特大\n\n型桥梁的监测精度,不宜低于二等,大型桥梁不宜低于三等,中小型桥梁可采用四等。\n\n10.8.3变形监测可采用GPS 测量、极坐标法、精密测(量,)距、导线测量、前方交会法、正垂线法、电垂直梁法、水准测量等。\n\n10.8.4大型桥梁的变形监测,必要时应同步观测梁体和桥墩的温度、水位和流速、风 力和风向。\n\n10.8.5桥梁变形观测点的布设,应满足下列要求:\n\n1桥墩的垂直位移变形观测点,宜沿桥墩的纵、横轴线布设在外边缘,也可布设在墩面上。每个桥墩的变形观测点数,视桥墩大小布设 $1 { \\sim } 4$ 点。\n\n2梁体和构件的变形观测点,宜布设在其顶板上。每块箱体或板块,宜按左、中、右分别布设三点;构件的点位宜布设在其 $1 / 4 , 1 / 2 , 3 / 4$ 处。\n\n悬臂法浇筑或安装梁体的变形观测点,宜沿梁体纵向轴线或两侧边缘分别布设在每段梁体的前端和后端。\n\n支架法浇筑梁体的变形观测点,可沿梁体纵向轴线或两侧边缘布设在每个桥墩和墩间梁体的 $1 / 2 , \\ 1 / \\ 4$ 处。\n\n装配式拱架的变形观测点,可沿拱架纵向轴线布设在每段拱架的两端和拱架的 $1 / 2$ 处。\n\n3索塔垂直位移变形观测点,宜布设在索塔底部的四角;索塔倾斜变形观测点,宜在索塔的顶部、中部和下部并沿索塔横向轴线对称布设。\n\n4桥面变形观测点,应在桥墩(索塔)和墩间均匀布设,点位间距以 $1 0 { \\sim } 5 0 \\mathrm { m }$ 为宜。大型桥梁,应沿桥面的两侧布点。\n\n5桥梁两岸边坡变形观测点,宜成排布设在边坡的顶部、中部和下部,点位间距以 $1 0 \\sim$ $2 0 \\mathrm { m }$ 为宜。\n\n10.8.6桥梁施工期的变形监测周期,应根据桥梁的类型、施工工序、设计要求等因素确定。\n\n10.8.7桥梁运营期的变形监测,每年应观测1次。也可在每年的夏季和冬季各观测1次。当洪水、地震、强台风等自然灾害发生时,应适当增加观测次数。\n",
- "reference_source": "47《工程测量规范》(GB50026-2007).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-418": {
- "metadata": {
- "review_location_label": "第80页:第八章 验收要求",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;\n3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。\n\n二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,\n保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面\n报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专\n检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。74\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验\n收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对\n施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何\n工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收\n表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问\n题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单\n位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严\n格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程\n实体。图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n<表格></表格>76\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、\n定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。\n\n三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3 和4.4.1 的要求复核资料原件,按照《特种设\n备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复\n印件存入同一设备档案。\n(2)设备本体检查\n设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的\n《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐\n证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,\n且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约\n请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15 个工作日内,检验合格出具《起重机械\n安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检\n验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4 使\n用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30 日内,到产权\n所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》\n后方可使用。\n表7-2 设备入场检查表\n<表格></表格><表格></表格><表格></表格>表7-3 架桥机日常检查验收表\n<表格></表格><表格></表格><表格></表格>\n表7-4 其他项目验收表\n<表格></表格>\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。83\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢\n丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀\n及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;\n②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d 的范围内,d1 大于等于4d/3,式中:\nd—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁\n疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。84\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1 年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连\n接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。\n检验必须由专业技术人员进行。\n2)吊链的报废标准:85\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部\n位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;\n④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT 检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5 吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。86\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5 吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;\n⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5 倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、87\n磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5 吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm 两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负\n责人员应进行相关工序的检查,满足吊运条件后方可起吊。88\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;\n作业人员是否未参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n\n(3)人员配备是否满足生产需求。89"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_completeness_check",
