| 12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273747576777879808182838485868788899091929394959697989910010110210310410510610710810911011111211311411511611711811912012112212312412512612712812913013113213313413513613713813914014114214314414514614714814915015115215315415515615715815916016116216316416516616716816917017117217317417517617717817918018118218318418518618718818919019119219319419519619719819920020120220320420520620720820921021121221321421521621721821922022122222322422522622722822923023123223323423523623723823924024124224324424524624724824925025125225325425525625725825926026126226326426526626726826927027127227327427527627727827928028128228328428528628728828929029129229329429529629729829930030130230330430530630730830931031131231331431531631731831932032132232332432532632732832933033133233333433533633733833934034134234334434534634734834935035135235335435535635735835936036136236336436536636736836937037137237337437537637737837938038138238338438538638738838939039139239339439539639739839940040140240340440540640740840941041141241341441541641741841942042142242342442542642742842943043143243343443543643743843944044144244344444544644744844945045145245345445545645745845946046146246346446546646746846947047147247347447547647747847948048148248348448548648748848949049149249349449549649749849950050150250350450550650750850951051151251351451551651751851952052152252352452552652752852953053153253353453553653753853954054154254354454554654754854955055155255355455555655755855956056156256356456556656756856957057157257357457557657757857958058158258358458558658758858959059159259359459559659759859960060160260360460560660760860961061161261361461561661761861962062162262362462562662762862963063163263363463563663763863964064164264364464564664764864965065165265365465565665765865966066166266366466566666766866967067167267367467567667767867968068168268368468568668768868969069169269369469569669769869970070170270370470570670770870971071171271371471571671771871972072172272372472572672772872973073173273373473573673773873974074174274374474574674774874975075175275375475575675775875976076176276376476576676776876977077177277377477577677777877978078178278378478578678778878979079179279379479579679779879980080180280380480580680780880981081181281381481581681781881982082182282382482582682782882983083183283383483583683783883984084184284384484584684784884985085185285385485585685785885986086186286386486586686786886987087187287387487587687787887988088188288388488588688788888989089189289389489589689789889990090190290390490590690790890991091191291391491591691791891992092192292392492592692792892993093193293393493593693793893994094194294394494594694794894995095195295395495595695795895996096196296396496596696796896997097197297397497597697797897998098198298398498598698798898999099199299399499599699799899910001001100210031004100510061007100810091010101110121013101410151016101710181019102010211022102310241025102610271028102910301031103210331034103510361037103810391040104110421043104410451046104710481049105010511052105310541055105610571058105910601061106210631064106510661067106810691070107110721073107410751076107710781079108010811082108310841085108610871088108910901091109210931094109510961097109810991100110111021103110411051106110711081109111011111112111311141115111611171118111911201121112211231124112511261127112811291130113111321133113411351136113711381139114011411142114311441145114611471148114911501151115211531154115511561157115811591160116111621163116411651166116711681169117011711172117311741175117611771178117911801181118211831184118511861187118811891190119111921193119411951196119711981199120012011202120312041205120612071208120912101211121212131214121512161217121812191220122112221223122412251226122712281229123012311232123312341235123612371238123912401241124212431244124512461247124812491250125112521253125412551256125712581259126012611262126312641265126612671268126912701271127212731274127512761277127812791280128112821283128412851286128712881289129012911292129312941295129612971298129913001301130213031304130513061307130813091310131113121313131413151316131713181319132013211322132313241325132613271328132913301331133213331334133513361337133813391340134113421343134413451346134713481349135013511352135313541355135613571358135913601361136213631364136513661367136813691370137113721373137413751376137713781379138013811382138313841385138613871388138913901391139213931394139513961397139813991400140114021403140414051406140714081409141014111412141314141415141614171418141914201421142214231424142514261427142814291430143114321433143414351436143714381439144014411442144314441445144614471448144914501451145214531454145514561457145814591460146114621463146414651466146714681469147014711472147314741475147614771478147914801481148214831484148514861487148814891490149114921493149414951496149714981499150015011502150315041505150615071508150915101511151215131514151515161517151815191520152115221523152415251526152715281529153015311532153315341535153615371538153915401541154215431544154515461547154815491550155115521553155415551556155715581559156015611562156315641565156615671568156915701571157215731574157515761577157815791580158115821583158415851586158715881589159015911592159315941595159615971598159916001601160216031604160516061607160816091610161116121613161416151616161716181619162016211622162316241625162616271628162916301631163216331634163516361637163816391640164116421643164416451646164716481649165016511652165316541655165616571658165916601661166216631664166516661667166816691670167116721673167416751676167716781679168016811682168316841685168616871688168916901691169216931694169516961697169816991700170117021703170417051706170717081709171017111712171317141715171617171718171917201721172217231724172517261727172817291730173117321733173417351736173717381739174017411742174317441745174617471748174917501751175217531754175517561757175817591760176117621763176417651766176717681769177017711772177317741775177617771778177917801781178217831784178517861787178817891790179117921793179417951796179717981799180018011802180318041805180618071808180918101811181218131814181518161817181818191820182118221823182418251826182718281829183018311832183318341835183618371838183918401841184218431844184518461847184818491850185118521853185418551856185718581859186018611862186318641865186618671868186918701871187218731874187518761877187818791880188118821883188418851886188718881889189018911892189318941895189618971898189919001901190219031904190519061907190819091910191119121913191419151916191719181919192019211922192319241925192619271928192919301931193219331934193519361937193819391940194119421943194419451946194719481949195019511952195319541955195619571958195919601961196219631964196519661967196819691970197119721973197419751976197719781979198019811982198319841985198619871988198919901991199219931994199519961997199819992000200120022003200420052006200720082009201020112012201320142015201620172018201920202021202220232024202520262027202820292030203120322033203420352036203720382039204020412042204320442045204620472048204920502051205220532054205520562057205820592060206120622063206420652066206720682069207020712072207320742075207620772078207920802081208220832084208520862087208820892090209120922093209420952096209720982099210021012102210321042105210621072108210921102111211221132114211521162117211821192120212121222123212421252126212721282129213021312132213321342135213621372138213921402141214221432144214521462147214821492150215121522153215421552156215721582159216021612162216321642165216621672168216921702171217221732174217521762177217821792180218121822183218421852186218721882189219021912192219321942195219621972198219922002201220222032204220522062207220822092210221122122213221422152216221722182219222022212222222322242225222622272228222922302231223222332234223522362237223822392240224122422243224422452246224722482249225022512252225322542255225622572258225922602261226222632264226522662267226822692270227122722273227422752276227722782279228022812282228322842285228622872288228922902291229222932294229522962297229822992300230123022303230423052306230723082309231023112312231323142315231623172318231923202321232223232324232523262327232823292330233123322333233423352336233723382339234023412342234323442345234623472348234923502351235223532354235523562357235823592360236123622363236423652366236723682369237023712372237323742375237623772378237923802381238223832384238523862387238823892390239123922393239423952396239723982399240024012402240324042405240624072408240924102411241224132414241524162417241824192420242124222423242424252426242724282429243024312432243324342435243624372438243924402441244224432444244524462447244824492450245124522453245424552456245724582459246024612462246324642465246624672468246924702471247224732474247524762477247824792480248124822483248424852486248724882489249024912492249324942495249624972498249925002501250225032504250525062507250825092510251125122513251425152516251725182519252025212522252325242525252625272528252925302531253225332534253525362537253825392540254125422543254425452546254725482549255025512552255325542555255625572558255925602561256225632564256525662567256825692570257125722573257425752576257725782579258025812582258325842585258625872588258925902591259225932594259525962597259825992600260126022603260426052606260726082609261026112612261326142615261626172618261926202621262226232624262526262627262826292630263126322633263426352636263726382639264026412642264326442645264626472648264926502651265226532654265526562657265826592660266126622663266426652666266726682669267026712672267326742675267626772678267926802681268226832684268526862687268826892690269126922693269426952696269726982699270027012702270327042705270627072708270927102711271227132714271527162717271827192720272127222723272427252726272727282729273027312732273327342735273627372738273927402741274227432744274527462747274827492750275127522753275427552756275727582759276027612762276327642765276627672768276927702771277227732774277527762777277827792780278127822783278427852786278727882789279027912792279327942795279627972798279928002801280228032804280528062807280828092810281128122813281428152816281728182819282028212822282328242825282628272828282928302831283228332834283528362837283828392840284128422843284428452846284728482849285028512852285328542855285628572858285928602861286228632864286528662867286828692870287128722873287428752876287728782879288028812882288328842885288628872888288928902891289228932894289528962897289828992900290129022903290429052906290729082909291029112912291329142915291629172918291929202921292229232924292529262927292829292930293129322933293429352936293729382939294029412942294329442945294629472948294929502951295229532954295529562957295829592960296129622963296429652966296729682969297029712972297329742975297629772978297929802981298229832984298529862987298829892990299129922993299429952996299729982999300030013002300330043005300630073008300930103011301230133014301530163017301830193020302130223023302430253026302730283029303030313032303330343035303630373038303930403041304230433044304530463047304830493050305130523053305430553056305730583059306030613062306330643065306630673068306930703071307230733074307530763077307830793080308130823083308430853086308730883089309030913092309330943095309630973098309931003101310231033104310531063107310831093110311131123113311431153116311731183119312031213122312331243125312631273128312931303131313231333134313531363137313831393140314131423143314431453146314731483149315031513152315331543155315631573158315931603161316231633164316531663167316831693170317131723173317431753176317731783179318031813182318331843185318631873188318931903191319231933194319531963197319831993200320132023203320432053206320732083209321032113212321332143215321632173218321932203221322232233224322532263227322832293230323132323233323432353236323732383239324032413242324332443245324632473248324932503251325232533254325532563257325832593260326132623263326432653266326732683269327032713272327332743275327632773278327932803281328232833284328532863287328832893290329132923293329432953296329732983299330033013302330333043305330633073308330933103311331233133314331533163317331833193320332133223323332433253326332733283329333033313332333333343335333633373338333933403341334233433344334533463347334833493350335133523353335433553356335733583359336033613362336333643365336633673368336933703371337233733374337533763377337833793380338133823383338433853386338733883389339033913392339333943395339633973398339934003401340234033404340534063407340834093410341134123413341434153416341734183419342034213422342334243425342634273428342934303431343234333434343534363437343834393440344134423443344434453446344734483449345034513452345334543455345634573458345934603461346234633464346534663467346834693470347134723473347434753476347734783479348034813482348334843485348634873488348934903491349234933494349534963497349834993500350135023503350435053506350735083509351035113512351335143515351635173518351935203521352235233524352535263527352835293530353135323533353435353536353735383539354035413542354335443545354635473548354935503551355235533554355535563557355835593560356135623563356435653566356735683569357035713572357335743575357635773578357935803581358235833584358535863587358835893590359135923593359435953596359735983599360036013602360336043605360636073608360936103611361236133614361536163617361836193620362136223623362436253626362736283629363036313632363336343635363636373638363936403641364236433644364536463647364836493650365136523653365436553656365736583659366036613662366336643665366636673668366936703671367236733674367536763677367836793680368136823683368436853686368736883689369036913692369336943695369636973698369937003701370237033704370537063707370837093710371137123713371437153716371737183719372037213722372337243725372637273728372937303731373237333734373537363737373837393740374137423743374437453746374737483749375037513752375337543755375637573758375937603761376237633764376537663767376837693770377137723773377437753776377737783779378037813782378337843785378637873788378937903791379237933794379537963797379837993800380138023803380438053806380738083809381038113812381338143815381638173818381938203821382238233824382538263827382838293830383138323833383438353836383738383839384038413842384338443845384638473848384938503851385238533854385538563857385838593860386138623863386438653866386738683869387038713872387338743875387638773878387938803881388238833884388538863887388838893890389138923893389438953896389738983899390039013902390339043905390639073908390939103911391239133914391539163917391839193920392139223923392439253926392739283929393039313932393339343935393639373938393939403941394239433944394539463947394839493950395139523953395439553956395739583959396039613962396339643965396639673968396939703971397239733974397539763977397839793980398139823983398439853986398739883989399039913992399339943995399639973998399940004001400240034004400540064007400840094010401140124013401440154016401740184019402040214022402340244025402640274028402940304031403240334034403540364037403840394040404140424043404440454046404740484049405040514052405340544055405640574058405940604061406240634064406540664067406840694070407140724073407440754076407740784079408040814082408340844085408640874088408940904091409240934094409540964097409840994100410141024103410441054106410741084109411041114112411341144115411641174118411941204121412241234124412541264127412841294130413141324133413441354136413741384139414041414142414341444145414641474148414941504151415241534154415541564157415841594160416141624163416441654166416741684169417041714172417341744175417641774178417941804181418241834184418541864187418841894190419141924193419441954196419741984199420042014202420342044205420642074208420942104211421242134214421542164217421842194220422142224223422442254226422742284229423042314232423342344235423642374238423942404241424242434244424542464247424842494250425142524253425442554256425742584259426042614262426342644265426642674268426942704271427242734274427542764277427842794280428142824283428442854286428742884289429042914292429342944295429642974298429943004301430243034304430543064307430843094310431143124313431443154316431743184319432043214322432343244325432643274328432943304331433243334334433543364337433843394340434143424343434443454346434743484349435043514352435343544355435643574358435943604361436243634364436543664367436843694370437143724373437443754376437743784379438043814382438343844385438643874388438943904391439243934394439543964397439843994400440144024403440444054406440744084409441044114412441344144415441644174418441944204421442244234424442544264427442844294430443144324433443444354436443744384439444044414442444344444445444644474448444944504451445244534454445544564457445844594460446144624463446444654466446744684469447044714472447344744475447644774478447944804481448244834484448544864487448844894490449144924493449444954496449744984499450045014502450345044505450645074508450945104511451245134514451545164517451845194520452145224523452445254526452745284529453045314532453345344535453645374538453945404541454245434544454545464547454845494550455145524553455445554556455745584559456045614562456345644565456645674568456945704571457245734574457545764577457845794580458145824583458445854586458745884589459045914592459345944595459645974598459946004601460246034604460546064607460846094610461146124613461446154616461746184619462046214622462346244625462646274628462946304631463246334634463546364637463846394640464146424643464446454646464746484649465046514652465346544655465646574658465946604661466246634664466546664667466846694670467146724673467446754676467746784679468046814682468346844685468646874688468946904691469246934694469546964697469846994700470147024703470447054706470747084709471047114712471347144715471647174718471947204721472247234724472547264727472847294730473147324733473447354736473747384739474047414742474347444745474647474748474947504751475247534754475547564757475847594760476147624763476447654766476747684769477047714772477347744775477647774778477947804781478247834784478547864787478847894790479147924793479447954796479747984799480048014802480348044805480648074808480948104811481248134814481548164817481848194820482148224823482448254826482748284829483048314832483348344835483648374838483948404841484248434844484548464847484848494850485148524853485448554856485748584859486048614862486348644865486648674868486948704871487248734874487548764877487848794880488148824883488448854886488748884889489048914892489348944895489648974898489949004901490249034904490549064907490849094910491149124913491449154916491749184919492049214922492349244925492649274928492949304931493249334934493549364937493849394940494149424943494449454946494749484949495049514952495349544955495649574958495949604961496249634964496549664967496849694970497149724973497449754976497749784979498049814982498349844985498649874988498949904991499249934994499549964997499849995000500150025003500450055006500750085009501050115012501350145015501650175018501950205021502250235024502550265027502850295030503150325033503450355036503750385039504050415042504350445045504650475048504950505051505250535054505550565057505850595060506150625063506450655066506750685069507050715072507350745075507650775078507950805081508250835084508550865087508850895090509150925093509450955096509750985099510051015102510351045105510651075108510951105111511251135114511551165117511851195120512151225123512451255126512751285129513051315132513351345135513651375138513951405141514251435144514551465147514851495150515151525153515451555156515751585159516051615162516351645165516651675168516951705171517251735174517551765177517851795180518151825183518451855186518751885189519051915192519351945195519651975198519952005201520252035204520552065207520852095210521152125213521452155216521752185219522052215222522352245225522652275228522952305231523252335234523552365237523852395240524152425243524452455246524752485249525052515252525352545255525652575258525952605261526252635264526552665267526852695270527152725273527452755276527752785279528052815282528352845285528652875288528952905291529252935294529552965297529852995300530153025303530453055306530753085309531053115312531353145315531653175318531953205321532253235324532553265327532853295330533153325333533453355336533753385339534053415342534353445345534653475348534953505351535253535354535553565357535853595360536153625363536453655366536753685369537053715372537353745375537653775378537953805381538253835384538553865387538853895390539153925393539453955396539753985399540054015402540354045405540654075408540954105411541254135414541554165417541854195420542154225423542454255426542754285429543054315432543354345435543654375438543954405441544254435444544554465447544854495450545154525453545454555456545754585459546054615462546354645465546654675468546954705471547254735474547554765477547854795480548154825483548454855486548754885489549054915492549354945495549654975498549955005501550255035504550555065507550855095510551155125513551455155516551755185519552055215522552355245525552655275528552955305531553255335534553555365537553855395540554155425543554455455546554755485549555055515552555355545555555655575558555955605561556255635564556555665567556855695570557155725573557455755576557755785579558055815582558355845585558655875588558955905591559255935594559555965597559855995600560156025603560456055606560756085609561056115612561356145615561656175618561956205621562256235624562556265627562856295630563156325633563456355636563756385639564056415642564356445645564656475648564956505651565256535654565556565657565856595660566156625663566456655666566756685669567056715672567356745675567656775678567956805681568256835684568556865687568856895690569156925693569456955696569756985699570057015702570357045705570657075708570957105711571257135714571557165717571857195720572157225723572457255726572757285729573057315732573357345735573657375738573957405741574257435744574557465747574857495750575157525753575457555756575757585759576057615762576357645765576657675768576957705771577257735774577557765777577857795780578157825783578457855786578757885789579057915792579357945795579657975798579958005801580258035804580558065807580858095810581158125813581458155816581758185819582058215822582358245825582658275828582958305831583258335834583558365837583858395840584158425843584458455846584758485849585058515852585358545855585658575858585958605861586258635864586558665867586858695870587158725873587458755876587758785879588058815882588358845885588658875888588958905891589258935894589558965897589858995900590159025903590459055906590759085909591059115912591359145915591659175918591959205921592259235924592559265927592859295930593159325933593459355936593759385939594059415942594359445945594659475948594959505951595259535954595559565957595859595960596159625963596459655966596759685969597059715972597359745975597659775978597959805981598259835984598559865987598859895990599159925993599459955996599759985999600060016002600360046005600660076008600960106011601260136014601560166017601860196020602160226023602460256026602760286029603060316032603360346035603660376038603960406041604260436044604560466047604860496050605160526053605460556056605760586059606060616062606360646065606660676068606960706071607260736074607560766077607860796080608160826083608460856086608760886089609060916092609360946095609660976098609961006101610261036104610561066107610861096110611161126113611461156116611761186119612061216122612361246125612661276128612961306131613261336134613561366137613861396140614161426143614461456146614761486149615061516152615361546155615661576158615961606161616261636164616561666167616861696170617161726173617461756176617761786179618061816182618361846185618661876188618961906191619261936194619561966197619861996200620162026203620462056206620762086209621062116212621362146215621662176218621962206221622262236224622562266227622862296230623162326233623462356236623762386239624062416242624362446245624662476248624962506251625262536254625562566257625862596260626162626263626462656266626762686269627062716272627362746275627662776278627962806281628262836284628562866287628862896290629162926293629462956296629762986299630063016302630363046305630663076308630963106311631263136314631563166317631863196320632163226323632463256326632763286329633063316332633363346335633663376338633963406341634263436344634563466347634863496350635163526353635463556356635763586359636063616362636363646365636663676368636963706371637263736374637563766377637863796380638163826383638463856386638763886389639063916392639363946395639663976398639964006401640264036404640564066407640864096410641164126413641464156416641764186419642064216422642364246425642664276428642964306431643264336434643564366437643864396440644164426443644464456446644764486449645064516452645364546455645664576458645964606461646264636464646564666467646864696470647164726473647464756476647764786479648064816482648364846485648664876488648964906491649264936494649564966497649864996500650165026503650465056506650765086509651065116512651365146515651665176518651965206521652265236524652565266527652865296530653165326533653465356536653765386539654065416542654365446545654665476548654965506551655265536554655565566557655865596560656165626563656465656566656765686569657065716572657365746575657665776578657965806581658265836584658565866587658865896590659165926593659465956596659765986599660066016602660366046605660666076608660966106611661266136614661566166617661866196620662166226623662466256626662766286629663066316632663366346635663666376638663966406641664266436644664566466647664866496650665166526653665466556656665766586659666066616662666366646665666666676668666966706671667266736674667566766677667866796680668166826683668466856686668766886689669066916692669366946695669666976698669967006701670267036704670567066707670867096710671167126713671467156716671767186719672067216722672367246725672667276728672967306731673267336734673567366737673867396740674167426743674467456746674767486749675067516752675367546755675667576758675967606761676267636764676567666767676867696770677167726773677467756776677767786779678067816782678367846785678667876788678967906791679267936794679567966797679867996800680168026803680468056806680768086809681068116812681368146815681668176818681968206821682268236824682568266827682868296830683168326833683468356836683768386839684068416842684368446845684668476848684968506851685268536854685568566857685868596860686168626863686468656866686768686869687068716872687368746875687668776878687968806881688268836884688568866887688868896890689168926893689468956896689768986899690069016902690369046905690669076908690969106911691269136914691569166917691869196920692169226923692469256926692769286929693069316932693369346935693669376938693969406941694269436944694569466947694869496950695169526953695469556956695769586959696069616962696369646965696669676968696969706971697269736974697569766977697869796980698169826983698469856986698769886989699069916992699369946995699669976998699970007001700270037004700570067007700870097010701170127013701470157016701770187019702070217022702370247025702670277028702970307031703270337034703570367037703870397040704170427043704470457046704770487049705070517052705370547055705670577058705970607061706270637064706570667067706870697070707170727073707470757076707770787079708070817082708370847085708670877088708970907091709270937094709570967097709870997100710171027103710471057106710771087109711071117112711371147115711671177118711971207121712271237124712571267127712871297130713171327133713471357136713771387139714071417142714371447145714671477148714971507151715271537154715571567157715871597160716171627163716471657166716771687169717071717172717371747175717671777178717971807181718271837184718571867187718871897190719171927193719471957196719771987199720072017202720372047205720672077208720972107211721272137214721572167217721872197220722172227223722472257226722772287229723072317232723372347235723672377238723972407241724272437244724572467247724872497250725172527253725472557256725772587259726072617262726372647265726672677268726972707271727272737274727572767277727872797280728172827283728472857286728772887289729072917292729372947295729672977298729973007301730273037304730573067307730873097310731173127313731473157316731773187319732073217322732373247325732673277328732973307331733273337334733573367337733873397340734173427343734473457346734773487349735073517352735373547355735673577358735973607361736273637364736573667367736873697370737173727373737473757376737773787379738073817382738373847385738673877388738973907391739273937394739573967397739873997400740174027403740474057406740774087409741074117412741374147415741674177418741974207421742274237424742574267427742874297430743174327433743474357436743774387439744074417442744374447445744674477448744974507451745274537454745574567457745874597460746174627463746474657466746774687469747074717472747374747475747674777478747974807481748274837484748574867487748874897490749174927493749474957496749774987499750075017502750375047505750675077508750975107511751275137514751575167517751875197520752175227523752475257526752775287529753075317532753375347535753675377538753975407541754275437544754575467547754875497550755175527553755475557556755775587559756075617562756375647565756675677568756975707571757275737574757575767577757875797580758175827583758475857586758775887589759075917592759375947595759675977598759976007601760276037604760576067607760876097610761176127613761476157616761776187619762076217622762376247625762676277628762976307631763276337634763576367637763876397640764176427643764476457646764776487649765076517652765376547655765676577658765976607661766276637664766576667667766876697670767176727673767476757676767776787679768076817682768376847685768676877688768976907691769276937694769576967697769876997700770177027703770477057706770777087709771077117712771377147715771677177718771977207721772277237724772577267727772877297730773177327733773477357736773777387739774077417742774377447745774677477748774977507751775277537754775577567757775877597760776177627763776477657766776777687769777077717772777377747775777677777778777977807781778277837784778577867787778877897790779177927793779477957796779777987799780078017802780378047805780678077808780978107811781278137814781578167817781878197820782178227823782478257826782778287829783078317832783378347835783678377838783978407841784278437844784578467847784878497850785178527853785478557856785778587859786078617862786378647865786678677868786978707871787278737874787578767877787878797880788178827883788478857886788778887889789078917892789378947895789678977898789979007901790279037904790579067907790879097910791179127913791479157916791779187919792079217922792379247925792679277928792979307931793279337934793579367937793879397940794179427943794479457946794779487949795079517952795379547955795679577958795979607961796279637964796579667967796879697970797179727973797479757976797779787979798079817982798379847985798679877988798979907991799279937994799579967997799879998000800180028003800480058006800780088009801080118012801380148015801680178018801980208021802280238024802580268027802880298030803180328033803480358036803780388039804080418042804380448045804680478048804980508051805280538054805580568057805880598060806180628063806480658066806780688069807080718072807380748075807680778078807980808081808280838084808580868087808880898090809180928093809480958096809780988099810081018102810381048105810681078108810981108111811281138114811581168117811881198120812181228123812481258126812781288129813081318132813381348135813681378138813981408141814281438144814581468147814881498150815181528153815481558156815781588159816081618162816381648165816681678168816981708171817281738174817581768177817881798180818181828183818481858186818781888189819081918192819381948195819681978198819982008201820282038204820582068207820882098210821182128213821482158216821782188219822082218222822382248225822682278228822982308231823282338234823582368237823882398240824182428243824482458246824782488249825082518252825382548255825682578258825982608261826282638264826582668267826882698270827182728273827482758276827782788279828082818282828382848285828682878288828982908291829282938294829582968297829882998300830183028303830483058306830783088309831083118312831383148315831683178318831983208321832283238324832583268327832883298330833183328333833483358336833783388339834083418342834383448345834683478348834983508351835283538354835583568357835883598360836183628363836483658366836783688369837083718372837383748375837683778378837983808381838283838384838583868387838883898390839183928393839483958396839783988399840084018402840384048405840684078408840984108411841284138414841584168417841884198420842184228423842484258426842784288429843084318432843384348435843684378438843984408441844284438444844584468447844884498450845184528453845484558456845784588459846084618462846384648465846684678468846984708471847284738474847584768477847884798480848184828483848484858486848784888489849084918492849384948495849684978498849985008501850285038504850585068507850885098510851185128513851485158516851785188519852085218522852385248525852685278528852985308531853285338534853585368537853885398540854185428543854485458546854785488549855085518552855385548555855685578558855985608561856285638564856585668567856885698570857185728573857485758576857785788579858085818582858385848585858685878588858985908591859285938594859585968597859885998600860186028603860486058606860786088609861086118612861386148615861686178618861986208621862286238624862586268627862886298630863186328633863486358636863786388639864086418642864386448645864686478648864986508651865286538654865586568657865886598660866186628663866486658666866786688669867086718672867386748675867686778678867986808681868286838684868586868687868886898690869186928693869486958696869786988699870087018702870387048705870687078708870987108711871287138714871587168717871887198720872187228723872487258726872787288729873087318732873387348735873687378738873987408741874287438744874587468747874887498750875187528753875487558756875787588759876087618762876387648765876687678768876987708771877287738774877587768777877887798780878187828783878487858786878787888789879087918792879387948795879687978798879988008801880288038804880588068807880888098810881188128813881488158816881788188819882088218822882388248825882688278828882988308831883288338834883588368837883888398840884188428843884488458846884788488849885088518852885388548855885688578858885988608861886288638864886588668867886888698870887188728873887488758876887788788879888088818882888388848885888688878888888988908891889288938894889588968897889888998900890189028903890489058906890789088909891089118912891389148915891689178918891989208921892289238924892589268927892889298930893189328933893489358936893789388939894089418942894389448945894689478948894989508951895289538954895589568957895889598960896189628963896489658966896789688969897089718972897389748975897689778978897989808981898289838984898589868987898889898990899189928993899489958996899789988999900090019002900390049005900690079008900990109011901290139014901590169017901890199020902190229023902490259026902790289029903090319032903390349035903690379038903990409041904290439044904590469047904890499050905190529053905490559056905790589059906090619062906390649065906690679068906990709071907290739074907590769077907890799080908190829083908490859086908790889089909090919092909390949095909690979098909991009101910291039104910591069107910891099110911191129113911491159116911791189119912091219122912391249125912691279128912991309131913291339134913591369137913891399140914191429143914491459146914791489149915091519152915391549155915691579158915991609161916291639164916591669167916891699170 |
- {
- "callback_task_id": "a92b8bbcb5ab6c92f5128266055a4495-1772962259",
- "file_id": "a92b8bbcb5ab6c92f5128266055a4495",
- "file_name": "47_会理至禄劝(四川境)高速公路项目土建项目_词句语法检查_测试案例使用.docx",
- "user_id": "user-001",
- "overall_task_status": "processing",
- "stage_status": {
- "document": "completed",
- "ai_review": "completed",
- "report": "pending"
- },
- "document_result": {
- "file_id": "a92b8bbcb5ab6c92f5128266055a4495",
- "structured_content": {
- "document_name": "施工方案文档_docx",
- "document_type": "docx",
- "total_chunks": 36,
- "chunks": [
- {
- "chunk_id": "doc_chunk_第一章_1",
- "page": 1,
- "content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4)《中华人民共和国道路交通安全法》2021年4月29日修订\n5)《中华人民共和国水土保持法》2010年12月25日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019年4月23日修订\n9)《建设工程安全生产管理条例》2023年最新修正\n10)《四川省安全生产条例》2023年5月25日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n(2)项目文件\n1)《S81线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段实施性施工组织设计》;\n3)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段T梁预制、运输及安装专项施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环境等参考资料;\n编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度地避免安全事故造成的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n编制原则\n(1)严格执行合同中标文件中所规定的,工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n编制范围\n本专项施工方案适用于S81线会理至禄劝(四川境)高速公路ZCB1-3标段架桥机的安装与拆除施工。",
- "section_label": "第一章 编制依据与说明",
- "project_plan_type": "basis",
- "chapter_classification": "basis",
- "element_tag": {
- "chunk_id": "doc_chunk_第一章_1",
- "page": 1,
- "serial_number": "第一章"
- },
- "chapter": "第一章 编制依据与说明",
- "title": "第一章 编制依据与说明",
- "original_content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4..."
- },
- {
- "chunk_id": "doc_chunk_第二章->一_1",
- "page": 3,
- "content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、乌东德(四川)隧道、且沿线存在3处深挖路堑高边坡地段,桥隧比为90.44%,预估建安费15亿元,总工期为43个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东德特长隧道。项目总体平面布置图见下图所视\n项目拟建梁场位于K17+035-K17+270段路基上,该段落位于大柳树沟1#桥和2#桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。\n图2-1 项目总体平面布置图",
- "section_label": "第二章 工程概况->一)工程简介",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->一_1",
- "page": 3,
- "serial_number": "一"
- },
- "chapter": "第二章 工程概况->一)工程简介",
- "title": "第二章 工程概况->一)工程简介",
- "original_content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟..."
- },
- {
- "chunk_id": "doc_chunk_第二章->二_1",
- "page": 3,
- "content": "二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程性质较好。",
- "section_label": "第二章 工程概况->二)周边环境条件及工程地质",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->二_1",
- "page": 3,
- "serial_number": "二"
- },
- "chapter": "第二章 工程概况->二)周边环境条件及工程地质",
- "title": "第二章 工程概况->二)周边环境条件及工程地质",
- "original_content": "二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G..."
- },
- {
- "chunk_id": "doc_chunk_第二章->三_1",
- "page": 3,
- "content": "三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年平均日照2306.4小时,无霜期262天,太阳辐射强,年辐射热平均总量为136.2千卡/平方厘米,多年平均降水1095.5毫米,但气候垂直变化大,高山积雪与峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、岩性及裂隙发育程度控制。",
- "section_label": "第二章 工程概况->三)气象水文",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->三_1",
- "page": 3,
- "serial_number": "三"
- },
- "chapter": "第二章 工程概况->三)气象水文",
- "title": "第二章 工程概况->三)气象水文",
- "original_content": "三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年..."
- },
- {
- "chunk_id": "doc_chunk_第二章->四_1",
- "page": 3,
- "content": "四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲率半径大于450m以上、0-45°斜交公路桥。“混凝土浇筑完成后,应及时进行养护,养护时间不少与7天。\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便于施工场地的转移、运输;该型架桥机边梁横移一次就位,省去了前、后墩台人工移梁的麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安全、高效作业。同时略微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系统组成。\n图2-2 架桥机方案总图\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3架桥机技术参数表",
- "section_label": "第二章 工程概况->四)架桥机概况",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->四_1",
- "page": 3,
- "serial_number": "四"
- },
- "chapter": "第二章 工程概况->四)架桥机概况",
- "title": "第二章 工程概况->四)架桥机概况",
- "original_content": "四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲..."
- },
- {
- "chunk_id": "doc_chunk_第二章->五_1",
- "page": 3,
- "content": "五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K17+270段右侧,位于大柳树沟1号桥与大柳树沟2号桥之间,K17+035~K17+120该段表层为5.7m的崩坡积块碎石土,K17+120~K17+270段表层为0~1.5m碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-4 K17+847~K17+915段路基\n(2)K17+847~K17+915段路基位于大柳树沟2号大桥与大柳树沟3号大桥之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基\nK18+300~K18+490段右侧,位于大柳树沟2号大桥与黄家庄大桥之间,该段表层为8~12m的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基K19+100~K19+200段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为57.2m。K19+314~K19+450段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。",
- "section_label": "第二章 工程概况->五)施工平面布置",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->五_1",
- "page": 3,
- "serial_number": "五"
- },
- "chapter": "第二章 工程概况->五)施工平面布置",
- "title": "第二章 工程概况->五)施工平面布置",
- "original_content": "五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K..."
- },
- {
- "chunk_id": "doc_chunk_第二章->六_1",
- "page": 4,
- "content": "六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量要求\n适用于本项目的高速桥梁架设高速公路桥梁,能够满足大坡度、小半径斜桥、弯桥,架设要求满足架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。",
- "section_label": "第二章 工程概况->六)施工要求",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->六_1",
- "page": 4,
- "serial_number": "六"
- },
- "chapter": "第二章 工程概况->六)施工要求",
- "title": "第二章 工程概况->六)施工要求",
- "original_content": "六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量..."
- },
- {
- "chunk_id": "doc_chunk_第二章->七_1",
- "page": 4,
- "content": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2-2 风险分析表\n\n<表格></表格>",
- "section_label": "第二章 工程概况->七)风险辨识与分级",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->七_1",
- "page": 4,
- "serial_number": "七"
- },
- "chapter": "第二章 工程概况->七)风险辨识与分级",
- "title": "第二章 工程概况->七)风险辨识与分级",
- "original_content": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2..."
- },
- {
- "chunk_id": "doc_chunk_第二章->八_1",
- "page": 4,
- "content": "八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有限公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司",
- "section_label": "第二章 工程概况->八)参建各方责任主体单位",
- "project_plan_type": "overview",
- "chapter_classification": "overview",
- "element_tag": {
- "chunk_id": "doc_chunk_第二章->八_1",
- "page": 4,
- "serial_number": "八"
- },
- "chapter": "第二章 工程概况->八)参建各方责任主体单位",
- "title": "第二章 工程概况->八)参建各方责任主体单位",
- "original_content": "八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交..."
- },
- {
- "chunk_id": "doc_chunk_第三章->一_1",
- "page": 5,
- "content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期358天,约12个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2号大桥→大柳树沟3号大桥→黄家庄大桥→小村左线大桥→小村右线1号中桥→小村右线2号大桥→大柳树沟1号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3项目架桥机安拆计划\n根据现场情况包括施工条件和环境,以及吊车的配合,对于安装工期的预计是从拼装开始算起到验收完成预计大约需要7天左右的时间,如果遇到比如大风或者大雨这些不可抗拒的人力因素那么工期就要相应顺延。架桥机首次组装施工计划如下图所示\n图3-1 架桥机首次安装施工计划横道图",
- "section_label": "第三章 施工计划->一)施工进度计划",
- "project_plan_type": "plan",
- "chapter_classification": "plan",
- "element_tag": {
- "chunk_id": "doc_chunk_第三章->一_1",
- "page": 5,
- "serial_number": "一"
- },
- "chapter": "第三章 施工计划->一)施工进度计划",
- "title": "第三章 施工计划->一)施工进度计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期..."
- },
- {
- "chunk_id": "doc_chunk_第三章->二_1",
- "page": 5,
- "content": "二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n\n<表格></表格>\n\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表\n\n<表格></表格>",
- "section_label": "第三章 施工计划->二)材料机械设备和人员计划",
- "project_plan_type": "plan",
- "chapter_classification": "plan",
- "element_tag": {
- "chunk_id": "doc_chunk_第三章->二_1",
- "page": 5,
- "serial_number": "二"
- },
- "chapter": "第三章 施工计划->二)材料机械设备和人员计划",
- "title": "第三章 施工计划->二)材料机械设备和人员计划",
- "original_content": "二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力..."
- },
- {
- "chunk_id": "doc_chunk_第四章->一_1",
- "page": 5,
- "content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接\n2、前临时支腿\n前临时支腿在引导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 0~45°斜交桥架设时的调整功能。注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载试验进行制动检测,试验方法与重载试验相同,动作3次,检验制动\n器制动效果。\n卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发现有窜动,要立即停止作业,加固好必须检验后使用。\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 500mm。(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、整机横移时要注意观察,并听从指挥人员的信号。",
- "section_label": "第四章 施工工艺技术->一)主要部件说明",
- "project_plan_type": "technology",
- "chapter_classification": "technology",
- "element_tag": {
- "chunk_id": "doc_chunk_第四章->一_1",
- "page": 5,
- "serial_number": "一"
- },
- "chapter": "第四章 施工工艺技术->一)主要部件说明",
- "title": "第四章 施工工艺技术->一)主要部件说明",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮..."
- },
- {
- "chunk_id": "doc_chunk_第四章->二_1",
- "page": 7,
- "content": "二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、固定压板→安装三道上横梁及尾支腿\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4级,视线良好的环境下进行安装。\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式\n表4-2 钢丝绳破断拉力表\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支腿支点距应该满足安装需求(约为30m左右),起重设备采用1台80t吊车进行起重安装(单机抬吊)\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m左右)、高度差,确定合理的前、中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20的钢丝绳,设置于支腿两侧。在硬化场地上预埋直径25mm的U型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm以上,横轨横向应保持水平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16或中120*6以上圆管)5t手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。注意事项:\n台车跑轮须用木楔楔实,保证不能左右滑动。\n前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1台80t汽车吊将单节主梁吊装安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n布线要整齐,接头处必须做好防水、漏电事项。\n试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n架桥机拆除\n1、准备工作\n1.1拆除场地检查、清理、平整\nA拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护措施\nB清理场地和周围影响拆除作业的障碍物\nC桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m",
- "section_label": "第四章 施工工艺技术->二)架桥机安装施工",
- "project_plan_type": "technology",
- "chapter_classification": "technology",
- "element_tag": {
- "chunk_id": "doc_chunk_第四章->二_1",
- "page": 7,
- "serial_number": "二"
- },
- "chapter": "第四章 施工工艺技术->二)架桥机安装施工",
- "title": "第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会..."
- },
- {
- "chunk_id": "doc_chunk_第四章->二_2",
- "page": 10,
- "content": "2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2拆除人员组织及技术准备\nA拆除人员按照施工专项方案安排到位,并持证上岗\nB由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行全面的安全质量技术交底\nC制定各项防火、防雷击等预防措施\n1.3架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊\n机、电缆等辅助材料的质量和数量是否满足要求。\n拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方能继续进行\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得赶进度在夜间或雷雨时间作业。",
- "section_label": "第四章 施工工艺技术->二)架桥机安装施工",
- "project_plan_type": "technology",
- "chapter_classification": "technology",
- "element_tag": {
- "chunk_id": "doc_chunk_第四章->二_2",
- "page": 10,
- "serial_number": "二"
- },
- "chapter": "第四章 施工工艺技术->二)架桥机安装施工",
- "title": "第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,..."
- },
- {
- "chunk_id": "doc_chunk_第五章->一_1",
- "page": 11,
- "content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安全风险数据库,做好安全风险管控,落实安全防护措施。\n图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n\n<表格></表格>\n\n5、安全生产管理制度\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24学时,每年再培训8学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32学时,每年再培训12学时。转岗或歇工6个月以上复工人员,应当重新接受本单位安全教育培训24学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT点评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防火检查制度\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。",
- "section_label": "第五章 施工安全保证措施->一) 组织保证措施",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第五章->一_1",
- "page": 11,
- "serial_number": "一"
- },
- "chapter": "第五章 施工安全保证措施->一) 组织保证措施",
- "title": "第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层..."
- },
- {
- "chunk_id": "doc_chunk_第五章->一_2",
- "page": 13,
- "content": "③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。",
- "section_label": "第五章 施工安全保证措施->一) 组织保证措施",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第五章->一_2",
- "page": 13,
- "serial_number": "一"
- },
- "chapter": "第五章 施工安全保证措施->一) 组织保证措施",
- "title": "第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员..."
- },
- {
- "chunk_id": "doc_chunk_第五章->二_1",
- "page": 13,
- "content": "技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项的现场技术员进行每日班前5分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各种机械超负荷运转或带病作业。\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S接零保护系统,同时必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1时间以上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于2.5m的使用220V电压。在潮湿和易触及带电体的照明电源必须使用220V电压,电气设备架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b倒扣进行防护,避免人为操作失误将临时电缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警示牌。\n10)靠近电源线路作业前,应先联系停电。确认停电后方可进行工作,并应设置绝缘档壁。作业者最少离开电线2米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。",
- "section_label": "第五章 施工安全保证措施->二) 技术保证措施",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第五章->二_1",
- "page": 13,
- "serial_number": "二"
- },
- "chapter": "第五章 施工安全保证措施->二) 技术保证措施",
- "title": "第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,..."
- },
- {
- "chunk_id": "doc_chunk_第五章->二_2",
- "page": 15,
- "content": "上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。\n16)超过3米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的支腿垂直度。\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械通行。\n3、设备设施要求",
- "section_label": "第五章 施工安全保证措施->二) 技术保证措施",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第五章->二_2",
- "page": 15,
- "serial_number": "二"
- },
- "chapter": "第五章 施工安全保证措施->二) 技术保证措施",
- "title": "第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型..."
- },
- {
- "chunk_id": "doc_chunk_第五章->二_3",
- "page": 17,
- "content": "(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。\n(1)在现场开展防暑降温保健、中暑急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加强对工人身体状况的检查工作,搞好医疗保健。(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,落实劳动保护措施。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚",
- "section_label": "第五章 施工安全保证措施->二) 技术保证措施",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第五章->二_3",
- "page": 17,
- "serial_number": "二"
- },
- "chapter": "第五章 施工安全保证措施->二) 技术保证措施",
- "title": "第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措..."
- },
- {
- "chunk_id": "doc_chunk_第六章_1",
- "page": 18,
- "content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作质量,从而确保工程质量。3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提出保证工程质量的措施。\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放过,不分清责任不放过,没有改进措施不放过。",
- "section_label": "第六章 质量保证措施",
- "project_plan_type": "quality",
- "chapter_classification": "quality",
- "element_tag": {
- "chunk_id": "doc_chunk_第六章_1",
- "page": 18,
- "serial_number": "第六章"
- },
- "chapter": "第六章 质量保证措施",
- "title": "第六章 质量保证措施",
- "original_content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行..."
- },
- {
- "chunk_id": "doc_chunk_第七章_1",
- "page": 19,
- "content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。",
- "section_label": "第七章 环境保证措施",
- "project_plan_type": "environment",
- "chapter_classification": "environment",
- "element_tag": {
- "chunk_id": "doc_chunk_第七章_1",
- "page": 19,
- "serial_number": "第七章"
- },
- "chapter": "第七章 环境保证措施",
- "title": "第七章 环境保证措施",
- "original_content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进..."
- },
- {
- "chunk_id": "doc_chunk_第八章->一_1",
- "page": 19,
- "content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。",
- "section_label": "第八章 验收要求->一) 验收标准",
- "project_plan_type": "acceptance",
- "chapter_classification": "acceptance",
- "element_tag": {
- "chunk_id": "doc_chunk_第八章->一_1",
- "page": 19,
- "serial_number": "一"
- },
- "chapter": "第八章 验收要求->一) 验收标准",
- "title": "第八章 验收要求->一) 验收标准",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。"
- },
- {
- "chunk_id": "doc_chunk_第八章->二_1",
- "page": 20,
- "content": "二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程实体。\n图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n\n<表格></表格>\n\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。",
- "section_label": "第八章 验收要求->二)验收程序及人员",
- "project_plan_type": "acceptance",
- "chapter_classification": "acceptance",
- "element_tag": {
- "chunk_id": "doc_chunk_第八章->二_1",
- "page": 20,
- "serial_number": "二"
- },
- "chapter": "第八章 验收要求->二)验收程序及人员",
- "title": "第八章 验收要求->二)验收程序及人员",
- "original_content": "二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须..."