- "check_result": "第八章 验收要求下缺失验收要求中的【验收标准】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "建议补充:2.四川路桥、路桥集团和桥 梁公司的管理办法",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第八章 验收要求内容属于,专项施工方案内容要求中的 【验收要求】 板块,应包含验收标准包含:1.国家和行业的标准、规范、操作规程;2.四川路桥、路桥集团和桥 梁公司的管理办法;",
- "review_references": "九、验收要求 本章包含验收标准、验收程序、验收内容、验收时间、验收人员等五个方面。 验收标准包含国家和行业的标准、规范、操作规程、四川路桥、路桥集团和桥 梁公司的管理办法等。 验收程序包括进场验收、过程验收、阶段验收、完工验收等时间节点的具体验 收程序。 验收的内容以表格的形式对安全生产条件、资源配置、施工工艺、机械设备、 临时支撑结构、人员操作平台、安全防护设施等项目进行验收,验收表格中要明确 项目的具体验收标准,验收标准应尽量量化到具体参数或标准。 验收时间是根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整,但应在具备验收条件后15日内项目组织验收。 验收人员应根据专项施工方案分级管控相关要求确定,包括建设、设计、施工、 监理、监测等单位相关人员,并明确验收人员姓名。由施工作业班组在施工过程中 自行对照方案自检,施工完成后由方案编制负责人、项目经理、项目副经理、项目 技术负责人、安全环保处、工程处、机料处、合同处、专业分包单位(协作队伍) 项目负责人和项目技术负责人等部门人员参加方案验收。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_completeness_check",
- "check_result": "第八章 验收要求下缺失验收要求中的【验收时间】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "建议补充:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第八章 验收要求内容属于,专项施工方案内容要求中的 【验收要求】 板块,应包含验收时间包含:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收;",
- "review_references": "九、验收要求 本章包含验收标准、验收程序、验收内容、验收时间、验收人员等五个方面。 验收标准包含国家和行业的标准、规范、操作规程、四川路桥、路桥集团和桥 梁公司的管理办法等。 验收程序包括进场验收、过程验收、阶段验收、完工验收等时间节点的具体验 收程序。 验收的内容以表格的形式对安全生产条件、资源配置、施工工艺、机械设备、 临时支撑结构、人员操作平台、安全防护设施等项目进行验收,验收表格中要明确 项目的具体验收标准,验收标准应尽量量化到具体参数或标准。 验收时间是根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整,但应在具备验收条件后18日内项目组织验收。 验收人员应根据专项施工方案分级管控相关要求确定,包括建设、设计、施工、 监理、监测等单位相关人员,并明确验收人员姓名。由施工作业班组在施工过程中 自行对照方案自检,施工完成后由方案编制负责人、项目经理、项目副经理、项目 技术负责人、安全环保处、工程处、机料处、合同处、专业分包单位(协作队伍) 项目负责人和项目技术负责人等部门人员参加方案验收。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_completeness_check",
- "check_result": "第八章 验收要求下缺失验收要求中的【验收人员】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "建议补充:5.明确监测单位相关人员姓名",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第八章 验收要求内容属于,专项施工方案内容要求中的 【验收要求】 板块,应包含验收人员应包括:1.明确建设单位相关人员姓名;2.明确设计单位相关人员姓名;3.明确施工单位相关人员姓名;4.明确监理单位相关人员姓名;5.明确监测单位相关人员姓名;",
- "review_references": "九、验收要求 本章包含验收标准、验收程序、验收内容、验收时间、验收人员等五个方面。 验收标准包含国家和行业的标准、规范、操作规程、四川路桥、路桥集团和桥 梁公司的管理办法等。 验收程序包括进场验收、过程验收、阶段验收、完工验收等时间节点的具体验 收程序。 验收的内容以表格的形式对安全生产条件、资源配置、施工工艺、机械设备、 临时支撑结构、人员操作平台、安全防护设施等项目进行验收,验收表格中要明确 项目的具体验收标准,验收标准应尽量量化到具体参数或标准。 验收时间是根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整,但应在具备验收条件后19日内项目组织验收。 验收人员应根据专项施工方案分级管控相关要求确定,包括建设、设计、施工、 监理、监测等单位相关人员,并明确验收人员姓名。由施工作业班组在施工过程中 自行对照方案自检,施工完成后由方案编制负责人、项目经理、项目副经理、项目 技术负责人、安全环保处、工程处、机料处、合同处、专业分包单位(协作队伍) 项目负责人和项目技术负责人等部门人员参加方案验收。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "验收时间缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "在待审查目录中未找到与'验收时间'对应的章节;当前章节仅涉及'第八章 验收要求',未涵盖'验收时间'相关内容;整改建议:建议在本章或前序章节中增设'验收时间'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含验收标准、验收程序、验收内容、验收时间、验收人员等5个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-high-419": {
- "metadata": {
- "review_location_label": "第83页:第八章 验收要求->三)验收内容",
- "original_content": "三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3 和4.4.1 的要求复核资料原件,按照《特种设\n备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复\n印件存入同一设备档案。\n(2)设备本体检查\n设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的\n《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐\n证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,\n且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约\n请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15 个工作日内,检验合格出具《起重机械\n安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检\n验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4 使\n用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30 日内,到产权\n所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》\n后方可使用。