- },
- {
- "chunk_id": "doc_chunk_第八章->三_1",
- "page": 20,
- "content": "三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复印件存入同一设备档案。\n(2)设备本体检查设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。\n2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15个工作日内,检验合格出具《起重机械安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4使用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30日内,到产权所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》后方可使用。\n表7-2 设备入场检查表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-3 架桥机日常检查验收表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-4 其他项目验收表\n\n<表格></表格>\n\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。检验必须由专业技术人员进行。\n2)吊链的报废标准:\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负责人员应进行相关工序的检查,满足吊运条件后方可起吊。\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;作业人员是否参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n(3)人员配备是否满足生产需求。",
- "section_label": "第八章 验收要求->三)验收内容",
- "project_plan_type": "acceptance",
- "chapter_classification": "acceptance",
- "element_tag": {
- "chunk_id": "doc_chunk_第八章->三_1",
- "page": 20,
- "serial_number": "三"
- },
- "chapter": "第八章 验收要求->三)验收内容",
- "title": "第八章 验收要求->三)验收内容",
- "original_content": "三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一..."
- },
- {
- "chunk_id": "doc_chunk_第九章->一_1",
- "page": 24,
- "content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1施工组织机构图",
- "section_label": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "project_plan_type": "management",
- "chapter_classification": "management",
- "element_tag": {
- "chunk_id": "doc_chunk_第九章->一_1",
- "page": 24,
- "serial_number": "一"
- },
- "chapter": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "title": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能..."
- },
- {
- "chunk_id": "doc_chunk_第九章->二_1",
- "page": 25,
- "content": "二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>",
- "section_label": "第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "project_plan_type": "management",
- "chapter_classification": "management",
- "element_tag": {
- "chunk_id": "doc_chunk_第九章->二_1",
- "page": 25,
- "serial_number": "二"
- },
- "chapter": "第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "title": "第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "original_content": "二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>"
- },
- {
- "chunk_id": "doc_chunk_第九章->三_1",
- "page": 25,
- "content": "三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400毫米,吊物行驶中不得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查处理。\n司索(信号)工岗位职责1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。\n4、起吊重物水平行走时,距地面距离不许超过0.5米。\n5、吊运重物接近额定负荷时,应升至100毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录",
- "section_label": "第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "project_plan_type": "management",
- "chapter_classification": "management",
- "element_tag": {
- "chunk_id": "doc_chunk_第九章->三_1",
- "page": 25,
- "serial_number": "三"
- },
- "chapter": "第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "title": "第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "original_content": "三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下..."
- },
- {
- "chunk_id": "doc_chunk_第九章->一_2",
- "page": 27,
- "content": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图8-1 会禄高速ZCB1-3项目应急组织体系",
- "section_label": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第九章->一_2",
- "page": 27,
- "serial_number": "一"
- },
- "chapter": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "title": "第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应..."
- },
- {
- "chunk_id": "doc_chunk_第十章->二_1",
- "page": 27,
- "content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指挥部、总监办,1小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工作,并保证通道的畅通。3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,写出应急处置报告。\n\n<表格></表格>",
- "section_label": "第十章 应急处理措施->二) 职责",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第十章->二_1",
- "page": 27,
- "serial_number": "二"
- },
- "chapter": "第十章 应急处理措施->二) 职责",
- "title": "第十章 应急处理措施->二) 职责",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工..."
- },
- {
- "chunk_id": "doc_chunk_第十章->三_1",
- "page": 28,
- "content": "三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n信息传递\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。",
- "section_label": "第十章 应急处理措施->三) 预警及信息报告",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第十章->三_1",
- "page": 28,
- "serial_number": "三"
- },
- "chapter": "第十章 应急处理措施->三) 预警及信息报告",
- "title": "第十章 应急处理措施->三) 预警及信息报告",
- "original_content": "三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开..."
- },
- {
- "chunk_id": "doc_chunk_第十章->四_1",
- "page": 29,
- "content": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。",
- "section_label": "第十章 应急处理措施->四) 应急响应",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第十章->四_1",
- "page": 29,
- "serial_number": "四"
- },
- "chapter": "第十章 应急处理措施->四) 应急响应",
- "title": "第十章 应急处理措施->四) 应急响应",
- "original_content": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织..."
- },
- {
- "chunk_id": "doc_chunk_第十章->四_2",
- "page": 31,
- "content": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老化、脆裂、漏气的胶管不准使用。\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般不小于10米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20米。不准使用过短或过长的软管,接头出必须用专用的卡子或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。4、严禁从高处向下方抛物料。\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。",
- "section_label": "第十章 应急处理措施->四) 应急响应",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第十章->四_2",
- "page": 31,
- "serial_number": "四"
- },
- "chapter": "第十章 应急处理措施->四) 应急响应",
- "title": "第十章 应急处理措施->四) 应急响应",
- "original_content": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插..."
- },
- {
- "chunk_id": "doc_chunk_第十章->四_3",
- "page": 32,
- "content": "在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护和运输等应急救援力量到位。3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状态,并及时予以补充和更新。\n表8-1 应急物资一览表\n\n<表格></表格>\n\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有效投入。",
- "section_label": "第十章 应急处理措施->四) 应急响应",
- "project_plan_type": "safety",
- "chapter_classification": "safety",
- "element_tag": {
- "chunk_id": "doc_chunk_第十章->四_3",
- "page": 32,
- "serial_number": "四"
- },
- "chapter": "第十章 应急处理措施->四) 应急响应",
- "title": "第十章 应急处理措施->四) 应急响应",
- "original_content": "在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体..."
- },
- {
- "chunk_id": "doc_chunk_第十一章->一_1",
- "page": 33,
- "content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2的安全系数):10.87×1.2=13T;\n查表徐工80t吊车起重性能表,得工作幅度8m,主臂长度18m额定起重量为25.4>13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式,规格为Φ36,长度为6m*2根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36钢丝绳的破断拉力为81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故φ36mm钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)规范要求。",
- "section_label": "第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "project_plan_type": "other",
- "chapter_classification": "other",
- "element_tag": {
- "chunk_id": "doc_chunk_第十一章->一_1",
- "page": 33,
- "serial_number": "一"
- },
- "chapter": "第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "title": "第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重..."
- },
- {
- "chunk_id": "doc_chunk_第十一章->二_1",
- "page": 33,
- "content": "二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不利荷载仅有2个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。",
- "section_label": "第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "project_plan_type": "other",
- "chapter_classification": "other",
- "element_tag": {
- "chunk_id": "doc_chunk_第十一章->二_1",
- "page": 33,
- "serial_number": "二"
- },
- "chapter": "第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "title": "第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "original_content": "二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不..."
- },
- {
- "chunk_id": "doc_chunk_第十二章_1",
- "page": 33,
- "content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书",
- "section_label": "第十二章 附件",
- "project_plan_type": "other",
- "chapter_classification": "other",
- "element_tag": {
- "chunk_id": "doc_chunk_第十二章_1",
- "page": 33,
- "serial_number": "第十二章"
- },
- "chapter": "第十二章 附件",
- "title": "第十二章 附件",
- "original_content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书"
- }
- ],
- "metadata": {
- "total_pages": 33,
- "total_chars": 41411
- },
- "outline": {
- "chapters": [
- {
- "index": 1,
- "title": "第一章 编制依据与说明",
- "page": 1,
- "original": "第一章 编制依据与说明\t1",
- "chapter_classification": "basis",
- "subsections": [
- {
- "title": "一) 编制依据",
- "page": 1,
- "level": 2,
- "original": "一) 编制依据\t1"
- },
- {
- "title": "二) 编制说明",
- "page": 2,
- "level": 2,
- "original": "二) 编制说明\t2"
- },
- {
- "title": "三) 编制原则",
- "page": 2,
- "level": 2,
- "original": "三) 编制原则\t2"
- },
- {
- "title": "四) 编制范围",
- "page": 2,
- "level": 2,
- "original": "四) 编制范围\t2"
- }
- ]
- },
- {
- "index": 2,
- "title": "第二章 工程概况",
- "page": 3,
- "original": "第二章 工程概况\t3",
- "chapter_classification": "overview",
- "subsections": [
- {
- "title": "一)工程简介",
- "page": 3,
- "level": 2,
- "original": "一)工程简介\t3"
- },
- {
- "title": "二)周边环境条件及工程地质",
- "page": 3,
- "level": 2,
- "original": "二)周边环境条件及工程地质\t3"
- },
- {
- "title": "1、周边环境条件",
- "page": 3,
- "level": 3,
- "original": "1、周边环境条件\t3"
- },
- {
- "title": "2、工程地质",
- "page": 4,
- "level": 3,
- "original": "2、工程地质\t4"
- },
- {
- "title": "三)气象水文",
- "page": 4,
- "level": 2,
- "original": "三)气象水文\t4"
- },
- {
- "title": "四)架桥机概况",
- "page": 4,
- "level": 2,
- "original": "四)架桥机概况\t4"
- },
- {
- "title": "五)施工平面布置",
- "page": 9,
- "level": 2,
- "original": "五)施工平面布置\t9"
- },
- {
- "title": "六)施工要求",
- "page": 11,
- "level": 2,
- "original": "六)施工要求\t11"
- },
- {
- "title": "七)风险辨识与分级",
- "page": 12,
- "level": 2,
- "original": "七)风险辨识与分级\t12"
- },
- {
- "title": "八)参建各方责任主体单位",
- "page": 14,
- "level": 2,
- "original": "八)参建各方责任主体单位\t14"
- }
- ]
- },
- {
- "index": 3,
- "title": "第三章 施工计划",
- "page": 15,
- "original": "第三章 施工计划\t15",
- "chapter_classification": "plan",
- "subsections": [
- {
- "title": "一)施工进度计划",
- "page": 15,
- "level": 2,
- "original": "一)施工进度计划\t15"
- },
- {
- "title": "二)材料机械设备和人员计划",
- "page": 16,
- "level": 2,
- "original": "二)材料机械设备和人员计划\t16"
- }
- ]
- },
- {
- "index": 4,
- "title": "第四章 施工工艺技术",
- "page": 19,
- "original": "第四章 施工工艺技术\t19",
- "chapter_classification": "technology",
- "subsections": [
- {
- "title": "一)主要部件说明",
- "page": 19,
- "level": 2,
- "original": "一)主要部件说明\t19"
- },
- {
- "title": "1、主梁总成",
- "page": 19,
- "level": 3,
- "original": "1、主梁总成\t19"
- },
- {
- "title": "2、前临时支腿",
- "page": 19,
- "level": 3,
- "original": "2、前临时支腿\t19"
- },
- {
- "title": "3、前支腿装置",
- "page": 20,
- "level": 3,
- "original": "3、前支腿装置\t20"
- },
- {
- "title": "4、中支腿装置",
- "page": 20,
- "level": 3,
- "original": "4、中支腿装置\t20"
- },
- {
- "title": "5、尾支腿装置",
- "page": 20,
- "level": 3,
- "original": "5、尾支腿装置\t20"
- },
- {
- "title": "6、纵移桁车",
- "page": 20,
- "level": 3,
- "original": "6、纵移桁车\t20"
- },
- {
- "title": "7、起重小车",
- "page": 21,
- "level": 3,
- "original": "7、起重小车\t21"
- },
- {
- "title": "8、横移轨道",
- "page": 21,
- "level": 3,
- "original": "8、横移轨道\t21"
- },
- {
- "title": "二)架桥机安装施工",
- "page": 21,
- "level": 2,
- "original": "二)架桥机安装施工\t21"
- },
- {
- "title": "1、安装准备",
- "page": 21,
- "level": 3,
- "original": "1、安装准备\t21"
- },
- {
- "title": "2、现场准备",
- "page": 22,
- "level": 3,
- "original": "2、现场准备\t22"
- },
- {
- "title": "3、架桥机安装前检查验收",
- "page": 23,
- "level": 3,
- "original": "3、架桥机安装前检查验收\t23"
- },
- {
- "title": "3、安装施工工艺流程",
- "page": 23,
- "level": 3,
- "original": "3、安装施工工艺流程\t23"
- },
- {
- "title": "4、安装步骤",
- "page": 25,
- "level": 3,
- "original": "4、安装步骤\t25"
- },
- {
- "title": "四) 架桥机拆除",
- "page": 28,
- "level": 2,
- "original": "四) 架桥机拆除\t28"
- },
- {
- "title": "1、准备工作",
- "page": 28,
- "level": 3,
- "original": "1、准备工作\t28"
- },
- {
- "title": "2、 拆除步骤",
- "page": 29,
- "level": 3,
- "original": "2、 拆除步骤\t29"
- },
- {
- "title": "3、架桥机拆除注意事项",
- "page": 29,
- "level": 3,
- "original": "3、架桥机拆除注意事项\t29"
- }
- ]
- },
- {
- "index": 5,
- "title": "第五章 施工安全保证措施",
- "page": 31,
- "original": "第五章 施工安全保证措施\t31",
- "chapter_classification": "safety",
- "subsections": [
- {
- "title": "一) 组织保证措施",
- "page": 31,
- "level": 2,
- "original": "一) 组织保证措施\t31"
- },
- {
- "title": "二) 技术保证措施",
- "page": 36,
- "level": 2,
- "original": "二) 技术保证措施\t36"
- },
- {
- "title": "1、施工安全保证措施",
- "page": 36,
- "level": 3,
- "original": "1、施工安全保证措施\t36"
- },
- {
- "title": "2、雨季施工安全保障措施",
- "page": 41,
- "level": 3,
- "original": "2、雨季施工安全保障措施\t41"
- },
- {
- "title": "3、夏季施工安全保证措施",
- "page": 42,
- "level": 3,
- "original": "3、夏季施工安全保证措施\t42"
- },
- {
- "title": "4、冬季施工安全保证措施",
- "page": 42,
- "level": 3,
- "original": "4、冬季施工安全保证措施\t42"
- },
- {
- "title": "5、职业健康保证措施",
- "page": 43,
- "level": 3,
- "original": "5、职业健康保证措施\t43"
- }
- ]
- },
- {
- "index": 6,
- "title": "第六章 质量保证措施",
- "page": 44,
- "original": "第六章 质量保证措施\t44",
- "chapter_classification": "quality",
- "subsections": []
- },
- {
- "index": 7,
- "title": "第七章 环境保证措施",
- "page": 46,
- "original": "第七章 环境保证措施\t46",
- "chapter_classification": "environment",
- "subsections": []
- },
- {
- "index": 8,
- "title": "第八章 验收要求",
- "page": 47,
- "original": "第八章 验收要求\t47",
- "chapter_classification": "acceptance",
- "subsections": [
- {
- "title": "一) 验收标准",
- "page": 47,
- "level": 2,
- "original": "一) 验收标准\t47"
- },
- {
- "title": "二)验收程序及人员",
- "page": 47,
- "level": 2,
- "original": "二)验收程序及人员\t47"
- },
- {
- "title": "1、验收程序",
- "page": 47,
- "level": 3,
- "original": "1、验收程序\t47"
- },
- {
- "title": "2、验收人员",
- "page": 48,
- "level": 3,
- "original": "2、验收人员\t48"
- },
- {
- "title": "三)验收内容",
- "page": 49,
- "level": 2,
- "original": "三)验收内容\t49"
- },
- {
- "title": "1、机械设备",
- "page": 49,
- "level": 3,
- "original": "1、机械设备\t49"
- },
- {
- "title": "2、吊索具验收",
- "page": 55,
- "level": 3,
- "original": "2、吊索具验收\t55"
- },
- {
- "title": "3、人员验收",
- "page": 58,
- "level": 3,
- "original": "3、人员验收\t58"
- }
- ]
- },
- {
- "index": 9,
- "title": "第九章 施工管理人员及作业人员配备及分工",
- "page": 59,
- "original": "第九章 施工管理人员及作业人员配备及分工\t59",
- "chapter_classification": "management",
- "subsections": [
- {
- "title": "一) 组织机构",
- "page": 59,
- "level": 2,
- "original": "一) 组织机构\t59"
- },
- {
- "title": "二) 施工管理人员",
- "page": 59,
- "level": 2,
- "original": "二) 施工管理人员\t59"
- },
- {
- "title": "三) 施工作业人员配备及分工",
- "page": 60,
- "level": 2,
- "original": "三) 施工作业人员配备及分工\t60"
- }
- ]
- },
- {
- "index": 10,
- "title": "第十章 应急处理措施",
- "page": 64,
- "original": "第十章 应急处理措施\t64",
- "chapter_classification": "safety",
- "subsections": [
- {
- "title": "一) 组织机构",
- "page": 64,
- "level": 2,
- "original": "一) 组织机构\t64"
- },
- {
- "title": "二) 职责",
- "page": 65,
- "level": 2,
- "original": "二) 职责\t65"
- },
- {
- "title": "三) 预警及信息报告",
- "page": 67,
- "level": 2,
- "original": "三) 预警及信息报告\t67"
- },
- {
- "title": "四) 应急响应",
- "page": 68,
- "level": 2,
- "original": "四) 应急响应\t68"
- }
- ]
- },
- {
- "index": 11,
- "title": "第十一章 计算书及相关图纸",
- "page": 78,
- "original": "第十一章 计算书及相关图纸\t78",
- "chapter_classification": "other",
- "subsections": [
- {
- "title": "一)主梁整体吊装受力验算",
- "page": 78,
- "level": 2,
- "original": "一)主梁整体吊装受力验算\t78"
- },
- {
- "title": "二)吊车支腿基础验算",
- "page": 81,
- "level": 2,
- "original": "二)吊车支腿基础验算\t81"
- }
- ]
- },
- {
- "index": 12,
- "title": "第十二章 附件",
- "page": 82,
- "original": "第十二章 附件\t82",
- "chapter_classification": "other",
- "subsections": []
- }
- ],
- "total_chapters": 12
- }
- },
- "document_name": "施工方案文档_docx",
- "total_chunks": 36,
- "metadata": {
- "total_pages": 33,
- "total_chars": 41411
- }
- },
- "ai_review_result": {
- "file_id": "a92b8bbcb5ab6c92f5128266055a4495",
- "total_units": 48,
- "successful_units": 49,
- "failed_units": 0,
- "review_results": [
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-0": {
- "metadata": {
- "review_location_label": "第1页:第一章 编制依据与说明",
- "original_content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4)《中华人民共和国道路交通安全法》2021年4月29日修订\n5)《中华人民共和国水土保持法》2010年12月25日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019年4月23日修订\n9)《建设工程安全生产管理条例》2023年最新修正\n10)《四川省安全生产条例》2023年5月25日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n(2)项目文件\n1)《S81线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段实施性施工组织设计》;\n3)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段T梁预制、运输及安装专项施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环境等参考资料;\n编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度地避免安全事故造成的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n编制原则\n(1)严格执行合同中标文件中所规定的,工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n编制范围\n本专项施工方案适用于S81线会理至禄劝(四川境)高速公路ZCB1-3标段架桥机的安装与拆除施工。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 5,
- "medium": 22,
- "low": 18
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "1)《中华人民共和国安全生产法》2021年修订版",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《中华人民共和国安全生产法》(2021)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "2)《中华人民共和国环境保护法》2021年修订版",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国环境保护法》(中华人民共和国主席令第九号(2014年修订版))",
- "reason": "与参考文件《中华人民共和国环境保护法》(中华人民共和国主席令第九号(2014年修订版))编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "3)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建设工程安全生产管理条例》(国务院令第393号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "4)《中华人民共和国道路交通安全法》2021年4月29日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国道路交通安全法》(主席令第47号(2021修订))",
- "reason": "与参考文件《中华人民共和国道路交通安全法》(主席令第47号(2021修订))编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "5)《中华人民共和国水土保持法》2010年12月25日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国水土保持法》(20110301)",
- "reason": "与参考文件《中华人民共和国水土保持法》(20110301)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路水运工程临时用电技术规程》(JT/T 1499-2024)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "8)《建设工程质量管理条例》2019年4月23日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《建设工程质量管理条例》(国务院令第279号)",
- "reason": "与参考文件《建设工程质量管理条例》(国务院令第279号)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "9)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建设工程安全生产管理条例》(国务院令第393号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "10)《四川省安全生产条例》2023年5月25日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《四川省安全生产条例》(2023)",
- "reason": "与参考文件《四川省安全生产条例》(2023)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "11)《危险性较大的分部分项工程安全管理规定》住建部令第37号",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《危险性较大的分部分项工程安全管理规定》(住建部令第37号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "12)《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑机械使用安全技术规程》(JGJ 33-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重机-手势信号》(GB/T 5082-2019)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "15)《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《施工现场机械设备检查技术规范》(JGJ160-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "16)《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《粗直径钢丝绳》(GB/T 20067-2017)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工起重吊装工程安全技术规范》(JGJ 276-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "18)《架桥机安全规程》GB 26469—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《架桥机安全规程》(GB 26469-2011)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "19)《起重机械安全规程》GB 6067.1—2010",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重机械安全规程》(GB/T 6067.1-2010)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《电气装置安装工程起重机电气装置施工及验收规范》(GB 50256-2014)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "21)《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重设备安装工程施工及验收规范》(GB50278-2010)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "22)《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路工程施工安全技术规范》(JTG F90-2015)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "23)《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工高处作业安全技术规范》(JGJ 80-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)《中华人民共和国安全生产法》2021年修订版",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "2)《中华人民共和国环境保护法》2021年修订版",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "3)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "4)《中华人民共和国道路交通安全法》2021年4月29日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "5)《中华人民共和国水土保持法》2010年12月25日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "8)《建设工程质量管理条例》2019年4月23日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "9)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "10)《四川省安全生产条例》2023年5月25日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "11)《危险性较大的分部分项工程安全管理规定》住建部令第37号",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "12)《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "15)《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "16)《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "18)《架桥机安全规程》GB 26469—2011",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "19)《起重机械安全规程》GB 6067.1—2010",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "21)《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "22)《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "23)《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-1": {
- "metadata": {
- "review_location_label": "第1页:第一章 编制依据与说明",
- "original_content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4)《中华人民共和国道路交通安全法》2021年4月29日修订\n5)《中华人民共和国水土保持法》2010年12月25日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019年4月23日修订\n9)《建设工程安全生产管理条例》2023年最新修正\n10)《四川省安全生产条例》2023年5月25日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n(2)项目文件\n1)《S81线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段实施性施工组织设计》;\n3)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段T梁预制、运输及安装专项施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环境等参考资料;\n编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度地避免安全事故造成的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n编制原则\n(1)严格执行合同中标文件中所规定的,工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n编制范围\n本专项施工方案适用于S81线会理至禄劝(四川境)高速公路ZCB1-3标段架桥机的安装与拆除施工。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_completeness_check",
- "check_result": "第一章 编制依据与说明下缺失编制依据中的【文件制度】内容: 1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "建议补充:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第一章 编制依据与说明内容属于,专项施工方案内容要求中的 【编制依据】 板块,应包含文件制度包括:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件;",
- "review_references": "一、编制依据 本章包含法律法规、标准规范、文件制度、编制原则、编制范围等五个方面。 法律法规包括国家、工程所在地省级政府发布的法律法规、规章制度等; 标准规范包括行业标准、技术规程等; 文件制度包括四川路桥、路桥集团、桥梁公司、建设单位下发的文件制度和管 理程序文件等; 所采用的规范和标准应全面且在有效期内,并应与招投标文件及设计要求的规 范、标准对应。 编制原则应认真贯彻执行国家方针、政策、标准和设计文件,严格执行基本建 设程序,实现工程项目的全部功能;全面履行工程合同,满足建设单位要求,有效 地集中施工力量,按期完成;按照工序关系,合理安排施工顺序,统筹考虑。 编制范围应填写完整,涵盖本方案包含的所有工程,部分工程可简要说明采取 的施工工艺。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-2": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->一)工程简介",
- "original_content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、乌东德(四川)隧道、且沿线存在3处深挖路堑高边坡地段,桥隧比为90.44%,预估建安费15亿元,总工期为43个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东德特长隧道。项目总体平面布置图见下图所视\n项目拟建梁场位于K17+035-K17+270段路基上,该段落位于大柳树沟1#桥和2#桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。\n图2-1 项目总体平面布置图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-3": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->二)周边环境条件及工程地质",
- "original_content": "二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程性质较好。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-4": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->三)气象水文",
- "original_content": "三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年平均日照2306.4小时,无霜期262天,太阳辐射强,年辐射热平均总量为136.2千卡/平方厘米,多年平均降水1095.5毫米,但气候垂直变化大,高山积雪与峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、岩性及裂隙发育程度控制。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-5": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->四)架桥机概况",
- "original_content": "四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲率半径大于450m以上、0-45°斜交公路桥。“混凝土浇筑完成后,应及时进行养护,养护时间不少与7天。\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便于施工场地的转移、运输;该型架桥机边梁横移一次就位,省去了前、后墩台人工移梁的麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安全、高效作业。同时略微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系统组成。\n图2-2 架桥机方案总图\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3架桥机技术参数表"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-6": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->五)施工平面布置",
- "original_content": "五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K17+270段右侧,位于大柳树沟1号桥与大柳树沟2号桥之间,K17+035~K17+120该段表层为5.7m的崩坡积块碎石土,K17+120~K17+270段表层为0~1.5m碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-4 K17+847~K17+915段路基\n(2)K17+847~K17+915段路基位于大柳树沟2号大桥与大柳树沟3号大桥之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基\nK18+300~K18+490段右侧,位于大柳树沟2号大桥与黄家庄大桥之间,该段表层为8~12m的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基K19+100~K19+200段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为57.2m。K19+314~K19+450段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-7": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况",
- "original_content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、乌东德(四川)隧道、且沿线存在3处深挖路堑高边坡地段,桥隧比为90.44%,预估建安费15亿元,总工期为43个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东德特长隧道。项目总体平面布置图见下图所视\n项目拟建梁场位于K17+035-K17+270段路基上,该段落位于大柳树沟1#桥和2#桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。\n图2-1 项目总体平面布置图\n\n二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程性质较好。\n\n三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年平均日照2306.4小时,无霜期262天,太阳辐射强,年辐射热平均总量为136.2千卡/平方厘米,多年平均降水1095.5毫米,但气候垂直变化大,高山积雪与峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、岩性及裂隙发育程度控制。\n\n四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲率半径大于450m以上、0-45°斜交公路桥。“混凝土浇筑完成后,应及时进行养护,养护时间不少与7天。\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便于施工场地的转移、运输;该型架桥机边梁横移一次就位,省去了前、后墩台人工移梁的麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安全、高效作业。同时略微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系统组成。\n图2-2 架桥机方案总图\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3架桥机技术参数表\n\n五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K17+270段右侧,位于大柳树沟1号桥与大柳树沟2号桥之间,K17+035~K17+120该段表层为5.7m的崩坡积块碎石土,K17+120~K17+270段表层为0~1.5m碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-4 K17+847~K17+915段路基\n(2)K17+847~K17+915段路基位于大柳树沟2号大桥与大柳树沟3号大桥之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基\nK18+300~K18+490段右侧,位于大柳树沟2号大桥与黄家庄大桥之间,该段表层为8~12m的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基K19+100~K19+200段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为57.2m。K19+314~K19+450段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。\n\n六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量要求\n适用于本项目的高速桥梁架设高速公路桥梁,能够满足大坡度、小半径斜桥、弯桥,架设要求满足架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。\n\n七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2-2 风险分析表\n\n<表格></表格>\n\n八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有限公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【设计概况】内容: 1.工程简介;2.主要技术标准",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:2.主要技术标准",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含设计概况包含:1.工程简介;2.主要技术标准;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【施工平面及立面布置】内容: 1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离;2.施工作业平台(场站)的尺寸、地面形式以及施工便道的长度、宽度、路面形式、最小弯曲半径;3.临时用水的来源、管线布置、距离,变压器、配电箱的位置、大小、线路走向、敷设方式",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含施工平面及立面布置包括:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离;2.施工作业平台(场站)的尺寸、地面形式以及施工便道的长度、宽度、路面形式、最小弯曲半径;3.临时用水的来源、管线布置、距离,变压器、配电箱的位置、大小、线路走向、敷设方式;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-8": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->六)施工要求",
- "original_content": "六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量要求\n适用于本项目的高速桥梁架设高速公路桥梁,能够满足大坡度、小半径斜桥、弯桥,架设要求满足架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "安全目标中‘不发生生产安全责任事故’表述绝对化",
- "location": "(3)安全目标\n6)认真落实各类事故防范措施,不发生生产安全责任事故。",
- "suggestion": "建议修改为‘最大限度减少生产安全责任事故,确保不发生重大及以上生产安全责任事故’或‘力争实现生产安全责任事故为零’,避免使用绝对化表述。",
- "reason": "‘不发生生产安全责任事故’属于工程文件中常见的绝对化用语,虽为表达安全目标的初衷,但现实中难以做到绝对保证,易引发法律或责任推诿风险,不符合工程管理的严谨性要求。根据相关规范,应使用‘力争’‘最大限度减少’等相对稳妥的表述。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-9": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->七)风险辨识与分级",
- "original_content": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2-2 风险分析表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "风险辨识与分级中存在表述不当问题",
- "location": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。",
- "suggestion": "将‘辩识’修改为‘辨识’,并建议在列举风险事件后补充‘等’字前增加‘可能’或‘潜在’等限定词,以避免绝对化表述,如‘可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等’可调整为‘可能引发事故伤害的风险事件包括:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落及自然灾害等’。",
- "reason": "‘辩识’为错别字,应为‘辨识’,属于表述错误;同时,列举风险事件时使用‘可能导致的’虽为常见表达,但结合上下文‘风险辨识与分级’的语境,若未加限定词,易被理解为已确定必然发生,存在工程绝对化用语风险,可能引发理解偏差或潜在法律风险,不符合安全技术文件严谨性要求。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-10": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->八)参建各方责任主体单位",
- "original_content": "八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有限公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-11": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划->一)施工进度计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期358天,约12个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2号大桥→大柳树沟3号大桥→黄家庄大桥→小村左线大桥→小村右线1号中桥→小村右线2号大桥→大柳树沟1号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3项目架桥机安拆计划\n根据现场情况包括施工条件和环境,以及吊车的配合,对于安装工期的预计是从拼装开始算起到验收完成预计大约需要7天左右的时间,如果遇到比如大风或者大雨这些不可抗拒的人力因素那么工期就要相应顺延。架桥机首次组装施工计划如下图所示\n图3-1 架桥机首次安装施工计划横道图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-12": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划->二)材料机械设备和人员计划",
- "original_content": "二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n\n<表格></表格>\n\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-13": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期358天,约12个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2号大桥→大柳树沟3号大桥→黄家庄大桥→小村左线大桥→小村右线1号中桥→小村右线2号大桥→大柳树沟1号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3项目架桥机安拆计划\n根据现场情况包括施工条件和环境,以及吊车的配合,对于安装工期的预计是从拼装开始算起到验收完成预计大约需要7天左右的时间,如果遇到比如大风或者大雨这些不可抗拒的人力因素那么工期就要相应顺延。架桥机首次组装施工计划如下图所示\n图3-1 架桥机首次安装施工计划横道图\n\n二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n\n<表格></表格>\n\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【施工材料计划】内容: 1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含施工材料计划包含:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【施工设备计划】内容: 1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含施工设备计划包含:1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【安全生产费用使用计划】内容: 1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含安全生产费用使用计划包含:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-14": {
- "metadata": {
- "review_location_label": "第5页:第四章 施工工艺技术->一)主要部件说明",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接\n2、前临时支腿\n前临时支腿在引导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 0~45°斜交桥架设时的调整功能。注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载试验进行制动检测,试验方法与重载试验相同,动作3次,检验制动\n器制动效果。\n卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发现有窜动,要立即停止作业,加固好必须检验后使用。\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 500mm。(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、整机横移时要注意观察,并听从指挥人员的信号。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 4
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "主梁总成弦杆平面外计算长度取值不符合规范要求",
- "location": "7.4.3 当桁架弦杆侧向支承点之间的距离为节间长度的2倍(图7.4.3)且两节间的弦杆轴心压力不相同时,该弦杆在桁架平面外的计算长度应按下式确定(但不应小于 0.5l₁):\n$$\nl _ { 0 } = l _ { 1 } \\left( 0 . 7 5 + 0 . 2 5 \\frac { N _ { 2 } } { N _ { 1 } } \\right)\n$$\n式中:$N _ { 1 }$ ——较大的压力,计算时取正值;\n$N _ { 2 }$ ——较小的压力或拉力,计算时压力取正值,拉力取负值。",
- "suggestion": "应根据主梁总成中弦杆在侧向支承点间两节段的实际轴心压力(N₁ 和 N₂)计算其平面外计算长度,不得直接采用节间长度 l₁ 或其他简化取值。若 N₂ 为拉力,应按负值代入公式计算,确保计算长度合理且不小于 0.5l₁。",
- "reason": "根据《钢结构设计标准》GB50017-2017 第7.4.3条,当弦杆在侧向支承点间压力变化时,其平面外计算长度必须按公式计算,且需考虑压力差的影响。待审查内容中未体现该计算过程,仅说明主梁由7节12m梁通过销轴连接,未提供压力分布数据,亦未说明是否按规范公式进行计算,存在设计参数未满足标准要求的风险。",
- "risk_level": "高风险",
- "review_references": "图7.4.3弦杆轴心压力在侧向支承点间有变化的桁架简图 1—支撑;2—桁架\n【Top1 参考文档】\n【文件】108《钢结构设计标准含条文说明》(GB50017-2017).md\n【标题】7.4 轴心受力构件的计算长度和容许长细比\n...[前文已省略]...\n, $\\iota$ 为杆件的节间长度;2对端部缩头或压扁的圆管腹杆,其计算长度取 $l$ ;3 对于立体桁架,弦杆平面外的计算长度取0.9l,同时尚应以 $0 . 9 l _ { 1 }$ 按格构式压杆验算其稳定性。\n\n## 7.4.2 确定在交叉点相互连接的桁架交叉腹杆的长细比时,在桁架平面内的计算长度应取节点中心到交叉点的距离;在桁架平面外的计算长度,当两交叉杆长度相等且在中点相交时,应按下列规定采用:\n\n### 1 压杆。\n\n#### 1)相交另一杆受压,两杆截面相同并在交叉点均不中断,则:\n\n$$\nl _ { 0 } = l \\sqrt { \\frac { 1 } { 2 } \\big ( 1 + \\frac { N _ { 0 } } { N } \\big ) }\n$$\n\n#### 2)相交另一杆受压,此另一杆在交叉点中断但以节点板\n\n搭接,则:\n\n$$\nl _ { 0 } = l \\sqrt { 1 + \\frac { \\pi ^ { 2 } } { 1 2 } \\cdot \\frac { N _ { 0 } } { N } }\n$$\n\n#### 3)相交另一杆受拉,两杆截面相同并在交叉点均不中断,则:\n\n$$\nl _ { 0 } = l \\sqrt { \\frac { 1 } { 2 } \\Big ( 1 - \\frac { 3 } { 4 } \\cdot \\frac { N _ { 0 } } { N } \\Big ) } \\geq 0 . 5 l\n$$\n\n#### 4)相交另一杆受拉,此拉杆在交叉点中断但以节点板搭接,则:\n\n$$\nl _ { 0 } = l \\sqrt { 1 - \\frac { 3 } { 4 } \\cdot \\frac { N _ { 0 } } { N } } \\geqslant 0 . 5 l\n$$\n\n#### 5)当拉杆连续而压杆在交叉点中断但以节点板搭接,若$N _ { 0 } \\geqslant N$ 或拉杆在桁架平面外的弯曲刚度 $E I _ { \\mathrm { ~ y ~ } } \\geqslant$ 3N²(N-1)时,取l=0.5l。\n\n式中: $l$ —桁架节点中心间距离(交叉点不作为节点考虑)$\\mathrm { ( m m ) }$ ;\n\n$N$ 、 $N _ { 0 }$ ——所计算杆的内力及相交另一杆的内力,均为绝对值;两杆均受压时,取 $N _ { 0 } { \\leqslant } N$ ,两杆截面应相同(N)。\n\n### 2 拉杆,应取 ${ \\mathrm { \\Omega } } l _ { 0 } = l$ 。当确定交叉腹杆中单角钢杆件斜平面内的长细比时,计算长度应取节点中心至交叉点的距离。当交叉腹杆为单边连接的单角钢时,应按本标准第7.6.2条的规定确定杆件等效长细比。\n\n## 7.4.3 当桁架弦杆侧向支承点之间的距离为节间长度的2倍(图7.4.3)且两节间的弦杆轴心压力不相同时,该弦杆在桁架平面外的计算长度应按下式确定(但不应小于 $0 . 5 l _ { 1 } \\big )$ :\n$$\nl _ { 0 } = l _ { 1 } \\left( 0 . 7 5 + 0 . 2 5 \\frac { N _ { 2 } } { N _ { 1 } } \\right)\n$$\n\n式中: $N _ { 1 }$ - -较大的压力,计算时取正值;\n\n$N _ { 2 }$ -较小的压力或拉力,计算时压力取正值,拉力取负值。\n\n \n图7.4.3弦杆轴心压力在侧向支承点间有变化的桁架简图 1—支撑;2—桁架\n\n### 7.4.4塔架的单角钢主杆,应按所在两个侧面的节点分布情况,采用下列长细比确定稳定系数 $\\varphi$ :\n\n1当两个侧面腹杆体系的节点全部重合时[图7.4.4(a)]:\n\n$$\n\\lambda = l / i _ { \\mathrm { y } }\n$$\n\n \n图7.4.4不同腹杆体系的塔架\n\n2当两个侧面腹杆体系的节点部分重合时[图7.4.4(b)]:\n\n$$\n\\lambda = 1 . 1 l / i _ { \\mathrm { u } }\n$$\n\n3当两个侧面腹杆体系的节点全部都不重合时[图7.4.4 (c)]:\n\n$$\n\\lambda = 1 . 2 l / i _ { \\mathrm { u } }\n$$\n\n式中: $i _ { \\mathbf { y } }$ 截面绕非对称主轴的回转半径;\n\n、 $i _ { \\mathrm { u } }$ —分别为较大的节间长度和绕平行轴的回转半径。\n\n4当角钢宽厚比符合本标准第7.3.4条第2款要求时,应按该款规定确定系数 $\\varphi$ ,并按本标准第7.3.3条的规定计算主杆的承载力。\n\n### 7.4.5塔架单角钢人字形或 $\\mathrm { v }$ 形主斜杆,当辅助杆多于两道时,宜连接两相邻侧面的主斜杆以减小其计算长度。当连接有不多于两道辅助杆时,其长细比宜乘以1.1的放大系数。\n\n### 7.4.6验算容许长细比时,可不考虑扭转效应,计算单角钢受压构件的长细比时,应采用角钢的最小回转半径,但计算在交叉点相互连接的交叉杆件平面外的长细比时,可采用与角钢肢边平行轴的回转半径。轴心受压构件的容许长细比宜符合下列规定:\n1跨度等于或大于 $6 0 \\mathrm { m }$ 的桁架,其受压弦杆、端压杆和直接承受动力荷载的受压腹杆的长细比不宜大于120;\n\n2轴心受压构件的长细比不宜超过表7.4.6规定的容许值,但当杆件内力设计值不大于承载能力的 $50 \\%$ 时,容许长细比值可取200。\n\n表7.4.6 受压构件的长细比容许值 \n\n\n\n\n\n### 7.4.7验算容许长细比时,在直接或间接承受动力荷载的结构中,计算单角钢受拉构件的长细比时,应采用角钢的最小回转半径,但计算在交叉点相互连接的交叉杆件平面外的长细比时,可采用与角钢肢边平行轴的回转半径。受拉构件的容许长细比宜符合下列规定:\n\n1除对腹杆提供平面外支点的弦杆外,承受静力荷载的结构受拉构件,可仅计算竖向平面内的长细比;\n\n2中级、重级工作制吊车桁架下弦杆的长细比不宜超过200;\n\n3在设有夹钳或刚性料耙等硬钩起重机的厂房中,支撑的长细比不宜超过300;\n\n4受拉构件在永久荷载与风荷载组合作用下受压时,其长细比不宜超过250;\n\n5跨度等于或大于 $6 0 \\mathrm { m }$ 的桁架,其受拉弦杆和腹杆的长细比,承受静力荷载或间接承受动力荷载时不宜超过300,直接承受动力荷载时不宜超过 250;\n\n6受拉构件的长细比不宜超过表7.4.7规定的容许值。柱间支撑按拉杆设计时,竖向荷载作用下柱子的轴力应按无支撑时考虑。\n\n表7.4.7受拉构件的容许长细比 \n\n\n\n\n\n### 7.4.8上端与梁或桁架铰接且不能侧向移动的轴心受压柱,计算长度系数应根据柱脚构造情况采用,对铰轴柱脚应取1.0,对底板厚度不小于柱翼缘厚度2倍的平板支座柱脚可取为0.8。由侧向支撑分为多段的柱,当各段长度相差 $10 \\%$ 以上时,宜根据相关屈曲的原则确定柱在支撑平面内的计算长度。\n\n##\n...[后文已省略]...\n",
- "reference_source": "108《钢结构设计标准含条文说明》(GB50017-2017).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-15": {
- "metadata": {
- "review_location_label": "第5页:第四章 施工工艺技术",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接\n2、前临时支腿\n前临时支腿在引导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 0~45°斜交桥架设时的调整功能。注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载试验进行制动检测,试验方法与重载试验相同,动作3次,检验制动\n器制动效果。\n卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发现有窜动,要立即停止作业,加固好必须检验后使用。\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 500mm。(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、整机横移时要注意观察,并听从指挥人员的信号。\n\n二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、固定压板→安装三道上横梁及尾支腿\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4级,视线良好的环境下进行安装。\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式\n表4-2 钢丝绳破断拉力表\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支腿支点距应该满足安装需求(约为30m左右),起重设备采用1台80t吊车进行起重安装(单机抬吊)\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m左右)、高度差,确定合理的前、中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20的钢丝绳,设置于支腿两侧。在硬化场地上预埋直径25mm的U型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm以上,横轨横向应保持水平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16或中120*6以上圆管)5t手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。注意事项:\n台车跑轮须用木楔楔实,保证不能左右滑动。\n前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1台80t汽车吊将单节主梁吊装安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n布线要整齐,接头处必须做好防水、漏电事项。\n试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n架桥机拆除\n1、准备工作\n1.1拆除场地检查、清理、平整\nA拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护措施\nB清理场地和周围影响拆除作业的障碍物\nC桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m\n\n2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2拆除人员组织及技术准备\nA拆除人员按照施工专项方案安排到位,并持证上岗\nB由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行全面的安全质量技术交底\nC制定各项防火、防雷击等预防措施\n1.3架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊\n机、电缆等辅助材料的质量和数量是否满足要求。\n拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方能继续进行\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得赶进度在夜间或雷雨时间作业。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "technology",
- "check_item_code": "technology_completeness_check",
- "check_result": "第四章 施工工艺技术下缺失施工工艺技术中的【主要施工方法概述】内容: 1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "建议补充:2.模板等重要材料的配置数量",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第四章 施工工艺技术内容属于,专项施工方案内容要求中的 【施工工艺技术】 板块,应包含主要施工方法概述包括:1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量;",
- "review_references": "四、施工工艺技术 本章包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操 作要求、检查要求等六个方面。 主要施工方法概述应简要说明采取的主要施工工艺和施工方法,以及模板等重 要材料的配置数量。 技术参数包含主要使用材料的类型、规格,以及主要设备的名称、型号、出厂 时间、性能参数、自重等。 施工准备包含测量放样、临时用水、临时用电、场地、人员、设备、安全防护 措施和人员上下通道等内容。 工艺流程包含整个方案的主要施工工序,按照施工的先后顺序,建议采用金山 软件流程图或微软Visio进行绘制,工艺流程图采用无颜色填充,字体为五号或小 五号。 施工方法及操作要求根据工艺流程中主要的施工工序依次进行描述其操作方法, 并说明施工要点,常见问题及预防、处理措施。 检查要求包含所用的材料,构配件进场质量检查、抽查,以及施工过程中各道 工序检查内容及标准。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-16": {
- "metadata": {
- "review_location_label": "第7页:第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、固定压板→安装三道上横梁及尾支腿\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4级,视线良好的环境下进行安装。\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式\n表4-2 钢丝绳破断拉力表\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支腿支点距应该满足安装需求(约为30m左右),起重设备采用1台80t吊车进行起重安装(单机抬吊)\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m左右)、高度差,确定合理的前、中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20的钢丝绳,设置于支腿两侧。在硬化场地上预埋直径25mm的U型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm以上,横轨横向应保持水平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16或中120*6以上圆管)5t手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。注意事项:\n台车跑轮须用木楔楔实,保证不能左右滑动。\n前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1台80t汽车吊将单节主梁吊装安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n布线要整齐,接头处必须做好防水、漏电事项。\n试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n架桥机拆除\n1、准备工作\n1.1拆除场地检查、清理、平整\nA拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护措施\nB清理场地和周围影响拆除作业的障碍物\nC桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊装钢丝绳安全系数与强度等级不符合规范要求",
- "location": "【待审查内容】4、安装步骤(2)安装说明:吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式",
- "suggestion": "应核实并调整吊装钢丝绳的安全系数和强度等级,确保符合《架桥机通用技术条件》(GB/T26470-2011)中关于金属结构件材料及吊装安全的相关规定。建议安全系数不低于10,且钢丝绳强度等级应根据实际工况和规范要求进行校核。",
- "reason": "根据【参考依据】5311条,架桥机主要结构件材料应符合GB/T26470-2011中的规定,且不允许采用级以下钢材。虽然该条未直接规定钢丝绳的强度等级和安全系数,但作为架桥机安装过程中的关键吊装设备,钢丝绳的安全性能直接影响施工安全。GB/T26470-2011中虽未明确钢丝绳安全系数,但结合《起重机械安全规程》(GB6067)等通用规范,吊装钢丝绳安全系数通常不应低于10。当前提出的8倍安全系数低于行业通用安全要求,存在安全隐患。同时,1770MPa强度等级虽属高强钢丝绳,但若未明确其是否满足GB/T26470-2011中对吊具及承力件的材料要求,也存在合规风险。",
- "risk_level": "高风险",
- "review_references": "53 金属结构## 531 基本要求 5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n【Top2 参考文档】\n【文件】132《架桥机通用技术条件》(GB-T26470-2011).md\n【标题】53 金属结构\n53 金属结构## 531 基本要求\n\n5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n\n### 5.3.1.2 主要结构件在涂装前应进行表面喷(抛)丸处理,且应达到 GB/T8923中规定的 $\\mathrm { S a 2 \\frac { 1 } { 2 } }$ 级或\n\nSt3级,其他构件应达到Sa2级或St2级。\n\n5313 焊接构件用焊条、焊丝、焊剂应与被焊接的材料相适应。\n\n5314 金属结构件的设计应便于检查、维修和排水。\n\n## 532 焊接\n\n5321 焊接坡口的形式和尺寸应符合 / 和 / 规定。5322 钢的弧焊接头缺陷质量应符合 — 中 的规定。5323 架桥机主梁、导梁、小车架、吊具及主要承力支腿等位于受拉区的翼缘板及腹板的对接焊缝应进行 $100 \\%$ 无损检测,超声波检测时不应低于 / 中的 级要求,射线检测时不应低于 / 中规定的 级。\n\n## 533 高强度螺栓连接\n\n### 5.3.3.1 高强度螺栓连接的设计应符合 GB/T3811和 GB50017的相关规定。\n\n5332 非剪切型高强度螺栓接头所用螺栓、螺母、垫圈及其技术要求应分别符合 / 、和 的规定 扭剪型高强度螺栓接头所用的钢结构用扭剪型高强度螺栓连接副应符合 / 的规定。\n\n## 534 主梁(架桥机主梁组装完成以后)\n\n5341 主梁设计要求有上拱时,跨中上拱允许偏差为 $S / 5 ~ 0 0 0$ ,且最大上拱度应位于跨中部 $S / 1 0$ 范围内。设计未要求上拱时,主梁跨度中部最低点不应低于水平线 $S / 1 \\ 0 0 0$ 。\n\n5342 主梁在水平方向产生的弯曲,对正轨箱形梁和半偏轨箱形梁不应大于 $S _ { 3 } / 1 5 0 0 ( S _ { 3 }$ 为两端始于第一块横向加筋肋的实测长度,在离上翼缘板约 $1 0 0 \\ \\mathrm { m m }$ 的横向加筋肋处测量),最大不应超过15mm。\n\n对全偏轨箱形梁、单腹板梁和桁架梁,应满足 和 对轨道的要求。\n\n5343 主梁腹板的局部翘曲,用以 $1 \\textrm { m }$ 平尺检测,离上翼缘板 $H / 3$ 以内不应大于 δ,其余区域不应大于 $1 , 2 \\delta$ (见图 )。\n\n \n图 10\n\n \n图 11\n\n5344 箱形梁及单腹板梁上翼缘板的水平偏斜值 $C { \\leqslant } B / 2 0 0$ (见图 ),此值允许在未装轨道前在大筋板或节点处测量。\n\n5345 箱形梁腹板的垂直偏斜 $h { \\leqslant } H / 2 0 0$ ,单腹板梁及桁架梁的垂直偏斜 $h { \\leqslant } H / 3 0 0$ (见图 ),此值应在大筋板或节点处测量。\n\n5346 桁架梁杆件的直线度 $\\Delta l { \\leqslant } 0 . \\ 0 0 1 \\ 5 a$ (见图 )。\n\n \n图 12\n\n \n图 13\n\n5347 架桥机主梁支承跨度范围内以各支腿中心线形成的平面和小车轨道上表面中心线的交点所得的对角线长度的差值不应大于 $5 ~ \\mathrm { m m }$ 。\n\n5348 吊梁小车轨道应满足以下要求(见图 ):\n\n对于起重量小于 $3 2 0 ~ \\mathrm { t }$ 的分段拼接桁架梁,每段梁上小车轨道不允许有接缝(允许焊为一体),桁架梁拼接处的小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 4 ~ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 2 ~ \\mathrm { m m }$ ; \n) 非焊接连接的轨道应当在端部加挡铁。\n\n对于其他梁,小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 1 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 1 ~ \\mathrm { m m }$ ; \n) 对正轨箱形梁及半偏轨箱形梁,轨道接缝应该放在筋板上,允差不应大于 $1 5 ~ \\mathrm { m m }$ ; \n) 两端最短一段轨道长度不应小于 $1 , 5 \\textrm { m }$ ,并且在端部加挡铁。\n\n \n图 14\n\n \n图 15\n\n5349 主梁为偏轨箱形梁 单腹板梁的小车轨道中心线对承轨腹板中心线的位置偏差 见图$g { \\leqslant } { \\delta } / 2 , { \\delta }$ 为腹板厚度。\n53410 两根运行小车轨道轨距偏差 $\\Delta K = \\pm 8 ~ \\mathrm { m m }$ ,如图 所示。 $K$ 为小车轨距的名义值。\n\n53411 在与小车运行方向相垂直的同一截面上两根小车轨道表面之间的高低差,当 $K { \\leqslant } 2 \\mathrm { ~ m ~ }$ 时,$\\Delta h { \\leqslant } 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h { \\leqslant } 2 . 5 ~ K , K$ 以米 $\\left( \\mathrm { m } \\right)$ )计, $\\Delta h$ 最大不超过 $1 0 ~ \\mathrm { m m }$ ,如图 所示。\n\n \n图 16\n53412 架桥机两根小车轨道顶部形成的局部平面度 $\\Delta h _ { \\mathrm { r } }$ (见图 ,相对于四个轮子形成的标准平面),当 $K { \\leqslant } 2 \\mathrm { m }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 2 . 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 1 . 2 5 \\ K , K$ 以米 $\\mathrm { { ( m ) } }$ )计, $\\Delta h _ { \\mathrm { r } }$ 最大不超过 $5 ~ \\mathrm { m m }$ ( $. K$ 为小车轨距的名义值)。\n\n \n图 17\n\n53413 小车运行轨道的侧向直线度(见图 ),应符合以下要求:\n\n) 每 $2 \\textrm { m }$ 长度内 $b$ 不应大于 $2 \\textrm { m m }$ ; \nb) 轨道全长范围内 $b$ 不应大于 $1 0 \\ \\mathrm { m m }$ 。\n\n单位为毫米\n图 18\n",
- "reference_source": "132《架桥机通用技术条件》(GB-T26470-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊装钢丝绳安全系数与强度等级不符合规范要求",
- "location": "4、安装步骤\n(2)安装说明\n步骤5:主梁及导梁安装\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。",
- "suggestion": "将吊装钢丝绳安全系数调整为不低于10,强度等级应符合GB/T26470-2011中对架桥机用钢丝绳的安全要求,建议采用1870MPa或更高强度等级的钢丝绳。",
- "reason": "根据【参考依据】《架桥机通用技术条件》(GB/T26470-2011)5311条,架桥机主要结构件材料应符合相关标准,且不允许采用级以下钢材。虽然该条未直接规定钢丝绳参数,但结合其对结构安全性的整体要求,钢丝绳作为关键吊装部件,其安全系数和强度等级应满足设备安全运行的最低要求。GB/T26470-2011中虽未明确列出钢丝绳安全系数,但依据《起重机械安全规程》(GB6067)及行业通用标准,架桥机吊装用钢丝绳安全系数不应低于10,强度等级不应低于1870MPa。当前方案中安全系数为8、强度等级1770MPa,低于行业通用安全要求,存在严重安全隐患。",
- "risk_level": "高风险",
- "review_references": "53 金属结构## 531 基本要求 5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n【Top2 参考文档】\n【文件】132《架桥机通用技术条件》(GB-T26470-2011).md\n【标题】53 金属结构\n53 金属结构## 531 基本要求\n\n5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n\n### 5.3.1.2 主要结构件在涂装前应进行表面喷(抛)丸处理,且应达到 GB/T8923中规定的 $\\mathrm { S a 2 \\frac { 1 } { 2 } }$ 级或\n\nSt3级,其他构件应达到Sa2级或St2级。\n\n5313 焊接构件用焊条、焊丝、焊剂应与被焊接的材料相适应。\n\n5314 金属结构件的设计应便于检查、维修和排水。\n\n## 532 焊接\n\n5321 焊接坡口的形式和尺寸应符合 / 和 / 规定。5322 钢的弧焊接头缺陷质量应符合 — 中 的规定。5323 架桥机主梁、导梁、小车架、吊具及主要承力支腿等位于受拉区的翼缘板及腹板的对接焊缝应进行 $100 \\%$ 无损检测,超声波检测时不应低于 / 中的 级要求,射线检测时不应低于 / 中规定的 级。\n\n## 533 高强度螺栓连接\n\n### 5.3.3.1 高强度螺栓连接的设计应符合 GB/T3811和 GB50017的相关规定。\n\n5332 非剪切型高强度螺栓接头所用螺栓、螺母、垫圈及其技术要求应分别符合 / 、和 的规定 扭剪型高强度螺栓接头所用的钢结构用扭剪型高强度螺栓连接副应符合 / 的规定。\n\n## 534 主梁(架桥机主梁组装完成以后)\n\n5341 主梁设计要求有上拱时,跨中上拱允许偏差为 $S / 5 ~ 0 0 0$ ,且最大上拱度应位于跨中部 $S / 1 0$ 范围内。设计未要求上拱时,主梁跨度中部最低点不应低于水平线 $S / 1 \\ 0 0 0$ 。\n\n5342 主梁在水平方向产生的弯曲,对正轨箱形梁和半偏轨箱形梁不应大于 $S _ { 3 } / 1 5 0 0 ( S _ { 3 }$ 为两端始于第一块横向加筋肋的实测长度,在离上翼缘板约 $1 0 0 \\ \\mathrm { m m }$ 的横向加筋肋处测量),最大不应超过15mm。\n\n对全偏轨箱形梁、单腹板梁和桁架梁,应满足 和 对轨道的要求。\n\n5343 主梁腹板的局部翘曲,用以 $1 \\textrm { m }$ 平尺检测,离上翼缘板 $H / 3$ 以内不应大于 δ,其余区域不应大于 $1 , 2 \\delta$ (见图 )。\n\n \n图 10\n\n \n图 11\n\n5344 箱形梁及单腹板梁上翼缘板的水平偏斜值 $C { \\leqslant } B / 2 0 0$ (见图 ),此值允许在未装轨道前在大筋板或节点处测量。\n\n5345 箱形梁腹板的垂直偏斜 $h { \\leqslant } H / 2 0 0$ ,单腹板梁及桁架梁的垂直偏斜 $h { \\leqslant } H / 3 0 0$ (见图 ),此值应在大筋板或节点处测量。\n\n5346 桁架梁杆件的直线度 $\\Delta l { \\leqslant } 0 . \\ 0 0 1 \\ 5 a$ (见图 )。\n\n \n图 12\n\n \n图 13\n\n5347 架桥机主梁支承跨度范围内以各支腿中心线形成的平面和小车轨道上表面中心线的交点所得的对角线长度的差值不应大于 $5 ~ \\mathrm { m m }$ 。\n\n5348 吊梁小车轨道应满足以下要求(见图 ):\n\n对于起重量小于 $3 2 0 ~ \\mathrm { t }$ 的分段拼接桁架梁,每段梁上小车轨道不允许有接缝(允许焊为一体),桁架梁拼接处的小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 4 ~ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 2 ~ \\mathrm { m m }$ ; \n) 非焊接连接的轨道应当在端部加挡铁。\n\n对于其他梁,小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 1 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 1 ~ \\mathrm { m m }$ ; \n) 对正轨箱形梁及半偏轨箱形梁,轨道接缝应该放在筋板上,允差不应大于 $1 5 ~ \\mathrm { m m }$ ; \n) 两端最短一段轨道长度不应小于 $1 , 5 \\textrm { m }$ ,并且在端部加挡铁。\n\n \n图 14\n\n \n图 15\n\n5349 主梁为偏轨箱形梁 单腹板梁的小车轨道中心线对承轨腹板中心线的位置偏差 见图$g { \\leqslant } { \\delta } / 2 , { \\delta }$ 为腹板厚度。\n53410 两根运行小车轨道轨距偏差 $\\Delta K = \\pm 8 ~ \\mathrm { m m }$ ,如图 所示。 $K$ 为小车轨距的名义值。\n\n53411 在与小车运行方向相垂直的同一截面上两根小车轨道表面之间的高低差,当 $K { \\leqslant } 2 \\mathrm { ~ m ~ }$ 时,$\\Delta h { \\leqslant } 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h { \\leqslant } 2 . 5 ~ K , K$ 以米 $\\left( \\mathrm { m } \\right)$ )计, $\\Delta h$ 最大不超过 $1 0 ~ \\mathrm { m m }$ ,如图 所示。\n\n \n图 16\n53412 架桥机两根小车轨道顶部形成的局部平面度 $\\Delta h _ { \\mathrm { r } }$ (见图 ,相对于四个轮子形成的标准平面),当 $K { \\leqslant } 2 \\mathrm { m }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 2 . 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 1 . 2 5 \\ K , K$ 以米 $\\mathrm { { ( m ) } }$ )计, $\\Delta h _ { \\mathrm { r } }$ 最大不超过 $5 ~ \\mathrm { m m }$ ( $. K$ 为小车轨距的名义值)。\n\n \n图 17\n\n53413 小车运行轨道的侧向直线度(见图 ),应符合以下要求:\n\n) 每 $2 \\textrm { m }$ 长度内 $b$ 不应大于 $2 \\textrm { m m }$ ; \nb) 轨道全长范围内 $b$ 不应大于 $1 0 \\ \\mathrm { m m }$ 。\n\n单位为毫米\n图 18\n",
- "reference_source": "132《架桥机通用技术条件》(GB-T26470-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-17": {
- "metadata": {
- "review_location_label": "第10页:第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2拆除人员组织及技术准备\nA拆除人员按照施工专项方案安排到位,并持证上岗\nB由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行全面的安全质量技术交底\nC制定各项防火、防雷击等预防措施\n1.3架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊\n机、电缆等辅助材料的质量和数量是否满足要求。\n拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方能继续进行\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得赶进度在夜间或雷雨时间作业。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥面拆除完毕后架桥机各部件转运到存放地点。",
- "suggestion": "将第3条中'确保吊装站位,及伸缩臂能安全有效进行'修改为'确保吊装站位及伸缩臂作业空间畅通,不影响吊装作业'",
- "reason": "1) 原文第3条要求'严禁堆放杂物'以保障吊装站位和伸缩臂安全,但第4条在描述吊装过程时,将'待桥面拆除完毕后架桥机各部件转运到存放地点'作为吊装过程的后续动作,逻辑上存在矛盾:若吊装作业尚未完成,架桥机部件尚在桥上,而第3条却要求确保吊装站位和伸缩臂能安全有效进行,这暗示吊装作业正在进行,但第4条又将其置于桥面拆除之后,造成时间顺序冲突;2) 吊装作业应在桥面拆除前或过程中进行,而原文将架桥机部件转运到存放地点作为桥面拆除后的动作,与第3条中对吊装作业条件的前置要求不一致,导致逻辑矛盾;3) 若按此顺序执行,可能导致吊装作业无法开展或设备无法转移,影响施工流程,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-18": {
- "metadata": {
- "review_location_label": "第11页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安全风险数据库,做好安全风险管控,落实安全防护措施。\n图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n\n<表格></表格>\n\n5、安全生产管理制度\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24学时,每年再培训8学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32学时,每年再培训12学时。转岗或歇工6个月以上复工人员,应当重新接受本单位安全教育培训24学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT点评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防火检查制度\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 3,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "安全环保部组织验收安全检查的职责与参与部门分工不明确",
- "location": "(2)安全检查制度\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。",
- "suggestion": "明确安全环保部在验收安全检查中的具体职责,应与【参考依据】中工程管理部门的职责保持一致,即‘组织均衡生产,保证安全工程与生产任务协调一致’。建议将‘安全环保部和工程建设部组织’修改为‘工程管理部门牵头组织,安全环保部参与并监督’,以符合GB50656-2011中对工程管理部门在生产组织与安全管理协调中的核心职责定位。",
- "reason": "根据【参考依据】第6条,工程管理部门负责‘组织均衡生产,保证安全工程与生产任务协调一致’,而安全环保部属于监督与执行部门,不具备组织验收检查的主导权。当前条款将安全环保部列为验收检查的组织方,与规范中对工程管理部门的职责定位存在偏差,可能导致职责交叉或管理权责不清,影响安全管理的系统性与合规性。",
- "risk_level": "高风险",
- "review_references": "## 6、工程管理部门 (1)组织均衡生产,保证安全工程与生产任务协调一致; (2)科学合理组织生产,保证施工人员劳逸结合;\n【Top1 参考文档】\n【文件】69《建筑施工企业安全生产管理规范》(GB50656-2011).md\n【标题】5 安全生产管理组织体系\n5 安全生产管理组织体系5.0.1对于各层次的管理者,除负责各自管理范围内的生产经营管理职责外,还应负责其运行范围内的安全生产管理,确保管理范围内的安全生产管理体系正常运行和安全业绩的持续改进。安全生产责任体系由纵向与横向展开。\n\n5.0.31企业安全生产决策机构可为安全生产委员会或安全生产领导小组等。\n\n2 由于安全生产在建筑施工企业处于特殊的重要地位,安全与生产矛盾处理难度大,建筑施安全生产的第一责任人必须是企业的主要负责人,只有这样才能把安全与生产从组织领导上统一起来,使安全管理体系得以有效运行。\n\n4各管理层的其他职能部门和(或)相关岗位负责落实与其职能相对应如:安全生产教育培训、资金保障、技术管理、设施设备管理、消防管理、分包管理、劳动保护、文明卫生等相关职责和目标,可能有的职能部门会负责多项内容。\n\n例如:\n\n1、企业法定代表人(实际负责人)\n\n2、企业安全生产工作的第一责任人,对本企业安全生产负全面领导责任;\n\n(1) 贯彻执行国家和市有关安全生产的方针政策和法规、规范;(2) 掌握本企业安全生产动态,定期研究安全工作;(3) 组织制定安全工作实施计划。(4) 组织制定和完善各项安全生产规章制度及奖惩办法;(5) 建立、健全安全生产责任制,并领导、组织考核工作;(6) 建立、健全安全生产保证体系,保证安全生产投入;(7) 督促、检查安全生产工作,及时消除生产安全事故隐患;(8) 组织制定并实施生产安全事故应急救援预案;(9) 及时、如实报告生产安全事故。在事故调查组的指导下,领导、组织有关部门或人员,配合事故调查处理工作,监督防范措施的制定和落实,预防事故重复发生。\n\n2、企业主管安全生产负责人\n\n(1)组织落实安全生产责任制和安全生产管理制度,对安全生产工作负直接 \n领导责任,(2) 组织实施安全工作规划、目标及实施计划;(3) 领导、组织安全生产宣传教育工作(4) 确定安全生产考核指标。(5) 领导、组织安全生产检查;(6) 领导、组织对分包分供方的安全生产主体资格考核与审查;(7) 认真听取、采纳安全生产的合理化建议,保证安全生产保障体系的正常 \n运转;(8)发生生产安全事故,组织实施生产安全事故应急救援;\n\n3、企业技术负责人的安全生产职责\n\n(1) 贯彻执行国家和上级的安全生产方针、政策,在本企业施工安全生产中\n\n负技术领导责任;\n\n(2)审批施工组织设计和施工方案时,审查其安全技术措施,并做出决定性意见;(3) 领导开展安全技术攻关活动,并组织技术鉴定和验收;(4)新材料、新技术、新工艺使用前,组织审查其使用和实施过程中的安全性,组织编制或审定相应的操作规程;(5)参加生产安全事故的调查和分析,从技术上分析事故原因,制定整改防范措施。\n\n## 4、企业总会计师\n\n(1)组织落实本企业财务工作的安全生产责任制,认真执行安全生产奖惩规定;\n\n(2)组织编制年度财务计划的同时,编制安全生产费用投入计划,保证经费到位和合理开支;\n\n(3) 监督、检查安全生产费用的使用情况;\n\n## 5、企业其他负责人应当按照分工抓好主管范围内的安全生产工作,对主管范围内的安全生产工作负领导责任。\n\n## 6、工程管理部门\n\n(1)组织均衡生产,保证安全工程与生产任务协调一致; \n(2)科学合理组织生产,保证施工人员劳逸结合;\n\n## 7、技术管理部门\n\n(1) 贯彻执行国家和上级有关安全技术及安全操作规程规定;(2) 组织编制、审查专项安全施工方并抽查实施情况;(3) 新技术、新材料、新工艺使用前,制定相应的安全技术措施和安全操作规程;(4) 分析伤亡事故和重大已、未遂事故中技术原因,从技术上提出防范措施。\n\n## 8、机械动力管理部门\n\n(1) 负责本企业机械动力设备的安全管理,监督检查; \n(2) 对相关特种作业人员定期培训、考核; \n(3) 参与设备施工组织设计、施工方案的会审; \n(4) 分析事故涉及设备原因,提出防范措施。\n\n## 9、劳务管理\n\n(1) 审查劳务分包人员资格;\n\n(2)从用工方面分析事故原因,提出防范措施\n\n## 10、物资管理部门\n\n(1)确保购置(租赁)的各类安全物资、劳动保护用品符合国家或有关行业的技术标准、规范的要求;\n\n## 11、人力资源部门\n\n(1)审查安全管理人员资格,足额配备安全管理人员,开发、培养安全管理力量;\n\n## 12、财务管理部门安全生产职责\n\n(1)及时提取安全技术措施经费、劳动保护经费及其它安全生产所需经费,保证专款专用;\n\n(2) 协助安全主管部门办理安全奖、罚款手续。\n\n## 13、保卫消防部门\n\n(1) 贯彻执行有关消防保卫的法规、规定;\n\n(2) 参与火灾事故的调查,提出处理意见;\n\n## 14、行政卫生部门安全生产职责\n\n(1) 监测有毒有害作业场所的尘毒浓度,做好职业病预防工作;\n\n## 15、工会组织\n\n(1) 依法组织职工参加本企业安全生产工作的民主管理和民主监督;\n\n(2) 对侵害职工在安全生产方面的合法权益的问题进行调查,代表职工与企业进行交涉;\n\n(3) 参加对生产安全事故调查处理,向有关部门提出处理意见。\n",
- "reference_source": "69《建筑施工企业安全生产管理规范》(GB50656-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "专职安全员未明确执行跟班检查、日常例检及纠正违章行为的记录要求",
- "location": "(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。",
- "suggestion": "明确专职安全员每日深入现场进行例检时需作好检查记录,对违规行为及时纠正或处罚,并将记录纳入安全检查制度的执行台账中。",
- "reason": "根据【参考依据】4.5.3条,施工安全技术措施包括‘监控检查验收’,且要求对安全技术措施落实情况进行监督。待审查内容中虽提及‘专职安全员应每天深入现场进行例检,纠正或处罚违章行为’,但未明确要求‘作好检查记录’,与《建筑机械使用安全技术规程》中对安全检查、监督和记录的要求不一致,属于对非参数性安全要求的遗漏。",
- "risk_level": "中风险",
- "review_references": "施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。 劳动力计划包括:专职安全管理人员、特种作业人员等。\n【Top1 参考文档】\n【文件】3《建筑机械使用安全技术规程》(JGJ33-2012).md\n【标题】4 建筑起重机械\n4 建筑起重机械## 4.1 一般规定\n\n### 4.1.2 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第七条制定的。\n\n### 4.1.3 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第八条制定的。\n\n### 4.1.4 《建筑起重机械安全监督管理规定》(第166号建设部令)规定:\n\n安装单位应当按照安全技术标准及建筑起重机械性能要求,编制建筑起重机械安装、拆卸工程专项施工方案,并由本单位技术负责人签字;专项施工方案,安装、拆卸人员名单,安装、拆卸时间等材料报施工总承包单位和监理单位审核后,告知工程所在地县级以上地方人民政府建设主管部门。\n\n建筑起重机械安装完毕后,安装单位应当按照安全技术标准及安装使用说明书的有关要求对建筑起重机械进行自检、调试和试运转。自检合格的,应当出具自检合格证明,并向使用单位进行安全使用说明。使用单位应当组织出租、安装、监理等有关单位进行验收,或者委托具有相应资质的检验检测机构进行验收。建筑起重机械经验收合格后方可投人使用,未经验收或者验收不合格的不得使用。\n\n### 4.1.8 基础承载能力不满足要求,容易引起起重机的倾翻。\n\n### 4.1.11 本条规定的安全装置是起重机必备的,否则不能使用。利用限位装置或限制器代替抽动停车等动作,将造成失误而发生事故。建筑起重机械安全装置见表4-1。\n\n表4-1建筑起重机械安全装置一览表 \n\n\n\n\n\n注: $\\bullet$ 表示该起重机械有此安全装置;$\\bigcirc$ 表示该起重机械无此安全装置。\n\n### 4.1.12 本条规定了信号司索工的职责,要求操作人员要听从指挥,但对错误指挥要拒绝执行,这对防止失误十分必要。\n\n### 4.1.14 风力等级和风速对照见表4-2。\n\n表4-2风力等级和风速对照表 \n\n\n\n\n\n本规程风速指施工现场风速,包括地面和高耸设备高处风速。\n\n恶劣天气能使露天作业的起重机部件受损、受潮,所以需要经过试吊无误后再使用。\n\n### 4.1.18 起重机的额定起重量是以吊钩与重物在垂直情况下核定的。斜吊、斜拉其作用力在起重机的一侧,破坏了起重机的稳定性,会造成超载及钢丝绳出槽,还会使起重臂因侧向力而扭弯,甚至造成倾翻事故。对于地下埋设或凝固在地面上的重物,除本身重量外,还有不可估计的附着力(埋设深度和凝固强度决定附着力的大小),将造成严重超载而酿成事故。\n\n### 4.1.19 吊索水平夹角越小,吊索受拉力就越大,同时,吊索对物体的水平压力也越大。因此,吊索水平夹角不得小于 $3 0 ^ { \\circ }$ ,因为 $3 0 ^ { \\circ }$ 时吊索所受拉力已增加一倍。\n\n### 4.1.20 重物下降时突然制动,其冲击载荷将使起升机构损伤,严重时会破坏起重机稳定性而倾翻。如回转未停稳即反转,所吊重物因惯性而大幅度摆动,也会使起重臂扭弯或起重机倾翻。\n\n### 4.1.22 使用起升制动器,可使起吊重物停留在空中,如遇操作人员疏忽或制动器失灵时,将使重物失控而快速下降,造成事故。因此,当吊装因故中断时,悬空重物需要设法降下。\n\n### 4.1.28 转动的卷筒缠绕钢丝绳时,如用手拉或脚踩钢丝绳,容易将手或脚带入卷筒内造成伤亡事故。\n\n### 4.1.29 建设部2007年第659号公告《建设部关于发布建设事业“十一五”推广应用和限用禁止使用技术(第一批)的公告》的规定,超过一定使用年限的塔式起重机: $6 3 0 \\mathrm { k N \\cdot \\ m }$ (不含$6 3 0 \\mathrm { k N \\cdot m } )$ 、出厂年限超过10年(不含10年)的塔式起重机;$6 3 0 \\mathrm { k N } \\cdot \\mathrm { m } { \\sim } 1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ (不含 $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m } )$ 、出厂年限超过15年(不含15年)的塔式起重机; $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ 以上、出厂年限超过20年(不含20年)的塔式起重机。由于使用年限过久,存在设备结构疲劳、锈蚀、变形等安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。超过一定使用年限的施工升降机:出厂年限超过8年(不含8年)的SC型施工升降机,传动系统磨损严重,钢结构疲劳、变形、腐蚀等较严重,存在安全隐忠,出厂年限超过5年(T合5个)的SS型施宝升降机,使用时间过长造成结构件疲劳、变形、腐蚀等较严重,运动件磨损严重,存在安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。\n\n## 4.2 履带式起重机\n### 4.2.1 履带式起重机自重大,对地面承载相对高,作业时重心变化大,对停放地面要有较高要求,以保证安全。 \n### 4.2.5 俯仰变幅的起重臂,其最大仰角要有一定限度,以防止起重臂后倾造成重大事故。 \n### 4.2.6 起重机的变幅机构一般采用蜗杆减速器和自动常闭带式制动器,这种制动器仅能起辅助作用,如果操作中在起重臂未停稳前即换挡,由于起重臂下降的惯性超过了辅助制动器的摩擦力,将造成起重臂失控摔坏的事故。 \n### 4.2.7 起吊载荷接近满负荷时,其安全系数相应降低,操作中稍有疏忽,就会发生超载,需要慢速操作,以保证安全。 \n### 4.2.8 起重吊装作业不能有丝毫差错,要求在起吊重物时先稍离地面试吊无误后再起吊,以便及时发现和消除不安全因素,保证吊装作业的安全可靠。起吊过程中,操作人员要脚踩在制动踏板上是为了在发生险情时,可及时控制。 \n### 4.2.9 双机抬吊是特殊的起重吊装作业,要慎重对待,关键是要做到载荷的合理分配和双机动作的同步。因此,需要统一指挥。降低起重量和保持吊钩滑轮组的垂直状态,这些要求都是防止超载。 \n### 4.2.10 起重机如在不平的地面上急转弯,容易造成倾翻事故。\n### 4.2.11 起重机带载行走时,由于机身晃动,起重臂随之俯仰,幅度也不断变化,所吊重物因惯性而摆动,形成“斜吊”,因此,需要降低额定起重量,以防止超载。行走时重物要在起重机正前方,便于操作人员观察和控制。履带式行走机构不要作长距离行走,带载行走更不安全。 \n### 4.2.12 起重机上下坡时,起重机的重心和起重臂的幅度随坡度而变化,因此,不能再带载行驶。下坡空挡滑行,将会失去控制而造成事故。 \n### 4.2.13 作业后,起重臂要转到顺风方向,这是为了减少迎风\n\n面,降低起重机受到的风压。\n\n### 4.2.14 当起重机转移时,需要按照本规定采取的各项保证安全的措施执行。\n\n## 4.3 汽车、轮胎式起重机\n\n### 4.3.4 轮胎式起重机完全依靠支腿来保持它的稳定性和机身的水平状态。因此,作业前需要按本条要求将支腿垫实和调整好。\n\n### 4.3.5 如果在载荷情况下扳动支腿操纵阀,将使支腿失去作用而造成起重机倾翻事故。\n\n### 4.3.6 起重臂的工作幅度是由起重臂长度和仰角决定的,不同幅度有不同的额定起重量,作业时要根据重物的重量和提升高度选择适当的幅度。\n\n### 4.3.7 起重臂分顺序伸缩、同步伸缩两种。\n\n起重机由双作用液压缸通过控制阀、选择阀和分配阀等液压控制装置使起重臂按规定程序伸出或缩回,以保证起重臂的结构强度符合额定起重量的需求。如果伸臂中出现前、后节长度不等时或其他原因制动器发生停顿时,说明液压系统存在故障,需要排除后才能使用。\n\n### 4.3.8 各种长度的起重臂都有规定的仰角,如果仰角小于规定,对于桁架式起重臂将造成水平压力增大和变幅钢丝绳拉力增大;对于箱形伸缩式起重臂,由于其自重大,基本上属于悬臂结构,将增加起重臂的挠度,影响起重臂的安全性能。\n\n### 4.3.9 汽车式起重机作业时,其液压系统通过取力器以获得内燃机的动力。其操纵杆一般设在汽车驾驶室内,因此,作业时汽车驾驶室要锁闭,以防误动操纵杆。\n\n### 4.3.11 发现起重机不稳或倾斜等现象时,迅速放下重物能使起重机恢复稳定,否则将造成倾翻事故。采用紧急制动,会造成起重机倾翻事故。\n\n### 4.3.13 起重机在满载或接近满载时,稳定性的安全系数相应降低,如果同时进行两种动作,容易造成超载而发生事故。\n\n### 4.3.14 起重机带载回转时,重物因惯性造成偏离而大幅度晃动,使起重机处于不稳定状态,容易发生事故。\n\n### 4.3.16 本条叙述了起重机作业后要做的各项工作,如挂牢吊钩、螺母固定撑杆、销式制动器插人销孔、脱开取力器等要求,都是为在再一次行驶时起重机的装置不移动、不旋转等稳定的安全措施。\n\n### 4.3.17 内燃机水温在 $8 0 ^ { \\circ } \\mathrm { C } \\sim 9 0 ^ { \\circ } \\mathrm { C }$ 时,润滑性能较好,温度过低使润滑油黏度增大,流动性能变差,如高速运转,将增加机件磨损。\n\n## 4.4 塔式起重机\n\n### 4.4.14 塔式起重机顶升属高处作业,安装过程使起重机回转台及以上结构与塔身处于分离状态,需要有严格的作业要求。本条所列各项均属于保证安全顶升的必要措施。\n\n### 4.4.15 本条规定塔式起重机升降作业时安全技术要求。如果因连接螺栓拆卸困难而采用旋转起重臂来松动螺栓的错误做法,将破坏起重臂平衡而造成倾翻事故。\n\n### 4.4.16 塔式起重机接高到一定高度需要与建筑物附着锚固,以保持其稳定性。本条所列各项均属于说明书规定的一般性要求,目的是保证锚固装置的牢固可靠,以保持接高后起重机的稳定性。\n\n### 4.4.17 内爬升起重机是在建筑物内部爬升,作业范围小,要求高。本条所列各项均属于保证安全爬升的必要措施。其中第5款规定了起重机的最小固定间隔,尽可能减少爬升次数,第6款是为了保证支承起重机的楼层有足够的承载能力。\n\n### 4.4.21 塔式起重机与大地之间是一个“C”形导体,当大量电HAV人人 y 1员站在道轨或地面上,接触吊钩时正好使“C”形导体形成一个“O”形导体,人体就会被电击或烧伤。这里所采取的绝缘措施\n\n是为了保护人身安全。\n\n### 4.4.29 行程限位开关是防止超越有效行程的安全保护装置,如当作控制开关使用,将失去安全保护作用而易发生事故。\n\n### 4.4.30 动臂式起重机的变幅机构要求动作平衡,变幅时起重量随幅度变化而增减。因此,当载荷接近额定起重量时,不能再向下变幅,以防超载造成起重机倾倒。\n\n### 4.4.36 遇有风暴时,使起重臂能随风转动,以减少起重机迎风面积的风压,锁紧夹轨器是为了增加稳定性,防止造成倾翻。\n\n### 4.4.43 主要为防止大风骤起时,塔身受风压面加大而发生事故。\n\n## 4.5 枪杆式起重机\n\n### 4.5.2 枪杆式起重机现场大量使用,本条针对专项方案提出具体要求,并强调专人对专项方案实施情况进行现场监督和按规定进行监测。\n\n### 4.5.3 本条参考住房和城乡建设部《危险性较大的分部分项工程安全管理办法》中第七条的规定。\n编制依据包括:相关法律、法规、规范性文件、标准、规范及图纸(国标图集)、施工组织设计等。\n\n施工工艺流程包括:钢丝绳走向及固定方法、卷扬机的固定位置和方法、枪杆式起重机底座的安装及固定等。\n\n施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。\n\n劳动力计划包括:专职安全管理人员、特种作业人员等。\n### 4.5.7 枪杆式起重机缆风绳与地面的夹角关系到起重机的稳定性能。夹角小,缆风绳受力小,起重机稳定性好,但要增加缆风绳长度和占地面积。因此,缆风绳的水平夹角一般保持在 $3 0 ^ { \\circ } \\sim$ $4 5 ^ { \\circ }$ 之间。因膨胀螺栓在使用中会松动,故严禁使用。所有的定滑轮用闭口滑轮,为确保安全。\n### 4.5.11 枪杆式起重机结构简单,起重能力大,完全是依靠各根缆风绳均匀地拉牢主杆使之保持垂直,只要当一个地锚稍有松动,就能造成主杆倾斜而发生重大事故,因此,需要经常检查地锚的牢固程度。\n",