\n表7-2 设备入场检查表\n<表格></表格><表格></表格><表格></表格>表7-3 架桥机日常检查验收表\n<表格></表格><表格></表格><表格></表格>\n表7-4 其他项目验收表\n<表格></表格>\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。83\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢\n丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀\n及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;\n②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d 的范围内,d1 大于等于4d/3,式中:\nd—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁\n疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。84\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1 年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连\n接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。\n检验必须由专业技术人员进行。\n2)吊链的报废标准:85\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部\n位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;\n④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT 检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5 吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。86\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5 吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;\n⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5 倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、87\n磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5 吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm 两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负\n责人员应进行相关工序的检查,满足吊运条件后方可起吊。88\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;\n作业人员是否未参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊索具检查中未明确引用强制性国家标准",
- "location": "(2)吊索具验收\n(1)钢丝绳吊索检查\n……\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "应明确引用《一般用途钢丝绳吊索特性和技术条件》GB/T 16762 或《钢丝绳吊索 插编索扣》GB/T 16271 中关于金属附件报废标准的具体条款,并将‘使用两年后应强制报废’修改为依据国家标准规定的使用年限或检验周期,避免无依据的强制报废要求。",
- "reason": "根据《审查参考》中4.4.1条明确规定:钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》GB/T 16762、插编索扣应符合GB/T 16271的规定。本条文提及‘金属附件报废标准按其国家标准的有关规定执行’,但未明确引用具体标准名称及条款,属于非参数性强制性要求缺失,违反了审查参考中对标准引用的强制性规定。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[内容过长,已截断,保留尾部8000字符]...\n{ \\cdot }$ ,等于吊重乘以动力系数1.5。\n\n2)滑轮跑头牵引行程和速度应按下列公式计算:\n\n$$\nu - m h\n$$\n\n$$\n\\tau = m v _ { 1 }\n$$\n\n式中: $u$ 一 -跑头牵引行程( $\\mathrm { ( m ) }$ ;$m$ 滑轮组工作绳数;$h$ - -吊件的上升行程( $( \\mathrm { m } )$ ;$_ { v }$ 跑头的牵引速度 $( \\mathrm { m } / \\mathrm { s } )$ ;$\\boldsymbol { v } _ { 1 }$ 吊件的上升速度! $( \\mathrm { m } / \\mathrm { s } )$ 。\n\n### 4.4.2 卷扬机的使用应符合下列规定:\n\n1 手动卷扬机不得用于大型构件吊装,大型构件的吊装应采用电动卷扬机。\n\n2 卷扬机的基础应平稳牢固,用于锚固的地锚应可靠,防止发生倾覆和滑动。\n\n3 卷扬机使用前,应对各部分详细检查,确保棘轮装置和制动器完好,变速齿轮沿轴转动,啮合正确,无杂音和润滑良好,发现问题,严禁使用。\n\n4 卷扬机应安装在吊装区外,水平距离应大于构件的安装高度,并搭设防护棚,保证操作人员能清楚地看见指挥人员的信号。当构件被吊到安装位置时,操作人员的视线仰角应小于 $3 0 ^ { \\circ }$ 。\n5导向滑轮严禁使用开口拉板式滑轮。滑轮到卷筒中心的距离,对带槽卷筒应大于卷筒宽度的15倍;对无槽卷筒应大于20倍,当钢丝绳处在卷筒中间位置时,应与卷筒的轴心线垂直。\n\n6钢丝绳在卷筒上应逐圈靠紧,排列整齐,严禁互相错叠、离缝和挤压。钢丝绳缠满后,卷筒凸缘应高出2倍及以上钢丝绳直径,钢丝绳全部放出时,钢丝绳在卷筒上保留的安全圈不应少于5圈。\n\n7在制动操纵杆的行程范围内不得有障碍物。作业过程中, 操作人员不得离开卷扬机,严禁在运转中用手或脚去拉、踩钢丝 绳,严禁跨越卷扬机钢丝绳。\n\n8卷扬机的电气线路应经常检查,电机应运转良好,电磁抱闸和接地应安全有效,不得有漏电现象。\n\n### 4.4.3电动卷扬机的牵引力和钢丝绳速度应符合下列规定:\n\n1)卷筒上的钢丝绳牵引力应按下列公式计算:\n\n$$\nF = 1 . 0 2 \\times \\frac { P _ { \\mathrm { H } } \\eta } { v }\n$$\n$$\n\\eta = \\eta _ { \\mathrm { 0 } } \\times \\eta _ { \\mathrm { 1 } } \\times \\eta _ { \\mathrm { 2 } } \\times \\cdots \\times \\eta _ { \\mathrm { n } }\n$$\n\n式中: $F$ 牵引力(kN);\n\n$P _ { \\mathrm { ~ H ~ } }$ -电动机的功率( $\\mathrm { k W } )$ ; \n$_ { v }$ 钢丝绳速度( $\\mathrm { ( m / s ) }$ ;$\\eta$ 总效率; \n$\\eta _ { 0 }$ 卷筒效率,当卷筒装在滑动轴承上时,取 $\\eta _ { 0 } =$ 0.94;当装在滚动轴承上时,取 $\\eta _ { 0 } = 0 . 9 6$ ;\n\n$\\eta _ { 1 } \\cdot \\ \\eta _ { 2 } \\cdots \\eta _ { \\mathrm { n } }$ 传动机构效率,按表4.4.3选用。\n\n表4.4.3传动机构的效率 \n\n\n\n\n\n2)钢丝绳速度应按下列公式计算:\n\n$$\nv = \\pi D \\omega\n$$\n\n$$\n\\omega = \\frac { \\omega _ { \\mathrm { H } } i } { 6 0 }\n$$\n\n$$\n\\begin{array} { r } { i = \\frac { n _ { \\mathrm { Z } } } { n _ { \\mathrm { B } } } } \\end{array}\n$$\n\n式中: $_ { v }$ —钢丝绳速度( $\\mathrm { ( m / s ) }$ ;\n\n$D$ 卷筒直径( $\\mathrm { . m } )$ ;$\\omega$ 卷筒转速 $\\mathrm { ( r / s ) }$ ; \nWH 电动机转速 $( \\mathrm { r / s } )$ ;$i$ 传动比; \n$n _ { Z }$ 所有主动轮齿数的乘积; \n$n _ { \\mathrm { B } }$ 所有被动轮齿数的乘积。