- "reference_source": "3《建筑机械使用安全技术规程》(JGJ33-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "施工用电定期检查制度中未明确要求对电气设备运行状态及安全防护进行重点排查",
- "location": "(2)安全检查制度\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。",
- "suggestion": "在‘定期检查’条款中明确增加‘重点排查电气设备运行状态及安全防护措施’的具体要求,并细化检查内容,如电缆绝缘性能、接地装置、漏电保护器动作情况、配电箱防护状态等,确保与《施工现场临时用电安全技术规范》(JGJ46)中关于电气设备安全检查的要求保持一致。",
- "reason": "根据【参考依据】4.4.1规定,施工现场临时用电应符合《施工现场临时用电安全技术规范》(JGJ46)的有关规定。而待审查内容中的‘定期检查’虽提及‘施工用电’,但未具体说明检查内容是否涵盖电气设备运行状态及安全防护措施,与JGJ46中关于电气设备定期检查、漏电保护、接地、电缆防护等强制性要求存在脱节,可能导致安全检查流于形式,无法有效识别电气安全隐患。",
- "risk_level": "高风险",
- "review_references": "## 4.4 施工临时用电 ### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n【Top1 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】4 施工准备\n4 施工准备## 4.1 驻地和场站建设\n\n### 4.1.1 施工现场驻地和场站应选在地质良好的地段,应避开易发生滑坡、塌方、泥石流、崩塌、落石、洪水、雪崩等危险区域,宜避让取土、弃土场地。\n\n### 4.1.2 施工现场生产区、生活区、办公区应分开设置,距离集中爆破区应不小于 $5 0 0 \\mathrm { m }$ 。\n\n### 4.1.3 施工现场临时用房、临时设施、生产区、生活区、办公区的防火间距应符合现行《建设工程施工现场消防安全技术规范》(GB 50720)的相关要求。\n\n### 4.1.4 办公区、生活区宜避开存在噪声、粉尘、烟雾或对人体有害物质的区域,无法避开时应设在噪声、粉尘、烟雾或对人体有害物质所在区域最大频率风向的上风侧。\n\n### 4.1.5 施工现场原材料、半成品、成品、预制构件等堆放及机械、设备停放应整齐、稳固、规范、标识清楚,且不得侵占场内道路或影响安全。\n\n### 4.1.6 材料加工场应符合下列规定:\n\n1宜设围墙或围栏防护实行封闭管理,并宜设排水设施。\n\n2场内应设置明显的安全警示标志及相关工种的操作规程。\n\n3加工棚宜采用轻钢结构,并应采取防雨雪、防风等措施。\n\n### 4.1.7 预制场、拌和场应符合下列规定:\n\n1应合理分区、硬化场地,并应设置排水设施。\n\n2拌和及起重设备基础的地基承载力应满足要求,材料及成品存放区地基应稳定。\n\n3料仓墙体强度和稳定性应满足要求,料仓墙体外围应设警戒区,距离宜不小于墙高2倍。\n\n4拌和及起重设备应设置防倾覆和防雷设施。\n\n### 4.1.8 施工现场变电站建设应符合现行《施工现场临时用电安全技术规范》 (JGJ46)\n\n的有关规定。\n\n### 4.1.9 储油罐的设置应符合下列规定:\n\n1储油罐与在建工程的防火间距应不小于 $1 5 \\mathrm { m }$ ,并应远离明火作业区、人员密集区、建(构)筑物集中区。\n\n2储油罐顶部应设置遮阳棚。\n\n3应按要求配备泡沫灭火器、干粉灭火器、沙土袋、沙土箱等灭火消防器材及沙土等灭火消防材料。\n\n4应设防静电、防雷接地装置及加油车接地装置,接地电阻不得大于100。\n\n5应悬挂醒目的禁止烟火等警示标识。\n\n## 4.2 施工便道\n\n### 4.2.1 施工便道应根据运输荷载、使用功能、环境条件进行设计和施工,不得破坏原有水系、降低原有泄洪能力,并应符合下列规定:\n\n1双车道施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ 。\n\n2单车道施工便道宽度不宜小于4.5m,并宜设置错车道,错车道应设在视野良好地段,间距不宜大于 $3 0 0 \\mathrm { m }$ 。设置错车道路段的施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ ,有效长度不宜小于 $2 0 \\mathrm { m }$ 。\n\n3路拱坡度应根据路面类型和现场自然条件确定,并应大于 $1 , 5 \\%$ 。\n\n4施工便道应根据需要设置排水沟和圆管涵等排水设施。\n\n5施工便道在急弯、陡坡、连续转弯等危险路段应进行硬化,设置警示标志,并根据需要设置防护设施。\n\n6施工便道中易发生落石、滑坡等危险路段应根据需要设置防护设施。\n\n### 4.2.2 施工便道与既有道路平面交叉处应设置道口警示标志,有高度限制的应设置限高架。\n\n### 4.2.3 施工便桥应根据使用要求和水文条件进行设计,并应设置限宽、限速、限载标志,建成后应验收。\n\n## 4.3 临时码头和栈桥\n\n### 4.3.1 临时码头宜选择在水域开阔、岸坡稳定、波浪和流速较小、水深适宜、地质条件较好、陆路交通便利的岸段。\n\n### 4.3.2 临时码头宜设置在桥梁、隧道、大坝、架空高压线、水下管线、取水泵房、\n\n危险品库、水产养殖场等区域的下游方向,与其他构筑物的安全距离应符合现行《海港总平面设计规范》(JTJ211)和《河港工程总体设计规范》(JTJ212)的有关规定。\n\n### 4.3.3 临时码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应设置安全警示标志,配备相应的安全防护设施。\n\n### 4.3.4 栈桥和栈桥码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应符合下列规定:\n\n1通航水域搭设的栈桥和栈桥码头应取得海事和航道管理部门批准,并应按要求设置航行警示标志。\n\n2栈桥和栈桥码头的设计应考虑自重荷载、车辆荷载、波浪力、风力、水流力、船舶系靠力及漂浮物、腐蚀等,并应按施工期可能出现的最不利荷载组合进行验算。\n\n3栈桥和栈桥码头应设置行车限速、防船舶碰撞、防人员触电及落水等安全警示标志和救生器材。\n\n4栈桥上车辆和人员行走区域的面板应满铺,并应与下部结构连接牢固。悬臂板应采取有效的加固措施。\n\n5栈桥两侧和栈桥码头四周应设置高度不低于 $1 , 2 \\mathrm { m }$ 的防护栏杆。防护栏杆上杆任何部位应能承受1000N的外力。\n\n6栈桥行车道两侧宜设置护轮坎。\n\n7长距离栈桥应设置会车、掉头区域,间隔不宜大于 $5 0 0 \\mathrm { m }$ 。\n\n8通过栈桥的电缆应绝缘良好,并应固定在栈桥的一侧。\n\n9发生栈桥面或栈桥码头面被洪水、潮汛淹没,或栈桥被船舶撞击,或桩柱受海水严重腐蚀等情况,应重新检修、复核原构筑物。\n\n10栈桥应设置满足施工安全要求的照明设施。\n\n11 栈桥和栈桥码头应设专人管理,非施工车辆及人员不得进入,非施工船舶不得靠泊。\n\n## 4.4 施工临时用电\n\n### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n\n### 4.4.2 施工用电设备数量在5台及以上,或用电设备容量在 $5 0 \\mathrm { k W }$ 及以上时,应编制用电组织设计。\n\n### 4.4.3 施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压电力系统,必须符合下列规定:\n\n1采用三级配电系统。 \n2采 用TN-S 接零保护系统。 \n3采用二级保护系统。\n\n### 4.4.4 电线架设应符合下列规定:\n\n1架空线路宜避开施工作业面、作业棚、生活设施与器材堆放场地。\n\n2架空线路边线无法避开在建工程(含脚手架)时,其安全距离应符合表4.4.4-1的规定。\n\n表4.4.4-1外电架空线路边线外侧边缘与在建工程(含脚手架)间安全距离\n3施工现场的机动车道与外电架空线路交叉时,架空线路的最低点与路面的垂直安全距离应符合表4.4.4-2的规定。\n\n表4.4.4-2施工现场的机动车道与外电架空线路交叉时的垂直安全距离\n\n\n\n\n\n### 4.4.5 铺设电缆线应符合下列规定:\n\n1施工现场开挖沟槽边缘与埋设电缆沟槽边缘的安全距离不得小于 $0 , 5 \\mathrm { m }$ 。\n\n2地下埋设电缆应设防护管。\n\n3架空铺设电缆应沿墙或电杆做绝缘固定。\n\n4通往水上的岸电应用绝缘物架设,电缆线应留有余量,作业过程中不得挤压或拉拽电缆线。\n\n### 4.4.6 水上或潮湿地带的电缆线必须绝缘良好并具有防水功能,电缆线接头必须经防水处理。\n\n### 4.4.7 每台用电设备必须独立设置开关箱;开关箱必须装设隔离开关及短路、过载、漏电保护器,严禁设置分路开关;配电箱、开关箱的电源进线端严禁用插头和插座做活动连接。\n\n### 4.4.8 配电箱及开关箱设置应符合下列规定:\n\n1总配电箱应设在靠近电源的区域;分配电箱应设在用电设备或负荷相对集中的区域;开关箱与分配电箱的距离不得大于 $3 0 \\mathrm { m }$ ,开关箱应靠近用电设备,与其控制的固定式用电设备水平距离不宜大于 $3 \\mathrm { m }$ 。\n\n2动力配电箱与照明配电箱宜分别设置。合并设置的配电箱,动力和照明应分路\n\n设置。\n\n3配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在存在瓦斯、烟气、潮气及其他有害介质的场所。\n\n4配电箱、开关箱应选用专业厂家定型、合格产品。\n\n5总配电箱中漏电保护器的额定漏电动作电流应大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间应大于0.1s,额定漏电动作电流与额定漏电动作时间的乘积不得大于 $3 0 \\mathrm { m A \\cdot s }$ 。开关箱中漏电保护器的额定漏电动作电流不得大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间不应大于0.1s。潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,额定漏电动作电流不得大于 $1 5 \\mathrm { m A }$ ,额定漏电动作时间不得大于0.1s。\n\n6配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为1 $. 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上,其中心点与地面的垂直距离应为 $0 . 8 \\sim 1 . 6 \\mathrm { m }$ 。\n\n### 4.4.9 遇有临时停电、停工、检修或移动电气设备时,应关闭电源。\n\n## 4.5 生产生活用水\n\n### 4.5.1 生活饮用水水质应符合现行《生活饮用水卫生标准》(GB 5749)的有关规定。\n\n### 4.5.2 施工现场搭设的水塔、水箱等储水设施应稳固、牢靠,并应采取防倾覆措施。\n\n## 4.6 施工机械设备\n\n### 4.6.1 应制定施工机械设备安全技术操作规程,建立设备安全技术档案。\n\n### 4.6.2 施工机械设备进场前应查验机械设备证件、性能、状况;进场后,应向操作人员进行安全技术交底。\n\n### 4.6.3 特种设备现场安装、拆除应按相关规定具有相应作业资质。\n\n### 4.6.4 龙门吊、架桥机等轨道行走类设备应设置夹轨器和轨道限位器。轨道的基础承载力、宽度、平整度、坡度、轨距、曲线半径等应满足说明书和设计要求。\n\n### 4.6.5 机械设备集中停放的场所应设置消防通道,并应配备消防器材。\n\n### 4.6.6 施工现场专用机动车辆驾驶人员应按相关规定经过专门培训,并应取得相应资格证书。\n### 4.6.7 施工现场运输车辆应状态良好,车身应设置反光警示标识。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "安全环保部组织验收安全检查的职责与部门职责分工不符",
- "location": "安全环保部 组织安全生产检查、隐患排查治理及安全技术交底监督工作 负责组织验收安全检查、定期检查及专项检查,需联合工程建设部、施工员和操作班组共同签字确认",
- "suggestion": "将安全环保部组织验收安全检查的职责调整为由工程管理部门或项目部统一组织,安全环保部负责监督与检查,确保职责分工符合《建筑施工企业安全生产管理规范》(GB50656-2011)中对工程管理部门的职责要求。",
- "reason": "根据【参考依据】第6条‘工程管理部门’职责明确指出:‘(1)组织均衡生产,保证安全工程与生产任务协调一致;(2)科学合理组织生产,保证施工人员劳逸结合。’该条文表明工程管理部门在组织生产与安全协调方面具有核心职责,而安全检查、隐患排查及验收工作属于生产组织与安全管理的交叉职能,应由工程管理部门牵头组织,安全环保部作为监督部门参与。当前条款将验收安全检查的组织职责赋予安全环保部,与规范中对工程管理部门的职责定位不一致,存在职责错位风险。",
- "risk_level": "高风险",
- "review_references": "## 6、工程管理部门 (1)组织均衡生产,保证安全工程与生产任务协调一致; (2)科学合理组织生产,保证施工人员劳逸结合;\n【Top1 参考文档】\n【文件】69《建筑施工企业安全生产管理规范》(GB50656-2011).md\n【标题】5 安全生产管理组织体系\n5 安全生产管理组织体系5.0.1对于各层次的管理者,除负责各自管理范围内的生产经营管理职责外,还应负责其运行范围内的安全生产管理,确保管理范围内的安全生产管理体系正常运行和安全业绩的持续改进。安全生产责任体系由纵向与横向展开。\n\n5.0.31企业安全生产决策机构可为安全生产委员会或安全生产领导小组等。\n\n2 由于安全生产在建筑施工企业处于特殊的重要地位,安全与生产矛盾处理难度大,建筑施安全生产的第一责任人必须是企业的主要负责人,只有这样才能把安全与生产从组织领导上统一起来,使安全管理体系得以有效运行。\n\n4各管理层的其他职能部门和(或)相关岗位负责落实与其职能相对应如:安全生产教育培训、资金保障、技术管理、设施设备管理、消防管理、分包管理、劳动保护、文明卫生等相关职责和目标,可能有的职能部门会负责多项内容。\n\n例如:\n\n1、企业法定代表人(实际负责人)\n\n2、企业安全生产工作的第一责任人,对本企业安全生产负全面领导责任;\n\n(1) 贯彻执行国家和市有关安全生产的方针政策和法规、规范;(2) 掌握本企业安全生产动态,定期研究安全工作;(3) 组织制定安全工作实施计划。(4) 组织制定和完善各项安全生产规章制度及奖惩办法;(5) 建立、健全安全生产责任制,并领导、组织考核工作;(6) 建立、健全安全生产保证体系,保证安全生产投入;(7) 督促、检查安全生产工作,及时消除生产安全事故隐患;(8) 组织制定并实施生产安全事故应急救援预案;(9) 及时、如实报告生产安全事故。在事故调查组的指导下,领导、组织有关部门或人员,配合事故调查处理工作,监督防范措施的制定和落实,预防事故重复发生。\n\n2、企业主管安全生产负责人\n\n(1)组织落实安全生产责任制和安全生产管理制度,对安全生产工作负直接 \n领导责任,(2) 组织实施安全工作规划、目标及实施计划;(3) 领导、组织安全生产宣传教育工作(4) 确定安全生产考核指标。(5) 领导、组织安全生产检查;(6) 领导、组织对分包分供方的安全生产主体资格考核与审查;(7) 认真听取、采纳安全生产的合理化建议,保证安全生产保障体系的正常 \n运转;(8)发生生产安全事故,组织实施生产安全事故应急救援;\n\n3、企业技术负责人的安全生产职责\n\n(1) 贯彻执行国家和上级的安全生产方针、政策,在本企业施工安全生产中\n\n负技术领导责任;\n\n(2)审批施工组织设计和施工方案时,审查其安全技术措施,并做出决定性意见;(3) 领导开展安全技术攻关活动,并组织技术鉴定和验收;(4)新材料、新技术、新工艺使用前,组织审查其使用和实施过程中的安全性,组织编制或审定相应的操作规程;(5)参加生产安全事故的调查和分析,从技术上分析事故原因,制定整改防范措施。\n\n## 4、企业总会计师\n\n(1)组织落实本企业财务工作的安全生产责任制,认真执行安全生产奖惩规定;\n\n(2)组织编制年度财务计划的同时,编制安全生产费用投入计划,保证经费到位和合理开支;\n\n(3) 监督、检查安全生产费用的使用情况;\n\n## 5、企业其他负责人应当按照分工抓好主管范围内的安全生产工作,对主管范围内的安全生产工作负领导责任。\n\n## 6、工程管理部门\n\n(1)组织均衡生产,保证安全工程与生产任务协调一致; \n(2)科学合理组织生产,保证施工人员劳逸结合;\n\n## 7、技术管理部门\n\n(1) 贯彻执行国家和上级有关安全技术及安全操作规程规定;(2) 组织编制、审查专项安全施工方并抽查实施情况;(3) 新技术、新材料、新工艺使用前,制定相应的安全技术措施和安全操作规程;(4) 分析伤亡事故和重大已、未遂事故中技术原因,从技术上提出防范措施。\n\n## 8、机械动力管理部门\n\n(1) 负责本企业机械动力设备的安全管理,监督检查; \n(2) 对相关特种作业人员定期培训、考核; \n(3) 参与设备施工组织设计、施工方案的会审; \n(4) 分析事故涉及设备原因,提出防范措施。\n\n## 9、劳务管理\n\n(1) 审查劳务分包人员资格;\n\n(2)从用工方面分析事故原因,提出防范措施\n\n## 10、物资管理部门\n\n(1)确保购置(租赁)的各类安全物资、劳动保护用品符合国家或有关行业的技术标准、规范的要求;\n\n## 11、人力资源部门\n\n(1)审查安全管理人员资格,足额配备安全管理人员,开发、培养安全管理力量;\n\n## 12、财务管理部门安全生产职责\n\n(1)及时提取安全技术措施经费、劳动保护经费及其它安全生产所需经费,保证专款专用;\n\n(2) 协助安全主管部门办理安全奖、罚款手续。\n\n## 13、保卫消防部门\n\n(1) 贯彻执行有关消防保卫的法规、规定;\n\n(2) 参与火灾事故的调查,提出处理意见;\n\n## 14、行政卫生部门安全生产职责\n\n(1) 监测有毒有害作业场所的尘毒浓度,做好职业病预防工作;\n\n## 15、工会组织\n\n(1) 依法组织职工参加本企业安全生产工作的民主管理和民主监督;\n\n(2) 对侵害职工在安全生产方面的合法权益的问题进行调查,代表职工与企业进行交涉;\n\n(3) 参加对生产安全事故调查处理,向有关部门提出处理意见。\n",
- "reference_source": "69《建筑施工企业安全生产管理规范》(GB50656-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "专职安全员职责描述与规范要求不一致",
- "location": "一) 组织保证措施\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。",
- "suggestion": "将‘专职安全员要对安全技术措施的执行情况进行监督检查’修改为‘专职安全员应每日深入现场进行例检,对安全技术措施落实情况、跟班检查、纠正违章行为及监督执行情况进行检查,并作好检查记录’,以符合《建筑机械使用安全技术规程》(JGJ33-2012)中关于专职安全管理人员职责的明确要求。",
- "reason": "根据【参考依据】中4.5.3条明确指出:‘劳动力计划包括:专职安全管理人员、特种作业人员等’,且在施工安全技术措施中强调‘监控检查验收’等环节。同时,4.1.4条要求安装、拆卸及使用单位应组织验收,并由专职安全管理人员参与监督。待审查内容中虽提及专职安全员监督安全技术措施落实,但未明确其‘每日深入现场例检’‘纠正违章行为’‘跟班检查’等具体职责,与规程中对专职安全管理人员在施工过程中的动态监管职责要求存在差距,属于对职责描述不完整,影响专业表达和安全责任落实。",
- "risk_level": "中风险",
- "review_references": "施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。 劳动力计划包括:专职安全管理人员、特种作业人员等。\n【Top1 参考文档】\n【文件】3《建筑机械使用安全技术规程》(JGJ33-2012).md\n【标题】4 建筑起重机械\n4 建筑起重机械## 4.1 一般规定\n\n### 4.1.2 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第七条制定的。\n\n### 4.1.3 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第八条制定的。\n\n### 4.1.4 《建筑起重机械安全监督管理规定》(第166号建设部令)规定:\n\n安装单位应当按照安全技术标准及建筑起重机械性能要求,编制建筑起重机械安装、拆卸工程专项施工方案,并由本单位技术负责人签字;专项施工方案,安装、拆卸人员名单,安装、拆卸时间等材料报施工总承包单位和监理单位审核后,告知工程所在地县级以上地方人民政府建设主管部门。\n\n建筑起重机械安装完毕后,安装单位应当按照安全技术标准及安装使用说明书的有关要求对建筑起重机械进行自检、调试和试运转。自检合格的,应当出具自检合格证明,并向使用单位进行安全使用说明。使用单位应当组织出租、安装、监理等有关单位进行验收,或者委托具有相应资质的检验检测机构进行验收。建筑起重机械经验收合格后方可投人使用,未经验收或者验收不合格的不得使用。\n\n### 4.1.8 基础承载能力不满足要求,容易引起起重机的倾翻。\n\n### 4.1.11 本条规定的安全装置是起重机必备的,否则不能使用。利用限位装置或限制器代替抽动停车等动作,将造成失误而发生事故。建筑起重机械安全装置见表4-1。\n\n表4-1建筑起重机械安全装置一览表 \n\n\n\n\n\n注: $\\bullet$ 表示该起重机械有此安全装置;$\\bigcirc$ 表示该起重机械无此安全装置。\n\n### 4.1.12 本条规定了信号司索工的职责,要求操作人员要听从指挥,但对错误指挥要拒绝执行,这对防止失误十分必要。\n\n### 4.1.14 风力等级和风速对照见表4-2。\n\n表4-2风力等级和风速对照表 \n\n\n\n\n\n本规程风速指施工现场风速,包括地面和高耸设备高处风速。\n\n恶劣天气能使露天作业的起重机部件受损、受潮,所以需要经过试吊无误后再使用。\n\n### 4.1.18 起重机的额定起重量是以吊钩与重物在垂直情况下核定的。斜吊、斜拉其作用力在起重机的一侧,破坏了起重机的稳定性,会造成超载及钢丝绳出槽,还会使起重臂因侧向力而扭弯,甚至造成倾翻事故。对于地下埋设或凝固在地面上的重物,除本身重量外,还有不可估计的附着力(埋设深度和凝固强度决定附着力的大小),将造成严重超载而酿成事故。\n\n### 4.1.19 吊索水平夹角越小,吊索受拉力就越大,同时,吊索对物体的水平压力也越大。因此,吊索水平夹角不得小于 $3 0 ^ { \\circ }$ ,因为 $3 0 ^ { \\circ }$ 时吊索所受拉力已增加一倍。\n\n### 4.1.20 重物下降时突然制动,其冲击载荷将使起升机构损伤,严重时会破坏起重机稳定性而倾翻。如回转未停稳即反转,所吊重物因惯性而大幅度摆动,也会使起重臂扭弯或起重机倾翻。\n\n### 4.1.22 使用起升制动器,可使起吊重物停留在空中,如遇操作人员疏忽或制动器失灵时,将使重物失控而快速下降,造成事故。因此,当吊装因故中断时,悬空重物需要设法降下。\n\n### 4.1.28 转动的卷筒缠绕钢丝绳时,如用手拉或脚踩钢丝绳,容易将手或脚带入卷筒内造成伤亡事故。\n\n### 4.1.29 建设部2007年第659号公告《建设部关于发布建设事业“十一五”推广应用和限用禁止使用技术(第一批)的公告》的规定,超过一定使用年限的塔式起重机: $6 3 0 \\mathrm { k N \\cdot \\ m }$ (不含$6 3 0 \\mathrm { k N \\cdot m } )$ 、出厂年限超过10年(不含10年)的塔式起重机;$6 3 0 \\mathrm { k N } \\cdot \\mathrm { m } { \\sim } 1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ (不含 $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m } )$ 、出厂年限超过15年(不含15年)的塔式起重机; $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ 以上、出厂年限超过20年(不含20年)的塔式起重机。由于使用年限过久,存在设备结构疲劳、锈蚀、变形等安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。超过一定使用年限的施工升降机:出厂年限超过8年(不含8年)的SC型施工升降机,传动系统磨损严重,钢结构疲劳、变形、腐蚀等较严重,存在安全隐忠,出厂年限超过5年(T合5个)的SS型施宝升降机,使用时间过长造成结构件疲劳、变形、腐蚀等较严重,运动件磨损严重,存在安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。\n\n## 4.2 履带式起重机\n### 4.2.1 履带式起重机自重大,对地面承载相对高,作业时重心变化大,对停放地面要有较高要求,以保证安全。 \n### 4.2.5 俯仰变幅的起重臂,其最大仰角要有一定限度,以防止起重臂后倾造成重大事故。 \n### 4.2.6 起重机的变幅机构一般采用蜗杆减速器和自动常闭带式制动器,这种制动器仅能起辅助作用,如果操作中在起重臂未停稳前即换挡,由于起重臂下降的惯性超过了辅助制动器的摩擦力,将造成起重臂失控摔坏的事故。 \n### 4.2.7 起吊载荷接近满负荷时,其安全系数相应降低,操作中稍有疏忽,就会发生超载,需要慢速操作,以保证安全。 \n### 4.2.8 起重吊装作业不能有丝毫差错,要求在起吊重物时先稍离地面试吊无误后再起吊,以便及时发现和消除不安全因素,保证吊装作业的安全可靠。起吊过程中,操作人员要脚踩在制动踏板上是为了在发生险情时,可及时控制。 \n### 4.2.9 双机抬吊是特殊的起重吊装作业,要慎重对待,关键是要做到载荷的合理分配和双机动作的同步。因此,需要统一指挥。降低起重量和保持吊钩滑轮组的垂直状态,这些要求都是防止超载。 \n### 4.2.10 起重机如在不平的地面上急转弯,容易造成倾翻事故。\n### 4.2.11 起重机带载行走时,由于机身晃动,起重臂随之俯仰,幅度也不断变化,所吊重物因惯性而摆动,形成“斜吊”,因此,需要降低额定起重量,以防止超载。行走时重物要在起重机正前方,便于操作人员观察和控制。履带式行走机构不要作长距离行走,带载行走更不安全。 \n### 4.2.12 起重机上下坡时,起重机的重心和起重臂的幅度随坡度而变化,因此,不能再带载行驶。下坡空挡滑行,将会失去控制而造成事故。 \n### 4.2.13 作业后,起重臂要转到顺风方向,这是为了减少迎风\n\n面,降低起重机受到的风压。\n\n### 4.2.14 当起重机转移时,需要按照本规定采取的各项保证安全的措施执行。\n\n## 4.3 汽车、轮胎式起重机\n\n### 4.3.4 轮胎式起重机完全依靠支腿来保持它的稳定性和机身的水平状态。因此,作业前需要按本条要求将支腿垫实和调整好。\n\n### 4.3.5 如果在载荷情况下扳动支腿操纵阀,将使支腿失去作用而造成起重机倾翻事故。\n\n### 4.3.6 起重臂的工作幅度是由起重臂长度和仰角决定的,不同幅度有不同的额定起重量,作业时要根据重物的重量和提升高度选择适当的幅度。\n\n### 4.3.7 起重臂分顺序伸缩、同步伸缩两种。\n\n起重机由双作用液压缸通过控制阀、选择阀和分配阀等液压控制装置使起重臂按规定程序伸出或缩回,以保证起重臂的结构强度符合额定起重量的需求。如果伸臂中出现前、后节长度不等时或其他原因制动器发生停顿时,说明液压系统存在故障,需要排除后才能使用。\n\n### 4.3.8 各种长度的起重臂都有规定的仰角,如果仰角小于规定,对于桁架式起重臂将造成水平压力增大和变幅钢丝绳拉力增大;对于箱形伸缩式起重臂,由于其自重大,基本上属于悬臂结构,将增加起重臂的挠度,影响起重臂的安全性能。\n\n### 4.3.9 汽车式起重机作业时,其液压系统通过取力器以获得内燃机的动力。其操纵杆一般设在汽车驾驶室内,因此,作业时汽车驾驶室要锁闭,以防误动操纵杆。\n\n### 4.3.11 发现起重机不稳或倾斜等现象时,迅速放下重物能使起重机恢复稳定,否则将造成倾翻事故。采用紧急制动,会造成起重机倾翻事故。\n\n### 4.3.13 起重机在满载或接近满载时,稳定性的安全系数相应降低,如果同时进行两种动作,容易造成超载而发生事故。\n\n### 4.3.14 起重机带载回转时,重物因惯性造成偏离而大幅度晃动,使起重机处于不稳定状态,容易发生事故。\n\n### 4.3.16 本条叙述了起重机作业后要做的各项工作,如挂牢吊钩、螺母固定撑杆、销式制动器插人销孔、脱开取力器等要求,都是为在再一次行驶时起重机的装置不移动、不旋转等稳定的安全措施。\n\n### 4.3.17 内燃机水温在 $8 0 ^ { \\circ } \\mathrm { C } \\sim 9 0 ^ { \\circ } \\mathrm { C }$ 时,润滑性能较好,温度过低使润滑油黏度增大,流动性能变差,如高速运转,将增加机件磨损。\n\n## 4.4 塔式起重机\n\n### 4.4.14 塔式起重机顶升属高处作业,安装过程使起重机回转台及以上结构与塔身处于分离状态,需要有严格的作业要求。本条所列各项均属于保证安全顶升的必要措施。\n\n### 4.4.15 本条规定塔式起重机升降作业时安全技术要求。如果因连接螺栓拆卸困难而采用旋转起重臂来松动螺栓的错误做法,将破坏起重臂平衡而造成倾翻事故。\n\n### 4.4.16 塔式起重机接高到一定高度需要与建筑物附着锚固,以保持其稳定性。本条所列各项均属于说明书规定的一般性要求,目的是保证锚固装置的牢固可靠,以保持接高后起重机的稳定性。\n\n### 4.4.17 内爬升起重机是在建筑物内部爬升,作业范围小,要求高。本条所列各项均属于保证安全爬升的必要措施。其中第5款规定了起重机的最小固定间隔,尽可能减少爬升次数,第6款是为了保证支承起重机的楼层有足够的承载能力。\n\n### 4.4.21 塔式起重机与大地之间是一个“C”形导体,当大量电HAV人人 y 1员站在道轨或地面上,接触吊钩时正好使“C”形导体形成一个“O”形导体,人体就会被电击或烧伤。这里所采取的绝缘措施\n\n是为了保护人身安全。\n\n### 4.4.29 行程限位开关是防止超越有效行程的安全保护装置,如当作控制开关使用,将失去安全保护作用而易发生事故。\n\n### 4.4.30 动臂式起重机的变幅机构要求动作平衡,变幅时起重量随幅度变化而增减。因此,当载荷接近额定起重量时,不能再向下变幅,以防超载造成起重机倾倒。\n\n### 4.4.36 遇有风暴时,使起重臂能随风转动,以减少起重机迎风面积的风压,锁紧夹轨器是为了增加稳定性,防止造成倾翻。\n\n### 4.4.43 主要为防止大风骤起时,塔身受风压面加大而发生事故。\n\n## 4.5 枪杆式起重机\n\n### 4.5.2 枪杆式起重机现场大量使用,本条针对专项方案提出具体要求,并强调专人对专项方案实施情况进行现场监督和按规定进行监测。\n\n### 4.5.3 本条参考住房和城乡建设部《危险性较大的分部分项工程安全管理办法》中第七条的规定。\n编制依据包括:相关法律、法规、规范性文件、标准、规范及图纸(国标图集)、施工组织设计等。\n\n施工工艺流程包括:钢丝绳走向及固定方法、卷扬机的固定位置和方法、枪杆式起重机底座的安装及固定等。\n\n施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。\n\n劳动力计划包括:专职安全管理人员、特种作业人员等。\n### 4.5.7 枪杆式起重机缆风绳与地面的夹角关系到起重机的稳定性能。夹角小,缆风绳受力小,起重机稳定性好,但要增加缆风绳长度和占地面积。因此,缆风绳的水平夹角一般保持在 $3 0 ^ { \\circ } \\sim$ $4 5 ^ { \\circ }$ 之间。因膨胀螺栓在使用中会松动,故严禁使用。所有的定滑轮用闭口滑轮,为确保安全。\n### 4.5.11 枪杆式起重机结构简单,起重能力大,完全是依靠各根缆风绳均匀地拉牢主杆使之保持垂直,只要当一个地锚稍有松动,就能造成主杆倾斜而发生重大事故,因此,需要经常检查地锚的牢固程度。\n",
- "reference_source": "3《建筑机械使用安全技术规程》(JGJ33-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "施工用电定期检查制度中未明确依据《施工现场临时用电安全技术规范》(JGJ46)要求进行电气设备运行状态及安全防护检查",
- "location": "(2)安全检查制度\n④定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。",
- "suggestion": "在定期检查制度中明确依据《施工现场临时用电安全技术规范》(JGJ46)的要求,对电气设备运行状态及安全防护措施进行专项检查,包括但不限于配电系统、接地与接零保护、漏电保护器性能、电缆敷设与接头防水、开关箱设置等关键项目,并将检查结果纳入隐患排查治理台账。",
- "reason": "根据【参考依据】4.4.1规定,施工现场临时用电必须符合现行《施工现场临时用电安全技术规范》(JGJ46)的有关规定。待审查内容中虽提及对施工用电进行定期检查,但未明确检查依据和具体技术标准,缺乏与JGJ46的直接关联,不符合规范对技术参数和标准符合性的要求,存在专业表达不完整、可能引发理解偏差的风险。",
- "risk_level": "中风险",
- "review_references": "## 4.4 施工临时用电 ### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n【Top1 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】4 施工准备\n4 施工准备## 4.1 驻地和场站建设\n\n### 4.1.1 施工现场驻地和场站应选在地质良好的地段,应避开易发生滑坡、塌方、泥石流、崩塌、落石、洪水、雪崩等危险区域,宜避让取土、弃土场地。\n\n### 4.1.2 施工现场生产区、生活区、办公区应分开设置,距离集中爆破区应不小于 $5 0 0 \\mathrm { m }$ 。\n\n### 4.1.3 施工现场临时用房、临时设施、生产区、生活区、办公区的防火间距应符合现行《建设工程施工现场消防安全技术规范》(GB 50720)的相关要求。\n\n### 4.1.4 办公区、生活区宜避开存在噪声、粉尘、烟雾或对人体有害物质的区域,无法避开时应设在噪声、粉尘、烟雾或对人体有害物质所在区域最大频率风向的上风侧。\n\n### 4.1.5 施工现场原材料、半成品、成品、预制构件等堆放及机械、设备停放应整齐、稳固、规范、标识清楚,且不得侵占场内道路或影响安全。\n\n### 4.1.6 材料加工场应符合下列规定:\n\n1宜设围墙或围栏防护实行封闭管理,并宜设排水设施。\n\n2场内应设置明显的安全警示标志及相关工种的操作规程。\n\n3加工棚宜采用轻钢结构,并应采取防雨雪、防风等措施。\n\n### 4.1.7 预制场、拌和场应符合下列规定:\n\n1应合理分区、硬化场地,并应设置排水设施。\n\n2拌和及起重设备基础的地基承载力应满足要求,材料及成品存放区地基应稳定。\n\n3料仓墙体强度和稳定性应满足要求,料仓墙体外围应设警戒区,距离宜不小于墙高2倍。\n\n4拌和及起重设备应设置防倾覆和防雷设施。\n\n### 4.1.8 施工现场变电站建设应符合现行《施工现场临时用电安全技术规范》 (JGJ46)\n\n的有关规定。\n\n### 4.1.9 储油罐的设置应符合下列规定:\n\n1储油罐与在建工程的防火间距应不小于 $1 5 \\mathrm { m }$ ,并应远离明火作业区、人员密集区、建(构)筑物集中区。\n\n2储油罐顶部应设置遮阳棚。\n\n3应按要求配备泡沫灭火器、干粉灭火器、沙土袋、沙土箱等灭火消防器材及沙土等灭火消防材料。\n\n4应设防静电、防雷接地装置及加油车接地装置,接地电阻不得大于100。\n\n5应悬挂醒目的禁止烟火等警示标识。\n\n## 4.2 施工便道\n\n### 4.2.1 施工便道应根据运输荷载、使用功能、环境条件进行设计和施工,不得破坏原有水系、降低原有泄洪能力,并应符合下列规定:\n\n1双车道施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ 。\n\n2单车道施工便道宽度不宜小于4.5m,并宜设置错车道,错车道应设在视野良好地段,间距不宜大于 $3 0 0 \\mathrm { m }$ 。设置错车道路段的施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ ,有效长度不宜小于 $2 0 \\mathrm { m }$ 。\n\n3路拱坡度应根据路面类型和现场自然条件确定,并应大于 $1 , 5 \\%$ 。\n\n4施工便道应根据需要设置排水沟和圆管涵等排水设施。\n\n5施工便道在急弯、陡坡、连续转弯等危险路段应进行硬化,设置警示标志,并根据需要设置防护设施。\n\n6施工便道中易发生落石、滑坡等危险路段应根据需要设置防护设施。\n\n### 4.2.2 施工便道与既有道路平面交叉处应设置道口警示标志,有高度限制的应设置限高架。\n\n### 4.2.3 施工便桥应根据使用要求和水文条件进行设计,并应设置限宽、限速、限载标志,建成后应验收。\n\n## 4.3 临时码头和栈桥\n\n### 4.3.1 临时码头宜选择在水域开阔、岸坡稳定、波浪和流速较小、水深适宜、地质条件较好、陆路交通便利的岸段。\n\n### 4.3.2 临时码头宜设置在桥梁、隧道、大坝、架空高压线、水下管线、取水泵房、\n\n危险品库、水产养殖场等区域的下游方向,与其他构筑物的安全距离应符合现行《海港总平面设计规范》(JTJ211)和《河港工程总体设计规范》(JTJ212)的有关规定。\n\n### 4.3.3 临时码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应设置安全警示标志,配备相应的安全防护设施。\n\n### 4.3.4 栈桥和栈桥码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应符合下列规定:\n\n1通航水域搭设的栈桥和栈桥码头应取得海事和航道管理部门批准,并应按要求设置航行警示标志。\n\n2栈桥和栈桥码头的设计应考虑自重荷载、车辆荷载、波浪力、风力、水流力、船舶系靠力及漂浮物、腐蚀等,并应按施工期可能出现的最不利荷载组合进行验算。\n\n3栈桥和栈桥码头应设置行车限速、防船舶碰撞、防人员触电及落水等安全警示标志和救生器材。\n\n4栈桥上车辆和人员行走区域的面板应满铺,并应与下部结构连接牢固。悬臂板应采取有效的加固措施。\n\n5栈桥两侧和栈桥码头四周应设置高度不低于 $1 , 2 \\mathrm { m }$ 的防护栏杆。防护栏杆上杆任何部位应能承受1000N的外力。\n\n6栈桥行车道两侧宜设置护轮坎。\n\n7长距离栈桥应设置会车、掉头区域,间隔不宜大于 $5 0 0 \\mathrm { m }$ 。\n\n8通过栈桥的电缆应绝缘良好,并应固定在栈桥的一侧。\n\n9发生栈桥面或栈桥码头面被洪水、潮汛淹没,或栈桥被船舶撞击,或桩柱受海水严重腐蚀等情况,应重新检修、复核原构筑物。\n\n10栈桥应设置满足施工安全要求的照明设施。\n\n11 栈桥和栈桥码头应设专人管理,非施工车辆及人员不得进入,非施工船舶不得靠泊。\n\n## 4.4 施工临时用电\n\n### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n\n### 4.4.2 施工用电设备数量在5台及以上,或用电设备容量在 $5 0 \\mathrm { k W }$ 及以上时,应编制用电组织设计。\n\n### 4.4.3 施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压电力系统,必须符合下列规定:\n\n1采用三级配电系统。 \n2采 用TN-S 接零保护系统。 \n3采用二级保护系统。\n\n### 4.4.4 电线架设应符合下列规定:\n\n1架空线路宜避开施工作业面、作业棚、生活设施与器材堆放场地。\n\n2架空线路边线无法避开在建工程(含脚手架)时,其安全距离应符合表4.4.4-1的规定。\n\n表4.4.4-1外电架空线路边线外侧边缘与在建工程(含脚手架)间安全距离\n3施工现场的机动车道与外电架空线路交叉时,架空线路的最低点与路面的垂直安全距离应符合表4.4.4-2的规定。\n\n表4.4.4-2施工现场的机动车道与外电架空线路交叉时的垂直安全距离\n\n\n\n\n\n### 4.4.5 铺设电缆线应符合下列规定:\n\n1施工现场开挖沟槽边缘与埋设电缆沟槽边缘的安全距离不得小于 $0 , 5 \\mathrm { m }$ 。\n\n2地下埋设电缆应设防护管。\n\n3架空铺设电缆应沿墙或电杆做绝缘固定。\n\n4通往水上的岸电应用绝缘物架设,电缆线应留有余量,作业过程中不得挤压或拉拽电缆线。\n\n### 4.4.6 水上或潮湿地带的电缆线必须绝缘良好并具有防水功能,电缆线接头必须经防水处理。\n\n### 4.4.7 每台用电设备必须独立设置开关箱;开关箱必须装设隔离开关及短路、过载、漏电保护器,严禁设置分路开关;配电箱、开关箱的电源进线端严禁用插头和插座做活动连接。\n\n### 4.4.8 配电箱及开关箱设置应符合下列规定:\n\n1总配电箱应设在靠近电源的区域;分配电箱应设在用电设备或负荷相对集中的区域;开关箱与分配电箱的距离不得大于 $3 0 \\mathrm { m }$ ,开关箱应靠近用电设备,与其控制的固定式用电设备水平距离不宜大于 $3 \\mathrm { m }$ 。\n\n2动力配电箱与照明配电箱宜分别设置。合并设置的配电箱,动力和照明应分路\n\n设置。\n\n3配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在存在瓦斯、烟气、潮气及其他有害介质的场所。\n\n4配电箱、开关箱应选用专业厂家定型、合格产品。\n\n5总配电箱中漏电保护器的额定漏电动作电流应大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间应大于0.1s,额定漏电动作电流与额定漏电动作时间的乘积不得大于 $3 0 \\mathrm { m A \\cdot s }$ 。开关箱中漏电保护器的额定漏电动作电流不得大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间不应大于0.1s。潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,额定漏电动作电流不得大于 $1 5 \\mathrm { m A }$ ,额定漏电动作时间不得大于0.1s。\n\n6配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为1 $. 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上,其中心点与地面的垂直距离应为 $0 . 8 \\sim 1 . 6 \\mathrm { m }$ 。\n\n### 4.4.9 遇有临时停电、停工、检修或移动电气设备时,应关闭电源。\n\n## 4.5 生产生活用水\n\n### 4.5.1 生活饮用水水质应符合现行《生活饮用水卫生标准》(GB 5749)的有关规定。\n\n### 4.5.2 施工现场搭设的水塔、水箱等储水设施应稳固、牢靠,并应采取防倾覆措施。\n\n## 4.6 施工机械设备\n\n### 4.6.1 应制定施工机械设备安全技术操作规程,建立设备安全技术档案。\n\n### 4.6.2 施工机械设备进场前应查验机械设备证件、性能、状况;进场后,应向操作人员进行安全技术交底。\n\n### 4.6.3 特种设备现场安装、拆除应按相关规定具有相应作业资质。\n\n### 4.6.4 龙门吊、架桥机等轨道行走类设备应设置夹轨器和轨道限位器。轨道的基础承载力、宽度、平整度、坡度、轨距、曲线半径等应满足说明书和设计要求。\n\n### 4.6.5 机械设备集中停放的场所应设置消防通道,并应配备消防器材。\n\n### 4.6.6 施工现场专用机动车辆驾驶人员应按相关规定经过专门培训,并应取得相应资格证书。\n### 4.6.7 施工现场运输车辆应状态良好,车身应设置反光警示标识。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-19": {
- "metadata": {
- "review_location_label": "第11页:第五章 施工安全保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安全风险数据库,做好安全风险管控,落实安全防护措施。\n图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n\n<表格></表格>\n\n5、安全生产管理制度\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24学时,每年再培训8学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32学时,每年再培训12学时。转岗或歇工6个月以上复工人员,应当重新接受本单位安全教育培训24学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT点评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防火检查制度\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。\n\n③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。\n\n技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项的现场技术员进行每日班前5分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各种机械超负荷运转或带病作业。\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S接零保护系统,同时必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1时间以上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于2.5m的使用220V电压。在潮湿和易触及带电体的照明电源必须使用220V电压,电气设备架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b倒扣进行防护,避免人为操作失误将临时电缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警示牌。\n10)靠近电源线路作业前,应先联系停电。确认停电后方可进行工作,并应设置绝缘档壁。作业者最少离开电线2米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。\n\n上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。\n16)超过3米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的支腿垂直度。\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械通行。\n3、设备设施要求\n\n(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。\n(1)在现场开展防暑降温保健、中暑急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加强对工人身体状况的检查工作,搞好医疗保健。(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,落实劳动保护措施。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第五章 施工安全保证措施下缺失安全保证措施中的【应急处置措施】内容: 1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "建议补充:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第五章 施工安全保证措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含应急处置措施包含:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件20)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-20": {
- "metadata": {
- "review_location_label": "第13页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 5
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-21": {
- "metadata": {
- "review_location_label": "第13页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项的现场技术员进行每日班前5分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各种机械超负荷运转或带病作业。\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S接零保护系统,同时必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1时间以上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于2.5m的使用220V电压。在潮湿和易触及带电体的照明电源必须使用220V电压,电气设备架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b倒扣进行防护,避免人为操作失误将临时电缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警示牌。\n10)靠近电源线路作业前,应先联系停电。确认停电后方可进行工作,并应设置绝缘档壁。作业者最少离开电线2米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 2,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "高空作业平台检查及安全带使用要求未明确对应安全标志设置",
- "location": "(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。",
- "suggestion": "在高空作业平台周围设置‘当心坠落’‘当心落物’‘必须系安全带’‘禁止停留’等安全标志,确保作业前检查阶段已落实标志设置要求。",
- "reason": "根据《公路工程施工安全标志设置规范 JT/T 1507-2024》第8.2条,高墩翻模爬模施工及盖梁施工平台应设置‘当心坠落’‘当心落物’‘禁止停留’‘禁止靠近’‘禁止抛物’‘必须系安全带’等安全标志。待审查内容中虽提及检查平台牢固性与安全带使用,但未体现应在作业平台设置相应安全标志,违反规范强制性要求。",
- "risk_level": "高风险",
- "review_references": "- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n【Top1 参考文档】\n【文件】66 公路工程施工安全标志设置规范JT T1507-2024.md\n【标题】8 桥涵工程施工安全标志设置\n8 桥涵工程施工安全标志设置## 8.1 基础施工时,应设置下列安全标志: \n- 挖孔桩孔口处:“当心坑洞”“当心坠落”“必须通风”“必须戴安全帽”“必须系安全带”; \n- 钻孔桩孔口处:“当心坑洞”“当心坠落”; \n- 泥浆池四周:“禁止翻越”“泥浆池危险请勿靠近”; \n- 水上作业平台:“注意安全”“当心落水”“必须穿救生衣”; \n- 围堰周边:“当心落水”“当心坠落”“必须穿救生衣”“非工作人员禁止入内”; \n- 承台基坑周边:“当心坠落”“禁止翻越”“基坑危险请勿靠近”; \n- 基坑壁:“当心塌方”“当心落物”。 \n\n## 8.2 下部结构施工时,高墩翻模爬模施工应在作业平台防护栏杆上设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志;盖梁施工平台应设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志。 \n\n## 8.3 上部结构施工时,应设置下列安全标志: \n- 架桥机作业点:“当心坠落”“当心吊物”“当心障碍物”“禁止抛物”“必须系安全带”; \n- 架梁施工警戒区:“禁止通行”“吊装重地请勿靠近”“危险区域禁止逗留”; \n- 运梁通道沿线:限速; \n- 支架现浇施工:“当心落物”“当心吊物”“禁止靠近”“禁止停留”“必须戴安全帽”“必须系安全带”; \n- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n8.4 桥面系及附属工程施工时,应在桥面端头设置“当心坑洞”“当心坠落”“必须戴安全帽”“非施工车辆及人员禁止入内”以及限速安全标志。防撞护栏施工应在施工平台上或作业点处设置“当心坠落”“禁止抛物”“必须系安全带”安全标志。伸缩缝施工应在作业点来车方向前方设置“禁止通行”“前方施工减速慢行”“道路封闭禁止通行”安全标志。\n8.5 跨既有线施工时,应在施工作业面醒目位置设置“注意安全”“当心坠落”“禁止抛物”安全标志,应在既有线路边合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”以及限高限宽限速安全标志。\n8.6 不中断交通施工时,应在施工现场附近合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”安全标志。桥梁拼接、抬升施工警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志。\n8.7 桥梁拆除警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志;采用爆破拆除还应设置“爆破区域禁止进入”安全标志。\n",
- "reference_source": "66 公路工程施工安全标志设置规范JT T1507-2024.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "配电箱设置未完全符合‘一机、一闸、一漏’及距离要求",
- "location": "8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n8.1.2 分配电箱与开关箱的距离不得超过 30 m,开关箱与其控制的固定式用电设备的水平距离不宜超过 3 m。",
- "suggestion": "在技术保证措施中应明确强调:每台用电设备必须独立配置专用开关箱,严禁一箱多机;开关箱与所控制的固定式用电设备水平距离不得大于3m,确保操作安全与管理规范。",
- "reason": "待审查内容中提到‘安装和使用按‘一机、一闸、一漏’的原则,不能同时控制两台或两台以上的设备’,但未明确说明‘开关箱与被控设备距离不得超过3m’这一强制性要求,而该要求出自《施工现场临时用电安全技术规范》(JGJ46-2005)第8.1.2条,属于安全关键控制点,未在措施中体现构成合规性缺失。",
- "risk_level": "高风险",
- "review_references": "8 配电箱及开关箱## 8.1 配电箱及开关箱的设置 8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n【Top2 参考文档】\n【文件】68《施工现场临时用电安全技术规范》(JGJ46-2005).md\n【标题】8 配电箱及开关箱\n8 配电箱及开关箱## 8.1 配电箱及开关箱的设置\n8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n\n配电系统宜使三相负荷平衡。220V或380V单相用电设备宜接入220/380V三相四线系统;当单相照明线路电流大于30A时,宜采用220/380V三相四线制供电。\n\n室内配电柜的设置应符合本规范第6.1节的规定,\n\n8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。\n\n总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $3 0 \\mathrm { m }$ ,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3 \\mathrm { m }$\n\n8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n\n8.1.4 动力配电箱与照明配电箱宜分别设置。当合并设置为同一配电箱时,动力和照明应分路配电;动力开关箱与照明开关箱必须分设。\n\n8.1.5 配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中,亦不得装设在易受外来固体物撞击、强烈振动、液体浸溅及热源烘烤场所。否则,应予清除或做防护处理。\n\n8.1.6 配电箱、开关箱周围应有足够2人同时工作的空间和通道,不得堆放任何妨碍操作、维修的物品,不得有灌木、杂草。\n\n8.1.7 配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作,钢板厚度应为 $1 . 2 { \\sim } 2 . 0 \\mathrm { m m }$ ,其中开关箱箱体钢板厚度不得小于 $1 . 2 \\mathrm { r n m }$ ,配电箱箱体钢板厚度不得小于 $1 . 5 \\mathrm { m m }$ ,箱体表面应做防腐处理。\n\n8.1.8 配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为 $1 . 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上。其中心点与地面的垂直距离宜为 ${ 0 . 8 } \\mathrm { { \\sim } } 1 . 6 \\mathrm { { m } }$ 。\n\n8.1.9 配电箱、开关箱内的电器(含插座)应先安装在金属或非木质阻燃绝缘电器安装板上,然后方可整体紧固在配电箱。开关箱箱体内,\n\n金属电器安装板与金属箱体应做电气连接。\n\n8.1.10 配电箱、开关箱内的电器(含插座)应按其规定位置紧固在电器安装板上,不得歪斜和松动。\n\n8.1.11 配电箱的电器安装板上必须分设N线端子板和PE线端子板。N线端子板必须与金属电器 安装板绝缘;PE线端子板必须与金属电器安装板做电气连接。\n\n进出线中的N线必须通过N线端子板连接;PE线必须通过PE线端子板连接。\n\n8.1.12 配电箱、开关箱内的连接线必须采用钢芯绝缘导线。导线绝缘的颜色标志应按本规范第5.1.11条要求配置并排列整齐;导线分支接头不得采用螺栓压接,应采用焊接并做绝缘包扎,不得有外露带电部分。\n\n8.1.13 配电箱、开关箱的金属箱体、金属电器安装报板以及电器正常不带电的金属底座、外壳等必须通过PE线端子板与PE线做电气连接,金属箱门与金属箱体必须通过采用编织软铜线做电气连接。\n\n8.1.14 配电箱、开关箱的箱体尺寸应与箱内电器的数量和尺寸相适应,箱内电器安装板板面电器安装尺寸可按照表8.1.14确定。\n\n表8.1.14 配电箱、开关箱内电器安装尺寸选择值 \n\n\n\n\n\n8.1.15 配电箱、开关箱中导线的进线口和出线口应设在箱体的下底面。\n\n8.1.16 配电箱、开关箱的进、出线口应配置固定线卡,进出线应加绝缘护套并成束卡固在箱体上,不得与箱体直接接触。移动式配电箱、开关箱的进、出线应采用橡皮护套绝缘电缆,不得有接头。\n\n8.1.17 配电箱、开关箱外形结构应能防雨、防尘。\n\n## 8.2 电器装置的选择\n8.2.1 配电箱、开关箱内的电器必须可靠、完好,严禁使用破损、不合格的电器。\n\n8.2.2 总配电箱的电器应具备电源隔离,正常接通与分断电路,以及短路、过载、漏电保护功能。电器设置应符合下列原则:\n\n1 当总路设置总漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当所设总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设总断路器或总熔断器。\n\n2 当各分路设置分路漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当分路所设漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设分路断路器或分路熔断器。\n\n3 隔离开关应设置于电源进线端,应采用分断时具有可见分断点,并能同时断开电源所有极的隔离电器。如采用分断时具有可见分断点的断路器,可不另设隔离开关;\n\n4 熔断器应选用具有可靠灭弧分断功能的产品。\n\n5 总开关电器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应。\n\n8.2.3 总配电箱应装设电压表、总电流表、电度表及其他需要的仪表。专用电能计量仪表的装设应符合当地供用电管理部门的要求。\n\n装设电流互感器时,其二次回路必须与保护零线有一个连接点,且严禁断开电路。\n\n8.2.4 分配电箱位装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。其设置和选择应符合本规范第8.2.2条要求。\n\n8.2.5 开关箱必须装设隔离开关、断路器或熔断器,以及漏电保护器。当漏电保护器是同时具有短路、过载、漏电保护功能的漏电断路器时,可不装设断路器或熔断器。隔离开关应采用分断时具有可见分断点,能同时断开电源所有极的隔离电器,并应设置于电源进线端。当断路器是具有可见分断点时,可不另设隔离开关。\n\n8.2.6 开关箱中的隔离开关只可直接控制照明电路和容量不大于3.0kW的动力电路应采用断路器控制,操作频繁时还应附设接触器或其他启动控制装置。\n\n8.2.7 开关箱中各种开关电器的额定值和动作整定值应与其控制用电设备的额定值和特性相适应。通用电动机开关箱中电器的规格可按本规范附录C选配。\n\n8.2.8 漏电保护器时装设在总配电箱、开关箱靠近负荷的一侧,且不得用于启动电气设备的操作。\n8.2.9 漏电保护器的选择应符合现行国家标准《剩余电流动作保护器的一般要求》GB6829和《漏电保护器安装和运行的要求》GB13955的规定。\n\n8.2.10 开关箱中漏电保护器的额定漏电动作电流不应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间不应大于 \n0.1s。\n\n使用于潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,其额定漏电动作电流不应大于15mA,额定漏电动作时间不应大于0.1s。\n\n8.2.11 总配电箱中漏电保护器的额定漏电动作电流应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间应大于\n\n0.1s,但其额定漏电动作电流与额定漏电动作时间的乘积不应大于 $3 0 \\mathrm { m A } \\cdot \\mathrm { s } _ { \\circ }$\n\n8.2.12 总配电箱和开关箱中漏电保护器的极数和线数必须与其负荷侧负荷的相数和线数一致。\n\n8.2.13 配电箱、开关箱中的漏电保护器宜选用无辅助电源型(电磁式)产品,或选用辅助电源故障时能自动断开的辅助电源型(电子式)产品。当选用辅助电源故障时不能自动断开的辅助电源型(电子式)产品时,应同时设置缺相保护。\n\n8.2.14 漏电保护器应按产品说明书安装、使用。对搁置已久重新使用或连续使用的漏电保护器应逐月检测其特性,发现问题应及时修理或更换。\n\n \n图8.2.14 漏电保护器使用接线方法示意\n\n$\\mathrm { L } _ { 1 }$ 、 $\\mathrm { L } _ { 2 }$ 、 $\\mathrm { L } _ { 3 }$ 一相线;N一工作零线;PE一保护零线、保护线;1一工作接地;2一重复接地;T一变压器;RCD一漏电保护器;H一照明器;W一电焊机;M一电动机\n\n8.2.15 配电箱、开关箱的电源进线端严禁采用插头和插座做活动连接。\n\n## 8.3 使用与维护\n8.3.1 配电箱、开关箱应有名称、用途、分路标记及系统接线图。\n\n8.3.2 配电箱、开关箱箱门应配锁,并应由专人负责。\n\n8.3.3 配电箱、开关箱应定期检查、维修。检查、维修人员必须是专业电工;检查、维修时必须按规定穿、戴绝缘鞋。手套,必须使用电工绝缘工具,并应做检查、维修工作记录。\n\n8.3.4 对配电箱、开关箱进行定期维修、检查时,必须将其前一级相应的电源隔离开关分闸断电,并悬挂“禁止合闸、有人工作”停电标志牌,严禁带电作业。\n\n8.3.5 配电箱、外关箱必须按照下列顺序操作:\n\n1 送电操作顺序为:总配电箱一 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 开关箱; \n2 停电操作顺序为:开关箱 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 总配电箱。 \n但出现电气故障的紧急情况可除外。\n\n8.3.6 施工现场停止作业1小时以上时,应将动力开关箱断电上锁。\n\n8.3.7 开关箱的操作人员必须符合本规范第3.2.3条规定。\n\n8.3.8 配电精、开关箱内不得放置任何杂物,并应保持整洁。\n\n8.3.9 配电箱、开关箱内不得随意拉接其他用电设备。\n\n8.3.10 配电箱、开关箱内的电器配置和接线严禁随意改动。\n\n熔断器的熔体更换时,严禁采用不符合原规格的熔体代替。漏电保护器每天使用前应启动漏电试验按钮试跳一次,试跳不正常时严禁继续使用。\n8.3.11 配电箱、开关箱的进线和出线严禁承受外力,严禁与金属尖锐断口、强腐蚀介质和易燃易爆物接触。\n",
- "reference_source": "68《施工现场临时用电安全技术规范》(JGJ46-2005).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "高空作业平台检查要求与安全标志设置不一致",
- "location": "(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。",
- "suggestion": "在高空作业平台设置‘当心坠落’‘当心落物’‘必须系安全带’‘禁止停留’等安全标志,确保作业区域警示明确,符合《公路工程施工安全标志设置规范JT/T1507-2024》中8.2条关于高墩翻模爬模及盖梁施工平台的安全标志要求。",
- "reason": "根据【参考依据】8.2条规定,高墩翻模爬模施工及盖梁施工平台应在作业平台防护栏杆上设置‘当心坠落’‘当心落物’‘禁止停留’‘禁止靠近’‘禁止抛物’‘必须系安全带’等安全标志。待审查内容虽提及检查平台牢固性与安全带使用,但未明确要求设置相应安全标志,存在安全警示缺失问题,不符合规范要求。",
- "risk_level": "高风险",
- "review_references": "- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n【Top1 参考文档】\n【文件】66 公路工程施工安全标志设置规范JT T1507-2024.md\n【标题】8 桥涵工程施工安全标志设置\n8 桥涵工程施工安全标志设置## 8.1 基础施工时,应设置下列安全标志: \n- 挖孔桩孔口处:“当心坑洞”“当心坠落”“必须通风”“必须戴安全帽”“必须系安全带”; \n- 钻孔桩孔口处:“当心坑洞”“当心坠落”; \n- 泥浆池四周:“禁止翻越”“泥浆池危险请勿靠近”; \n- 水上作业平台:“注意安全”“当心落水”“必须穿救生衣”; \n- 围堰周边:“当心落水”“当心坠落”“必须穿救生衣”“非工作人员禁止入内”; \n- 承台基坑周边:“当心坠落”“禁止翻越”“基坑危险请勿靠近”; \n- 基坑壁:“当心塌方”“当心落物”。 \n\n## 8.2 下部结构施工时,高墩翻模爬模施工应在作业平台防护栏杆上设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志;盖梁施工平台应设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志。 \n\n## 8.3 上部结构施工时,应设置下列安全标志: \n- 架桥机作业点:“当心坠落”“当心吊物”“当心障碍物”“禁止抛物”“必须系安全带”; \n- 架梁施工警戒区:“禁止通行”“吊装重地请勿靠近”“危险区域禁止逗留”; \n- 运梁通道沿线:限速; \n- 支架现浇施工:“当心落物”“当心吊物”“禁止靠近”“禁止停留”“必须戴安全帽”“必须系安全带”; \n- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n8.4 桥面系及附属工程施工时,应在桥面端头设置“当心坑洞”“当心坠落”“必须戴安全帽”“非施工车辆及人员禁止入内”以及限速安全标志。防撞护栏施工应在施工平台上或作业点处设置“当心坠落”“禁止抛物”“必须系安全带”安全标志。伸缩缝施工应在作业点来车方向前方设置“禁止通行”“前方施工减速慢行”“道路封闭禁止通行”安全标志。\n8.5 跨既有线施工时,应在施工作业面醒目位置设置“注意安全”“当心坠落”“禁止抛物”安全标志,应在既有线路边合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”以及限高限宽限速安全标志。\n8.6 不中断交通施工时,应在施工现场附近合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”安全标志。桥梁拼接、抬升施工警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志。\n8.7 桥梁拆除警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志;采用爆破拆除还应设置“爆破区域禁止进入”安全标志。\n",
- "reference_source": "66 公路工程施工安全标志设置规范JT T1507-2024.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "配电箱与被控制设备距离不得超过3m的规定与规范要求不一致",
- "location": "8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $30\\mathrm{m}$,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3\\mathrm{m}$",
- "suggestion": "将‘配电箱与被控制设备距离不得超过3m’修改为‘开关箱与其控制的固定式用电设备的水平距离不宜超过3m’,并明确‘配电箱’指代的是开关箱,避免混淆总配电箱或分配电箱与设备的距离要求。",
- "reason": "根据《施工现场临时用电安全技术规范》(JGJ46-2005)8.1.2条,仅规定‘开关箱与其控制的固定式用电设备的水平距离不宜超过3m’,而待审查内容中将‘配电箱’泛指为与设备距离不得超过3m,存在实体概念错误,易导致误解为所有配电箱(包括总配电箱、分配电箱)均需满足此距离,与规范不符。",
- "risk_level": "高风险",
- "review_references": "8 配电箱及开关箱## 8.1 配电箱及开关箱的设置 8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n【Top2 参考文档】\n【文件】68《施工现场临时用电安全技术规范》(JGJ46-2005).md\n【标题】8 配电箱及开关箱\n8 配电箱及开关箱## 8.1 配电箱及开关箱的设置\n8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n\n配电系统宜使三相负荷平衡。220V或380V单相用电设备宜接入220/380V三相四线系统;当单相照明线路电流大于30A时,宜采用220/380V三相四线制供电。\n\n室内配电柜的设置应符合本规范第6.1节的规定,\n\n8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。\n\n总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $3 0 \\mathrm { m }$ ,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3 \\mathrm { m }$\n\n8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n\n8.1.4 动力配电箱与照明配电箱宜分别设置。当合并设置为同一配电箱时,动力和照明应分路配电;动力开关箱与照明开关箱必须分设。\n\n8.1.5 配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中,亦不得装设在易受外来固体物撞击、强烈振动、液体浸溅及热源烘烤场所。否则,应予清除或做防护处理。\n\n8.1.6 配电箱、开关箱周围应有足够2人同时工作的空间和通道,不得堆放任何妨碍操作、维修的物品,不得有灌木、杂草。\n\n8.1.7 配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作,钢板厚度应为 $1 . 2 { \\sim } 2 . 0 \\mathrm { m m }$ ,其中开关箱箱体钢板厚度不得小于 $1 . 2 \\mathrm { r n m }$ ,配电箱箱体钢板厚度不得小于 $1 . 5 \\mathrm { m m }$ ,箱体表面应做防腐处理。\n\n8.1.8 配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为 $1 . 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上。其中心点与地面的垂直距离宜为 ${ 0 . 8 } \\mathrm { { \\sim } } 1 . 6 \\mathrm { { m } }$ 。\n\n8.1.9 配电箱、开关箱内的电器(含插座)应先安装在金属或非木质阻燃绝缘电器安装板上,然后方可整体紧固在配电箱。开关箱箱体内,\n\n金属电器安装板与金属箱体应做电气连接。\n\n8.1.10 配电箱、开关箱内的电器(含插座)应按其规定位置紧固在电器安装板上,不得歪斜和松动。\n\n8.1.11 配电箱的电器安装板上必须分设N线端子板和PE线端子板。N线端子板必须与金属电器 安装板绝缘;PE线端子板必须与金属电器安装板做电气连接。\n\n进出线中的N线必须通过N线端子板连接;PE线必须通过PE线端子板连接。\n\n8.1.12 配电箱、开关箱内的连接线必须采用钢芯绝缘导线。导线绝缘的颜色标志应按本规范第5.1.11条要求配置并排列整齐;导线分支接头不得采用螺栓压接,应采用焊接并做绝缘包扎,不得有外露带电部分。\n\n8.1.13 配电箱、开关箱的金属箱体、金属电器安装报板以及电器正常不带电的金属底座、外壳等必须通过PE线端子板与PE线做电气连接,金属箱门与金属箱体必须通过采用编织软铜线做电气连接。\n\n8.1.14 配电箱、开关箱的箱体尺寸应与箱内电器的数量和尺寸相适应,箱内电器安装板板面电器安装尺寸可按照表8.1.14确定。\n\n表8.1.14 配电箱、开关箱内电器安装尺寸选择值 \n\n\n\n\n\n8.1.15 配电箱、开关箱中导线的进线口和出线口应设在箱体的下底面。\n\n8.1.16 配电箱、开关箱的进、出线口应配置固定线卡,进出线应加绝缘护套并成束卡固在箱体上,不得与箱体直接接触。移动式配电箱、开关箱的进、出线应采用橡皮护套绝缘电缆,不得有接头。\n\n8.1.17 配电箱、开关箱外形结构应能防雨、防尘。\n\n## 8.2 电器装置的选择\n8.2.1 配电箱、开关箱内的电器必须可靠、完好,严禁使用破损、不合格的电器。\n\n8.2.2 总配电箱的电器应具备电源隔离,正常接通与分断电路,以及短路、过载、漏电保护功能。电器设置应符合下列原则:\n\n1 当总路设置总漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当所设总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设总断路器或总熔断器。\n\n2 当各分路设置分路漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当分路所设漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设分路断路器或分路熔断器。\n\n3 隔离开关应设置于电源进线端,应采用分断时具有可见分断点,并能同时断开电源所有极的隔离电器。如采用分断时具有可见分断点的断路器,可不另设隔离开关;\n\n4 熔断器应选用具有可靠灭弧分断功能的产品。\n\n5 总开关电器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应。\n\n8.2.3 总配电箱应装设电压表、总电流表、电度表及其他需要的仪表。专用电能计量仪表的装设应符合当地供用电管理部门的要求。\n\n装设电流互感器时,其二次回路必须与保护零线有一个连接点,且严禁断开电路。\n\n8.2.4 分配电箱位装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。其设置和选择应符合本规范第8.2.2条要求。\n\n8.2.5 开关箱必须装设隔离开关、断路器或熔断器,以及漏电保护器。当漏电保护器是同时具有短路、过载、漏电保护功能的漏电断路器时,可不装设断路器或熔断器。隔离开关应采用分断时具有可见分断点,能同时断开电源所有极的隔离电器,并应设置于电源进线端。当断路器是具有可见分断点时,可不另设隔离开关。\n\n8.2.6 开关箱中的隔离开关只可直接控制照明电路和容量不大于3.0kW的动力电路应采用断路器控制,操作频繁时还应附设接触器或其他启动控制装置。\n\n8.2.7 开关箱中各种开关电器的额定值和动作整定值应与其控制用电设备的额定值和特性相适应。通用电动机开关箱中电器的规格可按本规范附录C选配。\n\n8.2.8 漏电保护器时装设在总配电箱、开关箱靠近负荷的一侧,且不得用于启动电气设备的操作。\n8.2.9 漏电保护器的选择应符合现行国家标准《剩余电流动作保护器的一般要求》GB6829和《漏电保护器安装和运行的要求》GB13955的规定。\n\n8.2.10 开关箱中漏电保护器的额定漏电动作电流不应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间不应大于 \n0.1s。\n\n使用于潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,其额定漏电动作电流不应大于15mA,额定漏电动作时间不应大于0.1s。\n\n8.2.11 总配电箱中漏电保护器的额定漏电动作电流应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间应大于\n\n0.1s,但其额定漏电动作电流与额定漏电动作时间的乘积不应大于 $3 0 \\mathrm { m A } \\cdot \\mathrm { s } _ { \\circ }$\n\n8.2.12 总配电箱和开关箱中漏电保护器的极数和线数必须与其负荷侧负荷的相数和线数一致。\n\n8.2.13 配电箱、开关箱中的漏电保护器宜选用无辅助电源型(电磁式)产品,或选用辅助电源故障时能自动断开的辅助电源型(电子式)产品。当选用辅助电源故障时不能自动断开的辅助电源型(电子式)产品时,应同时设置缺相保护。\n\n8.2.14 漏电保护器应按产品说明书安装、使用。对搁置已久重新使用或连续使用的漏电保护器应逐月检测其特性,发现问题应及时修理或更换。\n\n \n图8.2.14 漏电保护器使用接线方法示意\n\n$\\mathrm { L } _ { 1 }$ 、 $\\mathrm { L } _ { 2 }$ 、 $\\mathrm { L } _ { 3 }$ 一相线;N一工作零线;PE一保护零线、保护线;1一工作接地;2一重复接地;T一变压器;RCD一漏电保护器;H一照明器;W一电焊机;M一电动机\n\n8.2.15 配电箱、开关箱的电源进线端严禁采用插头和插座做活动连接。\n\n## 8.3 使用与维护\n8.3.1 配电箱、开关箱应有名称、用途、分路标记及系统接线图。\n\n8.3.2 配电箱、开关箱箱门应配锁,并应由专人负责。\n\n8.3.3 配电箱、开关箱应定期检查、维修。检查、维修人员必须是专业电工;检查、维修时必须按规定穿、戴绝缘鞋。手套,必须使用电工绝缘工具,并应做检查、维修工作记录。\n\n8.3.4 对配电箱、开关箱进行定期维修、检查时,必须将其前一级相应的电源隔离开关分闸断电,并悬挂“禁止合闸、有人工作”停电标志牌,严禁带电作业。\n\n8.3.5 配电箱、外关箱必须按照下列顺序操作:\n\n1 送电操作顺序为:总配电箱一 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 开关箱; \n2 停电操作顺序为:开关箱 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 总配电箱。 \n但出现电气故障的紧急情况可除外。\n\n8.3.6 施工现场停止作业1小时以上时,应将动力开关箱断电上锁。\n\n8.3.7 开关箱的操作人员必须符合本规范第3.2.3条规定。\n\n8.3.8 配电精、开关箱内不得放置任何杂物,并应保持整洁。\n\n8.3.9 配电箱、开关箱内不得随意拉接其他用电设备。\n\n8.3.10 配电箱、开关箱内的电器配置和接线严禁随意改动。\n\n熔断器的熔体更换时,严禁采用不符合原规格的熔体代替。漏电保护器每天使用前应启动漏电试验按钮试跳一次,试跳不正常时严禁继续使用。\n8.3.11 配电箱、开关箱的进线和出线严禁承受外力,严禁与金属尖锐断口、强腐蚀介质和易燃易爆物接触。\n",
- "reference_source": "68《施工现场临时用电安全技术规范》(JGJ46-2005).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-22": {
- "metadata": {
- "review_location_label": "第15页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。\n16)超过3米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的支腿垂直度。\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械通行。\n3、设备设施要求"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 2,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "严禁夜间施工作业",
- "location": "(4)起重作业安全保障措施\n14)严禁夜间施工作业。",
- "suggestion": "建议修改为“夜间作业应确保照明充足且符合安全要求,未经批准不得进行高风险作业”或“除特殊情况并经审批外,禁止夜间进行高风险作业”。",
- "reason": "原文中‘严禁夜间施工作业’属于绝对化用语,不符合实际施工管理中的灵活性要求。在具备足够照明和安全措施的前提下,部分作业可合法合规地在夜间进行。该表述存在工程绝对化风险,可能影响施工组织安排,且与《建设工程安全生产管理条例》等法规中关于‘合理安排作业时间’的原则相悖,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "(4)起重作业安全保障措施 14)严禁夜间施工作业。 与 (2)高空作业安全保障措施 12)夜间作业,必须设置足够的照明设施,否则禁止施工。",
- "suggestion": "将(4)起重作业安全保障措施14)中的'严禁夜间施工作业'修改为'夜间作业时,必须设置足够的照明设施并采取可靠安全措施,否则禁止施工',以与高空作业条款保持一致。",
- "reason": "1) 矛盾点在于:同一施工方案中,高空作业条款允许在设置足够照明的前提下进行夜间作业(‘否则禁止施工’),而起重作业条款却绝对禁止夜间作业(‘严禁’),二者在逻辑上冲突。2) 从安全逻辑看,只要具备足够照明和防护措施,夜间起重作业在技术上是可行的,禁止所有夜间作业属于过度绝对化,与前文允许夜间作业的条件相矛盾。3) 可能导致施工组织混乱,影响工期安排,或在实际执行中因条款冲突而引发违规操作或安全管理漏洞。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未完全被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "架桥机试吊及日常定期检查要求与参考依据不一致",
- "location": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "将‘支腿垂直度需用水平传感器测量,主梁跨中挠度采用水准仪和水平弦线法观测,吊杆螺母每吊装200片梁需进行无损探伤’等内容,调整为与参考依据一致的表述,即:‘起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查’。试吊过程中的监测项目应以确保安全为前提,但不得超出或补充规范未明确要求的量化指标。",
- "reason": "根据【参考依据】,仅规定‘起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查’,未提及支腿垂直度、主梁挠度的具体测量方法(如水平传感器、水准仪、水平弦线法)以及吊杆螺母每200片梁探伤的频率。待审查内容中增加的监测方法和频次超出了参考依据的强制性规定范围,属于对非参数性条文的自行扩展,违反了审查规则中‘禁止编造审查依据或引用【参考依据】以外的信息’的要求。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top2 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊杆螺母每吊装200片梁需进行无损探伤与规范要求不符",
- "location": "(5)架桥机监测监控措施\n9)架桥机定期检查\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;",
- "suggestion": "将‘每吊装200片梁时’修改为‘每吊装100片梁时’或根据实际设计参数和规范要求明确探伤频率,确保符合安全冗余要求。",
- "reason": "根据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条第1款规定,吊具应定期进行探伤检查,但未明确具体频次。结合工程安全原则及对关键受力部件的可靠性要求,吊杆螺母作为高应力关键部件,其探伤周期不宜超过100片梁。现行‘200片’周期过长,可能增加安全隐患,不符合‘安全第一’的施工原则,且与高风险设备维护逻辑不符。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top2 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-23": {
- "metadata": {
- "review_location_label": "第17页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。\n(1)在现场开展防暑降温保健、中暑急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加强对工人身体状况的检查工作,搞好医疗保健。(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,落实劳动保护措施。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "条件结论不匹配",
- "location": "3、夏季施工安全保证措施\n1、夏季劳保防护措施\n(5)日最高气温达到39℃以上时,当日应停止作业",
- "suggestion": "将‘当日应停止作业’修改为‘当日应停止高处、露天等高温作业’",
- "reason": "1) 原文条件为‘日最高气温达到39℃以上’,结论为‘当日应停止作业’,该结论过于绝对,未区分作业类型,与常识及施工实际不符;2) 高温环境下并非所有作业都必须完全停止,如地下作业、室内作业等可继续进行,强制‘停止所有作业’缺乏合理性;3) 此类不加区分的绝对化结论可能导致施工组织混乱,影响工期,且违背‘科学防暑’原则,可能引发不必要的资源浪费或管理僵化,存在中等风险。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-24": {
- "metadata": {
- "review_location_label": "第27页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图8-1 会禄高速ZCB1-3项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-25": {
- "metadata": {
- "review_location_label": "第27页:第十章 应急处理措施->二) 职责",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指挥部、总监办,1小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工作,并保证通道的畅通。3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,写出应急处置报告。\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-26": {
- "metadata": {
- "review_location_label": "第27页:第十章 应急处理措施",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指挥部、总监办,1小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工作,并保证通道的畅通。3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,写出应急处置报告。\n\n<表格></表格>\n\n三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n信息传递\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。\n\n四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。\n\n9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老化、脆裂、漏气的胶管不准使用。\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般不小于10米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20米。不准使用过短或过长的软管,接头出必须用专用的卡子或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。4、严禁从高处向下方抛物料。\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。\n\n在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护和运输等应急救援力量到位。3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状态,并及时予以补充和更新。\n表8-1 应急物资一览表\n\n<表格></表格>\n\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有效投入。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【安全保证体系】内容: 1.引用公司标准体系框图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.引用公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含安全保证体系包含:1.引用公司标准体系框图;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件16)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【监测监控措施】内容: 1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含监测监控措施包括:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件19)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-27": {
- "metadata": {
- "review_location_label": "第28页:第十章 应急处理措施->三) 预警及信息报告",
- "original_content": "三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n信息传递\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "预警及信息报告中的应急响应等级表述存在绝对化用语风险",
- "location": "三) 预警及信息报告\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将‘可能造成3人及以上死亡的事故’修改为‘可能发生3人及以上死亡的事故’,避免使用‘可能造成’这种绝对化、结果导向的表述,以符合工程安全预案中对不确定性的客观描述要求。",
- "reason": "‘可能造成3人及以上死亡’存在绝对化用语风险,容易被解读为对事故后果的确定性判断,违背应急管理中对风险不确定性的科学认知,属于工程表述中的绝对化用语,可能引发对责任认定或风险预判的误解,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "三) 预警及信息报告\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将Ⅲ级响应的描述修改为:‘Ⅲ级响应:重伤事故或可能造成1-2人伤亡的事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。’",
- "reason": "1) 矛盾点在于:Ⅲ级响应定义为‘重伤事故’,但Ⅱ级响应为‘死亡1-2人事故’,而‘重伤’在严重程度上通常低于‘死亡’,但此处Ⅲ级响应却对应更低级别的事故,与响应等级从Ⅲ到Ⅰ递增的逻辑不符。2) 依据常规应急响应等级划分原则,等级越高,事故严重性越大,而当前设置中‘重伤事故’(Ⅲ级)的严重性低于‘死亡1-2人’(Ⅱ级),违反了等级递进逻辑。3) 此逻辑错误可能导致应急响应启动时机混乱,如重伤事故未被及时升级响应,延误救援,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-28": {
- "metadata": {
- "review_location_label": "第29页:第十章 应急处理措施->四) 应急响应",
- "original_content": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 1,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急响应分级中关于死亡人数的表述存在绝对化用语风险",
- "location": "Ⅰ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将‘可能造成3人及以上死亡的事故’修改为‘可能造成3人及以上人员伤亡的事故’,或进一步明确为‘可能造成重大人员伤亡的事故’,避免使用具体死亡人数作为判定标准,以规避绝对化表述带来的风险。",
- "reason": "原文中使用‘3人及以上死亡’作为Ⅰ级响应的触发条件,属于对人员伤亡结果的绝对化表述,存在潜在的法律和舆情风险。在工程应急响应中,应避免以具体死亡人数作为唯一判断标准,以防引发对事故严重性预判的误解或对应急响应机制的质疑。此类表述可能被解读为对生命价值的量化,不符合国家关于安全生产和应急管理中以人为本、预防为主的原则,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "起重机械倾覆及吊装构件滑落等应急处置场景中安全措施与设备管理要求不一致",
- "location": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。",
- "suggestion": "在‘起重机械发生倾覆事故或吊装构件滑落时的应急处置场景’中,应明确要求‘立即断电’‘封锁现场’‘组织救援’等措施必须由持证人员执行,且所有设备在使用前必须完成安装调试并经验收合格。建议在应急措施中补充:‘所有应急操作必须由持证人员执行,严禁无证人员参与设备断电、救援吊装或现场处置。设备修复后必须重新验收合格方可恢复使用。’",
- "reason": "根据【参考依据】11.4.1规定,钢筋弯曲机等机械设备在安装调试合格后方可使用,且需专人专机、定期检查。虽然该条文针对钢筋弯曲机,但其体现的‘设备验收合格后使用’‘专人专机’‘持证操作’‘定期检查’等原则适用于所有机械设备,包括起重机械。待审查内容中虽提及‘需由持证人员操作,定期检查,安装调试合格后方可使用’,但未在应急处置流程中明确该要求的执行主体和程序,存在安全隐患,可能导致非持证人员在紧急情况下擅自操作设备,引发二次事故。因此,该条款与非参数性安全要求存在不一致,违反了‘设备使用前必须验收合格’‘持证操作’的核心安全原则。",
- "risk_level": "高风险",
- "review_references": "11.4 钢筋弯曲机## 11.4.1 传动系统及工作机构应符合下列规定:\n【Top2 参考文档】\n【文件】65《施工现场机械设备检查技术规范》(JGJ160-2016).md\n【标题】11.4 钢筋弯曲机\n11.4 钢筋弯曲机## 11.4.1 传动系统及工作机构应符合下列规定:\n\n1工作台和弯曲机台面应保持水平;传动齿轮啮合应良好,位置不应偏移;\n\n2芯轴、成型轴、挡铁轴和轴套应完整,安装应牢固,工作台转动应灵活,不应有卡阻;\n\n3芯轴和成型轴、挡铁轴的规格与加工钢筋的直径和弯曲 半径应相适应;芯轴直径应为钢筋直径的2.5倍;挡铁轴应有 轴套。\n\n## 11.4.2 芯轴、挡铁轴、转盘等不应有裂纹和损伤,防护罩应坚固可靠。\n",
- "reference_source": "65《施工现场机械设备检查技术规范》(JGJ160-2016).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-29": {
- "metadata": {
- "review_location_label": "第31页:第十章 应急处理措施->四) 应急响应",
- "original_content": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老化、脆裂、漏气的胶管不准使用。\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般不小于10米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20米。不准使用过短或过长的软管,接头出必须用专用的卡子或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。4、严禁从高处向下方抛物料。\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 5,
- "medium": 2,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急措施中提及启动应急救援案及成立指挥中心等表述存在绝对化和潜在敏感性",
- "location": "应急措施: 针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。",
- "suggestion": "将‘启动应急救援案’修改为‘启动应急预案’;将‘成立指挥中心’调整为‘成立应急指挥小组’,避免使用可能引发误解的术语。同时,将‘村民’改为‘周边人员’,以避免地域或群体指向性风险。",
- "reason": "‘应急救援案’一词在正式文件中不规范,应为‘应急预案’;‘成立指挥中心’可能被误读为具有行政或组织权力的实体,存在表述不当风险;‘村民’一词在非特定语境下可能引发对特定群体的指向性联想,不符合工程文件中应保持中立、客观的表达要求。该表述虽无恶意,但存在潜在敏感性,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "门式起重机用于桥梁施工中梁体吊装作业的安全要求与参考依据不符",
- "location": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "门式起重机作为非专用架桥机或起重船的替代设备,其用于箱梁架设安装时,应明确其是否通过技术质量监督部门产品认证,并满足起重参数、基础处理、安装资质等要求;若未在参考依据中明确允许使用门式起重机,应补充说明其适用条件或调整为符合规范要求的设备类型。",
- "reason": "参考依据中仅规定箱梁架设应采用通过认证的专用架桥机或具备船舶证书及起重检验证书的起重船,未提及门式起重机的适用性。而待审查内容中提出使用门式起重机进行梁体吊装,涉及设备选型、基础加固、安装资质等安全要求,但该内容未在参考依据中得到支持或明确允许,存在与强制性规定不一致的风险。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top1 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "漏电保护装置设置不符合三级配电、二级漏电保护系统要求",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。",
- "suggestion": "应明确两级漏电保护装置的设置位置,即总配电箱和开关箱均应设置漏电保护器,且动作电流和动作时间应匹配,符合《建筑施工安全检查标准》(JGJ59-2011)第4.1.1条关于‘二级漏电保护系统’的要求。",
- "reason": "根据【参考依据】《建筑施工安全检查标准》(JGJ59-2011)第4条明确规定:施工现场配电系统应采用三级配电、二级漏电保护系统,总配电箱与开关箱应安装漏电保护器,且参数应匹配并灵敏可靠。待审查内容中虽提及‘设两级漏电保护装置’,但未明确其设置层级与系统匹配关系,未体现‘总配电箱’与‘开关箱’的分级配置要求,存在对强制性条文理解不完整的问题。",
- "risk_level": "高风险",
- "review_references": "4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n【Top1 参考文档】\n【文件】133《建筑施工安全检查标准》(JGJ59-2011).md\n【标题】4 配电箱与开关箱\n4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n\n2)箱体结构、箱内电器设置及使用应符合规范要求;\n\n3)配电箱必须分设工作零线端子板和保护零线端子板,保护零线、工作零线必\n\n须通过各自的端子板连接;\n\n4)总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠;5)箱体应设置系统接线图和分路标记,并应有门、锁及防雨措施;6)箱体安装位置、高度及周边通道应符合规范要求;7)分配箱与开关箱间的距离不应超过 $3 0 \\mathrm { m } ,$ ,开关箱与用电设备间的距离不应超过3m。\n",
- "reference_source": "133《建筑施工安全检查标准》(JGJ59-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "电焊机触电保护器设置要求与规范依据不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。\n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。",
- "suggestion": "将‘电焊机触电保护器’的设置要求明确引用《手持式电动工具的安全 第一部分:通用要求》(GB3883.1)的相关规定,并确保其安装符合‘安全隔离变压器、漏电保护器、控制箱和电源连接器’的配置要求,或参照JTGF90-2015中5.11.7对手持式电动工具的防护要求进行等效匹配。",
- "reason": "根据【参考依据】5.11.7规定,手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器,而电焊机作为一类特殊手持式电动工具,其触电保护应符合该条文要求。但待审查内容中仅提及‘加装电焊机触电保护器’,未明确其配置是否满足上述四项核心设备要求,且未引用GB3883.1或JTGF90-2015中对应条款,存在安全防护措施不完整、依据不充分的风险。",
- "risk_level": "高风险",
- "review_references": "## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n【Top2 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】5.11小型机具\n5.11小型机具## 5.11.1小型机具应有出厂合格证和操作说明书。\n\n## 5.11.2小型机具应制定管理制度,建立台账,并按要求维修、保养和使用。\n\n## 5.11.3作业人员应了解所用机具性能并熟悉掌握其安全操作常识,施工中应正确佩戴各类安全防护用品。\n\n## 5.11.4各种机具不得带病运转。运转中发现不正常时,应先停机检查,排除故障后方可使用。\n\n## 5.11.5不得站在不稳定的地方使用电动或气动机具,必须使用时应有专人监护。\n\n## 5.11.6齿轮传动、皮带传动、联轴器传动的小型机具应设有安全防护装置。\n\n## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n\n## 5.11.8 小型起重机具使用应符合下列规定:\n\n### 1千斤顶应垂直安装在坚实可靠的基础上,底部宜用枕木等垫平。2电动葫芦应设缓冲器,轨道两端应设挡板。电动葫芦不得超载起吊,起吊过程中,手不得握在绳索与吊物之间。3卷扬机卷筒上的钢丝绳应排列整齐,不得在转动中用手拉或脚踩钢丝绳。作业中,不得跨越卷扬机钢丝绳。卷筒剩余钢丝绳不得少于3圈。\n\n## 5.11.9严禁2台及以上手拉葫芦同时起吊重物。\n\n## 5.11.10手持式电动工具的作业应符合现行《手持式电动工具的安全第一部分:通用要求》(GB3883.1)的规定。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "门式起重机用于桥梁施工中梁体吊装作业的设备选型与基础处理要求与规范不符",
- "location": "17.8.11 箱梁的架设安装应符合下列规定:1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "门式起重机不属于本条文中规定的可用于箱梁架设安装的设备类型。若需使用门式起重机进行梁体吊装,应明确其为临时性辅助吊装设备,并需满足专用架桥机或起重船的相关技术要求,包括设备认证、起重参数匹配、试吊确认及吊具探伤检查等。同时,应补充说明其基础处理、安装资质、稳定性验算等要求,确保与规范中对架设设备的安全控制要求一致。",
- "reason": "根据【参考依据】,箱梁架设安装应采用通过技术质量监督部门产品认证的专用架桥机或具备船舶证书及起重检验证书的起重船。门式起重机未被列为合法架设设备,且其使用涉及设备倾覆和垮塌风险,必须满足与专用架桥机同等的安全控制要求。待审查内容中未体现门式起重机的设备认证、试吊确认、吊具探伤等关键安全措施,也未说明其基础加固与安装资质的合规性,与规范中对架设设备的强制性要求存在明显不符。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top1 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "漏电保护装置设置要求与规范不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。",
- "suggestion": "将‘必须设两级漏电保护装置’修改为‘总配电箱与开关箱应安装漏电保护器,实行二级漏电保护’,并明确动作电流和动作时间应符合国家规范要求。",
- "reason": "根据【参考依据】4 配电箱与开关箱 第4条:‘总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠’,且第1条明确‘施工现场配电系统应采用三级配电、二级漏电保护系统’。待审查内容中‘设两级漏电保护装置’表述不准确,未体现‘二级漏电保护’应与‘三级配电’系统配套的规范要求,且未说明参数匹配要求,存在技术概念偏差。",
- "risk_level": "高风险",
- "review_references": "4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n【Top1 参考文档】\n【文件】133《建筑施工安全检查标准》(JGJ59-2011).md\n【标题】4 配电箱与开关箱\n4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n\n2)箱体结构、箱内电器设置及使用应符合规范要求;\n\n3)配电箱必须分设工作零线端子板和保护零线端子板,保护零线、工作零线必\n\n须通过各自的端子板连接;\n\n4)总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠;5)箱体应设置系统接线图和分路标记,并应有门、锁及防雨措施;6)箱体安装位置、高度及周边通道应符合规范要求;7)分配箱与开关箱间的距离不应超过 $3 0 \\mathrm { m } ,$ ,开关箱与用电设备间的距离不应超过3m。\n",
- "reference_source": "133《建筑施工安全检查标准》(JGJ59-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "电焊机触电保护器设置要求与规范依据不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。 \n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。",
- "suggestion": "将‘电焊机触电保护器’修改为符合国家标准的‘电焊机防触电保护装置’,并明确其应符合《手持式电动工具的安全 第一部分:通用要求》(GB3883.1)的规定,同时参照《公路工程施工安全技术规范》(JTGF90-2015)第5.11.7条关于手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器的要求,确保电焊机防护措施与相关标准一致。",
- "reason": "根据【参考依据】5.11.7条,手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器,但未提及‘电焊机触电保护器’这一术语。而电焊机属于特殊用途电气设备,其保护措施应依据GB3883.1等国家标准执行。待审查内容中‘电焊机触电保护器’这一表述缺乏明确标准支撑,且与规范中‘漏电保护器’等术语不一致,存在术语不准确和标准引用模糊的问题,可能导致现场误用或漏装合规设备,属于影响专业表达和安全合规性的问题。",
- "risk_level": "中风险",
- "review_references": "## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n【Top2 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】5.11小型机具\n5.11小型机具## 5.11.1小型机具应有出厂合格证和操作说明书。\n\n## 5.11.2小型机具应制定管理制度,建立台账,并按要求维修、保养和使用。\n\n## 5.11.3作业人员应了解所用机具性能并熟悉掌握其安全操作常识,施工中应正确佩戴各类安全防护用品。\n\n## 5.11.4各种机具不得带病运转。运转中发现不正常时,应先停机检查,排除故障后方可使用。\n\n## 5.11.5不得站在不稳定的地方使用电动或气动机具,必须使用时应有专人监护。\n\n## 5.11.6齿轮传动、皮带传动、联轴器传动的小型机具应设有安全防护装置。\n\n## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n\n## 5.11.8 小型起重机具使用应符合下列规定:\n\n### 1千斤顶应垂直安装在坚实可靠的基础上,底部宜用枕木等垫平。2电动葫芦应设缓冲器,轨道两端应设挡板。电动葫芦不得超载起吊,起吊过程中,手不得握在绳索与吊物之间。3卷扬机卷筒上的钢丝绳应排列整齐,不得在转动中用手拉或脚踩钢丝绳。作业中,不得跨越卷扬机钢丝绳。卷筒剩余钢丝绳不得少于3圈。\n\n## 5.11.9严禁2台及以上手拉葫芦同时起吊重物。\n\n## 5.11.10手持式电动工具的作业应符合现行《手持式电动工具的安全第一部分:通用要求》(GB3883.1)的规定。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-30": {
- "metadata": {
- "review_location_label": "第32页:第十章 应急处理措施->四) 应急响应",
- "original_content": "在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护和运输等应急救援力量到位。3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状态,并及时予以补充和更新。\n表8-1 应急物资一览表\n\n<表格></表格>\n\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有效投入。"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急状态终止命令发布权限表述存在不严谨风险",
- "location": "5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。",
- "suggestion": "建议将‘由应急救援组长决定并发布应急状态终止命令’修改为‘由项目应急救援总指挥或相应层级应急指挥机构负责人决定并发布’,以明确指挥体系层级,避免因‘应急救援组长’称谓模糊引发职责争议。",
- "reason": "原文中‘应急救援组长’未明确其在应急指挥体系中的具体层级与法律授权依据,存在表述模糊、权责不清的风险,可能在实际应急响应中导致指挥混乱或责任推诿,属于影响专业表达和应急响应有效性的中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-31": {
- "metadata": {
- "review_location_label": "第18页:第六章 质量保证措施",
- "original_content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作质量,从而确保工程质量。3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提出保证工程质量的措施。\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放过,不分清责任不放过,没有改进措施不放过。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "quality",
- "check_item_code": "quality_sensitive_word_check",
- "check_result": {
- "issue_point": "质量目标中使用绝对化用语",
- "location": "(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。",
- "suggestion": "将‘杜绝重大质量事故’修改为‘努力杜绝重大质量事故’,将‘工程项目合格率100%’修改为‘力争实现工程项目合格率100%’或‘确保工程项目合格率达到100%’,以避免绝对化表述。",
- "reason": "‘杜绝’和‘100%’属于工程管理中的绝对化用语,可能在实际施工中因不可控因素导致无法完全实现,易引发法律或责任争议。根据工程行业规范,应避免使用‘绝对’‘杜绝’‘100%’等无条件承诺性表述,以符合实事求是原则和风险防控要求。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "quality",
- "check_item_code": "quality_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "quality",
- "check_item_code": "quality_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "质量管理体系运行要求与参考依据不一致",
- "location": "3.0.1 钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。",
- "suggestion": "将‘质量管理体系项目部建立并保证有效运行,贯穿于项目全过程的质量管理活动 需实现全员参与、横向到边、纵向到人,确保质量方针目标落实’修改为‘项目部应建立并有效运行符合GB50205-2020第3.0.1条要求的质量管理体系,确保施工全过程的质量控制,实现全员参与、横向到边、纵向到人,保障质量方针目标的落实’。",
- "reason": "根据【参考依据】3.0.1条,施工单位必须具备相应的质量管理体系,并在施工现场保证其有效运行。待审查内容中虽提及‘建立并保证有效运行’,但未明确其依据为GB50205-2020第3.0.1条,缺乏与强制性标准的直接关联性,属于对规范要求的表述不完整,存在理解偏差风险。该条文属于安全管理与质量控制的基础性要求,若未明确依据,可能影响合规性认定,构成高风险问题。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【Top1 参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_parameter_compliance_check",
- "check_result": {
- "issue_point": "质量管理体系运行要求与标准规定不一致",
- "location": "质量保证措施(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。",
- "suggestion": "应明确质量管理体系的建立和运行依据,确保符合《钢结构工程施工质量验收标准》(GB50205-2020)第3.0.1条关于‘钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度’的要求,建议补充说明质量管理体系文件的来源及审批流程。",
- "reason": "根据【参考依据】3.0.1条,施工单位应有相应的质量管理体系,且施工现场应有经审批的施工组织设计、施工方案等技术文件。待审查内容虽提及建立质量管理体系并保证有效运行,但未说明该体系是否依据标准建立、是否经过审批,不符合标准对体系建立和运行的合规性要求。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【Top1 参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-32": {