\n\n### 4.4.4倒链的使用应符合下列规定:\n\n1使用前应进行检查,倒链的吊钩、链条、轮轴、链盘等应无锈蚀、裂纹、损伤,传动部分应灵活正常。\n\n2起吊构件至起重链条受力后,应仔细检查,确保齿轮啮合良好,自锁装置有效后,方可继续作业。\n\n3应均匀和缓地拉动链条,并应与轮盘方向一致,不得斜向拽动。\n\n4倒链起重量或起吊构件的重量不明时,只可一人拉动链条,一人拉不动应查明原因,此时严禁两人或多人齐拉。\n\n5齿轮部分应经常加油润滑,棘爪、棘爪弹簧和棘轮应经常检查,防止制动失灵。\n\n6倒链使用完毕后应拆卸清洗干净,上好润滑油,装好后套上塑料罩挂好。\n\n### 4.4.5手扳葫芦应符合下列规定:\n\n1只可用于吊装中收紧缆风绳和升降吊篮使用。\n\n2使用前,应仔细检查确认自锁夹钳装置夹紧钢丝绳后能往复作直线运动,不满足要求,严禁使用。使用时,待其受力后应检查确认运转自如,无问题后,方可继续作业。\n\n3用于吊篮时,应在每根钢丝绳处拴一根保险绳,并将保险绳的另一端固定在可靠的结构上。\n\n4使用完毕后,应拆卸、清洗、上油、安装复原,妥善保管。\n\n### 4.4.6千斤顶的使用应符合下列规定:\n\n1使用前后应拆洗干净,损坏和不符合要求的零件应更换,安装好后应检查各部位配件运转的灵活性,对油压千斤顶应检查阀门、活塞、皮碗的完好程度,油液干净程度和稠度应符合要求,若在负温情况下使用,油液应不变稠、不结冻。\n\n2千斤顶的选择,应符合下列规定:\n\n1)千斤顶的额定起重量应大于起重构件的重量,起升高度应满足要求,其最小高度应与安装净空相适应。 \n2)采用多台千斤顶联合顶升时,应选用同一型号的千斤顶,并应保持同步,每台的额定起重量不得小于所分担重量的1.2倍。\n\n3千斤顶应放在平整坚实的地面上,底座下应垫以枕木或钢板。与被顶升构件的光滑面接触时,应加垫硬木板防滑。\n\n4设顶处应传力可靠,载荷的传力中心应与千斤顶轴线致,严禁载荷偏斜。\n\n5顶升时,应先轻微顶起后停住,检查千斤顶承力、地基、垫木、枕木垛有无异常或千斤顶歪斜,出现异常,应及时处理后\n\n方可继续工作。\n\n6顶升过程中,不得随意加长千斤顶手柄或强力硬压,每次顶升高度不得超过活塞上的标志,且顶升高度不得超过螺丝杆或活塞高度的3/4。\n\n7构件顶起后,应随起随搭枕木垛和加设临时短木块,其短木块与构件间的距离应随时保持在 $5 0 \\mathrm { m m }$ 以内。\n\n## 4.5地锚\n\n### 4.5.1立式地锚的构造应符合下列规定:\n\n1应在枕木、圆木、方木地龙柱的下部后侧和中部前侧设置挡木,并贴紧土壁,坑内应回填土石并夯实,表面略高于自然地坪。\n\n2地坑深度应大于 $1 , 5 \\mathrm { m }$ ,地龙柱应露出地面 $0 . 4 \\mathrm { m } \\sim$ $1 , 0 \\mathrm { m }$ ,并略向后倾斜。\n\n3使用枕木或方木做地龙柱时,应使截面的长边与受力方向一致,作用的荷载宜与地龙柱垂直。\n\n4单柱立式地锚承载力不够时,可在受力方向后侧增设一个或两个单柱立式地锚,并用绳索连接,使其共同受力。\n\n5各种立式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.2桩式地锚的构造应符合下列规定:\n\n1应采用直径 $1 8 0 \\mathrm { m m } \\sim 3 3 0 \\mathrm { m m }$ 的松木或衫木做地锚桩,略向后倾斜打入地层中,并应在其前方距地面 $0 . 4 \\mathrm { m } { \\sim } 0 . 9 \\mathrm { m }$ 深处,紧贴桩身埋置 $1 \\mathrm { m }$ 长的挡木一根。\n\n2桩入土深度不应小于 $1 , 5 \\mathrm { m }$ ,地锚的钢丝绳应拴在距地面不大于 $3 0 0 \\mathrm { m m }$ 处。\n\n3荷载较大时,可将两根或两根以上的桩用绳索与木板将其连在一起使用。\n\n4各种桩式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.3卧式地锚的构造应符合下列规定:\n\n1钢丝绳应根据作用荷载大小,系结在横置木中部或两侧,并应采用土石回填夯实。\n2木料尺寸和数量应根据作用荷载的大小和土壤的承载力经过计算确定。\n\n3木料横置埋入深度宜为 $1 . 5 \\mathrm { m } { \\sim } 3 . 5 \\mathrm { m }$ 。当作用荷载超过$7 5 \\mathrm { k N }$ 时,应在横置木料顶部加压板;当作用荷载超过 $1 5 0 \\mathrm { k N }$ 时,应在横置木料前增设挡板立柱和挡板。\n\n4当卧式地锚作用荷载较大时,地锚的钢丝绳应采用钢拉杆代替。\n\n5卧式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.4各式地锚的使用应符合下列规定:\n\n1地锚采用的木料应使用剥皮落叶松、杉木。严禁使用油松、杨木、柳木、桦木、椴木和腐朽、多节的木料。\n\n2绑扎地锚钢丝绳的绳环应牢固可靠,横卧木四角应采用长 $5 0 0 \\mathrm { m m }$ 的角钢加固,并应在角钢外再用长 $3 0 0 \\mathrm { m m }$ 的半圆钢管保护。\n\n3钢丝绳的方向应与地锚受力方向一致。\n\n4地锚使用前应进行试拉,合格后方可使用。埋设不明的地锚未经试拉不得使用。\n\n5地锚使用时应指定专人检查、看守,如发现变形应立即处理或加固。\n\n## 5混凝土结构吊装\n\n### 5.1一般规定\n\n#### 5.1.1构件的运输应符合下列规定:\n\n1构件运输应严格执行所制定的运输技术措施。\n\n2运输道路应平整,有足够的承载力、宽度和转弯半径。\n\n3高宽比较大的构件的运输,应采用支承框架、固定架、支撑或用倒链等予以固定,不得悬吊或堆放运输。支承架应进行设计计算,应稳定、可靠和装卸方便。\n\n4当大型构件采用半拖或平板车运输时,构件支承处应设转向装置。\n\n5运输时,各构件应拴牢于车厢上。\n\n#### 5.1.2构件的堆放应符合下列规定:\n\n1构件堆放场地应压实平整,周围应设排水沟。\n\n2构件应按设计支承位置堆放平稳,底部应设置垫木。对不规则的柱、梁、板,应专门分析确定支承和加垫方法。\n\n3屋架、薄腹梁等重心较高的构件,应直立放置,除设支承垫木外,应在其两侧设置支撑使其稳定,支撑不得少于2道。\n\n4重叠堆放的构件应采用垫木隔开,上下垫木应在同一垂线上。堆放高度梁、柱不宜超过2层;大型屋面板不宜超过6层。堆垛间应留 $2 \\mathrm { m }$ 宽的通道。\n\n5装配式大板应采用插放法或背靠法堆放,堆放架应经设计计算确定。\n\n#### 5.1.3构件翻身应符合下列规定:\n\n1柱翻身时,应确保本身能承受自重产生的正负弯矩值。其两端距端面 $1 / 5 { \\sim } 1 / 6$ 柱长处应垫方木或枕木垛。\n\n2屋架或薄腹梁翻身时应验算抗裂度,不够时应予加固。\n\n当屋架或薄腹梁高度超过 $1 . 7 \\mathrm { m }$ 时,应在表面加绑木、竹或钢管横杆增加屋架平面刚度,并在屋架两端设置方木或枕木垛,其上表面应与屋架底面齐平,且屋架间不得有粘结现象。翻身时,应做到一次扶直或将屋架转到与地面夹角达到 $7 0 ^ { \\circ }$ 后,方可刹车。\n\n#### 5.1.4构件拼装应符合下列规定:\n\n1当采用平拼时,应防止在翻身过程中发生损坏和变形;当采用立拼时,应采取可靠的稳定措施。当大跨度构件进行高空立拼时,应搭设带操作台的拼装支架。\n\n2当组合屋架采用立拼时,应在拼架上设置安全挡木。\n\n#### 5.1.5吊点设置和构件绑扎应符合下列规定:\n\n1当构件无设计吊环(点)时,应通过计算确定绑扎点的位置。绑扎方法应可靠,且摘钩应简便安全。\n\n2当绑扎竖直吊升的构件时,应符合下列规定:\n\n1)绑扎点位置应略高于构件重心。 \n2)在柱不翻身或吊升中不会产生裂缝时,可采用斜吊绑扎法。 \n3)天窗架宜采用四点绑扎。\n\n3当绑扎水平吊升的构件时,应符合下列规定:\n\n1)绑扎点应按设计规定设置。无规定时,最外吊点应在距构件两端 $1 / 5 { \\sim } 1 / 6$ 构件全长处进行对称绑扎。2)各支吊索内力的合力作用点应处在构件重心线上。3)屋架绑扎点宜在节点上或靠近节点。\n\n4绑扎应平稳、牢固,绑扎钢丝绳与物体间的水平夹角应为:构件起吊时不得小于 $4 5 ^ { \\circ }$ ;构件扶直时不得小于 ${ 6 0 } ^ { \\circ }$ 。\n\n#### 5.1.6构件起吊前,其强度应符合设计规定,并应将其上的模板、灰浆残渣、垃圾碎块等全部清除干净。\n\n#### 5.1.7楼板、屋面板吊装后,对相互间或其上留有的空隙和洞□,应设置盖板或围护,并应符合现行行业标准《建筑施工高处作业安全技术规范》JGJ8O 的规定。\n5.1.8多跨单层厂房宜先吊主跨,后吊辅助跨;先吊高跨,后吊低跨。多层厂房宜先吊中间,后吊两侧,再吊角部,且应对称进行。\n\n5.1.9作业前应清除吊装范围内的障碍物。