- "metadata": {
- "review_location_label": "第18页:第六章 质量保证措施",
- "original_content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作质量,从而确保工程质量。3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提出保证工程质量的措施。\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放过,不分清责任不放过,没有改进措施不放过。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量保证体系】内容: 1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量保证体系包含:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件17)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【工程创优规划】内容: 1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含工程创优规划包含:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件19)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量控制程序与具体措施】内容: 1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量控制程序与具体措施包含:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件20)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-33": {
- "metadata": {
- "review_location_label": "第19页:第七章 环境保证措施",
- "original_content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "environment",
- "check_item_code": "environment_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "environment",
- "check_item_code": "environment_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "environment",
- "check_item_code": "environment_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-34": {
- "metadata": {
- "review_location_label": "第19页:第七章 环境保证措施",
- "original_content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保证体系】内容: 1.公司标准体系框图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保证体系包含:1.公司标准体系框图;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件18)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保护组织机构】内容: 1.管理人员姓名、职务、职责",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.管理人员姓名、职务、职责",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保护组织机构包含:1.管理人员姓名、职务、职责;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件19)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-35": {
- "metadata": {
- "review_location_label": "第24页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1施工组织机构图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-36": {
- "metadata": {
- "review_location_label": "第24页:第九章 施工管理人员及作业人员配备及分工",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1施工组织机构图\n\n二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>\n\n三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400毫米,吊物行驶中不得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查处理。\n司索(信号)工岗位职责1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。\n4、起吊重物水平行走时,距地面距离不许超过0.5米。\n5、吊运重物接近额定负荷时,应升至100毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录\n\n一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图8-1 会禄高速ZCB1-3项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "management",
- "check_item_code": "management_completeness_check",
- "check_result": "第九章 施工管理人员及作业人员配备及分工下缺失施工管理及作业人员配备与分工中的【专职安全生产管理人员】内容: 1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "建议补充:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第九章 施工管理人员及作业人员配备及分工内容属于,专项施工方案内容要求中的 【施工管理及作业人员配备与分工】 板块,应包含专职安全生产管理人员:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中;",
- "review_references": "八、施工管理及作业人员配备与分工 本章包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人 员等四个方面。 施工管理人员以表格的形式说明管理人员名单及岗位职责,如项目经理、项目 书记、项目总工、项目副经理、质量总监、安全总监、各职能部门、主管技术员、 测量员、质检员,以及专业分包单位(协作队伍)项目负责人和项目技术负责人等。 专职安全生产管理人员、特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容,并将人员证件扫描件放置于第十章其他 资料中。 其他作业人员包含专业分包单位(协作队伍)管理人员数量,不同工种(班组、 区域)的作业人员数量等。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-37": {
- "metadata": {
- "review_location_label": "第25页:第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "original_content": "二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-38": {
- "metadata": {
- "review_location_label": "第25页:第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "original_content": "三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400毫米,吊物行驶中不得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查处理。\n司索(信号)工岗位职责1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。\n4、起吊重物水平行走时,距地面距离不许超过0.5米。\n5、吊运重物接近额定负荷时,应升至100毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-39": {
- "metadata": {
- "review_location_label": "第19页:第八章 验收要求->一) 验收标准",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-40": {
- "metadata": {
- "review_location_label": "第19页:第八章 验收要求",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。\n\n二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程实体。\n图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n\n<表格></表格>\n\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。\n\n三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复印件存入同一设备档案。\n(2)设备本体检查设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。\n2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15个工作日内,检验合格出具《起重机械安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4使用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30日内,到产权所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》后方可使用。\n表7-2 设备入场检查表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-3 架桥机日常检查验收表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-4 其他项目验收表\n\n<表格></表格>\n\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。检验必须由专业技术人员进行。\n2)吊链的报废标准:\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负责人员应进行相关工序的检查,满足吊运条件后方可起吊。\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;作业人员是否参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n(3)人员配备是否满足生产需求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_completeness_check",
- "check_result": "第八章 验收要求下缺失验收要求中的【验收时间】内容: 1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "建议补充:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第八章 验收要求内容属于,专项施工方案内容要求中的 【验收要求】 板块,应包含验收时间包含:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收;",
- "review_references": "九、验收要求 本章包含验收标准、验收程序、验收内容、验收时间、验收人员等五个方面。 验收标准包含国家和行业的标准、规范、操作规程、四川路桥、路桥集团和桥 梁公司的管理办法等。 验收程序包括进场验收、过程验收、阶段验收、完工验收等时间节点的具体验 收程序。 验收的内容以表格的形式对安全生产条件、资源配置、施工工艺、机械设备、 临时支撑结构、人员操作平台、安全防护设施等项目进行验收,验收表格中要明确 项目的具体验收标准,验收标准应尽量量化到具体参数或标准。 验收时间是根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整,但应在具备验收条件后18日内项目组织验收。 验收人员应根据专项施工方案分级管控相关要求确定,包括建设、设计、施工、 监理、监测等单位相关人员,并明确验收人员姓名。由施工作业班组在施工过程中 自行对照方案自检,施工完成后由方案编制负责人、项目经理、项目副经理、项目 技术负责人、安全环保处、工程处、机料处、合同处、专业分包单位(协作队伍) 项目负责人和项目技术负责人等部门人员参加方案验收。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-41": {
- "metadata": {
- "review_location_label": "第20页:第八章 验收要求->二)验收程序及人员",
- "original_content": "二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程实体。\n图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n\n<表格></表格>\n\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-42": {
- "metadata": {
- "review_location_label": "第20页:第八章 验收要求->三)验收内容",
- "original_content": "三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复印件存入同一设备档案。\n(2)设备本体检查设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。\n2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15个工作日内,检验合格出具《起重机械安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4使用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30日内,到产权所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》后方可使用。\n表7-2 设备入场检查表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-3 架桥机日常检查验收表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-4 其他项目验收表\n\n<表格></表格>\n\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。检验必须由专业技术人员进行。\n2)吊链的报废标准:\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负责人员应进行相关工序的检查,满足吊运条件后方可起吊。\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;作业人员是否参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n(3)人员配备是否满足生产需求。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索具报废标准与参考依据不一致",
- "location": "(2)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "将‘使用两年后应强制报废’修改为‘吊装作业使用频繁的钢丝绳索具,应根据使用频次和检查结果进行评估,使用年限不宜超过2年,且在达到使用年限前应进行专项安全评估,评估合格后方可继续使用’,并明确‘使用两年后应强制报废’的依据来源,避免与国家标准冲突。",
- "reason": "根据【参考依据】中6.1.3 a)钢丝绳吊具的报废标准,仅列出具体技术指标(如断丝率、直径减少、变形、锈蚀等),未提及‘使用两年后强制报废’这一时间性强制规定。该条款缺乏明确的国家标准依据,且与参考依据中‘报废标准’的定义不一致,属于对非参数性强制要求的不当扩展。依据审查规则,禁止编造审查依据,故该条款存在合规性风险。",
- "risk_level": "高风险",
- "review_references": "a)钢丝绳吊具: -检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); -报废标准。\n【Top3 参考文档】\n【文件】98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md\n【标题】6培训课程的内容\n6培训课程的内容## 6.1理论课程\n\n### 6.1.1有关起重机的知识\n培训课程中应包含下列有关起重机的知识:\n\na)起重机概述术语; 起重机动作:起重能力,额定起重\n\nb)类型、结构外形图、用途:流动机;一塔式起重机;臂架起重机;一桥式和门式起重机。 \nc)安全装置,吊具,制动器。\n\n\n\n### 6.1.2吊挂装置\n\n培训课程中应包含以下吊挂装置的知识a)钢丝绳吊具钢丝绳结构 钢丝绳极限工作载荷安全使用的防范措施b)吊链: 吊链的类型;极限工作载荷;安全使用的防范措施。\n\nc)纤维吊具的类型、极限工作载荷、防护措施:纤维吊装绳;纤维吊装带。\n\nd)其他吊具的类型、极限工作载荷、防护措施:滑轮组;吊具(夹钳、吊钩、卸扣、起重横梁、网式吊兜、吊环);衬垫、垫木。\n\n### 6.1.3吊挂装置的检查\n\n培训课程中应包含下列吊挂装置检查的知识:\n\na)钢丝绳吊具:\n\n-检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); \n-报废标准。\n\nb)吊链:检查项目(伸长、变形、扭曲、断裂、接头处的异常);报废标准。\n\nc)纤维吊具:-纤维吊装绳:\n\n1)检查项目(磨损、刮伤、割伤、腐蚀、编织松散); \n2)报废标准。\n\n纤维吊装带:\n\n1) 损坏(磨损、刮伤、缝纫线断开); \n2) 外部的异常(变色、染色、软化、尘污); \n3) 金属配件(变形、刮伤、断裂、锈蚀); \n4) 报废标准。\n\nd)夹钳:\n\n一夹钳主体或吊环的异常; \n钳口开启异常; \n凸轮或钳叉的齿部(有凸边的部分)处磨损或卡滞、损坏; \n夹钳的功能; \n安全销的功能; \n维护; \n报废标准。\n\n### 6.1.4吊装方法\n\n培训课程中应包含下列吊装方法的知识:\n\na)重心的确定和载荷质量的估算。\n\nb)按照载荷外形选择吊装方法:\n\n直接起升; \n-篮式系挂起升; \n箍式系挂起升; \n夹钳起升; \n-不规则形状载荷的起升(非对称载荷); \n-用起重横梁起升(集装箱吊具); \n使用辅助拉绳。\n\nc)根据载荷质量和起升角度选择吊具。\n\nd)悬吊载荷的运移。\n\n### 6.1.5发信号\n\n培训课程中应包含下列发信号的知识:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.1.6安全规范\n\n### 6.1.7工作规划\n培训课程中应包含下列工作规划:\n\na) 工作顺序; \nb) 载荷运移的路径; \nc) 入口和出口; \nd) 地面或支承面的条件; \ne) 包括吊装作业人员的位置; \n其他现场人员的配合。\n\n### 6.1.8危险因素确认和防控措施\n培训课程中应包含下列危险因素确认和防控措施的知识:\n\na)与起重机的使用和吊装操作相关的危险因素:挤压的危险,诸如跌落的载荷、载荷倒塌、移动载荷和其他物体之间的卡绊;切割的危险,诸如破断的钢丝绳、具有锋利边缘的载荷;冲击的危险,诸如载荷摆动、载荷倒塌、弹射物;缠绕的危险,诸如和钢丝绳吊具、牵绳缠绕在一起;从高处跌落的危险。\n\nb)起升作业现场应考虑的潜在危险因素:高架动力线;-高架公用线路,例如蒸汽管线、天然气管线、电话线;树木;不平坦的和/或不坚实的地面;允许的地面载荷;周围建筑物/容器/工程结构/设备;危险品;腐蚀性物品;障碍物;照明不足;-无线电干扰;恶劣天气。\n\n## 6.2操作课程\n\n### 6.2.1总则\n\n操作课程应包含吊装作业的各个步骤,诸如吊装作业的安全措施、发信号、重心的确定、载荷质量的估算、吊具的选择、吊具的检查,以及在载荷和吊钩上安装吊具、起升、吊运和下降载荷。受训者应基本掌握用篮式系挂、箍式系挂和夹钳起升的方法,以及不规则形状载荷的起升等吊装方法。\n\n### 6.2.2吊装作业的安全措施\n\n培训课程中应包含下列吊装作业安全措施的练习:\n\na)正确着装、使用个人防护用具; \nb)通过手势和喊话进行安全确认。\n\n### 6.2.3发信号\n\n培训课程中应包含下列发信号方法的练习:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.2.4确定重心和估算载荷质量\n\n培训课程中应包含确定重心和估算载荷质量的练习。\n\n### 6.2.5选择吊挂装置\n\n培训课程中应包含选择吊挂装置的练习。\n\n### 6.2.6检查吊挂装置\n\n培训课程中应包含检查吊挂装置的练习。\n\n#### 6.2.7吊装\n\n##### 6.2.7.1安装吊具\n\n培训课程中应包含下列安装吊具步骤的练习:\n\na) 确定重心和安装点; \nb) 载荷上方吊钩的定向和下降吊钩; \nc) 在载荷和吊钩上安装吊具; \nd) 确认吊装状况的安全性。\n\n##### 6.2.7.2试起升和起升载荷\n\n培训课程中应包含下列试起升和起升载荷步骤的练习:\n\na) 准确起升和停止; \nb) 安全性确认; \nc) 起升载荷。\n\n##### 6.2.7.3吊运载荷\n\n培训课程中应包含下列吊运载荷步骤的练习:\n\na) 设计载荷运移路径; \nb) 跨越(和其他起重机共用的空间); \nc) 向起重机司机发吊运路线和下降位置的信号; \nd) 载荷导向。\n\n##### 6.2.7.4下降载荷\n\n培训课程中应包含下列下降载荷步骤的练习:\n\na) 评估地面或支承结构表面的状况; \nb) 将载荷引导到下降位置和预支的垫木上; \nc) 下降载荷和停止下降; \nd) 准确下降,把载荷放在地上并确认其稳定性; \ne) 从吊钩和载荷上移走吊具; \nf 检查吊具并将它存放在指定位置。\n",
- "reference_source": "98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索使用前专项检查要求与强制报废规定不符合现行国家标准",
- "location": "三)验收内容\n2、吊索具验收\n(1)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "将‘使用两年后强制报废’的表述修改为‘钢丝绳吊索应按照GB/T5972《起重机 钢丝绳 保养、维护、安装、检验和报废》中规定的报废标准执行,不得仅以使用年限作为强制报废依据’,并明确报废判定应以实际检测结果为准,避免因时间累积导致误判或遗漏安全隐患。",
- "reason": "根据【参考依据】中4.3.1条明确指出:钢丝绳吊索的使用、检验、破断拉力值和报废等应符合《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972的规定。该标准未规定‘使用两年后强制报废’这一参数性要求,而是依据断丝、磨损、腐蚀、变形等实际状态进行综合评估。待审查内容中‘使用两年后强制报废’属于无依据的附加强制性要求,与国家标准不符,存在误导风险,可能造成安全隐患或资源浪费。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【Top1 参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[前文已省略]...\n塔式起重机安全规程》GB5144、《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196及《建筑机械使用安全技术规程》JGJ33中的相关规定。\n\n### 4.1.6 拔杆式起重机的制作安装应符合下列规定:\n\n1 拔杆式起重机应进行专门设计和制作,经严格的测试、试运转和技术鉴定合格后,方可投入使用。\n\n2 安装时的地基、基础、缆风绳和地锚等设施,应经计算确定。缆风绳与地面的夹角应在 $3 0 ^ { \\circ } \\sim 4 5 ^ { \\circ }$ 之间。缆风绳不得与供电线路接触,在靠近电线处,应装设由绝缘材料制作的护线架。\n\n### 4.1.7 拔杆式起重机的使用应符合下列规定:\n\n1 在整个吊装过程中,应派专人看守地锚。每进行一段工作或大雨后,应对拔杆、缆风绳、索具、地锚和卷扬机等进行详细检查,发现有摆动、损坏等情况时,应立即处理解决。\n\n2 拔杆式起重机移动时,其底座应垫以足够的承重枕木排和滚杠,并将起重臂收紧,处于移动方向的前方,倾斜不得超过${ 1 0 } ^ { \\circ }$ ,移动时拔杆不得向后倾斜,收放缆风绳应配合一致。\n\n## 4.2 绳索\n\n### 4.2.1 吊装作业中使用的白棕绳应符合下列规定:\n\n1 应由剑麻的茎纤维搓成,并不得涂油。其规格和破断拉力应符合产品说明书的规定。\n\n2 只可用作受力不大的缆风绳和溜绳等。白棕绳的驱动力只能是人力,不得用机械动力驱动。\n\n3 穿绕白棕绳的滑轮直径,应大于白棕绳直径的10倍。麻绳有结时,不得穿过滑车狭小之处。长期在滑车使用的白棕绳,应定期改变穿绳方向。\n\n4 整卷白棕绳应根据需要长度切断绳头,切断前应用铁丝或麻绳将切断口扎紧。\n\n5 使用中发生的扭结应立即抖直。当有局部损伤时,应切去损伤部分。\n\n6 当绳长度不够时,应采用编接接长。\n\n7 捆绑有棱角的物件时,应垫木板或麻袋等物。\n\n8 使用中不得在粗糙的构件上或地下拖拉,并应防止砂、石屑嵌入。\n\n9 编接绳头绳套时,编接前每股头上应用绳扎紧,编接后相互搭接长度:绳套不得小于白棕绳直径的15倍;绳头不得小于30倍。\n\n10 白棕绳在使用时不得超过其容许拉力,容许拉力应按下式计算:\n\n$$\n[ F _ { z } ] = \\frac { F _ { z } } { K }\n$$\n\n式中: $[ F _ { z } ]$ 一 -白棕绳的容许拉力(kN);$F _ { z }$ —白棕绳的破断拉力(kN);$K$ ——白棕绳的安全系数,应按表4.2.1采用。\n\n表4.2.1白棕绳的安全系数 \n\n\n\n\n\n### 4.2.2 采用纤维绳索、聚酯复丝绳索应符合现行国家标准《纤维绳索通用要求》 $\\mathrm { G B / T 2 1 3 2 8 } .$ 、《聚酯复丝绳索》 $\\mathrm { G B } / \\mathrm { T } 1 1 7 8 7$ 和《绳索有关物理和机械性能的测定》 $\\mathrm { G B / T 8 8 3 4 }$ 的相关规定。\n\n### 4.2.3 吊装作业中钢丝绳的使用、检验、破断拉力值和报废等应符合现行国家标准《重要用途钢丝绳》GB8918、《一般用途钢丝绳》GB/T20118和《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中的相关规定。\n\n## 4.3 吊索\n\n### 4.3.1 钢丝绳吊索应符合下列规定:\n1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n\n2 吊索宜采用 $6 \\times 3 7$ 型钢丝绳制作成环式或8股头式(图4.3.1),其长度和直径应根据吊物的几何尺寸、重量和所用的吊装工具、吊装方法确定。使用时可采用单根、双根、四根或多根悬吊形式。\n\n3 吊索的绳环或两端的绳套可采用压接接头,压接接头的长度不应小于钢丝绳直径的20倍,且不应小于 $3 0 0 \\mathrm { m m }$ 。8股头吊索两端的绳套可根据工作需要装上桃形环、卡环或吊钩等吊索附件。\n\n \n图4.3.1吊索\n\n4 当利用吊索上的吊钩、卡环钩挂重物上的起重吊环时,吊索的安全系数不应小于6;当用吊索直接捆绑重物,且吊索与重物棱角间已采取妥善的保护措施时,吊索的安全系数应取 $6 \\sim$ 8;当起吊重、大或精密的重物时,除应采取妥善保护措施外,吊索的安全系数应取10。\n\n5 吊索与所吊构件间的水平夹角宜大于 $4 5 ^ { \\circ }$ 。计算拉力时可按本规范附录A表A.1、表A.2选用。\n\n### 4.3.2 吊索附件应符合下列规定:\n\n1 套环应符合现行国家标准《钢丝绳用普通套环》GB/T5974.1和《钢丝绳用重型套环》 $\\mathrm { G B / T 5 9 7 4 . 2 }$ 的规定。\n\n2 使用套环时,其起吊的承载能力,应将套环的承载能力与表4.3.2中降低后的钢丝绳承载能力相比较,采用小值。\n\n3 吊钩应有制造厂的合格证明书,表面应光滑,不得有裂纹、刻痕、剥裂、锐角等现象。吊钩每次使用前应检查一次,不合格者应停止使用。\n\n4 活动卡环在绑扎时,起吊后销子的尾部应朝下,吊索在受力后应压紧销子,其容许荷载应按出厂说明书采用。\n\n表4.3.2使用套环时的钢丝绳强度降低率\n\n\n\n\n\n### 4.3.3 横吊梁应采用Q235或Q345 钢材,应经过设计计算,计算方法应按本规范附录B进行,并应按设计进行制作。\n\n## 4.4 起重吊装设备\n\n### 4.4.1 滑轮和滑轮组的使用应符合下列规定:\n\n1 使用前,应检查滑轮的轮槽、轮轴、夹板、吊钩等各部件,不得有裂缝和损伤,滑轮转动应灵活,润滑良好。\n\n2 滑轮应按本规范附录C表C.0.1中的容许荷载值使用。对起重量不明的滑轮,应先进行估算,并经负载试验合格后,方可使用。\n\n3 滑轮组绳索宜采用顺穿法,由三对以上动、定滑轮组成的滑轮组应采用花穿法。滑轮组穿绕后,应开动卷扬机慢慢将钢丝绳收紧和试吊,检查有无卡绳、磨绳的地方,绳间摩擦及其他部分应运转良好,如有问题,应立即修正。\n\n4 滑轮的吊钩或吊环应与起吊构件的重心在同一垂直线上。 \n5 滑轮使用前后应刷洗干净,擦油保养,轮轴应经常加油\n\n润滑,严禁锈蚀和磨损。\n\n6 对重要的吊装作业、较高处作业或在起重作业量较大时,不宜用钩型滑轮,应使用吊环、链环或吊梁型滑轮。\n\n7 滑轮组的上下定、动滑轮之间安全距离不应小于 $1 , 5 \\mathrm { m }$ 。\n\n8 对暂不使用的滑轮,应存放在干燥少尘的库房内,下面垫以木板,并应每3个月检查保养一次。\n\n9 滑轮和滑轮组的跑头拉力、牵引行程和速度应符合下列规定:\n\n1)滑轮组的跑头拉力应按下式计算:\n\n$$\nF = \\alpha Q\n$$\n\n式中: $F$ 一 跑头拉力(kN);$\\alpha$ 滑轮组的省力系数,其值可按本规范附录C表C.0.2选用;$Q$ - 一计算荷载( $\\mathrm\n...[后文已省略]...\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索报废标准中关于使用年限的强制报废规定与参考依据不符",
- "location": "(2)钢丝绳吊索检查\n(1)...⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "删除‘使用两年后应强制报废’的表述,改为依据《起重机吊装工和指挥人员的培训》(GB-T23721-2009)中关于钢丝绳吊具的报废标准进行判断,即以断丝、磨损、变形、锈蚀、连接件异常等具体技术参数为准,不设固定使用年限。",
- "reason": "根据【参考依据】a)钢丝绳吊具:检查项目及报废标准,报废标准应基于实际检查结果(如断丝数、丝径减小、磨损、扭结、变形、锈蚀、连接件异常等),并未规定使用满两年必须强制报废。该条款引入‘使用两年后强制报废’属于无依据的额外要求,与标准不符,可能造成资源浪费或误判,属于高风险问题。",
- "risk_level": "高风险",
- "review_references": "a)钢丝绳吊具: -检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); -报废标准。\n【Top3 参考文档】\n【文件】98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md\n【标题】6培训课程的内容\n6培训课程的内容## 6.1理论课程\n\n### 6.1.1有关起重机的知识\n培训课程中应包含下列有关起重机的知识:\n\na)起重机概述术语; 起重机动作:起重能力,额定起重\n\nb)类型、结构外形图、用途:流动机;一塔式起重机;臂架起重机;一桥式和门式起重机。 \nc)安全装置,吊具,制动器。\n\n\n\n### 6.1.2吊挂装置\n\n培训课程中应包含以下吊挂装置的知识a)钢丝绳吊具钢丝绳结构 钢丝绳极限工作载荷安全使用的防范措施b)吊链: 吊链的类型;极限工作载荷;安全使用的防范措施。\n\nc)纤维吊具的类型、极限工作载荷、防护措施:纤维吊装绳;纤维吊装带。\n\nd)其他吊具的类型、极限工作载荷、防护措施:滑轮组;吊具(夹钳、吊钩、卸扣、起重横梁、网式吊兜、吊环);衬垫、垫木。\n\n### 6.1.3吊挂装置的检查\n\n培训课程中应包含下列吊挂装置检查的知识:\n\na)钢丝绳吊具:\n\n-检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); \n-报废标准。\n\nb)吊链:检查项目(伸长、变形、扭曲、断裂、接头处的异常);报废标准。\n\nc)纤维吊具:-纤维吊装绳:\n\n1)检查项目(磨损、刮伤、割伤、腐蚀、编织松散); \n2)报废标准。\n\n纤维吊装带:\n\n1) 损坏(磨损、刮伤、缝纫线断开); \n2) 外部的异常(变色、染色、软化、尘污); \n3) 金属配件(变形、刮伤、断裂、锈蚀); \n4) 报废标准。\n\nd)夹钳:\n\n一夹钳主体或吊环的异常; \n钳口开启异常; \n凸轮或钳叉的齿部(有凸边的部分)处磨损或卡滞、损坏; \n夹钳的功能; \n安全销的功能; \n维护; \n报废标准。\n\n### 6.1.4吊装方法\n\n培训课程中应包含下列吊装方法的知识:\n\na)重心的确定和载荷质量的估算。\n\nb)按照载荷外形选择吊装方法:\n\n直接起升; \n-篮式系挂起升; \n箍式系挂起升; \n夹钳起升; \n-不规则形状载荷的起升(非对称载荷); \n-用起重横梁起升(集装箱吊具); \n使用辅助拉绳。\n\nc)根据载荷质量和起升角度选择吊具。\n\nd)悬吊载荷的运移。\n\n### 6.1.5发信号\n\n培训课程中应包含下列发信号的知识:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.1.6安全规范\n\n### 6.1.7工作规划\n培训课程中应包含下列工作规划:\n\na) 工作顺序; \nb) 载荷运移的路径; \nc) 入口和出口; \nd) 地面或支承面的条件; \ne) 包括吊装作业人员的位置; \n其他现场人员的配合。\n\n### 6.1.8危险因素确认和防控措施\n培训课程中应包含下列危险因素确认和防控措施的知识:\n\na)与起重机的使用和吊装操作相关的危险因素:挤压的危险,诸如跌落的载荷、载荷倒塌、移动载荷和其他物体之间的卡绊;切割的危险,诸如破断的钢丝绳、具有锋利边缘的载荷;冲击的危险,诸如载荷摆动、载荷倒塌、弹射物;缠绕的危险,诸如和钢丝绳吊具、牵绳缠绕在一起;从高处跌落的危险。\n\nb)起升作业现场应考虑的潜在危险因素:高架动力线;-高架公用线路,例如蒸汽管线、天然气管线、电话线;树木;不平坦的和/或不坚实的地面;允许的地面载荷;周围建筑物/容器/工程结构/设备;危险品;腐蚀性物品;障碍物;照明不足;-无线电干扰;恶劣天气。\n\n## 6.2操作课程\n\n### 6.2.1总则\n\n操作课程应包含吊装作业的各个步骤,诸如吊装作业的安全措施、发信号、重心的确定、载荷质量的估算、吊具的选择、吊具的检查,以及在载荷和吊钩上安装吊具、起升、吊运和下降载荷。受训者应基本掌握用篮式系挂、箍式系挂和夹钳起升的方法,以及不规则形状载荷的起升等吊装方法。\n\n### 6.2.2吊装作业的安全措施\n\n培训课程中应包含下列吊装作业安全措施的练习:\n\na)正确着装、使用个人防护用具; \nb)通过手势和喊话进行安全确认。\n\n### 6.2.3发信号\n\n培训课程中应包含下列发信号方法的练习:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.2.4确定重心和估算载荷质量\n\n培训课程中应包含确定重心和估算载荷质量的练习。\n\n### 6.2.5选择吊挂装置\n\n培训课程中应包含选择吊挂装置的练习。\n\n### 6.2.6检查吊挂装置\n\n培训课程中应包含检查吊挂装置的练习。\n\n#### 6.2.7吊装\n\n##### 6.2.7.1安装吊具\n\n培训课程中应包含下列安装吊具步骤的练习:\n\na) 确定重心和安装点; \nb) 载荷上方吊钩的定向和下降吊钩; \nc) 在载荷和吊钩上安装吊具; \nd) 确认吊装状况的安全性。\n\n##### 6.2.7.2试起升和起升载荷\n\n培训课程中应包含下列试起升和起升载荷步骤的练习:\n\na) 准确起升和停止; \nb) 安全性确认; \nc) 起升载荷。\n\n##### 6.2.7.3吊运载荷\n\n培训课程中应包含下列吊运载荷步骤的练习:\n\na) 设计载荷运移路径; \nb) 跨越(和其他起重机共用的空间); \nc) 向起重机司机发吊运路线和下降位置的信号; \nd) 载荷导向。\n\n##### 6.2.7.4下降载荷\n\n培训课程中应包含下列下降载荷步骤的练习:\n\na) 评估地面或支承结构表面的状况; \nb) 将载荷引导到下降位置和预支的垫木上; \nc) 下降载荷和停止下降; \nd) 准确下降,把载荷放在地上并确认其稳定性; \ne) 从吊钩和载荷上移走吊具; \nf 检查吊具并将它存放在指定位置。\n",
- "reference_source": "98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索报废标准中关于断丝比例与使用年限的规定与现行国家标准不符",
- "location": "(1)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "删除‘使用两年后应强制报废’的条款,或明确其为建议性要求而非强制性规定。应依据《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中关于钢丝绳报废的判定标准进行修订,明确报废条件以实际检测结果为准,而非固定使用年限。",
- "reason": "根据【参考依据】4.3.3条明确指出:钢丝绳吊索的使用、检验、破断拉力值和报废等应符合《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972的规定。GB/T5972中并未规定钢丝绳使用满两年即强制报废,而是根据断丝、磨损、腐蚀、变形等具体检测指标进行判定。因此,将‘使用两年后强制报废’作为独立报废条件,与国家标准不符,属于技术参数与标准不一致的问题。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【Top1 参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[前文已省略]...\n塔式起重机安全规程》GB5144、《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196及《建筑机械使用安全技术规程》JGJ33中的相关规定。\n\n### 4.1.6 拔杆式起重机的制作安装应符合下列规定:\n\n1 拔杆式起重机应进行专门设计和制作,经严格的测试、试运转和技术鉴定合格后,方可投入使用。\n\n2 安装时的地基、基础、缆风绳和地锚等设施,应经计算确定。缆风绳与地面的夹角应在 $3 0 ^ { \\circ } \\sim 4 5 ^ { \\circ }$ 之间。缆风绳不得与供电线路接触,在靠近电线处,应装设由绝缘材料制作的护线架。\n\n### 4.1.7 拔杆式起重机的使用应符合下列规定:\n\n1 在整个吊装过程中,应派专人看守地锚。每进行一段工作或大雨后,应对拔杆、缆风绳、索具、地锚和卷扬机等进行详细检查,发现有摆动、损坏等情况时,应立即处理解决。\n\n2 拔杆式起重机移动时,其底座应垫以足够的承重枕木排和滚杠,并将起重臂收紧,处于移动方向的前方,倾斜不得超过${ 1 0 } ^ { \\circ }$ ,移动时拔杆不得向后倾斜,收放缆风绳应配合一致。\n\n## 4.2 绳索\n\n### 4.2.1 吊装作业中使用的白棕绳应符合下列规定:\n\n1 应由剑麻的茎纤维搓成,并不得涂油。其规格和破断拉力应符合产品说明书的规定。\n\n2 只可用作受力不大的缆风绳和溜绳等。白棕绳的驱动力只能是人力,不得用机械动力驱动。\n\n3 穿绕白棕绳的滑轮直径,应大于白棕绳直径的10倍。麻绳有结时,不得穿过滑车狭小之处。长期在滑车使用的白棕绳,应定期改变穿绳方向。\n\n4 整卷白棕绳应根据需要长度切断绳头,切断前应用铁丝或麻绳将切断口扎紧。\n\n5 使用中发生的扭结应立即抖直。当有局部损伤时,应切去损伤部分。\n\n6 当绳长度不够时,应采用编接接长。\n\n7 捆绑有棱角的物件时,应垫木板或麻袋等物。\n\n8 使用中不得在粗糙的构件上或地下拖拉,并应防止砂、石屑嵌入。\n\n9 编接绳头绳套时,编接前每股头上应用绳扎紧,编接后相互搭接长度:绳套不得小于白棕绳直径的15倍;绳头不得小于30倍。\n\n10 白棕绳在使用时不得超过其容许拉力,容许拉力应按下式计算:\n\n$$\n[ F _ { z } ] = \\frac { F _ { z } } { K }\n$$\n\n式中: $[ F _ { z } ]$ 一 -白棕绳的容许拉力(kN);$F _ { z }$ —白棕绳的破断拉力(kN);$K$ ——白棕绳的安全系数,应按表4.2.1采用。\n\n表4.2.1白棕绳的安全系数 \n\n\n\n\n\n### 4.2.2 采用纤维绳索、聚酯复丝绳索应符合现行国家标准《纤维绳索通用要求》 $\\mathrm { G B / T 2 1 3 2 8 } .$ 、《聚酯复丝绳索》 $\\mathrm { G B } / \\mathrm { T } 1 1 7 8 7$ 和《绳索有关物理和机械性能的测定》 $\\mathrm { G B / T 8 8 3 4 }$ 的相关规定。\n\n### 4.2.3 吊装作业中钢丝绳的使用、检验、破断拉力值和报废等应符合现行国家标准《重要用途钢丝绳》GB8918、《一般用途钢丝绳》GB/T20118和《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中的相关规定。\n\n## 4.3 吊索\n\n### 4.3.1 钢丝绳吊索应符合下列规定:\n1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n\n2 吊索宜采用 $6 \\times 3 7$ 型钢丝绳制作成环式或8股头式(图4.3.1),其长度和直径应根据吊物的几何尺寸、重量和所用的吊装工具、吊装方法确定。使用时可采用单根、双根、四根或多根悬吊形式。\n\n3 吊索的绳环或两端的绳套可采用压接接头,压接接头的长度不应小于钢丝绳直径的20倍,且不应小于 $3 0 0 \\mathrm { m m }$ 。8股头吊索两端的绳套可根据工作需要装上桃形环、卡环或吊钩等吊索附件。\n\n \n图4.3.1吊索\n\n4 当利用吊索上的吊钩、卡环钩挂重物上的起重吊环时,吊索的安全系数不应小于6;当用吊索直接捆绑重物,且吊索与重物棱角间已采取妥善的保护措施时,吊索的安全系数应取 $6 \\sim$ 8;当起吊重、大或精密的重物时,除应采取妥善保护措施外,吊索的安全系数应取10。\n\n5 吊索与所吊构件间的水平夹角宜大于 $4 5 ^ { \\circ }$ 。计算拉力时可按本规范附录A表A.1、表A.2选用。\n\n### 4.3.2 吊索附件应符合下列规定:\n\n1 套环应符合现行国家标准《钢丝绳用普通套环》GB/T5974.1和《钢丝绳用重型套环》 $\\mathrm { G B / T 5 9 7 4 . 2 }$ 的规定。\n\n2 使用套环时,其起吊的承载能力,应将套环的承载能力与表4.3.2中降低后的钢丝绳承载能力相比较,采用小值。\n\n3 吊钩应有制造厂的合格证明书,表面应光滑,不得有裂纹、刻痕、剥裂、锐角等现象。吊钩每次使用前应检查一次,不合格者应停止使用。\n\n4 活动卡环在绑扎时,起吊后销子的尾部应朝下,吊索在受力后应压紧销子,其容许荷载应按出厂说明书采用。\n\n表4.3.2使用套环时的钢丝绳强度降低率\n\n\n\n\n\n### 4.3.3 横吊梁应采用Q235或Q345 钢材,应经过设计计算,计算方法应按本规范附录B进行,并应按设计进行制作。\n\n## 4.4 起重吊装设备\n\n### 4.4.1 滑轮和滑轮组的使用应符合下列规定:\n\n1 使用前,应检查滑轮的轮槽、轮轴、夹板、吊钩等各部件,不得有裂缝和损伤,滑轮转动应灵活,润滑良好。\n\n2 滑轮应按本规范附录C表C.0.1中的容许荷载值使用。对起重量不明的滑轮,应先进行估算,并经负载试验合格后,方可使用。\n\n3 滑轮组绳索宜采用顺穿法,由三对以上动、定滑轮组成的滑轮组应采用花穿法。滑轮组穿绕后,应开动卷扬机慢慢将钢丝绳收紧和试吊,检查有无卡绳、磨绳的地方,绳间摩擦及其他部分应运转良好,如有问题,应立即修正。\n\n4 滑轮的吊钩或吊环应与起吊构件的重心在同一垂直线上。 \n5 滑轮使用前后应刷洗干净,擦油保养,轮轴应经常加油\n\n润滑,严禁锈蚀和磨损。\n\n6 对重要的吊装作业、较高处作业或在起重作业量较大时,不宜用钩型滑轮,应使用吊环、链环或吊梁型滑轮。\n\n7 滑轮组的上下定、动滑轮之间安全距离不应小于 $1 , 5 \\mathrm { m }$ 。\n\n8 对暂不使用的滑轮,应存放在干燥少尘的库房内,下面垫以木板,并应每3个月检查保养一次。\n\n9 滑轮和滑轮组的跑头拉力、牵引行程和速度应符合下列规定:\n\n1)滑轮组的跑头拉力应按下式计算:\n\n$$\nF = \\alpha Q\n$$\n\n式中: $F$ 一 跑头拉力(kN);$\\alpha$ 滑轮组的省力系数,其值可按本规范附录C表C.0.2选用;$Q$ - 一计算荷载( $\\mathrm\n...[后文已省略]...\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-43": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2的安全系数):10.87×1.2=13T;\n查表徐工80t吊车起重性能表,得工作幅度8m,主臂长度18m额定起重量为25.4>13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式,规格为Φ36,长度为6m*2根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36钢丝绳的破断拉力为81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故φ36mm钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)规范要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-44": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "original_content": "二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不利荷载仅有2个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-45": {
- "metadata": {
- "review_location_label": "第33页:第十二章 附件",
- "original_content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-46": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2的安全系数):10.87×1.2=13T;\n查表徐工80t吊车起重性能表,得工作幅度8m,主臂长度18m额定起重量为25.4>13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式,规格为Φ36,长度为6m*2根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36钢丝绳的破断拉力为81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故φ36mm钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)规范要求。\n\n二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不利荷载仅有2个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【计算书】内容: 1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【相关施工图纸】内容: 1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【附图附表】内容: 1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【编制及审核人员情况】内容: 1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-47": {
- "metadata": {
- "review_location_label": "第33页:第十二章 附件",
- "original_content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【计算书】内容: 1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【相关施工图纸】内容: 1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【附图附表】内容: 1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【编制及审核人员情况】内容: 1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-48": {
- "metadata": {
- "review_location_label": "第1页:目录",
- "original_content": "第一章 编制依据与说明\t1一) 编制依据\t1二) 编制说明\t2三) 编制原则\t2四) 编制范围\t2第二章 工程概况\t3一)工程简介\t3二)周边环境条件及工程地质\t31、周边环境条件\t32、工程地质\t4三)气象水文\t4四)架桥机概况\t4五)施工平面布置\t9六)施工要求\t11七)风险辨识与分级\t12八)参建各方责任主体单位\t14第三章 施工计划\t15一)施工进度计划\t15二)材料机械设备和人员计划\t16第四章 施工工艺技术\t19一)主要部件说明\t191、主梁总成\t192、前临时支腿\t193、前支腿装置\t204、中支腿装置\t205、尾支腿装置\t206、纵移桁车\t207、起重小车\t218、横移轨道\t21二)架桥机安装施工\t211、安装准备\t212、现场准备\t223、架桥机安装前检查验收\t233、安装施工工艺流程\t234、安装步骤\t25四) 架桥机拆除\t281、准备工作\t282、 拆除步骤\t293、架桥机拆除注意事项\t29第五章 施工安全保证措施\t31一) 组织保证措施\t31二) 技术保证措施\t361、施工安全保证措施\t362、雨季施工安全保障措施\t413、夏季施工安全保证措施\t424、冬季施工安全保证措施\t425、职业健康保证措施\t43第六章 质量保证措施\t44第七章 环境保证措施\t46第八章 验收要求\t47一) 验收标准\t47二)验收程序及人员\t471、验收程序\t472、验收人员\t48三)验收内容\t491、机械设备\t492、吊索具验收\t553、人员验收\t58第九章 施工管理人员及作业人员配备及分工\t59一) 组织机构\t59二) 施工管理人员\t59三) 施工作业人员配备及分工\t60第十章 应急处理措施\t64一) 组织机构\t64二) 职责\t65三) 预警及信息报告\t67四) 应急响应\t68第十一章 计算书及相关图纸\t78一)主梁整体吊装受力验算\t78二)吊车支腿基础验算\t81第十二章 附件\t82"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "主要施工方法概述缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'主要施工方法概述'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'主要施工方法概述'相关内容;整改建议:建议在目录中补充'主要施工方法概述'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工方法及操作要求缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'施工方法及操作要求'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'施工方法及操作要求'相关内容;整改建议:建议在目录中补充'施工方法及操作要求'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工艺流程缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'工艺流程'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'工艺流程'相关内容;整改建议:建议在目录中补充'工艺流程'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "检查要求缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'检查要求'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'检查要求'相关内容;整改建议:建议在目录中补充'检查要求'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "技术参数缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'技术参数'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'技术参数'相关内容;整改建议:建议在目录中补充'技术参数'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工准备缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'施工准备'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'施工准备'相关内容;整改建议:建议在目录中补充'施工准备'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保护及文明施工措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录缺失:目录中缺失'环境保护及文明施工措施'这个小节;当前章节仅涉及'第七章 环境保证措施',目录中未体现'环境保护及文明施工措施'相关内容;整改建议:建议在目录中补充'环境保护及文明施工措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'环境保证体系'这个小节;当前章节仅涉及'第七章 环境保证措施',目录和大纲均未涵盖'环境保证体系'相关内容;整改建议:建议在本章或前序章节中增设'环境保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保护组织机构缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'环境保护组织机构'这个小节;当前章节仅涉及'第七章 环境保证措施',目录和大纲均未涵盖'环境保护组织机构'相关内容;整改建议:建议在本章或前序章节中增设'环境保护组织机构'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "设计概况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'设计概况'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'设计概况'相关内容;整改建议:建议在目录中补充'设计概况'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工平面及立面布置缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'施工平面及立面布置'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'施工平面及立面布置'相关内容;整改建议:建议在目录中补充'施工平面及立面布置'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工程地质与水文气象缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'工程地质与水文气象'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'工程地质与水文气象'相关内容;整改建议:建议在目录中补充'工程地质与水文气象'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "验收时间缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'验收时间'这个小节;当前章节仅涉及'第八章 验收要求',目录和大纲均未涵盖'验收时间'相关内容;整改建议:建议在本章或前序章节中增设'验收时间'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:验收标准、验收程序、验收内容、验收时间、验收人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "附图附表缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录缺失:目录中缺失'附图附表'这个小节;当前章节仅涉及'第十二章 附件',目录中未体现'附图附表'相关内容;整改建议:建议在目录中补充'附图附表'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "计算书缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'计算书'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'计算书'相关内容;整改建议:建议在本章或前序章节中增设'计算书'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'编制及审核人员情况'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "相关施工图纸缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'相关施工图纸'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'相关施工图纸'相关内容;整改建议:建议在本章或前序章节中增设'相关施工图纸'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "技术保证措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录缺失:目录中缺失'技术保证措施'这个小节;当前章节仅涉及'第十章 