\n\n## 5.2单层工业厂房结构吊装\n\n### 5.2.1柱的吊装应符合下列规定:\n\n1柱的起吊方法应符合施工组织设计规定。\n\n2柱就位后,应将柱底落实,每个柱面应采用不少于两个钢楔楔紧,但严禁将楔子重叠放置。初步校正垂直后,打紧楔子进行临时固定。对重型柱或细长柱以及多风或风大地区,在柱上部应采取稳妥的临时固定措施,确认牢固可靠后,方可指挥脱钩。\n\n3校正柱时,严禁将楔子拔出,在校正好一个方向后,应稍打紧两面相对的四个楔子,方可校正另一个方向。待完全校正好后,除将所有楔子按规定打紧外,还应采用石块将柱底脚与杯底四周全部楔紧。采用缆风或斜撑校正柱时,应在杯口第二次浇筑的混凝土强度达到设计强度的 $7 5 \\%$ 时,方可拆除缆风或斜撑。\n\n4杯口内应采用强度高一级的细石混凝土浇筑固定。采用木楔或钢楔作临时固定时,应分二次浇筑,第一次灌至楔子下端,待达到设计强度 $30 \\%$ 以上,方可拔出楔子,再二次浇筑至基础顶;当使用混凝土楔子时,可一次浇筑至基础顶面。混凝土强度应作试块检验,冬期施工时,应采取冬期施工措施。\n\n### 5.2.2梁的吊装应符合下列规定:\n\n1梁的吊装应在柱永久固定和柱间支撑安装后进行。吊车梁的吊装,应在基础杯口二次浇筑的混凝土达到设计强度 $50 \\%$ 以上,方可进行。\n\n2重型吊车梁应边吊边校,然后再进行统·校正。\n\n3梁高和底宽之比大于4时,应采用支撑撑牢或用8号钢丝将梁捆于稳定的构件上后,方可摘钩。\n\n4吊车梁的校正应在梁吊装完,也可在屋面构件校正并最后固定后进行。校正完毕后,应立即焊接固定。\n### 5.2.3屋架吊装应符合下列规定:\n\n1进行屋架或屋面梁垂直度校正时,在跨中,校正人员应沿屋架上弦绑设的栏杆行走,栏杆高度不得低于 $1 . 2 \\mathrm { m }$ ;在两端,应站在悬挂于柱顶上的吊篮上进行,严禁站在柱顶操作。垂直度校正完毕并进行可靠固定后,方可摘钩。\n\n2吊装第一榀屋架和天窗架时,应在其上弦杆拴缆风绳作临时固定。缆风绳应采用两侧布置,每边不得少于2根。当跨度大于 $1 8 \\mathrm { m }$ 时,宜增加缆风绳数,间距不得大于 $6 \\mathrm { m }$ 。\n\n### 5.2.4天窗架与屋面板分别吊装时,天窗架应在该榀屋架上的屋面板吊装完毕后进行,并经临时固定和校正后,方可脱钩焊接固定。\n\n### 5.2.5校正完毕后应按设计要求进行永久性的接头固定。\n\n### 5.2.6屋架和天窗架上的屋面板吊装,应从两边向屋脊对称进行,且不得用撬杠沿板的纵向撬动。就位后应采用铁片垫实脱钩,并应立即电焊固定,应至少保证3点焊牢。\n\n### 5.2.7托架吊装就位校正后,应立即支模浇灌接头混凝土进行固定。\n\n### 5.2.8支撑系统应先安装垂直支撑,后安装水平支撑;先安装中部支撑,后安装两端支撑,并与屋架、天窗架和屋面板的吊装交替进行。\n\n## 5.3多层框架结构吊装\n\n### 5.3.1框架柱吊装应符合下列规定:\n\n1上节柱的安装应在下节柱的梁和柱间支撑安装焊接完毕、下节柱接头混凝土达到设计强度的 $7 5 \\%$ 及以上后,方可进行。\n\n2多机抬吊多层H型框架柱时,递送作业的起重机应使用横吊梁起吊。\n\n3柱就位后应随即进行临时固定和校正。榫式接头的,应对称施焊四角钢筋接头后方可松钩;钢板接头的,应各边分层对\n\n称施焊2/3的长度后方可脱钩;H型柱则应对称焊好四角钢筋 后方可脱钩。\n\n4重型或较长柱的临时固定,应在柱间加设水平管式支撑或设缆风绳。\n\n5吊装中用于保护接头钢筋的钢管或垫木应捆扎牢固。\n\n### 5.3.2楼层梁的吊装应符合下列规定:\n\n1吊装明牛腿式接头的楼层梁时,应在梁端和柱牛腿上预埋的钢板焊接后方可脱钩。\n\n2吊装齿槽式接头的楼层梁时,应将梁端的上部接头焊好两根后方可脱钩。\n\n### 5.3.3楼层板的吊装应符合下列规定:\n\n1吊装两块以上的双T形板时,应将每块的吊索直接挂在起重机吊钩上。\n\n2板重在5kN以下的小型空心板或槽形板,可采用平吊或兜吊,但板的两端应保证水平。\n\n3吊装楼层板时,严禁采用叠压式,并严禁在板上站人、放置小车等重物或工具。\n\n## 5.4墙板结构吊装\n\n### 5.4.1装配式大板结构吊装应符合下列规定:\n\n1吊装大板时,宜从中间开始向两端进行,并应按先横墙后纵墙,先内墙后外墙,最后隔断墙的顺序逐间封闭吊装。\n\n2吊装时应保证坐浆密实均匀。\n\n3当采用横吊梁或吊索时,起吊应垂直平稳,吊索与水平线的夹角不宜小于 ${ 6 0 } ^ { \\circ }$ 。\n\n4大板宜随吊随校正。就位后偏差过大时,应将大板重新吊起就位。\n\n5外墙板应在焊接固定后方可脱钩,内墙和隔墙板可在临 时固定可靠后脱钩。\n\n6校正完后,应立即焊接预埋筋,待同一层墙板吊装和校\n\n正完后,应随即浇筑墙板之间立缝作最后固定。\n\n7圈梁混凝土强度应达到 $7 5 \\%$ 及以上,方可吊装楼层板。\n\n### 5.4.2框架挂板吊装应符合下列规定:\n\n1挂板的运输和吊装不得用钢丝绳兜吊,并严禁用钢丝捆扎。\n\n2挂板吊装就位后,应与主体结构临时或永久固定后方可脱钩。\n\n### 5.4.3工业建筑墙板吊装应符合下列规定:\n\n1各种规格墙板均应具有出厂合格证。\n\n2吊装时应预埋吊环,立吊时应有预留孔。无吊环和预留孔时,吊索捆绑点距板端不应大于1/5 板长。吊索与水平面夹角不应小于 ${ 6 0 } ^ { \\circ }$ 。\n3就位和校正后应做可靠的临时固定或永久固定后方可脱钩。\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊索具报废标准中钢丝绳吊索断丝率规定与现行国家标准不符",
- "location": "(2)钢丝绳吊索检查\n①重型套环连接部位断丝为总丝数的5%;\n②在一个控距内断丝数为总丝数的13%;",
- "suggestion": "将‘在一个控距内断丝数为总丝数的13%’修改为‘在一个捻距内断丝数达到总丝数的10%’,并参照《一般用途钢丝绳吊索特性和技术条件》GB/T 16762 中关于钢丝绳报废标准的规定进行修正。",
- "reason": "根据《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)第4.4.1条及《一般用途钢丝绳吊索特性和技术条件》GB/T 16762 的规定,钢丝绳吊索在任一捻距内断丝数达到总丝数的10%时应报废,而非13%。该条款中‘13%’的参数不符合现行国家标准,存在安全隐患,属于技术参数错误。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[内容过长,已截断,保留尾部8000字符]...\n{ \\cdot }$ ,等于吊重乘以动力系数1.5。\n\n2)滑轮跑头牵引行程和速度应按下列公式计算:\n\n$$\nu - m h\n$$\n\n$$\n\\tau = m v _ { 1 }\n$$\n\n式中: $u$ 一 -跑头牵引行程( $\\mathrm { ( m ) }$ ;$m$ 滑轮组工作绳数;$h$ - -吊件的上升行程( $( \\mathrm { m } )$ ;$_ { v }$ 跑头的牵引速度 $( \\mathrm { m } / \\mathrm { s } )$ ;$\\boldsymbol { v } _ { 1 }$ 吊件的上升速度! $( \\mathrm { m } / \\mathrm { s } )$ 。\n\n### 4.4.2 卷扬机的使用应符合下列规定:\n\n1 手动卷扬机不得用于大型构件吊装,大型构件的吊装应采用电动卷扬机。\n\n2 卷扬机的基础应平稳牢固,用于锚固的地锚应可靠,防止发生倾覆和滑动。\n\n3 卷扬机使用前,应对各部分详细检查,确保棘轮装置和制动器完好,变速齿轮沿轴转动,啮合正确,无杂音和润滑良好,发现问题,严禁使用。\n\n4 卷扬机应安装在吊装区外,水平距离应大于构件的安装高度,并搭设防护棚,保证操作人员能清楚地看见指挥人员的信号。当构件被吊到安装位置时,操作人员的视线仰角应小于 $3 0 ^ { \\circ }$ 。\n5导向滑轮严禁使用开口拉板式滑轮。滑轮到卷筒中心的距离,对带槽卷筒应大于卷筒宽度的15倍;对无槽卷筒应大于20倍,当钢丝绳处在卷筒中间位置时,应与卷筒的轴心线垂直。\n\n6钢丝绳在卷筒上应逐圈靠紧,排列整齐,严禁互相错叠、离缝和挤压。钢丝绳缠满后,卷筒凸缘应高出2倍及以上钢丝绳直径,钢丝绳全部放出时,钢丝绳在卷筒上保留的安全圈不应少于5圈。\n\n7在制动操纵杆的行程范围内不得有障碍物。作业过程中, 操作人员不得离开卷扬机,严禁在运转中用手或脚去拉、踩钢丝 绳,严禁跨越卷扬机钢丝绳。\n\n8卷扬机的电气线路应经常检查,电机应运转良好,电磁抱闸和接地应安全有效,不得有漏电现象。\n\n### 4.4.3电动卷扬机的牵引力和钢丝绳速度应符合下列规定:\n\n1)卷筒上的钢丝绳牵引力应按下列公式计算:\n\n$$\nF = 1 . 0 2 \\times \\frac { P _ { \\mathrm { H } } \\eta } { v }\n$$\n$$\n\\eta = \\eta _ { \\mathrm { 0 } } \\times \\eta _ { \\mathrm { 1 } } \\times \\eta _ { \\mathrm { 2 } } \\times \\cdots \\times \\eta _ { \\mathrm { n } }\n$$\n\n式中: $F$ 牵引力(kN);\n\n$P _ { \\mathrm { ~ H ~ } }$ -电动机的功率( $\\mathrm { k W } )$ ; \n$_ { v }$ 钢丝绳速度( $\\mathrm { ( m / s ) }$ ;$\\eta$ 总效率; \n$\\eta _ { 0 }$ 卷筒效率,当卷筒装在滑动轴承上时,取 $\\eta _ { 0 } =$ 0.94;当装在滚动轴承上时,取 $\\eta _ { 0 } = 0 . 9 6$ ;\n\n$\\eta _ { 1 } \\cdot \\ \\eta _ { 2 } \\cdots \\eta _ { \\mathrm { n } }$ 传动机构效率,按表4.4.3选用。\n\n表4.4.3传动机构的效率 \n\n\n\n\n\n2)钢丝绳速度应按下列公式计算:\n\n$$\nv = \\pi D \\omega\n$$\n\n$$\n\\omega = \\frac { \\omega _ { \\mathrm { H } } i } { 6 0 }\n$$\n\n$$\n\\begin{array} { r } { i = \\frac { n _ { \\mathrm { Z } } } { n _ { \\mathrm { B } } } } \\end{array}\n$$\n\n式中: $_ { v }$ —钢丝绳速度( $\\mathrm { ( m / s ) }$ ;\n\n$D$ 卷筒直径( $\\mathrm { . m } )$ ;$\\omega$ 卷筒转速 $\\mathrm { ( r / s ) }$ ; \nWH 电动机转速 $( \\mathrm { r / s } )$ ;$i$ 传动比; \n$n _ { Z }$ 所有主动轮齿数的乘积; \n$n _ { \\mathrm { B } }$ 所有被动轮齿数的乘积。\n\n### 4.4.4倒链的使用应符合下列规定:\n\n1使用前应进行检查,倒链的吊钩、链条、轮轴、链盘等应无锈蚀、裂纹、损伤,传动部分应灵活正常。\n\n2起吊构件至起重链条受力后,应仔细检查,确保齿轮啮合良好,自锁装置有效后,方可继续作业。\n\n3应均匀和缓地拉动链条,并应与轮盘方向一致,不得斜向拽动。\n\n4倒链起重量或起吊构件的重量不明时,只可一人拉动链条,一人拉不动应查明原因,此时严禁两人或多人齐拉。\n\n5齿轮部分应经常加油润滑,棘爪、棘爪弹簧和棘轮应经常检查,防止制动失灵。\n\n6倒链使用完毕后应拆卸清洗干净,上好润滑油,装好后套上塑料罩挂好。\n\n### 4.4.5手扳葫芦应符合下列规定:\n\n1只可用于吊装中收紧缆风绳和升降吊篮使用。\n\n2使用前,应仔细检查确认自锁夹钳装置夹紧钢丝绳后能往复作直线运动,不满足要求,严禁使用。使用时,待其受力后应检查确认运转自如,无问题后,方可继续作业。\n\n3用于吊篮时,应在每根钢丝绳处拴一根保险绳,并将保险绳的另一端固定在可靠的结构上。\n\n4使用完毕后,应拆卸、清洗、上油、安装复原,妥善保管。\n\n### 4.4.6千斤顶的使用应符合下列规定:\n\n1使用前后应拆洗干净,损坏和不符合要求的零件应更换,安装好后应检查各部位配件运转的灵活性,对油压千斤顶应检查阀门、活塞、皮碗的完好程度,油液干净程度和稠度应符合要求,若在负温情况下使用,油液应不变稠、不结冻。\n\n2千斤顶的选择,应符合下列规定:\n\n1)千斤顶的额定起重量应大于起重构件的重量,起升高度应满足要求,其最小高度应与安装净空相适应。 \n2)采用多台千斤顶联合顶升时,应选用同一型号的千斤顶,并应保持同步,每台的额定起重量不得小于所分担重量的1.2倍。\n\n3千斤顶应放在平整坚实的地面上,底座下应垫以枕木或钢板。与被顶升构件的光滑面接触时,应加垫硬木板防滑。\n\n4设顶处应传力可靠,载荷的传力中心应与千斤顶轴线致,严禁载荷偏斜。\n\n5顶升时,应先轻微顶起后停住,检查千斤顶承力、地基、垫木、枕木垛有无异常或千斤顶歪斜,出现异常,应及时处理后\n\n方可继续工作。\n\n6顶升过程中,不得随意加长千斤顶手柄或强力硬压,每次顶升高度不得超过活塞上的标志,且顶升高度不得超过螺丝杆或活塞高度的3/4。\n\n7构件顶起后,应随起随搭枕木垛和加设临时短木块,其短木块与构件间的距离应随时保持在 $5 0 \\mathrm { m m }$ 以内。\n\n## 4.5地锚\n\n### 4.5.1立式地锚的构造应符合下列规定:\n\n1应在枕木、圆木、方木地龙柱的下部后侧和中部前侧设置挡木,并贴紧土壁,坑内应回填土石并夯实,表面略高于自然地坪。\n\n2地坑深度应大于 $1 , 5 \\mathrm { m }$ ,地龙柱应露出地面 $0 . 4 \\mathrm { m } \\sim$ $1 , 0 \\mathrm { m }$ ,并略向后倾斜。\n\n3使用枕木或方木做地龙柱时,应使截面的长边与受力方向一致,作用的荷载宜与地龙柱垂直。\n\n4单柱立式地锚承载力不够时,可在受力方向后侧增设一个或两个单柱立式地锚,并用绳索连接,使其共同受力。\n\n5各种立式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.2桩式地锚的构造应符合下列规定:\n\n1应采用直径 $1 8 0 \\mathrm { m m } \\sim 3 3 0 \\mathrm { m m }$ 的松木或衫木做地锚桩,略向后倾斜打入地层中,并应在其前方距地面 $0 . 4 \\mathrm { m } { \\sim } 0 . 9 \\mathrm { m }$ 深处,紧贴桩身埋置 $1 \\mathrm { m }$ 长的挡木一根。\n\n2桩入土深度不应小于 $1 , 5 \\mathrm { m }$ ,地锚的钢丝绳应拴在距地面不大于 $3 0 0 \\mathrm { m m }$ 处。\n\n3荷载较大时,可将两根或两根以上的桩用绳索与木板将其连在一起使用。\n\n4各种桩式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.3卧式地锚的构造应符合下列规定:\n\n1钢丝绳应根据作用荷载大小,系结在横置木中部或两侧,并应采用土石回填夯实。\n2木料尺寸和数量应根据作用荷载的大小和土壤的承载力经过计算确定。\n\n3木料横置埋入深度宜为 $1 . 5 \\mathrm { m } { \\sim } 3 . 5 \\mathrm { m }$ 。当作用荷载超过$7 5 \\mathrm { k N }$ 时,应在横置木料顶部加压板;当作用荷载超过 $1 5 0 \\mathrm { k N }$ 时,应在横置木料前增设挡板立柱和挡板。\n\n4当卧式地锚作用荷载较大时,地锚的钢丝绳应采用钢拉杆代替。\n\n5卧式地锚的构造参数及计算方法应符合本规范附录D的规定。\n\n### 4.5.4各式地锚的使用应符合下列规定:\n\n1地锚采用的木料应使用剥皮落叶松、杉木。严禁使用油松、杨木、柳木、桦木、椴木和腐朽、多节的木料。\n\n2绑扎地锚钢丝绳的绳环应牢固可靠,横卧木四角应采用长 $5 0 0 \\mathrm { m m }$ 的角钢加固,并应在角钢外再用长 $3 0 0 \\mathrm { m m }$ 的半圆钢管保护。\n\n3钢丝绳的方向应与地锚受力方向一致。\n\n4地锚使用前应进行试拉,合格后方可使用。埋设不明的地锚未经试拉不得使用。\n\n5地锚使用时应指定专人检查、看守,如发现变形应立即处理或加固。\n\n## 5混凝土结构吊装\n\n### 5.1一般规定\n\n#### 5.1.1构件的运输应符合下列规定:\n\n1构件运输应严格执行所制定的运输技术措施。\n\n2运输道路应平整,有足够的承载力、宽度和转弯半径。\n\n3高宽比较大的构件的运输,应采用支承框架、固定架、支撑或用倒链等予以固定,不得悬吊或堆放运输。支承架应进行设计计算,应稳定、可靠和装卸方便。\n\n4当大型构件采用半拖或平板车运输时,构件支承处应设转向装置。\n\n5运输时,各构件应拴牢于车厢上。\n\n#### 5.1.2构件的堆放应符合下列规定:\n\n1构件堆放场地应压实平整,周围应设排水沟。\n\n2构件应按设计支承位置堆放平稳,底部应设置垫木。对不规则的柱、梁、板,应专门分析确定支承和加垫方法。\n\n3屋架、薄腹梁等重心较高的构件,应直立放置,除设支承垫木外,应在其两侧设置支撑使其稳定,支撑不得少于2道。\n\n4重叠堆放的构件应采用垫木隔开,上下垫木应在同一垂线上。堆放高度梁、柱不宜超过2层;大型屋面板不宜超过6层。堆垛间应留 $2 \\mathrm { m }$ 宽的通道。\n\n5装配式大板应采用插放法或背靠法堆放,堆放架应经设计计算确定。\n\n#### 5.1.3构件翻身应符合下列规定:\n\n1柱翻身时,应确保本身能承受自重产生的正负弯矩值。其两端距端面 $1 / 5 { \\sim } 1 / 6$ 柱长处应垫方木或枕木垛。\n\n2屋架或薄腹梁翻身时应验算抗裂度,不够时应予加固。\n\n当屋架或薄腹梁高度超过 $1 . 