应急处理措施',目录中未体现'技术保证措施'相关内容;整改建议:建议在目录中补充'技术保证措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "监测监控措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'监测监控措施'这个小节;当前章节仅涉及'第十章 应急处理措施',目录和大纲均未涵盖'监测监控措施'相关内容;整改建议:建议在本章或前序章节中增设'监测监控措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'安全保证体系'这个小节;当前章节仅涉及'第十章 应急处理措施',目录和大纲均未涵盖'安全保证体系'相关内容;整改建议:建议在本章或前序章节中增设'安全保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "其他作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录缺失:目录中缺失'其他作业人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录中未体现'其他作业人员'相关内容;整改建议:建议在目录中补充'其他作业人员'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "专职安全生产管理人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'专职安全生产管理人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录和大纲均未涵盖'专职安全生产管理人员'相关内容;整改建议:建议在本章或前序章节中增设'专职安全生产管理人员'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "特种作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'特种作业人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录和大纲均未涵盖'特种作业人员'相关内容;整改建议:建议在本章或前序章节中增设'特种作业人员'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "计算书缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录缺失:目录中缺失'计算书'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录中未体现'计算书'相关内容;整改建议:建议在目录中补充'计算书'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "相关施工图纸缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录缺失:目录中缺失'相关施工图纸'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录中未体现'相关施工图纸'相关内容;整改建议:建议在目录中补充'相关施工图纸'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "附图附表缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'附图附表'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录和大纲均未涵盖'附图附表'相关内容;整改建议:建议在本章或前序章节中增设'附图附表'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'编制及审核人员情况'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录和大纲均未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "劳动力计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录缺失:目录中缺失'劳动力计划'这个小节;当前章节仅涉及'第三章 施工计划',目录中未体现'劳动力计划'相关内容;整改建议:建议在目录中补充'劳动力计划'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工设备计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'施工设备计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'施工设备计划'相关内容;整改建议:建议在本章或前序章节中增设'施工设备计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工材料计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'施工材料计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'施工材料计划'相关内容;整改建议:建议在本章或前序章节中增设'施工材料计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全生产费用使用计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'安全生产费用使用计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'安全生产费用使用计划'相关内容;整改建议:建议在本章或前序章节中增设'安全生产费用使用计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量目标缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录缺失:目录中缺失'质量目标'这个小节;当前章节仅涉及'第六章 质量保证措施',目录中未体现'质量目标'相关内容;整改建议:建议在目录中补充'质量目标'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工程创优规划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'工程创优规划'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'工程创优规划'相关内容;整改建议:建议在本章或前序章节中增设'工程创优规划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量控制程序与具体措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'质量控制程序与具体措施'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'质量控制程序与具体措施'相关内容;整改建议:建议在本章或前序章节中增设'质量控制程序与具体措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'质量保证体系'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'质量保证体系'相关内容;整改建议:建议在本章或前序章节中增设'质量保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "监测监控措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录缺失:目录中缺失'监测监控措施'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录中未体现'监测监控措施'相关内容;整改建议:建议在目录中补充'监测监控措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录缺失:目录中缺失'安全保证体系'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录中未体现'安全保证体系'相关内容;整改建议:建议在目录中补充'安全保证体系'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "应急处置措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'应急处置措施'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录和大纲均未涵盖'应急处置措施'相关内容;整改建议:建议在本章或前序章节中增设'应急处置措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "标准规范缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "目录缺失:目录中缺失'标准规范'这个小节;当前章节仅涉及'第一章 编制依据与说明',目录中未体现'标准规范'相关内容;整改建议:建议在目录中补充'标准规范'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "法律法规缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "目录缺失:目录中缺失'法律法规'这个小节;当前章节仅涉及'第一章 编制依据与说明',目录中未体现'法律法规'相关内容;整改建议:建议在目录中补充'法律法规'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "文件制度缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "大纲缺失:大纲中缺失'文件制度'这个小节;当前章节仅涉及'第一章 编制依据与说明',大纲中未涵盖'文件制度'相关内容;整改建议:建议在大纲中补充'文件制度'相关内容,确保大纲完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- }
- ],
- "summary": {
- "risk_stats": {
- "low": 32,
- "medium": 4,
- "high": 13
- },
- "total_reviewed": 49,
- "total_issues": 49
- },
- "status": "completed"
- },
- "issues": [
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-0": {
- "metadata": {
- "review_location_label": "第1页:第一章 编制依据与说明",
- "original_content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4)《中华人民共和国道路交通安全法》2021年4月29日修订\n5)《中华人民共和国水土保持法》2010年12月25日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019年4月23日修订\n9)《建设工程安全生产管理条例》2023年最新修正\n10)《四川省安全生产条例》2023年5月25日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n(2)项目文件\n1)《S81线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段实施性施工组织设计》;\n3)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段T梁预制、运输及安装专项施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环境等参考资料;\n编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度地避免安全事故造成的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n编制原则\n(1)严格执行合同中标文件中所规定的,工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n编制范围\n本专项施工方案适用于S81线会理至禄劝(四川境)高速公路ZCB1-3标段架桥机的安装与拆除施工。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 5,
- "medium": 22,
- "low": 18
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "basis",
- "check_item_code": "basis_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "1)《中华人民共和国安全生产法》2021年修订版",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《中华人民共和国安全生产法》(2021)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "2)《中华人民共和国环境保护法》2021年修订版",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国环境保护法》(中华人民共和国主席令第九号(2014年修订版))",
- "reason": "与参考文件《中华人民共和国环境保护法》(中华人民共和国主席令第九号(2014年修订版))编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "3)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建设工程安全生产管理条例》(国务院令第393号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "4)《中华人民共和国道路交通安全法》2021年4月29日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国道路交通安全法》(主席令第47号(2021修订))",
- "reason": "与参考文件《中华人民共和国道路交通安全法》(主席令第47号(2021修订))编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "5)《中华人民共和国水土保持法》2010年12月25日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《中华人民共和国水土保持法》(20110301)",
- "reason": "与参考文件《中华人民共和国水土保持法》(20110301)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路水运工程临时用电技术规程》(JT/T 1499-2024)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "8)《建设工程质量管理条例》2019年4月23日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《建设工程质量管理条例》(国务院令第279号)",
- "reason": "与参考文件《建设工程质量管理条例》(国务院令第279号)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "9)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建设工程安全生产管理条例》(国务院令第393号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号错误",
- "location": "10)《四川省安全生产条例》2023年5月25日修订",
- "suggestion": "建议核实并更正为参考库中的正确编号《四川省安全生产条例》(2023)",
- "reason": "与参考文件《四川省安全生产条例》(2023)编号不一致",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "11)《危险性较大的分部分项工程安全管理规定》住建部令第37号",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《危险性较大的分部分项工程安全管理规定》(住建部令第37号)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "12)《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑机械使用安全技术规程》(JGJ 33-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重机-手势信号》(GB/T 5082-2019)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "15)《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《施工现场机械设备检查技术规范》(JGJ160-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "16)《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《粗直径钢丝绳》(GB/T 20067-2017)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工起重吊装工程安全技术规范》(JGJ 276-2012)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "18)《架桥机安全规程》GB 26469—2011",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《架桥机安全规程》(GB 26469-2011)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "19)《起重机械安全规程》GB 6067.1—2010",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重机械安全规程》(GB/T 6067.1-2010)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《电气装置安装工程起重机电气装置施工及验收规范》(GB 50256-2014)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "21)《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《起重设备安装工程施工及验收规范》(GB50278-2010)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "22)《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《公路工程施工安全技术规范》(JTG F90-2015)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "timeliness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_timeliness_check",
- "check_result": {
- "issue_point": "规范编号正确",
- "location": "23)《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "引用规范为现行有效版本,无需调整",
- "reason": "与参考文件《建筑施工高处作业安全技术规范》(JGJ 80-2016)名称编号一致,且文件状态为现行",
- "risk_level": "无风险"
- },
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)《中华人民共和国安全生产法》2021年修订版",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "2)《中华人民共和国环境保护法》2021年修订版",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "3)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "4)《中华人民共和国道路交通安全法》2021年4月29日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "5)《中华人民共和国水土保持法》2010年12月25日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "8)《建设工程质量管理条例》2019年4月23日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "9)《建设工程安全生产管理条例》2023年最新修正",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "10)《四川省安全生产条例》2023年5月25日修订",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "11)《危险性较大的分部分项工程安全管理规定》住建部令第37号",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "12)《建筑机械使用安全技术规程》JGJ 33—2012",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "15)《施工现场机械设备检查技术规范》JGJ 160—2016",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "16)《粗直径钢丝绳》GB/T 20067—2017",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "18)《架桥机安全规程》GB 26469—2011",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "19)《起重机械安全规程》GB 6067.1—2010",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "21)《起重设备安装工程施工及验收规范》GB 50278—2010",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "22)《公路工程施工安全技术规范》JTG F90—2015",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "23)《建筑施工高处作业安全技术规范》JGJ 80—2016",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "引用不符合正确格式:《规范名称》(编号)",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-1": {
- "metadata": {
- "review_location_label": "第1页:第一章 编制依据与说明",
- "original_content": "编制依据与说明\n编制依据\n(1)相关法律法规\n1)《中华人民共和国安全生产法》2021年修订版\n2)《中华人民共和国环境保护法》2021年修订版\n3)《建设工程安全生产管理条例》2023年最新修正\n4)《中华人民共和国道路交通安全法》2021年4月29日修订\n5)《中华人民共和国水土保持法》2010年12月25日修订\n6)《公路水运危险性较大工程专项施工方案编制审查规程》(JT/T 1495-2024)\n7)《公路水运工程临时用电技术规程》(JT/T 1499—2024)\n8)《建设工程质量管理条例》2019年4月23日修订\n9)《建设工程安全生产管理条例》2023年最新修正\n10)《四川省安全生产条例》2023年5月25日修订\n11)《危险性较大的分部分项工程安全管理规定》住建部令第37号\n12)《建筑机械使用安全技术规程》JGJ 33—2012\n13)《起重机—手势信号》GB/T 5082—201914)《架桥机通用技术条件》GB/T 26470—2011\n15)《施工现场机械设备检查技术规范》JGJ 160—2016\n16)《粗直径钢丝绳》GB/T 20067—2017\n17)《建筑施工起重吊装工程安全技术规范》JGJ 276—2012\n18)《架桥机安全规程》GB 26469—2011\n19)《起重机械安全规程》GB 6067.1—2010\n20)《电气装置安装工程起重机电气装置施工及验收规范》GB 50256—2014\n21)《起重设备安装工程施工及验收规范》GB 50278—2010\n22)《公路工程施工安全技术规范》JTG F90—2015\n23)《建筑施工高处作业安全技术规范》JGJ 80—2016\n(2)项目文件\n1)《S81线会理至禄劝(四川境)高速公路两阶段施工图设计》;\n2)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段实施性施工组织设计》;\n3)《S81线会理至禄劝(四川境)高速公路ZCB1-3标段T梁预制、运输及安装专项施工方案》。\n(3)我公司现有可投入工程的施工技术力量和机械设备;\n(4)近年来,我公司参加类似工程的经验;\n(5)本合同段工程现场踏勘、调查所获得的现场情况、自然环境、人文环境、市场环境等参考资料;\n编制说明\n为了贯彻落实“安全第一,预防为主,综合治理”的方针,最大限度地避免安全事故造成的人身伤亡和财产损失,切实保障员工生命安全和社会安定,特制定本方案。\n编制原则\n(1)严格执行合同中标文件中所规定的,工程施工工期,根据工程的特点和轻重缓急,分期分批组织施工,在工期安排上尽可能提前完成。\n(2)坚持在实事求是的基础上,力求技术先进、科学合理、经济适用的原则。在确保工程质量标准的前提下,积极采用新技术、新工艺、新机具、新材料、新测试方法。\n(3)合理安排施工程序和顺序,做到布局合理、突出重点、全面展开、平行流水作业;正确选用施工方法,科学组织,均衡生产。各工序紧密衔接,避免不必要的重复工作,以保证施工连续均衡有序地进行。\n(4)施工进度安排要注意各专业间的协调和配合,充分考虑气候、季节对施工的影响。\n(5)结合现场实际,因地制宜,尽量利用现有设施或就近已有的设施,减少各种临时工程,尽量利用当地合格资源,合理安排运输装卸与存储作业,减少物资运输周转工作量。\n(6)坚持自始至终对施工现场全过程严密监控,以科学的方法实行动态管理,并按动静结合的原理,精心进行施工场地规划布置,节约施工临时用地,不占或少占农田,不破坏植被。严格组织、精心管理,文明施工,创标准化施工现场。\n(7)严格执行招标文件明确的设计规范、施工规范和验收标准。\n编制范围\n本专项施工方案适用于S81线会理至禄劝(四川境)高速公路ZCB1-3标段架桥机的安装与拆除施工。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "basis",
- "check_item_code": "basis_completeness_check",
- "check_result": "第一章 编制依据与说明下缺失编制依据中的【文件制度】内容: 1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "建议补充:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第一章 编制依据与说明内容属于,专项施工方案内容要求中的 【编制依据】 板块,应包含文件制度包括:1.四川路桥下发的文件制度和管理程序文件;2.路桥集团下发的文件制度和管理程序文件;3.桥梁公司下发的文件制度和管理程序文件;4.建设单位下发的文件制度和管理程序文件;",
- "review_references": "一、编制依据 本章包含法律法规、标准规范、文件制度、编制原则、编制范围等五个方面。 法律法规包括国家、工程所在地省级政府发布的法律法规、规章制度等; 标准规范包括行业标准、技术规程等; 文件制度包括四川路桥、路桥集团、桥梁公司、建设单位下发的文件制度和管 理程序文件等; 所采用的规范和标准应全面且在有效期内,并应与招投标文件及设计要求的规 范、标准对应。 编制原则应认真贯彻执行国家方针、政策、标准和设计文件,严格执行基本建 设程序,实现工程项目的全部功能;全面履行工程合同,满足建设单位要求,有效 地集中施工力量,按期完成;按照工序关系,合理安排施工顺序,统筹考虑。 编制范围应填写完整,涵盖本方案包含的所有工程,部分工程可简要说明采取 的施工工艺。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-2": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->一)工程简介",
- "original_content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、乌东德(四川)隧道、且沿线存在3处深挖路堑高边坡地段,桥隧比为90.44%,预估建安费15亿元,总工期为43个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东德特长隧道。项目总体平面布置图见下图所视\n项目拟建梁场位于K17+035-K17+270段路基上,该段落位于大柳树沟1#桥和2#桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。\n图2-1 项目总体平面布置图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-3": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->二)周边环境条件及工程地质",
- "original_content": "二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程性质较好。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-4": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->三)气象水文",
- "original_content": "三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年平均日照2306.4小时,无霜期262天,太阳辐射强,年辐射热平均总量为136.2千卡/平方厘米,多年平均降水1095.5毫米,但气候垂直变化大,高山积雪与峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、岩性及裂隙发育程度控制。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-5": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->四)架桥机概况",
- "original_content": "四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲率半径大于450m以上、0-45°斜交公路桥。“混凝土浇筑完成后,应及时进行养护,养护时间不少与7天。\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便于施工场地的转移、运输;该型架桥机边梁横移一次就位,省去了前、后墩台人工移梁的麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安全、高效作业。同时略微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系统组成。\n图2-2 架桥机方案总图\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3架桥机技术参数表"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-6": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况->五)施工平面布置",
- "original_content": "五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K17+270段右侧,位于大柳树沟1号桥与大柳树沟2号桥之间,K17+035~K17+120该段表层为5.7m的崩坡积块碎石土,K17+120~K17+270段表层为0~1.5m碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-4 K17+847~K17+915段路基\n(2)K17+847~K17+915段路基位于大柳树沟2号大桥与大柳树沟3号大桥之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基\nK18+300~K18+490段右侧,位于大柳树沟2号大桥与黄家庄大桥之间,该段表层为8~12m的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基K19+100~K19+200段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为57.2m。K19+314~K19+450段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-7": {
- "metadata": {
- "review_location_label": "第3页:第二章 工程概况",
- "original_content": "一)工程简介\nS81线会理至禄劝(四川境)高速公路ZCB1-3合同段位于。会东县内,分部起点桩号K16+431,止点桩号K28+477,线路全长12046米。共有主线桥梁五座、隧道1座,分别为大柳树沟1#大桥、大柳树沟2#大桥、大柳树沟3#大桥、黄家庄大桥、小村大桥、乌东德(四川)隧道、且沿线存在3处深挖路堑高边坡地段,桥隧比为90.44%,预估建安费15亿元,总工期为43个月。全线控制工程为大柳树沟1#大桥主桥连续刚构施工、乌东德特长隧道。项目总体平面布置图见下图所视\n项目拟建梁场位于K17+035-K17+270段路基上,该段落位于大柳树沟1#桥和2#桥之间,该段落纵坡为3.8%,沿大桩号方向为下坡,曲线半径为1600m。本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。\n图2-1 项目总体平面布置图\n\n二)周边环境条件及工程地质\n1、周边环境条件\n项目自北向依次经过四川省凉山彝族自治州会东县铁柳镇、可河乡,主要河流有姜州河、小坝河、大柳树沟、铁柳河、鲹鱼河、金沙江,沿线河流均无通航要求。区域分布有G353、乌东德专用公路、会埫公路等,外购材料可通过省道运输至线位,项目沿线大部分路段分布有地方水泥路,局部路段需增设施工便道,材料可经地方水泥路及施工便道运输至施工路段。\n2、工程地质\n本项目位于四川凉山彝族自治州南端的会东县铁柳镇、可河乡境内,地处云贵高原西北边缘部分,属构造剥蚀低山、中山地貌区。根据地貌的成因、形态及组合特征可划分为三个地貌单元。路线走廊带内地形以构造剥蚀低山、中山地貌为主,金沙江沿江一带为山麓斜坡堆积地貌。\n本项目安拆架桥机均在路基段进行,主要为厚薄不均匀的崩坡积层碎石,稍密为主,含碎石黏土,可塑状。桥梁首末两端覆盖层较薄,局部基岩出露,下伏基岩为中生界白垩系上统小坝组粉砂质泥岩、砂岩,强风化层岩体破碎,中风化带岩体较完整,承载力较高,工程性质较好。\n\n三)气象水文\n本项目属中亚热带西部湿润季风气候区。主要特点是日照时数多,蒸发旺盛;雨量集中,干湿季分明;气温年较差小,日较差大;冬暖无严寒,夏短无无酷暑,四季如春。多年平均平均气温为16.2℃,累计年平均日照2306.4小时,无霜期262天,太阳辐射强,年辐射热平均总量为136.2千卡/平方厘米,多年平均降水1095.5毫米,但气候垂直变化大,高山积雪与峡谷炎热并见;气温回升和下降波动亦大。由于地形种类多、高差大,河谷、中山、高山地区气候各不相同。\n本项目处于金沙江水系,沿线水系发育,河流呈树枝状分布。根据区内地层岩性组合及地下水的赋存条件,路线走廊带内地下水类型可分为第四系松散层孔隙潜水,碎屑岩区裂隙水和碳酸盐岩区溶水三类,各类地下水的埋藏、分布、富水性受地质构造、地形地貌、岩性及裂隙发育程度控制。\n\n四)架桥机概况\n(1)总体性能\nJQG系列公路架桥机(以下简称架桥机)是混凝土桥梁架设专用设备,适用于架设T型、I字型、箱型及板型混凝土预制梁。适用于纵坡≤4%、横坡<2%(在架设时调平横移轨道)、曲率半径大于450m以上、0-45°斜交公路桥。“混凝土浇筑完成后,应及时进行养护,养护时间不少与7天。\n架桥机主体结构为多段三角桁架主梁总成(包含主梁、导梁),抗风能力强、易于拆装便于施工场地的转移、运输;该型架桥机边梁横移一次就位,省去了前、后墩台人工移梁的麻烦,提高了工作效率,同时也降低了移梁过程中的风险,确保安全、高效作业。同时略微调换前部导梁,可实现双向桥的调头作业功能。\n本项目采用的架桥机型号为JQG200-50A3,该机主要由主梁总成(包含主梁、导梁)、前临时支腿、前支腿(含底部台车、升降机构)、中支腿装置(含底部台车)、尾支腿(含升降机构)、纵移桁车、起重小车、横移轨道、运梁台车(本次运梁台车为需方白备)、电气控制系统组成。\n图2-2 架桥机方案总图\n(2)架桥机技术参数表\n表2-1 JGQ200-50A3架桥机技术参数表\n\n五)施工平面布置\n本项目架桥机的安拆均在各段路基上进行,架桥机配件的临时转运采用项目自配的平板车进行。施工平面布置图如下所示\n\n图2-3 K17+035~K17+270段路基\n(1)K17+035~K17+270段右侧,位于大柳树沟1号桥与大柳树沟2号桥之间,K17+035~K17+120该段表层为5.7m的崩坡积块碎石土,K17+120~K17+270段表层为0~1.5m碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。岩层产状和边坡组合有利,无长大贯通不利结构面,故在适当放坡情况下,边坡整体稳定。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-4 K17+847~K17+915段路基\n(2)K17+847~K17+915段路基位于大柳树沟2号大桥与大柳树沟3号大桥之间,该段为一般路基设计段,边坡最大级数为两级,按照从上到下,开挖一级防护一级的原则进行施工,分层分段施工顺序为;第二级边坡第一级边坡。主要防护为衡重式路中墙和衡重式路肩墙。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基\nK18+300~K18+490段右侧,位于大柳树沟2号大桥与黄家庄大桥之间,该段表层为8~12m的崩坡积块碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为42.5m。该段路基远离当地自有道路,均为自修便道,远离居民区,四周无管线。\n图2-5 K18+300~K18+490段路基K19+100~K19+200段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为57.2m。K19+314~K19+450段右侧,位于黄家庄大桥与小村大桥之间,该段表层为0.5~4.1m的残坡积碎石土,下伏基岩为中生界白垩系上统的红褐色粉砂质泥岩。最大坡高为39.4m。该两段路基位于小村大桥之间,紧临当地村道,远离居民区,四周无管线。\n\n六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量要求\n适用于本项目的高速桥梁架设高速公路桥梁,能够满足大坡度、小半径斜桥、弯桥,架设要求满足架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。\n\n七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2-2 风险分析表\n\n<表格></表格>\n\n八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有限公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【设计概况】内容: 1.工程简介;2.主要技术标准",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:2.主要技术标准",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含设计概况包含:1.工程简介;2.主要技术标准;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "overview",
- "check_item_code": "overview_completeness_check",
- "check_result": "第二章 工程概况下缺失工程概况中的【施工平面及立面布置】内容: 1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离;2.施工作业平台(场站)的尺寸、地面形式以及施工便道的长度、宽度、路面形式、最小弯曲半径;3.临时用水的来源、管线布置、距离,变压器、配电箱的位置、大小、线路走向、敷设方式",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "建议补充:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第二章 工程概况内容属于,专项施工方案内容要求中的 【工程概况】 板块,应包含施工平面及立面布置包括:1.本项目拌和站、钢筋加工场、材料(临时)堆码区域的位置和与该工程的距离;2.施工作业平台(场站)的尺寸、地面形式以及施工便道的长度、宽度、路面形式、最小弯曲半径;3.临时用水的来源、管线布置、距离,变压器、配电箱的位置、大小、线路走向、敷设方式;",
- "review_references": "二、工程概况 本章包含设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、 施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位等七个方面。 设计概况包含工程简介、主要技术标准两个方面。工程简介主要包括项目所在 地理位置、本项目所处的标段、本标段起止里程、主要结构物、平曲线和竖曲线情 况,以及详细描述本工程的主要工程数量、结构尺寸、纵(横)坡、主要材料数量 等内容。主要技术标准以设计文件(图纸)中总体设计技术标准为主,包含当建设 单位有特殊要求时,应结合招、投标文件向建设单位书面确认。 工程地质与水文气象主要包括与该工程有关的水文状况(历年季节降雨量,地 下水位,江河常水位、施工水位、最低水位及时间、最高水位及时间、历史最高水 位,流速、冲刷深度等)、气候条件(冬、夏、雨期分布月份,极端气温及时间, 季风情况,冻融深度,其他特殊气候如台风、潮汐等)、地形地貌、地质状况(针 对与该工程有关的整体地质状况的实际描述,以设计地勘资料为基础,以施工详勘 为主)等。周边环境主要包括与该工程有关的主要建(构)筑物、山体、边坡、河谷、深 基坑、道路、高压电、地下管线的位置关系、结构尺寸等情况,并在《施工平面布 置图》中绘制,标注距离和尺寸。 施工平面及立面布置包括本项目拌和站、钢筋加工场、材料(临时)堆码区域 的位置和与该工程的距离,施工作业平台(场站)的尺寸、地面形式以及施工便道 的长度、宽度、路面形式、最小弯曲半径,临时用水的来源、管线布置、距离,变 压器、配电箱的位置、大小,线路走向,敷设方式等。 施工要求和技术保证条件包含工期目标、质量目标、安全目标、环境目标。工 期目标包括本项目的总体工期和本工程的工期,仅需说明起止时间和持续时间。质 量目标、安全目标和环境目标应根据施工合同和业主要求填写。 风险辨识与分级包含在施工过程中所有的危险源,并按照法律法规的要求对其 进行分级,并说明其应对措施。如果页面采用横向布置,本章保留标题,相关表格 放置于第十章其他资料。 参建各方责任主体单位主要描述该项目的建设单位、设计单位、监理单位、施 工单位、监控单位、专业分包单位的名称。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-8": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->六)施工要求",
- "original_content": "六)施工要求\n(1)工期目标\n按业主单位、会禄高速ZCB1总包部及总监办要求,结合本项目年度施工计划,本项目架桥机安装施工计划于2025年4月中上旬 开始施工,于2025年4月底完成施工。\n(2)质量要求\n适用于本项目的高速桥梁架设高速公路桥梁,能够满足大坡度、小半径斜桥、弯桥,架设要求满足架设的要求。\n(3)安全目标\n1)事故隐患整改率达100%,重大事故隐患治理率达100%,教育培训覆盖率达到100%,新进场产业工人必须经过入场教育培训合格后方能上岗;\n2)强化设备设施的进场验收、维修保养、检验申报工作,加强设备安全管理;\n3)落实安全风险分级管控与隐患排查治理双重预防机制;\n4)保证安全生产经费有效投入;\n(5)按要求开展各类安全生产、职业健康及环境保护专项整治活动;\n6)认真落实各类事故防范措施,不发生生产安全责任事故。\n(4)环境保护要求\n1)施工过程中的废弃物按相关规定进行回收、集中处理。\n2)严格检查施工机械,防止油料泄漏污染环境,\n(3)混凝土过程浇筑中,多余的混凝土不得随意抛弃,要经过处理后方能弃置,并符合环境保护要求。\n4)施工污水排放必须符合环境保护要求,在施工现场建立工地临时污水排放系统并符合有关部门的有关规定,严禁将未经处理的污水直接排放。\n5)施工应根据国家和地方政府有关要求,制定针对性措施,降低噪声污染。\n(5)节能减排要求\n1)优先使用国家、行业推荐的节能、高效、环保的施工设备和机具,并及时做好维修保养工作。\n2)提高机械设备的使用率和满载率;加强机械设备的维修保养,及时检修,减少设备的故障率和跑、冒、漏、滴的发生。\n3)同时加强施工现场和生活区用电管理。\n4)根据工程进度和实际需要及时对工地机械设备进行调整和优化。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "安全目标中‘不发生生产安全责任事故’表述绝对化",
- "location": "(3)安全目标\n6)认真落实各类事故防范措施,不发生生产安全责任事故。",
- "suggestion": "建议修改为‘最大限度减少生产安全责任事故,确保不发生重大及以上生产安全责任事故’或‘力争实现生产安全责任事故为零’,避免使用绝对化表述。",
- "reason": "‘不发生生产安全责任事故’属于工程文件中常见的绝对化用语,虽为表达安全目标的初衷,但现实中难以做到绝对保证,易引发法律或责任推诿风险,不符合工程管理的严谨性要求。根据相关规范,应使用‘力争’‘最大限度减少’等相对稳妥的表述。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-9": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->七)风险辨识与分级",
- "original_content": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。\n表2-2 风险分析表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": {
- "issue_point": "风险辨识与分级中存在表述不当问题",
- "location": "七)风险辨识与分级\n根据生产区域、管理单元、作业环节、施工工艺等因素,进行工序风险辨识。辩识出可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等。",
- "suggestion": "将‘辩识’修改为‘辨识’,并建议在列举风险事件后补充‘等’字前增加‘可能’或‘潜在’等限定词,以避免绝对化表述,如‘可能导致的事故伤害的风险事件有:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落和自然灾害等’可调整为‘可能引发事故伤害的风险事件包括:机械伤害、起重伤害、物体打击、车辆伤害、触电、高空坠落及自然灾害等’。",
- "reason": "‘辩识’为错别字,应为‘辨识’,属于表述错误;同时,列举风险事件时使用‘可能导致的’虽为常见表达,但结合上下文‘风险辨识与分级’的语境,若未加限定词,易被理解为已确定必然发生,存在工程绝对化用语风险,可能引发理解偏差或潜在法律风险,不符合安全技术文件严谨性要求。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-10": {
- "metadata": {
- "review_location_label": "第4页:第二章 工程概况->八)参建各方责任主体单位",
- "original_content": "八)参建各方责任主体单位\n(1)项目建设单位:四川会禄高速公路建设有限公司(2)项目勘查单位:四川路桥集团勘查设计分公司\n(3)项目设计单位:四川路桥集团勘查设计分公司\n(4)施工总承包单位:四川川交路桥有限责任公司\n(5)项目监理单位:四川省亚通工程咨询有限公司\n(6)特种设备安拆单位:河南省新东方起重机集团有限公司"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "overview",
- "check_item_code": "overview_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-11": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划->一)施工进度计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期358天,约12个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2号大桥→大柳树沟3号大桥→黄家庄大桥→小村左线大桥→小村右线1号中桥→小村右线2号大桥→大柳树沟1号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3项目架桥机安拆计划\n根据现场情况包括施工条件和环境,以及吊车的配合,对于安装工期的预计是从拼装开始算起到验收完成预计大约需要7天左右的时间,如果遇到比如大风或者大雨这些不可抗拒的人力因素那么工期就要相应顺延。架桥机首次组装施工计划如下图所示\n图3-1 架桥机首次安装施工计划横道图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-12": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划->二)材料机械设备和人员计划",
- "original_content": "二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n\n<表格></表格>\n\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "plan",
- "check_item_code": "plan_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-13": {
- "metadata": {
- "review_location_label": "第5页:第三章 施工计划",
- "original_content": "一)施工进度计划\n根据总体进度计划要求,结合以往工程经验及本项目实际情况分析施工功效,T梁预制及安装均按2片/d计划,本项目共计预制T梁716片,其中25mT梁199片,40mT梁517片。计划总工期358天,约12个月,采用一台架桥机作业。\n根据项目总体规划和现场实际情况确定的架梁顺序制定架桥机安装拆除计划路线为:\n大柳树沟2号大桥→大柳树沟3号大桥→黄家庄大桥→小村左线大桥→小村右线1号中桥→小村右线2号大桥→大柳树沟1号大桥,架桥机安拆计划如下:\n表3-1 ZCB1-3项目架桥机安拆计划\n根据现场情况包括施工条件和环境,以及吊车的配合,对于安装工期的预计是从拼装开始算起到验收完成预计大约需要7天左右的时间,如果遇到比如大风或者大雨这些不可抗拒的人力因素那么工期就要相应顺延。架桥机首次组装施工计划如下图所示\n图3-1 架桥机首次安装施工计划横道图\n\n二)材料机械设备和人员计划\n架桥机现场安装必须统一指挥,要有严格的施工组织及安全防范措施以确保安全,在拼装前要根据人员,设备和场地编制安全合理的拼装方案。施工人员基本组成及要求如下:\n表3-2 劳动力计划表\n\n<表格></表格>\n\n安装机械设备计划如下表所示\n表3-3 主要材料机械设备计划表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【施工材料计划】内容: 1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含施工材料计划包含:1.方案实施过程中需要使用的所有施工措施材料;2.明确材料名称、规格、数量、重量、来源;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【施工设备计划】内容: 1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含施工设备计划包含:1.方案实施过程中需要使用的主要机械设备;2.应明确设备名称、规格、数量、来 源;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "plan",
- "check_item_code": "plan_completeness_check",
- "check_result": "第三章 施工计划下缺失施工计划中的【安全生产费用使用计划】内容: 1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "建议补充:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第三章 施工计划内容属于,专项施工方案内容要求中的 【施工计划】 板块,应包含安全生产费用使用计划包含:1.安全费用类别;2.费用名称;3.单项投入金额;4.安全生产费用总额;",
- "review_references": "三、施工计划 本章包含施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生 产费用使用计划等五个方面。 施工进度计划包括主要工序作业时间分析、关键工程(工序)节点安排、施工 进度计划横道图等。主要工序作业时间分析一个作业循环或节段的施工工序,以及 每道工序所需的作业时间、间隔时间,从而推算出施工一个循环或节段所需要的总 时间。关键工程(工序)节点安排包含主要工程(工序)节点的起止时间和持续时 间,可采用文字或表格的形式描述。施工进度计划横道图包含主要工序名称、起始 时间、截止时间、持续时间、时间横道等几个要素,优先采用Word、Excel、CAD等 软件进行绘制,使用软件较为熟练的人员可采用翰文进度计划、西西网络图绘制等 软件。施工进度计划横道图应保证清晰、绘制标准、比例协调、格式美观,文字大 小应为五号或者小五号。持续时间和工序转换较多的横道图,应将页面横向布置, 放置于第十章其他资料中。 施工材料计划包含方案实施过程中需要使用的所有施工措施材料,不包含主体 工程材料,如临时支撑结构材料、辅助施工材料、非主体工程的挡防措施、作业平台处理、模板配置、人员上下通道、安全防护措施和安全防护用品等。施工材料计 划应明确材料名称、规格、数量、重量、来源。 施工设备计划包含方案实施过程中需要使用的主要机械设备,如起重吊装设备、 混凝土浇筑设备、张拉压浆设备、人员升降设备、钻孔设备、隧道专用设备、监测 监控设备、质量检查验收设备等。施工设备计划应明确设备名称、规格、数量、来 源。 劳动力计划包含各阶段(周、旬、月或季度)不同工种的作业人员投入情况。 安全生产费用使用计划包含实施本方案拟投入的安全费用类别、费用名称、单 项投入金额和安全生产费用总额,注意不能将项目总的安全生产费用列入。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-14": {
- "metadata": {
- "review_location_label": "第5页:第四章 施工工艺技术->一)主要部件说明",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接\n2、前临时支腿\n前临时支腿在引导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 0~45°斜交桥架设时的调整功能。注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载试验进行制动检测,试验方法与重载试验相同,动作3次,检验制动\n器制动效果。\n卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发现有窜动,要立即停止作业,加固好必须检验后使用。\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 500mm。(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、整机横移时要注意观察,并听从指挥人员的信号。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 4
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "主梁总成弦杆平面外计算长度取值不符合规范要求",
- "location": "7.4.3 当桁架弦杆侧向支承点之间的距离为节间长度的2倍(图7.4.3)且两节间的弦杆轴心压力不相同时,该弦杆在桁架平面外的计算长度应按下式确定(但不应小于 0.5l₁):\n$$\nl _ { 0 } = l _ { 1 } \\left( 0 . 7 5 + 0 . 2 5 \\frac { N _ { 2 } } { N _ { 1 } } \\right)\n$$\n式中:$N _ { 1 }$ ——较大的压力,计算时取正值;\n$N _ { 2 }$ ——较小的压力或拉力,计算时压力取正值,拉力取负值。",
- "suggestion": "应根据主梁总成中弦杆在侧向支承点间两节段的实际轴心压力(N₁ 和 N₂)计算其平面外计算长度,不得直接采用节间长度 l₁ 或其他简化取值。若 N₂ 为拉力,应按负值代入公式计算,确保计算长度合理且不小于 0.5l₁。",
- "reason": "根据《钢结构设计标准》GB50017-2017 第7.4.3条,当弦杆在侧向支承点间压力变化时,其平面外计算长度必须按公式计算,且需考虑压力差的影响。待审查内容中未体现该计算过程,仅说明主梁由7节12m梁通过销轴连接,未提供压力分布数据,亦未说明是否按规范公式进行计算,存在设计参数未满足标准要求的风险。",
- "risk_level": "高风险",