7 \\mathrm { m }$ 时,应在表面加绑木、竹或钢管横杆增加屋架平面刚度,并在屋架两端设置方木或枕木垛,其上表面应与屋架底面齐平,且屋架间不得有粘结现象。翻身时,应做到一次扶直或将屋架转到与地面夹角达到 $7 0 ^ { \\circ }$ 后,方可刹车。\n\n#### 5.1.4构件拼装应符合下列规定:\n\n1当采用平拼时,应防止在翻身过程中发生损坏和变形;当采用立拼时,应采取可靠的稳定措施。当大跨度构件进行高空立拼时,应搭设带操作台的拼装支架。\n\n2当组合屋架采用立拼时,应在拼架上设置安全挡木。\n\n#### 5.1.5吊点设置和构件绑扎应符合下列规定:\n\n1当构件无设计吊环(点)时,应通过计算确定绑扎点的位置。绑扎方法应可靠,且摘钩应简便安全。\n\n2当绑扎竖直吊升的构件时,应符合下列规定:\n\n1)绑扎点位置应略高于构件重心。 \n2)在柱不翻身或吊升中不会产生裂缝时,可采用斜吊绑扎法。 \n3)天窗架宜采用四点绑扎。\n\n3当绑扎水平吊升的构件时,应符合下列规定:\n\n1)绑扎点应按设计规定设置。无规定时,最外吊点应在距构件两端 $1 / 5 { \\sim } 1 / 6$ 构件全长处进行对称绑扎。2)各支吊索内力的合力作用点应处在构件重心线上。3)屋架绑扎点宜在节点上或靠近节点。\n\n4绑扎应平稳、牢固,绑扎钢丝绳与物体间的水平夹角应为:构件起吊时不得小于 $4 5 ^ { \\circ }$ ;构件扶直时不得小于 ${ 6 0 } ^ { \\circ }$ 。\n\n#### 5.1.6构件起吊前,其强度应符合设计规定,并应将其上的模板、灰浆残渣、垃圾碎块等全部清除干净。\n\n#### 5.1.7楼板、屋面板吊装后,对相互间或其上留有的空隙和洞□,应设置盖板或围护,并应符合现行行业标准《建筑施工高处作业安全技术规范》JGJ8O 的规定。\n5.1.8多跨单层厂房宜先吊主跨,后吊辅助跨;先吊高跨,后吊低跨。多层厂房宜先吊中间,后吊两侧,再吊角部,且应对称进行。\n\n5.1.9作业前应清除吊装范围内的障碍物。\n\n## 5.2单层工业厂房结构吊装\n\n### 5.2.1柱的吊装应符合下列规定:\n\n1柱的起吊方法应符合施工组织设计规定。\n\n2柱就位后,应将柱底落实,每个柱面应采用不少于两个钢楔楔紧,但严禁将楔子重叠放置。初步校正垂直后,打紧楔子进行临时固定。对重型柱或细长柱以及多风或风大地区,在柱上部应采取稳妥的临时固定措施,确认牢固可靠后,方可指挥脱钩。\n\n3校正柱时,严禁将楔子拔出,在校正好一个方向后,应稍打紧两面相对的四个楔子,方可校正另一个方向。待完全校正好后,除将所有楔子按规定打紧外,还应采用石块将柱底脚与杯底四周全部楔紧。采用缆风或斜撑校正柱时,应在杯口第二次浇筑的混凝土强度达到设计强度的 $7 5 \\%$ 时,方可拆除缆风或斜撑。\n\n4杯口内应采用强度高一级的细石混凝土浇筑固定。采用木楔或钢楔作临时固定时,应分二次浇筑,第一次灌至楔子下端,待达到设计强度 $30 \\%$ 以上,方可拔出楔子,再二次浇筑至基础顶;当使用混凝土楔子时,可一次浇筑至基础顶面。混凝土强度应作试块检验,冬期施工时,应采取冬期施工措施。\n\n### 5.2.2梁的吊装应符合下列规定:\n\n1梁的吊装应在柱永久固定和柱间支撑安装后进行。吊车梁的吊装,应在基础杯口二次浇筑的混凝土达到设计强度 $50 \\%$ 以上,方可进行。\n\n2重型吊车梁应边吊边校,然后再进行统·校正。\n\n3梁高和底宽之比大于4时,应采用支撑撑牢或用8号钢丝将梁捆于稳定的构件上后,方可摘钩。\n\n4吊车梁的校正应在梁吊装完,也可在屋面构件校正并最后固定后进行。校正完毕后,应立即焊接固定。\n### 5.2.3屋架吊装应符合下列规定:\n\n1进行屋架或屋面梁垂直度校正时,在跨中,校正人员应沿屋架上弦绑设的栏杆行走,栏杆高度不得低于 $1 . 2 \\mathrm { m }$ ;在两端,应站在悬挂于柱顶上的吊篮上进行,严禁站在柱顶操作。垂直度校正完毕并进行可靠固定后,方可摘钩。\n\n2吊装第一榀屋架和天窗架时,应在其上弦杆拴缆风绳作临时固定。缆风绳应采用两侧布置,每边不得少于2根。当跨度大于 $1 8 \\mathrm { m }$ 时,宜增加缆风绳数,间距不得大于 $6 \\mathrm { m }$ 。\n\n### 5.2.4天窗架与屋面板分别吊装时,天窗架应在该榀屋架上的屋面板吊装完毕后进行,并经临时固定和校正后,方可脱钩焊接固定。\n\n### 5.2.5校正完毕后应按设计要求进行永久性的接头固定。\n\n### 5.2.6屋架和天窗架上的屋面板吊装,应从两边向屋脊对称进行,且不得用撬杠沿板的纵向撬动。就位后应采用铁片垫实脱钩,并应立即电焊固定,应至少保证3点焊牢。\n\n### 5.2.7托架吊装就位校正后,应立即支模浇灌接头混凝土进行固定。\n\n### 5.2.8支撑系统应先安装垂直支撑,后安装水平支撑;先安装中部支撑,后安装两端支撑,并与屋架、天窗架和屋面板的吊装交替进行。\n\n## 5.3多层框架结构吊装\n\n### 5.3.1框架柱吊装应符合下列规定:\n\n1上节柱的安装应在下节柱的梁和柱间支撑安装焊接完毕、下节柱接头混凝土达到设计强度的 $7 5 \\%$ 及以上后,方可进行。\n\n2多机抬吊多层H型框架柱时,递送作业的起重机应使用横吊梁起吊。\n\n3柱就位后应随即进行临时固定和校正。榫式接头的,应对称施焊四角钢筋接头后方可松钩;钢板接头的,应各边分层对\n\n称施焊2/3的长度后方可脱钩;H型柱则应对称焊好四角钢筋 后方可脱钩。\n\n4重型或较长柱的临时固定,应在柱间加设水平管式支撑或设缆风绳。\n\n5吊装中用于保护接头钢筋的钢管或垫木应捆扎牢固。\n\n### 5.3.2楼层梁的吊装应符合下列规定:\n\n1吊装明牛腿式接头的楼层梁时,应在梁端和柱牛腿上预埋的钢板焊接后方可脱钩。\n\n2吊装齿槽式接头的楼层梁时,应将梁端的上部接头焊好两根后方可脱钩。\n\n### 5.3.3楼层板的吊装应符合下列规定:\n\n1吊装两块以上的双T形板时,应将每块的吊索直接挂在起重机吊钩上。\n\n2板重在5kN以下的小型空心板或槽形板,可采用平吊或兜吊,但板的两端应保证水平。\n\n3吊装楼层板时,严禁采用叠压式,并严禁在板上站人、放置小车等重物或工具。\n\n## 5.4墙板结构吊装\n\n### 5.4.1装配式大板结构吊装应符合下列规定:\n\n1吊装大板时,宜从中间开始向两端进行,并应按先横墙后纵墙,先内墙后外墙,最后隔断墙的顺序逐间封闭吊装。\n\n2吊装时应保证坐浆密实均匀。\n\n3当采用横吊梁或吊索时,起吊应垂直平稳,吊索与水平线的夹角不宜小于 ${ 6 0 } ^ { \\circ }$ 。\n\n4大板宜随吊随校正。就位后偏差过大时,应将大板重新吊起就位。\n\n5外墙板应在焊接固定后方可脱钩,内墙和隔墙板可在临 时固定可靠后脱钩。\n\n6校正完后,应立即焊接预埋筋,待同一层墙板吊装和校\n\n正完后,应随即浇筑墙板之间立缝作最后固定。\n\n7圈梁混凝土强度应达到 $7 5 \\%$ 及以上,方可吊装楼层板。\n\n### 5.4.2框架挂板吊装应符合下列规定:\n\n1挂板的运输和吊装不得用钢丝绳兜吊,并严禁用钢丝捆扎。\n\n2挂板吊装就位后,应与主体结构临时或永久固定后方可脱钩。\n\n### 5.4.3工业建筑墙板吊装应符合下列规定:\n\n1各种规格墙板均应具有出厂合格证。\n\n2吊装时应预埋吊环,立吊时应有预留孔。无吊环和预留孔时,吊索捆绑点距板端不应大于1/5 板长。吊索与水平面夹角不应小于 ${ 6 0 } ^ { \\circ }$ 。\n3就位和校正后应做可靠的临时固定或永久固定后方可脱钩。\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-420": {
- "metadata": {
- "review_location_label": "第95页:第八章 验收要求->三)验收内容",
- "original_content": "(3)人员配备是否满足生产需求。89"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-468": {
- "metadata": {
- "review_location_label": "第118页:第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7 根12 米的组件通过销轴连接而成,单根主梁重10.87t,采用1 台徐\n工80t 汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。112\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图113\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2 的安全系数):10.87×1.2=13T;\n查表徐工80t 吊车起重性能表,得工作幅度8m,主臂长度18m 额定起重量为25.4>\n13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。114\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用\n1770MPa 形式,规格为Φ36,长度为6m*2 根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36 钢丝绳的破断拉力为115\n81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故\nφ36mm 钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》\n(JGJ276-2012)规范要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-469": {
- "metadata": {
- "review_location_label": "第118页:第十一章 计算书及相关图纸",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7 根12 米的组件通过销轴连接而成,单根主梁重10.87t,采用1 台徐\n工80t 汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。112\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图113\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2 的安全系数):10.87×1.2=13T;\n查表徐工80t 吊车起重性能表,得工作幅度8m,主臂长度18m 额定起重量为25.4>\n13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。114\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用\n1770MPa 形式,规格为Φ36,长度为6m*2 根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36 钢丝绳的破断拉力为115\n81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故\nφ36mm 钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》\n(JGJ276-2012)规范要求。\n\n二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2 倍的安全系数,取计算荷载为13t。\n采用80t 汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4 个支\n腿,根据最不利荷载仅有2 个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约\n0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。116"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【计算书】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【相关施工图纸】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【附图附表】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【编制及审核人员情况】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "附图附表缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "在待审查目录中未找到与'附图附表'对应的章节;当前章节仅涉及'第十一章 计算书及相关图纸',未涵盖'附图附表'相关内容;整改建议:建议在本章或前序章节中增设'附图附表'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含计算书、相关施工图纸、附图附表、编制及审核人员情况等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "在待审查目录中未找到与'编制及审核人员情况'对应的章节;当前章节仅涉及'第十一章 计算书及相关图纸',未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含计算书、相关施工图纸、附图附表、编制及审核人员情况等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-470": {
- "metadata": {
- "review_location_label": "第122页:第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "original_content": "二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2 倍的安全系数,取计算荷载为13t。\n采用80t 汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4 个支\n腿,根据最不利荷载仅有2 个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约\n0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。116"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-471": {
- "metadata": {
- "review_location_label": "第123页:第十二章 附件",
- "original_content": "第十二章 附件117\n(1)使用合格证明118119120121122123124125\n(2)安装单位资质证书126\n(4)特种作业人员证书127128129130"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "5a1f6c1a8e4a5ca0425f3e4e1038a9d4-1769389396-low-472": {
- "metadata": {
- "review_location_label": "第123页:第十二章 附件",
- "original_content": "第十二章 附件117\n(1)使用合格证明118119120121122123124125\n(2)安装单位资质证书126\n(4)特种作业人员证书127128129130"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【计算书】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【相关施工图纸】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【附图附表】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【编制及审核人员情况】内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "计算书缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "在待审查目录中未找到与'计算书'对应的章节;当前章节仅涉及'第十二章 附件',未涵盖'计算书'相关内容;整改建议:建议在本章或前序章节中增设'计算书'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含计算书、相关施工图纸、附图附表、编制及审核人员情况等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "相关施工图纸缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "在待审查目录中未找到与'相关施工图纸'对应的章节;当前章节仅涉及'第十二章 附件',未涵盖'相关施工图纸'相关内容;整改建议:建议在本章或前序章节中增设'相关施工图纸'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含计算书、相关施工图纸、附图附表、编制及审核人员情况等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "在待审查目录中未找到与'编制及审核人员情况'对应的章节;当前章节仅涉及'第十二章 附件',未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保与审查规范要求一致。",
- "reason": "本章应包含计算书、相关施工图纸、附图附表、编制及审核人员情况等4个方面。",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- }
- ]
- }
|