- "review_references": "图7.4.3弦杆轴心压力在侧向支承点间有变化的桁架简图 1—支撑;2—桁架\n【Top1 参考文档】\n【文件】108《钢结构设计标准含条文说明》(GB50017-2017).md\n【标题】7.4 轴心受力构件的计算长度和容许长细比\n...[前文已省略]...\n, $\\iota$ 为杆件的节间长度;2对端部缩头或压扁的圆管腹杆,其计算长度取 $l$ ;3 对于立体桁架,弦杆平面外的计算长度取0.9l,同时尚应以 $0 . 9 l _ { 1 }$ 按格构式压杆验算其稳定性。\n\n## 7.4.2 确定在交叉点相互连接的桁架交叉腹杆的长细比时,在桁架平面内的计算长度应取节点中心到交叉点的距离;在桁架平面外的计算长度,当两交叉杆长度相等且在中点相交时,应按下列规定采用:\n\n### 1 压杆。\n\n#### 1)相交另一杆受压,两杆截面相同并在交叉点均不中断,则:\n\n$$\nl _ { 0 } = l \\sqrt { \\frac { 1 } { 2 } \\big ( 1 + \\frac { N _ { 0 } } { N } \\big ) }\n$$\n\n#### 2)相交另一杆受压,此另一杆在交叉点中断但以节点板\n\n搭接,则:\n\n$$\nl _ { 0 } = l \\sqrt { 1 + \\frac { \\pi ^ { 2 } } { 1 2 } \\cdot \\frac { N _ { 0 } } { N } }\n$$\n\n#### 3)相交另一杆受拉,两杆截面相同并在交叉点均不中断,则:\n\n$$\nl _ { 0 } = l \\sqrt { \\frac { 1 } { 2 } \\Big ( 1 - \\frac { 3 } { 4 } \\cdot \\frac { N _ { 0 } } { N } \\Big ) } \\geq 0 . 5 l\n$$\n\n#### 4)相交另一杆受拉,此拉杆在交叉点中断但以节点板搭接,则:\n\n$$\nl _ { 0 } = l \\sqrt { 1 - \\frac { 3 } { 4 } \\cdot \\frac { N _ { 0 } } { N } } \\geqslant 0 . 5 l\n$$\n\n#### 5)当拉杆连续而压杆在交叉点中断但以节点板搭接,若$N _ { 0 } \\geqslant N$ 或拉杆在桁架平面外的弯曲刚度 $E I _ { \\mathrm { ~ y ~ } } \\geqslant$ 3N²(N-1)时,取l=0.5l。\n\n式中: $l$ —桁架节点中心间距离(交叉点不作为节点考虑)$\\mathrm { ( m m ) }$ ;\n\n$N$ 、 $N _ { 0 }$ ——所计算杆的内力及相交另一杆的内力,均为绝对值;两杆均受压时,取 $N _ { 0 } { \\leqslant } N$ ,两杆截面应相同(N)。\n\n### 2 拉杆,应取 ${ \\mathrm { \\Omega } } l _ { 0 } = l$ 。当确定交叉腹杆中单角钢杆件斜平面内的长细比时,计算长度应取节点中心至交叉点的距离。当交叉腹杆为单边连接的单角钢时,应按本标准第7.6.2条的规定确定杆件等效长细比。\n\n## 7.4.3 当桁架弦杆侧向支承点之间的距离为节间长度的2倍(图7.4.3)且两节间的弦杆轴心压力不相同时,该弦杆在桁架平面外的计算长度应按下式确定(但不应小于 $0 . 5 l _ { 1 } \\big )$ :\n$$\nl _ { 0 } = l _ { 1 } \\left( 0 . 7 5 + 0 . 2 5 \\frac { N _ { 2 } } { N _ { 1 } } \\right)\n$$\n\n式中: $N _ { 1 }$ - -较大的压力,计算时取正值;\n\n$N _ { 2 }$ -较小的压力或拉力,计算时压力取正值,拉力取负值。\n\n \n图7.4.3弦杆轴心压力在侧向支承点间有变化的桁架简图 1—支撑;2—桁架\n\n### 7.4.4塔架的单角钢主杆,应按所在两个侧面的节点分布情况,采用下列长细比确定稳定系数 $\\varphi$ :\n\n1当两个侧面腹杆体系的节点全部重合时[图7.4.4(a)]:\n\n$$\n\\lambda = l / i _ { \\mathrm { y } }\n$$\n\n \n图7.4.4不同腹杆体系的塔架\n\n2当两个侧面腹杆体系的节点部分重合时[图7.4.4(b)]:\n\n$$\n\\lambda = 1 . 1 l / i _ { \\mathrm { u } }\n$$\n\n3当两个侧面腹杆体系的节点全部都不重合时[图7.4.4 (c)]:\n\n$$\n\\lambda = 1 . 2 l / i _ { \\mathrm { u } }\n$$\n\n式中: $i _ { \\mathbf { y } }$ 截面绕非对称主轴的回转半径;\n\n、 $i _ { \\mathrm { u } }$ —分别为较大的节间长度和绕平行轴的回转半径。\n\n4当角钢宽厚比符合本标准第7.3.4条第2款要求时,应按该款规定确定系数 $\\varphi$ ,并按本标准第7.3.3条的规定计算主杆的承载力。\n\n### 7.4.5塔架单角钢人字形或 $\\mathrm { v }$ 形主斜杆,当辅助杆多于两道时,宜连接两相邻侧面的主斜杆以减小其计算长度。当连接有不多于两道辅助杆时,其长细比宜乘以1.1的放大系数。\n\n### 7.4.6验算容许长细比时,可不考虑扭转效应,计算单角钢受压构件的长细比时,应采用角钢的最小回转半径,但计算在交叉点相互连接的交叉杆件平面外的长细比时,可采用与角钢肢边平行轴的回转半径。轴心受压构件的容许长细比宜符合下列规定:\n1跨度等于或大于 $6 0 \\mathrm { m }$ 的桁架,其受压弦杆、端压杆和直接承受动力荷载的受压腹杆的长细比不宜大于120;\n\n2轴心受压构件的长细比不宜超过表7.4.6规定的容许值,但当杆件内力设计值不大于承载能力的 $50 \\%$ 时,容许长细比值可取200。\n\n表7.4.6 受压构件的长细比容许值 \n\n\n\n\n\n### 7.4.7验算容许长细比时,在直接或间接承受动力荷载的结构中,计算单角钢受拉构件的长细比时,应采用角钢的最小回转半径,但计算在交叉点相互连接的交叉杆件平面外的长细比时,可采用与角钢肢边平行轴的回转半径。受拉构件的容许长细比宜符合下列规定:\n\n1除对腹杆提供平面外支点的弦杆外,承受静力荷载的结构受拉构件,可仅计算竖向平面内的长细比;\n\n2中级、重级工作制吊车桁架下弦杆的长细比不宜超过200;\n\n3在设有夹钳或刚性料耙等硬钩起重机的厂房中,支撑的长细比不宜超过300;\n\n4受拉构件在永久荷载与风荷载组合作用下受压时,其长细比不宜超过250;\n\n5跨度等于或大于 $6 0 \\mathrm { m }$ 的桁架,其受拉弦杆和腹杆的长细比,承受静力荷载或间接承受动力荷载时不宜超过300,直接承受动力荷载时不宜超过 250;\n\n6受拉构件的长细比不宜超过表7.4.7规定的容许值。柱间支撑按拉杆设计时,竖向荷载作用下柱子的轴力应按无支撑时考虑。\n\n表7.4.7受拉构件的容许长细比 \n\n\n\n\n\n### 7.4.8上端与梁或桁架铰接且不能侧向移动的轴心受压柱,计算长度系数应根据柱脚构造情况采用,对铰轴柱脚应取1.0,对底板厚度不小于柱翼缘厚度2倍的平板支座柱脚可取为0.8。由侧向支撑分为多段的柱,当各段长度相差 $10 \\%$ 以上时,宜根据相关屈曲的原则确定柱在支撑平面内的计算长度。\n\n##\n...[后文已省略]...\n",
- "reference_source": "108《钢结构设计标准含条文说明》(GB50017-2017).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-15": {
- "metadata": {
- "review_location_label": "第5页:第四章 施工工艺技术",
- "original_content": "一)主要部件说明\n1、主梁总成\n主梁总成由主梁和导梁构成。主梁单节长12m,共7节,每节重10.87t,主梁为主要承载受力构件,其上弦杆上方设有轨道供纵移桁车走行,实现预制梁的纵向移动;下弦设有反滚轮行走轨道,作为导梁纵移、前中支腿移动纵行轨道。导梁长18m,主要是为降低过孔挠度和承受中支腿移动荷载,起安全引导、辅助过孔作用。主梁、导梁为三角桁架构件单元,采用销轴连接,前、后端各设置横联构架。\n图4-1 主梁总成图\n注意事项:\n更换上、下弦销轴时,应优先向设备供应方购买符合要求的备件。自行更换时,材料性能必须优于设计零件性能,并按规定进行热处理,否则可能造成人员、设备事故。\n销轴不得弯曲受力,不得用销轴作为锤砸工具,不得任意放置及焊接\n2、前临时支腿\n前临时支腿在引导梁最前端,为分节式管柱结构,配以手动螺旋式伸缩机构,满足过孔功能要求,并方便调整导梁的水平。柱身顶部通过横梁与导梁连接并设有转盘,可以实现 0~45°斜交桥架设时的调整功能。注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液压锁动作灵敏,各油路接头不得有泄露现象\n(2)过孔前要测量前临时支腿与前部墩台之间的高差,不符合要求时要进行调整。\n(3)前临时支腿就位后,支撑前保证支腿底部垫实、可靠,木等不得有腐烂现象。\n3、前支腿装置\n前支腿由反滚轮、支腿、调整架、转盘和纵移机构等组成。反滚轮自立走行,与支腿铰接可以保证车轮始终与轨面接触。调整节通过液压油缸伸缩使导柱在柱套内滑动实现高度调整,调整到位后穿上销轴固定导柱与柱套,使油缸辅助承受载荷,销轴为主要承力件起到机械保护作用。反滚轮上下转盘可以相互转动以实现架设斜桥之要求。上反滚轮机构可自立行走,带动前支腿,实现前支腿在导梁上纵向运动;下反滚轮可使导梁纵向运动,完成过孔功能。在架梁作业时前支腿通过反滚轮机构与导梁锁定。\n注意事项:\n(1)在过孔前要检查液压系统性能,并排除系统中的空气;保证油缸、液锁动作灵敏,各油路接头不得有泄露现象;调整好所需高度并穿好销轴\n(2)动作前要检查锁定装置是否解脱,检查两侧滚轮电机动作是否一致。\n(3)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n4、中支腿装置\n中支腿装置由中横梁、反滚轮、转盘、横移台车等组成。横移机构与前支腿横移机构相同,转盘可以实现架设斜桥的要求,横梁台车为单轨走行台车,跨孔时可以带着部分移轨道过孔。\n5、尾支腿装置\n尾支腿装置与前支腿升降机构相同是整机步履过孔时作为辅支撑,实现中支腿装置迈步前移。\n6、纵移桁车\n整机共有前、后两组纵移桁车并均能自立行走,为吊梁纵移主要承载与动力部件,两者配合能够实现预制梁体的纵向移动,完成预制梁的运输作业。纵移车采用三点式支承以保证轮压均匀分布。桁车横梁与两端的台车设有托架旋转法兰,托架与台车之间可自由调整角度,方便斜桥架设,最大限度地保证架梁安全与便捷。\n注意事项:\n(1)空重载试车时要保证两侧桁车运行方向、速度一致,保证轮组均匀受力\n(2)架梁作业时要检查锁定装置是否锁定,伸缩套销轴是否充分受力,并检查轨道垫实情况。\n(3)架设斜交桥时应先调整整机角度,再调整纵移车角度,使两者的斜交角度相同,并与架设桥梁的角度保持一致,满足斜交斜架要求\n7、起重小车\n起重小车配置J型慢速卷扬机机构、动定滑轮组、钢丝绳、横向行走驱动机构、专用吊具等。采用集中驱动方式。小车卷扬机构能使梁体起升、下降:小车驱动能带动扬机构沿纵移桁车横梁轨道运行,满足梁体横向移动、对位要求。\n注意事项:\n(1)卷扬机制动器在出厂时已调整到位,一般不需调整;若需调整,调整后心进行吊载试验进行制动检测,试验方法与重载试验相同,动作3次,检验制动\n器制动效果。\n卷扬机钢丝绳末端固定在卷筒一侧,要每天检查固定端情况,是否连接可靠如果发现有窜动,要立即停止作业,加固好必须检验后使用。\n8、横移轨道\n横移轨道为前支腿横移轨道一组,中支腿横移轨道一组,由多节箱型梁栓接而成,支承主机吊梁、横移传递荷载。在横移轨道两端设置限位挡块,满足架边梁安全要求。\n注意事项:\n(1)前支腿横移轨道在架梁前必须操垫稳固,操垫时第一层枕木长度方向与轨道梁垂直,多层时枕木要成井型并排,轨道梁下受力枕木下方不得悬空。两枕木支点间距不得大于 500mm。(2)受力枕木不得有腐烂或中空现象,枕木材质以硬咋木或处理后枕木为宜\n(3)前、后横轨接头处必须垫实,不得有悬空现象。后支腿受力、横轨接头应尽量在预制梁腹板或可承受较大载荷位置,不得在两预制梁粱翼缘板伸缩缝之间。专用横轨部分必须放置于双幅桥隔离带之间,不得换位。如果转场使用,所架设桥梁伸缩缝过大,双幅桥隔离带过宽(>240cm)时,请咨询供方技术部门,否则不得随意架设。\n(4)两端限位挡块为机械保护作用,不得用作整机横移的停机开关。操作者在落边梁、整机横移时要注意观察,并听从指挥人员的信号。\n\n二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、固定压板→安装三道上横梁及尾支腿\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4级,视线良好的环境下进行安装。\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式\n表4-2 钢丝绳破断拉力表\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支腿支点距应该满足安装需求(约为30m左右),起重设备采用1台80t吊车进行起重安装(单机抬吊)\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m左右)、高度差,确定合理的前、中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20的钢丝绳,设置于支腿两侧。在硬化场地上预埋直径25mm的U型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm以上,横轨横向应保持水平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16或中120*6以上圆管)5t手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。注意事项:\n台车跑轮须用木楔楔实,保证不能左右滑动。\n前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1台80t汽车吊将单节主梁吊装安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n布线要整齐,接头处必须做好防水、漏电事项。\n试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n架桥机拆除\n1、准备工作\n1.1拆除场地检查、清理、平整\nA拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护措施\nB清理场地和周围影响拆除作业的障碍物\nC桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m\n\n2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2拆除人员组织及技术准备\nA拆除人员按照施工专项方案安排到位,并持证上岗\nB由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行全面的安全质量技术交底\nC制定各项防火、防雷击等预防措施\n1.3架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊\n机、电缆等辅助材料的质量和数量是否满足要求。\n拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方能继续进行\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得赶进度在夜间或雷雨时间作业。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "technology",
- "check_item_code": "technology_completeness_check",
- "check_result": "第四章 施工工艺技术下缺失施工工艺技术中的【主要施工方法概述】内容: 1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "建议补充:2.模板等重要材料的配置数量",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第四章 施工工艺技术内容属于,专项施工方案内容要求中的 【施工工艺技术】 板块,应包含主要施工方法概述包括:1.应简要说明采取的主要施工工艺和施工方法;2.模板等重要材料的配置数量;",
- "review_references": "四、施工工艺技术 本章包含主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操 作要求、检查要求等六个方面。 主要施工方法概述应简要说明采取的主要施工工艺和施工方法,以及模板等重 要材料的配置数量。 技术参数包含主要使用材料的类型、规格,以及主要设备的名称、型号、出厂 时间、性能参数、自重等。 施工准备包含测量放样、临时用水、临时用电、场地、人员、设备、安全防护 措施和人员上下通道等内容。 工艺流程包含整个方案的主要施工工序,按照施工的先后顺序,建议采用金山 软件流程图或微软Visio进行绘制,工艺流程图采用无颜色填充,字体为五号或小 五号。 施工方法及操作要求根据工艺流程中主要的施工工序依次进行描述其操作方法, 并说明施工要点,常见问题及预防、处理措施。 检查要求包含所用的材料,构配件进场质量检查、抽查,以及施工过程中各道 工序检查内容及标准。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-16": {
- "metadata": {
- "review_location_label": "第7页:第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "二)架桥机安装施工\n1、安装准备\n(1)图纸审核\n1)为了使施工人员充分领会设计意图,熟悉设计内容,正确按图纸施工,确保工程质量,避免返工浪费,必须在工程开工前由现场技术负责人组织施工人员对图纸进行会审。熟悉随机设备带来的全套起重机械图纸、说明书、质量证明书等技术文件。了解起重机械结构的特点、工程量、起重机械各部位的关系及技术要求。\n2)图纸会审的重点:\n2.1 熟悉技术文件,设计图纸和有关资料。\n2 2.施工图与设备、特殊材料的技术要求是否一致。\n2.3 设计与施工主要技术方案是否相适应。\n2.4 图纸表达深度能否满足施工要求。\n2.5 能否满足安全施工的要求。\n2.6 其它有关施工中不明确的问题。\n(2)组织吊装人员熟悉起吊工艺流程。\n(3)对进入现场的人员进行安全技术交底。\n1)施工技术交底是为了使施工人员了解起重机械、工程特点、明确施工任务、特殊操作方法、质量标准、安全措施和降低成本措施等,做到施工前心中有数。\n2)施工技术交底是施工工序中的首要环节,必须严格执行,未经技术交底不能施工,谁施工谁负责。\n3)技术交底工作由班组负责人主持,班组技术员组织并负责交底,重大和关键项目由专业工程师负责技术交底,项目技术负责检查督促各班技术交底工作进行情况。\n4)施工人员应按交底要求施工,不得擅自变更施工方案。有必要更改时,应报交底人同意并记录备案,有关人员发现施工人员不按技术交底要求施工,有权停止其施工,并报上级有关部门处理。\n5)发生质量、设备或人身安全事故时,事故原因如属于交底错误的由交底人员负责,如属于违反交底要求的由施工负责人或施工人员负责。\n6) 技术交底内容根据作业指导书的内容进行技术交底。\n7) 施工班组要对技术交底的内容组织认真讨论,弄清交底内容,提出对技术交底补充修改意见等,报请批准。\n2、现场准备\n(1)勘测场地\n勘测架桥机及汽车吊进场道路是否满足要求,场地地面是否夯实.检查施工现场环境,查看是否有异物存在,如有异物甲方应及时清理;测量施工现场平面距离和纵坡是否满足要求;检查吊装场地地基承重力。\n(2)清点架桥机各部件数量完整性。\n(3)安装现场临时用电是否完备及安全。\n(4)安装工具是否完备。\n(5)氧气、乙炔等应满足现场施工需要。(6)液压油、齿轮油是否满足现场施工需要。\n3、架桥机安装前检查验收\n(1)设备技术文件是否齐全。\n(2)检查设备、材料及附件的型号、规格和数量是否符合设计和设备技术文件的要求。\n(3)检查机电设备在运输的情况下是否有变形损伤和锈蚀,钢丝绳是否有锈蚀损伤、拆弯、扭结,裂缝和松散现象。\n(4)因搬运不当和存放不好造成的缺陷和超过规定误差的部分,均应按技术要求调整修复,对金属结构部分的缺陷,必须在地面进行整改,否则不准安装。\n3、安装施工工艺流程\n安装前中支腿→吊装第一节主梁→安装后支腿及临时支腿→主梁依次接长→安装挂轮、固定压板→安装三道上横梁及尾支腿\n图4-7 架桥机安装施工工艺流程图\n4、安装步骤\n(1)安装注意事项\n1)架桥机安装要求在天气晴朗,无雨,风力小于4级,视线良好的环境下进行安装。\n2)架桥机所有部件全部为捆绑式吊装\n3)安装场地纵坡要求小于1%,地面夯实,且完成梁场临时混凝土硬化,满足汽车吊站位及地基承载力要求,本项目架桥机安装位于桥台后,硬化后实测承载力不小于10MPa。\n4)安装场地不小于80m*10m。\n5)吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式\n表4-2 钢丝绳破断拉力表\n图4-6 钢丝绳大样图\n(2)安装说明\n安装人员根据本项目施工现场场地平面情况(场地宽度、长度、作业面积),采用安装一节,推进一节的安装方式,保持两段平衡,但基础安装单元要长于前中支腿距离,前、中支腿支点距应该满足安装需求(约为30m左右),起重设备采用1台80t吊车进行起重安装(单机抬吊)\n(3)安装步骤\n步骤1:确定前、中支腿位置(支腿中心距离为30m左右)、高度差,确定合理的前、中支腿高度(高差不得大于规定值允许范围),并确保前、中支腿所在位置底部基础,能够承担所需载荷,不得有疏松、塌陷、流失、滑移等情况出现。\n前、中支腿通过设置缆风绳来进行临时稳固,缆风绳采用直径20的钢丝绳,设置于支腿两侧。在硬化场地上预埋直径25mm的U型筋,作为缆风绳的捆绑点,布置图如下所示\n图4-7 支腿临时稳固布置图\n步骤2:前横移轨道放置于背墙处墩台上,并用木操垫牢固、稳妥。\n注意事项:\n台车跑轮承压横轨底部不得悬空,枕木间距不得大于500mm。\n枕木操垫范围应超出前支腿两台车外侧跑轮中心距备800mm以上,横轨横向应保持水平,不得有坡度。\n步骤3:根据事先计算高差,确定前支腿总成高度,拼装前支腿组件\n步骤4:组装前、中支腿组件吊装、落实于横轨上,并采用撑杆([]16或中120*6以上圆管)5t手拉葫芦稳固好两支腿组件,接上临时电源,调试下滚轮运动方向一致。注意事项:\n台车跑轮须用木楔楔实,保证不能左右滑动。\n前、中支腿组件安装就位后,不得有晃动或歪斜现象,撑杆要撑实\n步骤5:按照步骤1-步骤4安装后支腿及临时支腿(不需手拉葫芦),但要固定稳固。\n注意事项:\n1)检查支腿下部基础,不得有疏松、塌陷、流失、滑移等情况出现,操垫台车底部横轨的枕木尽可能加大与基础接地面积。\n步骤6:主梁及导梁安装\n按主梁前后顺序分别组装依次组装两组主梁总成:选用1台80t汽车吊将单节主梁吊装安置于前中支腿上,稳定后再吊装第二节主梁于中后支腿上,再吊装第三节主梁于后支腿及临时支腿上,安装好的主梁依次前移,于后支腿处不断接长主梁。\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。\n步骤7:点动前、后支腿反滚轮装置,主梁、导梁前移至合理位置,安装尾部两节主梁,并安装紧固好后龙门、尾支腿、上反滚轮装置。\n注意事项:\n启动反滚轮装置时,必须先点动,观察运行方向,一致时方可正常启动\n步骤8:组装、吊装两组纵移桁车机构,放置于后支腿前方,吊装起重小车总成。\n步骤9:缠绕钢丝绳、专用吊具\n注意事项:\n缠绕钢丝绳前,需把钢丝绳内力进行释放,缠绕后涂抹防锈油。\n检查钢丝绳固定端压板,压板要压实,螺栓不得有漏紧现象。\n步骤10:安装电缆及控制柜,控制电路接线、液压泵站、液压管路安装。\n布线要整齐,接头处必须做好防水、漏电事项。\n试车时液压管路中的气体要排除干净,管路不得有漏油、打折现象。\n架桥机拆除\n1、准备工作\n1.1拆除场地检查、清理、平整\nA拆除前必须进行场地施工调查,了解是否在架桥施工场地和周围有影响拆除作业的障碍物,如电缆、电线和各种管道建筑物和构造物,若有情况必须先制定方案制定迁移或保护措施\nB清理场地和周围影响拆除作业的障碍物\nC桥面处理:根据本工地现场实际和架桥机拆除作业流程,需要在已架设桥面上或路基上拆除。为确保架桥机拆除和架桥运梁的作业安全,施工场地必须达到以下要求:\n1)场地坚实稳固,为此要认真检查路基路床压实密度,加强辗压,必要时铺设移动式钢板,拆除平台长度不少于 75m,宽度不少于 10m"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊装钢丝绳安全系数与强度等级不符合规范要求",
- "location": "【待审查内容】4、安装步骤(2)安装说明:吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式",
- "suggestion": "应核实并调整吊装钢丝绳的安全系数和强度等级,确保符合《架桥机通用技术条件》(GB/T26470-2011)中关于金属结构件材料及吊装安全的相关规定。建议安全系数不低于10,且钢丝绳强度等级应根据实际工况和规范要求进行校核。",
- "reason": "根据【参考依据】5311条,架桥机主要结构件材料应符合GB/T26470-2011中的规定,且不允许采用级以下钢材。虽然该条未直接规定钢丝绳的强度等级和安全系数,但作为架桥机安装过程中的关键吊装设备,钢丝绳的安全性能直接影响施工安全。GB/T26470-2011中虽未明确钢丝绳安全系数,但结合《起重机械安全规程》(GB6067)等通用规范,吊装钢丝绳安全系数通常不应低于10。当前提出的8倍安全系数低于行业通用安全要求,存在安全隐患。同时,1770MPa强度等级虽属高强钢丝绳,但若未明确其是否满足GB/T26470-2011中对吊具及承力件的材料要求,也存在合规风险。",
- "risk_level": "高风险",
- "review_references": "53 金属结构## 531 基本要求 5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n【Top2 参考文档】\n【文件】132《架桥机通用技术条件》(GB-T26470-2011).md\n【标题】53 金属结构\n53 金属结构## 531 基本要求\n\n5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n\n### 5.3.1.2 主要结构件在涂装前应进行表面喷(抛)丸处理,且应达到 GB/T8923中规定的 $\\mathrm { S a 2 \\frac { 1 } { 2 } }$ 级或\n\nSt3级,其他构件应达到Sa2级或St2级。\n\n5313 焊接构件用焊条、焊丝、焊剂应与被焊接的材料相适应。\n\n5314 金属结构件的设计应便于检查、维修和排水。\n\n## 532 焊接\n\n5321 焊接坡口的形式和尺寸应符合 / 和 / 规定。5322 钢的弧焊接头缺陷质量应符合 — 中 的规定。5323 架桥机主梁、导梁、小车架、吊具及主要承力支腿等位于受拉区的翼缘板及腹板的对接焊缝应进行 $100 \\%$ 无损检测,超声波检测时不应低于 / 中的 级要求,射线检测时不应低于 / 中规定的 级。\n\n## 533 高强度螺栓连接\n\n### 5.3.3.1 高强度螺栓连接的设计应符合 GB/T3811和 GB50017的相关规定。\n\n5332 非剪切型高强度螺栓接头所用螺栓、螺母、垫圈及其技术要求应分别符合 / 、和 的规定 扭剪型高强度螺栓接头所用的钢结构用扭剪型高强度螺栓连接副应符合 / 的规定。\n\n## 534 主梁(架桥机主梁组装完成以后)\n\n5341 主梁设计要求有上拱时,跨中上拱允许偏差为 $S / 5 ~ 0 0 0$ ,且最大上拱度应位于跨中部 $S / 1 0$ 范围内。设计未要求上拱时,主梁跨度中部最低点不应低于水平线 $S / 1 \\ 0 0 0$ 。\n\n5342 主梁在水平方向产生的弯曲,对正轨箱形梁和半偏轨箱形梁不应大于 $S _ { 3 } / 1 5 0 0 ( S _ { 3 }$ 为两端始于第一块横向加筋肋的实测长度,在离上翼缘板约 $1 0 0 \\ \\mathrm { m m }$ 的横向加筋肋处测量),最大不应超过15mm。\n\n对全偏轨箱形梁、单腹板梁和桁架梁,应满足 和 对轨道的要求。\n\n5343 主梁腹板的局部翘曲,用以 $1 \\textrm { m }$ 平尺检测,离上翼缘板 $H / 3$ 以内不应大于 δ,其余区域不应大于 $1 , 2 \\delta$ (见图 )。\n\n \n图 10\n\n \n图 11\n\n5344 箱形梁及单腹板梁上翼缘板的水平偏斜值 $C { \\leqslant } B / 2 0 0$ (见图 ),此值允许在未装轨道前在大筋板或节点处测量。\n\n5345 箱形梁腹板的垂直偏斜 $h { \\leqslant } H / 2 0 0$ ,单腹板梁及桁架梁的垂直偏斜 $h { \\leqslant } H / 3 0 0$ (见图 ),此值应在大筋板或节点处测量。\n\n5346 桁架梁杆件的直线度 $\\Delta l { \\leqslant } 0 . \\ 0 0 1 \\ 5 a$ (见图 )。\n\n \n图 12\n\n \n图 13\n\n5347 架桥机主梁支承跨度范围内以各支腿中心线形成的平面和小车轨道上表面中心线的交点所得的对角线长度的差值不应大于 $5 ~ \\mathrm { m m }$ 。\n\n5348 吊梁小车轨道应满足以下要求(见图 ):\n\n对于起重量小于 $3 2 0 ~ \\mathrm { t }$ 的分段拼接桁架梁,每段梁上小车轨道不允许有接缝(允许焊为一体),桁架梁拼接处的小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 4 ~ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 2 ~ \\mathrm { m m }$ ; \n) 非焊接连接的轨道应当在端部加挡铁。\n\n对于其他梁,小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 1 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 1 ~ \\mathrm { m m }$ ; \n) 对正轨箱形梁及半偏轨箱形梁,轨道接缝应该放在筋板上,允差不应大于 $1 5 ~ \\mathrm { m m }$ ; \n) 两端最短一段轨道长度不应小于 $1 , 5 \\textrm { m }$ ,并且在端部加挡铁。\n\n \n图 14\n\n \n图 15\n\n5349 主梁为偏轨箱形梁 单腹板梁的小车轨道中心线对承轨腹板中心线的位置偏差 见图$g { \\leqslant } { \\delta } / 2 , { \\delta }$ 为腹板厚度。\n53410 两根运行小车轨道轨距偏差 $\\Delta K = \\pm 8 ~ \\mathrm { m m }$ ,如图 所示。 $K$ 为小车轨距的名义值。\n\n53411 在与小车运行方向相垂直的同一截面上两根小车轨道表面之间的高低差,当 $K { \\leqslant } 2 \\mathrm { ~ m ~ }$ 时,$\\Delta h { \\leqslant } 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h { \\leqslant } 2 . 5 ~ K , K$ 以米 $\\left( \\mathrm { m } \\right)$ )计, $\\Delta h$ 最大不超过 $1 0 ~ \\mathrm { m m }$ ,如图 所示。\n\n \n图 16\n53412 架桥机两根小车轨道顶部形成的局部平面度 $\\Delta h _ { \\mathrm { r } }$ (见图 ,相对于四个轮子形成的标准平面),当 $K { \\leqslant } 2 \\mathrm { m }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 2 . 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 1 . 2 5 \\ K , K$ 以米 $\\mathrm { { ( m ) } }$ )计, $\\Delta h _ { \\mathrm { r } }$ 最大不超过 $5 ~ \\mathrm { m m }$ ( $. K$ 为小车轨距的名义值)。\n\n \n图 17\n\n53413 小车运行轨道的侧向直线度(见图 ),应符合以下要求:\n\n) 每 $2 \\textrm { m }$ 长度内 $b$ 不应大于 $2 \\textrm { m m }$ ; \nb) 轨道全长范围内 $b$ 不应大于 $1 0 \\ \\mathrm { m m }$ 。\n\n单位为毫米\n图 18\n",
- "reference_source": "132《架桥机通用技术条件》(GB-T26470-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "technology",
- "check_item_code": "technology_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊装钢丝绳安全系数与强度等级不符合规范要求",
- "location": "4、安装步骤\n(2)安装说明\n步骤5:主梁及导梁安装\n注意事项:\n拼装相应位置的三角桁架,高抗剪主梁不得错位\n安装销轴必须是供应方所供应销轴,不得私自进行更换、代替\n安装销轴时必须安装齐全,不得漏销。销轴在配合位置涂抹黄油,开口销安装齐全。",
- "suggestion": "将吊装钢丝绳安全系数调整为不低于10,强度等级应符合GB/T26470-2011中对架桥机用钢丝绳的安全要求,建议采用1870MPa或更高强度等级的钢丝绳。",
- "reason": "根据【参考依据】《架桥机通用技术条件》(GB/T26470-2011)5311条,架桥机主要结构件材料应符合相关标准,且不允许采用级以下钢材。虽然该条未直接规定钢丝绳参数,但结合其对结构安全性的整体要求,钢丝绳作为关键吊装部件,其安全系数和强度等级应满足设备安全运行的最低要求。GB/T26470-2011中虽未明确列出钢丝绳安全系数,但依据《起重机械安全规程》(GB6067)及行业通用标准,架桥机吊装用钢丝绳安全系数不应低于10,强度等级不应低于1870MPa。当前方案中安全系数为8、强度等级1770MPa,低于行业通用安全要求,存在严重安全隐患。",
- "risk_level": "高风险",
- "review_references": "53 金属结构## 531 基本要求 5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n【Top2 参考文档】\n【文件】132《架桥机通用技术条件》(GB-T26470-2011).md\n【标题】53 金属结构\n53 金属结构## 531 基本要求\n\n5311 架桥机主梁、支腿、小车架和导梁等主要结构件材料应符合 / — 中 的规定,且不允许采用 级以下钢材。\n\n### 5.3.1.2 主要结构件在涂装前应进行表面喷(抛)丸处理,且应达到 GB/T8923中规定的 $\\mathrm { S a 2 \\frac { 1 } { 2 } }$ 级或\n\nSt3级,其他构件应达到Sa2级或St2级。\n\n5313 焊接构件用焊条、焊丝、焊剂应与被焊接的材料相适应。\n\n5314 金属结构件的设计应便于检查、维修和排水。\n\n## 532 焊接\n\n5321 焊接坡口的形式和尺寸应符合 / 和 / 规定。5322 钢的弧焊接头缺陷质量应符合 — 中 的规定。5323 架桥机主梁、导梁、小车架、吊具及主要承力支腿等位于受拉区的翼缘板及腹板的对接焊缝应进行 $100 \\%$ 无损检测,超声波检测时不应低于 / 中的 级要求,射线检测时不应低于 / 中规定的 级。\n\n## 533 高强度螺栓连接\n\n### 5.3.3.1 高强度螺栓连接的设计应符合 GB/T3811和 GB50017的相关规定。\n\n5332 非剪切型高强度螺栓接头所用螺栓、螺母、垫圈及其技术要求应分别符合 / 、和 的规定 扭剪型高强度螺栓接头所用的钢结构用扭剪型高强度螺栓连接副应符合 / 的规定。\n\n## 534 主梁(架桥机主梁组装完成以后)\n\n5341 主梁设计要求有上拱时,跨中上拱允许偏差为 $S / 5 ~ 0 0 0$ ,且最大上拱度应位于跨中部 $S / 1 0$ 范围内。设计未要求上拱时,主梁跨度中部最低点不应低于水平线 $S / 1 \\ 0 0 0$ 。\n\n5342 主梁在水平方向产生的弯曲,对正轨箱形梁和半偏轨箱形梁不应大于 $S _ { 3 } / 1 5 0 0 ( S _ { 3 }$ 为两端始于第一块横向加筋肋的实测长度,在离上翼缘板约 $1 0 0 \\ \\mathrm { m m }$ 的横向加筋肋处测量),最大不应超过15mm。\n\n对全偏轨箱形梁、单腹板梁和桁架梁,应满足 和 对轨道的要求。\n\n5343 主梁腹板的局部翘曲,用以 $1 \\textrm { m }$ 平尺检测,离上翼缘板 $H / 3$ 以内不应大于 δ,其余区域不应大于 $1 , 2 \\delta$ (见图 )。\n\n \n图 10\n\n \n图 11\n\n5344 箱形梁及单腹板梁上翼缘板的水平偏斜值 $C { \\leqslant } B / 2 0 0$ (见图 ),此值允许在未装轨道前在大筋板或节点处测量。\n\n5345 箱形梁腹板的垂直偏斜 $h { \\leqslant } H / 2 0 0$ ,单腹板梁及桁架梁的垂直偏斜 $h { \\leqslant } H / 3 0 0$ (见图 ),此值应在大筋板或节点处测量。\n\n5346 桁架梁杆件的直线度 $\\Delta l { \\leqslant } 0 . \\ 0 0 1 \\ 5 a$ (见图 )。\n\n \n图 12\n\n \n图 13\n\n5347 架桥机主梁支承跨度范围内以各支腿中心线形成的平面和小车轨道上表面中心线的交点所得的对角线长度的差值不应大于 $5 ~ \\mathrm { m m }$ 。\n\n5348 吊梁小车轨道应满足以下要求(见图 ):\n\n对于起重量小于 $3 2 0 ~ \\mathrm { t }$ 的分段拼接桁架梁,每段梁上小车轨道不允许有接缝(允许焊为一体),桁架梁拼接处的小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 4 ~ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 2 ~ \\mathrm { m m }$ ; \n) 非焊接连接的轨道应当在端部加挡铁。\n\n对于其他梁,小车轨道应满足:\n\na) 接头处的高低差 $d { \\leqslant } 1 \\ \\mathrm { m m }$ ; \n) 接头处的间隙 $e { \\leqslant } 2 \\ \\mathrm { m m }$ ; \n) 接头处的侧向错位 $f { \\leqslant } 1 ~ \\mathrm { m m }$ ; \n) 对正轨箱形梁及半偏轨箱形梁,轨道接缝应该放在筋板上,允差不应大于 $1 5 ~ \\mathrm { m m }$ ; \n) 两端最短一段轨道长度不应小于 $1 , 5 \\textrm { m }$ ,并且在端部加挡铁。\n\n \n图 14\n\n \n图 15\n\n5349 主梁为偏轨箱形梁 单腹板梁的小车轨道中心线对承轨腹板中心线的位置偏差 见图$g { \\leqslant } { \\delta } / 2 , { \\delta }$ 为腹板厚度。\n53410 两根运行小车轨道轨距偏差 $\\Delta K = \\pm 8 ~ \\mathrm { m m }$ ,如图 所示。 $K$ 为小车轨距的名义值。\n\n53411 在与小车运行方向相垂直的同一截面上两根小车轨道表面之间的高低差,当 $K { \\leqslant } 2 \\mathrm { ~ m ~ }$ 时,$\\Delta h { \\leqslant } 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h { \\leqslant } 2 . 5 ~ K , K$ 以米 $\\left( \\mathrm { m } \\right)$ )计, $\\Delta h$ 最大不超过 $1 0 ~ \\mathrm { m m }$ ,如图 所示。\n\n \n图 16\n53412 架桥机两根小车轨道顶部形成的局部平面度 $\\Delta h _ { \\mathrm { r } }$ (见图 ,相对于四个轮子形成的标准平面),当 $K { \\leqslant } 2 \\mathrm { m }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 2 . 5 ~ \\mathrm { m m }$ ;当 $K { > } 2 \\mathrm { ~ m ~ }$ 时, $\\Delta h _ { \\mathrm { r } } { \\leqslant } 1 . 2 5 \\ K , K$ 以米 $\\mathrm { { ( m ) } }$ )计, $\\Delta h _ { \\mathrm { r } }$ 最大不超过 $5 ~ \\mathrm { m m }$ ( $. K$ 为小车轨距的名义值)。\n\n \n图 17\n\n53413 小车运行轨道的侧向直线度(见图 ),应符合以下要求:\n\n) 每 $2 \\textrm { m }$ 长度内 $b$ 不应大于 $2 \\textrm { m m }$ ; \nb) 轨道全长范围内 $b$ 不应大于 $1 0 \\ \\mathrm { m m }$ 。\n\n单位为毫米\n图 18\n",
- "reference_source": "132《架桥机通用技术条件》(GB-T26470-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-17": {
- "metadata": {
- "review_location_label": "第10页:第四章 施工工艺技术->二)架桥机安装施工",
- "original_content": "2)场地表面平整,纵横向坡度不得超过路基和桥面的设计指标,不积水\n3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥\n面拆除完毕后架桥机各部件转运到存放地点。\n1.2拆除人员组织及技术准备\nA拆除人员按照施工专项方案安排到位,并持证上岗\nB由架桥机拆除专业技术人员组织全体作业人员,学习讲解架桥机结构、性能参数及架桥机使用说明书的有关内容,学习专项方案、施工规范、操作规程,对拆除、拆卸作业进行全面的安全质量技术交底\nC制定各项防火、防雷击等预防措施\n1.3架桥机拆除前材料、设备准备工作\n1)架桥机拼装所在桥梁段最大纵坡为 2%,采用枕木及木板、钢板作为支垫,进行纵坡找平\n2)根据架桥机随机进场的使用说明书清单,检查架桥机的部件完整性\n3)检查架桥机各机构维修保养工作性能,审核维修监督检验证书和报告\n4)检查架桥机拆除、拆卸使用的起重机具、锁具的情况\n5)检查拆除起吊机械的参数和设备性能是否符合专项方案选择的要求\n6)对应拆除、拆除要求核实枕木、垫板、临时支架、起重葫芦、千斤顶、电焊\n机、电缆等辅助材料的质量和数量是否满足要求。\n拆除步骤\n架桥机的拆除过程与拼装相反,并注意如下事项:\n(1)先切断总电源、拆除电缆线,卸下高处的零部件;\n(2)收集好各种配件、紧固件,销轴、齿轮等需涂抹防锈漆,按照规范摆放:\n(3)及时保养、维修钢结构及各工作机构。\n3、架桥机拆除注意事项\n1)在设备拆除前,对设备进行仔细全面的检查,将一切非设备材料(如附着物、垃圾、废弃材料)全部清理干净,防止高空坠落事故\n2)对设备已损坏处予以明确标记,并记录在案,评估拆除是否可以正常进行,否则应采取加固、捆绑等措施,或修改拆除方案\n3)吊装作业前,仔细检查钢丝绳、卸扣、吊装位置的质量,如有必要及时更换或加固\n4)拆除作业应严格遵循先上后下、按部就班的顺序进行,严禁盲目作业。起钩前指挥应观察下方有否作业人员,确认吊装构件已与其它部件完全脱离\n5)起钩时应缓慢。钢丝绳完全吃力、吊装构件即将吊起时,应进一步确认正常后方能继续进行\n6)大、长、重构件(如桁架、横梁、支腿等)在起吊时必须采用人工软牵引,防止构件剧烈晃动,碰撞其它部件或吊机起重臂\n7)架桥机各支腿在就位后,应根据要求与桥面进行锚固,防止倾覆。主桁架、起重天车除作业及推进等工况外,其余拆除作业阶段均必须采取可靠的锚固措施8)其中一个中支腿在转移过程中,另一个中支腿必须与主桁架锁定\n9)严禁在不符合吊装条件(如风速过大、视线不良)的情况下进行起重吊装,不得赶进度在夜间或雷雨时间作业。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 0,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "technology",
- "check_item_code": "technology_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "3)场地区域内,严禁堆放杂物,确保吊装站位,及伸缩臂能安全有效进行\n4)设置警戒区域,无关人员禁止入内,且在吊装过程中,需要综合指挥,待桥面拆除完毕后架桥机各部件转运到存放地点。",
- "suggestion": "将第3条中'确保吊装站位,及伸缩臂能安全有效进行'修改为'确保吊装站位及伸缩臂作业空间畅通,不影响吊装作业'",
- "reason": "1) 原文第3条要求'严禁堆放杂物'以保障吊装站位和伸缩臂安全,但第4条在描述吊装过程时,将'待桥面拆除完毕后架桥机各部件转运到存放地点'作为吊装过程的后续动作,逻辑上存在矛盾:若吊装作业尚未完成,架桥机部件尚在桥上,而第3条却要求确保吊装站位和伸缩臂能安全有效进行,这暗示吊装作业正在进行,但第4条又将其置于桥面拆除之后,造成时间顺序冲突;2) 吊装作业应在桥面拆除前或过程中进行,而原文将架桥机部件转运到存放地点作为桥面拆除后的动作,与第3条中对吊装作业条件的前置要求不一致,导致逻辑矛盾;3) 若按此顺序执行,可能导致吊装作业无法开展或设备无法转移,影响施工流程,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "technology",
- "check_item_code": "technology_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-18": {
- "metadata": {
- "review_location_label": "第11页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安全风险数据库,做好安全风险管控,落实安全防护措施。\n图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n\n<表格></表格>\n\n5、安全生产管理制度\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24学时,每年再培训8学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32学时,每年再培训12学时。转岗或歇工6个月以上复工人员,应当重新接受本单位安全教育培训24学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT点评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防火检查制度\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 3,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "安全环保部组织验收安全检查的职责与参与部门分工不明确",
- "location": "(2)安全检查制度\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。",
- "suggestion": "明确安全环保部在验收安全检查中的具体职责,应与【参考依据】中工程管理部门的职责保持一致,即‘组织均衡生产,保证安全工程与生产任务协调一致’。建议将‘安全环保部和工程建设部组织’修改为‘工程管理部门牵头组织,安全环保部参与并监督’,以符合GB50656-2011中对工程管理部门在生产组织与安全管理协调中的核心职责定位。",
- "reason": "根据【参考依据】第6条,工程管理部门负责‘组织均衡生产,保证安全工程与生产任务协调一致’,而安全环保部属于监督与执行部门,不具备组织验收检查的主导权。当前条款将安全环保部列为验收检查的组织方,与规范中对工程管理部门的职责定位存在偏差,可能导致职责交叉或管理权责不清,影响安全管理的系统性与合规性。",
- "risk_level": "高风险",
- "review_references": "## 6、工程管理部门 (1)组织均衡生产,保证安全工程与生产任务协调一致; (2)科学合理组织生产,保证施工人员劳逸结合;\n【Top1 参考文档】\n【文件】69《建筑施工企业安全生产管理规范》(GB50656-2011).md\n【标题】5 安全生产管理组织体系\n5 安全生产管理组织体系5.0.1对于各层次的管理者,除负责各自管理范围内的生产经营管理职责外,还应负责其运行范围内的安全生产管理,确保管理范围内的安全生产管理体系正常运行和安全业绩的持续改进。安全生产责任体系由纵向与横向展开。\n\n5.0.31企业安全生产决策机构可为安全生产委员会或安全生产领导小组等。\n\n2 由于安全生产在建筑施工企业处于特殊的重要地位,安全与生产矛盾处理难度大,建筑施安全生产的第一责任人必须是企业的主要负责人,只有这样才能把安全与生产从组织领导上统一起来,使安全管理体系得以有效运行。\n\n4各管理层的其他职能部门和(或)相关岗位负责落实与其职能相对应如:安全生产教育培训、资金保障、技术管理、设施设备管理、消防管理、分包管理、劳动保护、文明卫生等相关职责和目标,可能有的职能部门会负责多项内容。\n\n例如:\n\n1、企业法定代表人(实际负责人)\n\n2、企业安全生产工作的第一责任人,对本企业安全生产负全面领导责任;\n\n(1) 贯彻执行国家和市有关安全生产的方针政策和法规、规范;(2) 掌握本企业安全生产动态,定期研究安全工作;(3) 组织制定安全工作实施计划。(4) 组织制定和完善各项安全生产规章制度及奖惩办法;(5) 建立、健全安全生产责任制,并领导、组织考核工作;(6) 建立、健全安全生产保证体系,保证安全生产投入;(7) 督促、检查安全生产工作,及时消除生产安全事故隐患;(8) 组织制定并实施生产安全事故应急救援预案;(9) 及时、如实报告生产安全事故。在事故调查组的指导下,领导、组织有关部门或人员,配合事故调查处理工作,监督防范措施的制定和落实,预防事故重复发生。\n\n2、企业主管安全生产负责人\n\n(1)组织落实安全生产责任制和安全生产管理制度,对安全生产工作负直接 \n领导责任,(2) 组织实施安全工作规划、目标及实施计划;(3) 领导、组织安全生产宣传教育工作(4) 确定安全生产考核指标。(5) 领导、组织安全生产检查;(6) 领导、组织对分包分供方的安全生产主体资格考核与审查;(7) 认真听取、采纳安全生产的合理化建议,保证安全生产保障体系的正常 \n运转;(8)发生生产安全事故,组织实施生产安全事故应急救援;\n\n3、企业技术负责人的安全生产职责\n\n(1) 贯彻执行国家和上级的安全生产方针、政策,在本企业施工安全生产中\n\n负技术领导责任;\n\n(2)审批施工组织设计和施工方案时,审查其安全技术措施,并做出决定性意见;(3) 领导开展安全技术攻关活动,并组织技术鉴定和验收;(4)新材料、新技术、新工艺使用前,组织审查其使用和实施过程中的安全性,组织编制或审定相应的操作规程;(5)参加生产安全事故的调查和分析,从技术上分析事故原因,制定整改防范措施。\n\n## 4、企业总会计师\n\n(1)组织落实本企业财务工作的安全生产责任制,认真执行安全生产奖惩规定;\n\n(2)组织编制年度财务计划的同时,编制安全生产费用投入计划,保证经费到位和合理开支;\n\n(3) 监督、检查安全生产费用的使用情况;\n\n## 5、企业其他负责人应当按照分工抓好主管范围内的安全生产工作,对主管范围内的安全生产工作负领导责任。\n\n## 6、工程管理部门\n\n(1)组织均衡生产,保证安全工程与生产任务协调一致; \n(2)科学合理组织生产,保证施工人员劳逸结合;\n\n## 7、技术管理部门\n\n(1) 贯彻执行国家和上级有关安全技术及安全操作规程规定;(2) 组织编制、审查专项安全施工方并抽查实施情况;(3) 新技术、新材料、新工艺使用前,制定相应的安全技术措施和安全操作规程;(4) 分析伤亡事故和重大已、未遂事故中技术原因,从技术上提出防范措施。\n\n## 8、机械动力管理部门\n\n(1) 负责本企业机械动力设备的安全管理,监督检查; \n(2) 对相关特种作业人员定期培训、考核; \n(3) 参与设备施工组织设计、施工方案的会审; \n(4) 分析事故涉及设备原因,提出防范措施。\n\n## 9、劳务管理\n\n(1) 审查劳务分包人员资格;\n\n(2)从用工方面分析事故原因,提出防范措施\n\n## 10、物资管理部门\n\n(1)确保购置(租赁)的各类安全物资、劳动保护用品符合国家或有关行业的技术标准、规范的要求;\n\n## 11、人力资源部门\n\n(1)审查安全管理人员资格,足额配备安全管理人员,开发、培养安全管理力量;\n\n## 12、财务管理部门安全生产职责\n\n(1)及时提取安全技术措施经费、劳动保护经费及其它安全生产所需经费,保证专款专用;\n\n(2) 协助安全主管部门办理安全奖、罚款手续。\n\n## 13、保卫消防部门\n\n(1) 贯彻执行有关消防保卫的法规、规定;\n\n(2) 参与火灾事故的调查,提出处理意见;\n\n## 14、行政卫生部门安全生产职责\n\n(1) 监测有毒有害作业场所的尘毒浓度,做好职业病预防工作;\n\n## 15、工会组织\n\n(1) 依法组织职工参加本企业安全生产工作的民主管理和民主监督;\n\n(2) 对侵害职工在安全生产方面的合法权益的问题进行调查,代表职工与企业进行交涉;\n\n(3) 参加对生产安全事故调查处理,向有关部门提出处理意见。\n",
- "reference_source": "69《建筑施工企业安全生产管理规范》(GB50656-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "专职安全员未明确执行跟班检查、日常例检及纠正违章行为的记录要求",
- "location": "(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。",
- "suggestion": "明确专职安全员每日深入现场进行例检时需作好检查记录,对违规行为及时纠正或处罚,并将记录纳入安全检查制度的执行台账中。",
- "reason": "根据【参考依据】4.5.3条,施工安全技术措施包括‘监控检查验收’,且要求对安全技术措施落实情况进行监督。待审查内容中虽提及‘专职安全员应每天深入现场进行例检,纠正或处罚违章行为’,但未明确要求‘作好检查记录’,与《建筑机械使用安全技术规程》中对安全检查、监督和记录的要求不一致,属于对非参数性安全要求的遗漏。",
- "risk_level": "中风险",
- "review_references": "施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。 劳动力计划包括:专职安全管理人员、特种作业人员等。\n【Top1 参考文档】\n【文件】3《建筑机械使用安全技术规程》(JGJ33-2012).md\n【标题】4 建筑起重机械\n4 建筑起重机械## 4.1 一般规定\n\n### 4.1.2 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第七条制定的。\n\n### 4.1.3 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第八条制定的。\n\n### 4.1.4 《建筑起重机械安全监督管理规定》(第166号建设部令)规定:\n\n安装单位应当按照安全技术标准及建筑起重机械性能要求,编制建筑起重机械安装、拆卸工程专项施工方案,并由本单位技术负责人签字;专项施工方案,安装、拆卸人员名单,安装、拆卸时间等材料报施工总承包单位和监理单位审核后,告知工程所在地县级以上地方人民政府建设主管部门。\n\n建筑起重机械安装完毕后,安装单位应当按照安全技术标准及安装使用说明书的有关要求对建筑起重机械进行自检、调试和试运转。自检合格的,应当出具自检合格证明,并向使用单位进行安全使用说明。使用单位应当组织出租、安装、监理等有关单位进行验收,或者委托具有相应资质的检验检测机构进行验收。建筑起重机械经验收合格后方可投人使用,未经验收或者验收不合格的不得使用。\n\n### 4.1.8 基础承载能力不满足要求,容易引起起重机的倾翻。\n\n### 4.1.11 本条规定的安全装置是起重机必备的,否则不能使用。利用限位装置或限制器代替抽动停车等动作,将造成失误而发生事故。建筑起重机械安全装置见表4-1。\n\n表4-1建筑起重机械安全装置一览表 \n\n\n\n\n\n注: $\\bullet$ 表示该起重机械有此安全装置;$\\bigcirc$ 表示该起重机械无此安全装置。\n\n### 4.1.12 本条规定了信号司索工的职责,要求操作人员要听从指挥,但对错误指挥要拒绝执行,这对防止失误十分必要。\n\n### 4.1.14 风力等级和风速对照见表4-2。\n\n表4-2风力等级和风速对照表 \n\n\n\n\n\n本规程风速指施工现场风速,包括地面和高耸设备高处风速。\n\n恶劣天气能使露天作业的起重机部件受损、受潮,所以需要经过试吊无误后再使用。\n\n### 4.1.18 起重机的额定起重量是以吊钩与重物在垂直情况下核定的。斜吊、斜拉其作用力在起重机的一侧,破坏了起重机的稳定性,会造成超载及钢丝绳出槽,还会使起重臂因侧向力而扭弯,甚至造成倾翻事故。对于地下埋设或凝固在地面上的重物,除本身重量外,还有不可估计的附着力(埋设深度和凝固强度决定附着力的大小),将造成严重超载而酿成事故。\n\n### 4.1.19 吊索水平夹角越小,吊索受拉力就越大,同时,吊索对物体的水平压力也越大。因此,吊索水平夹角不得小于 $3 0 ^ { \\circ }$ ,因为 $3 0 ^ { \\circ }$ 时吊索所受拉力已增加一倍。\n\n### 4.1.20 重物下降时突然制动,其冲击载荷将使起升机构损伤,严重时会破坏起重机稳定性而倾翻。如回转未停稳即反转,所吊重物因惯性而大幅度摆动,也会使起重臂扭弯或起重机倾翻。\n\n### 4.1.22 使用起升制动器,可使起吊重物停留在空中,如遇操作人员疏忽或制动器失灵时,将使重物失控而快速下降,造成事故。因此,当吊装因故中断时,悬空重物需要设法降下。\n\n### 4.1.28 转动的卷筒缠绕钢丝绳时,如用手拉或脚踩钢丝绳,容易将手或脚带入卷筒内造成伤亡事故。\n\n### 4.1.29 建设部2007年第659号公告《建设部关于发布建设事业“十一五”推广应用和限用禁止使用技术(第一批)的公告》的规定,超过一定使用年限的塔式起重机: $6 3 0 \\mathrm { k N \\cdot \\ m }$ (不含$6 3 0 \\mathrm { k N \\cdot m } )$ 、出厂年限超过10年(不含10年)的塔式起重机;$6 3 0 \\mathrm { k N } \\cdot \\mathrm { m } { \\sim } 1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ (不含 $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m } )$ 、出厂年限超过15年(不含15年)的塔式起重机; $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ 以上、出厂年限超过20年(不含20年)的塔式起重机。由于使用年限过久,存在设备结构疲劳、锈蚀、变形等安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。超过一定使用年限的施工升降机:出厂年限超过8年(不含8年)的SC型施工升降机,传动系统磨损严重,钢结构疲劳、变形、腐蚀等较严重,存在安全隐忠,出厂年限超过5年(T合5个)的SS型施宝升降机,使用时间过长造成结构件疲劳、变形、腐蚀等较严重,运动件磨损严重,存在安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。\n\n## 4.2 履带式起重机\n### 4.2.1 履带式起重机自重大,对地面承载相对高,作业时重心变化大,对停放地面要有较高要求,以保证安全。 \n### 4.2.5 俯仰变幅的起重臂,其最大仰角要有一定限度,以防止起重臂后倾造成重大事故。 \n### 4.2.6 起重机的变幅机构一般采用蜗杆减速器和自动常闭带式制动器,这种制动器仅能起辅助作用,如果操作中在起重臂未停稳前即换挡,由于起重臂下降的惯性超过了辅助制动器的摩擦力,将造成起重臂失控摔坏的事故。 \n### 4.2.7 起吊载荷接近满负荷时,其安全系数相应降低,操作中稍有疏忽,就会发生超载,需要慢速操作,以保证安全。 \n### 4.2.8 起重吊装作业不能有丝毫差错,要求在起吊重物时先稍离地面试吊无误后再起吊,以便及时发现和消除不安全因素,保证吊装作业的安全可靠。起吊过程中,操作人员要脚踩在制动踏板上是为了在发生险情时,可及时控制。 \n### 4.2.9 双机抬吊是特殊的起重吊装作业,要慎重对待,关键是要做到载荷的合理分配和双机动作的同步。因此,需要统一指挥。降低起重量和保持吊钩滑轮组的垂直状态,这些要求都是防止超载。 \n### 4.2.10 起重机如在不平的地面上急转弯,容易造成倾翻事故。\n### 4.2.11 起重机带载行走时,由于机身晃动,起重臂随之俯仰,幅度也不断变化,所吊重物因惯性而摆动,形成“斜吊”,因此,需要降低额定起重量,以防止超载。行走时重物要在起重机正前方,便于操作人员观察和控制。履带式行走机构不要作长距离行走,带载行走更不安全。 \n### 4.2.12 起重机上下坡时,起重机的重心和起重臂的幅度随坡度而变化,因此,不能再带载行驶。下坡空挡滑行,将会失去控制而造成事故。 \n### 4.2.13 作业后,起重臂要转到顺风方向,这是为了减少迎风\n\n面,降低起重机受到的风压。\n\n### 4.2.14 当起重机转移时,需要按照本规定采取的各项保证安全的措施执行。\n\n## 4.3 汽车、轮胎式起重机\n\n### 4.3.4 轮胎式起重机完全依靠支腿来保持它的稳定性和机身的水平状态。因此,作业前需要按本条要求将支腿垫实和调整好。\n\n### 4.3.5 如果在载荷情况下扳动支腿操纵阀,将使支腿失去作用而造成起重机倾翻事故。\n\n### 4.3.6 起重臂的工作幅度是由起重臂长度和仰角决定的,不同幅度有不同的额定起重量,作业时要根据重物的重量和提升高度选择适当的幅度。\n\n### 4.3.7 起重臂分顺序伸缩、同步伸缩两种。\n\n起重机由双作用液压缸通过控制阀、选择阀和分配阀等液压控制装置使起重臂按规定程序伸出或缩回,以保证起重臂的结构强度符合额定起重量的需求。如果伸臂中出现前、后节长度不等时或其他原因制动器发生停顿时,说明液压系统存在故障,需要排除后才能使用。\n\n### 4.3.8 各种长度的起重臂都有规定的仰角,如果仰角小于规定,对于桁架式起重臂将造成水平压力增大和变幅钢丝绳拉力增大;对于箱形伸缩式起重臂,由于其自重大,基本上属于悬臂结构,将增加起重臂的挠度,影响起重臂的安全性能。\n\n### 4.3.9 汽车式起重机作业时,其液压系统通过取力器以获得内燃机的动力。其操纵杆一般设在汽车驾驶室内,因此,作业时汽车驾驶室要锁闭,以防误动操纵杆。\n\n### 4.3.11 发现起重机不稳或倾斜等现象时,迅速放下重物能使起重机恢复稳定,否则将造成倾翻事故。采用紧急制动,会造成起重机倾翻事故。\n\n### 4.3.13 起重机在满载或接近满载时,稳定性的安全系数相应降低,如果同时进行两种动作,容易造成超载而发生事故。\n\n### 4.3.14 起重机带载回转时,重物因惯性造成偏离而大幅度晃动,使起重机处于不稳定状态,容易发生事故。\n\n### 4.3.16 本条叙述了起重机作业后要做的各项工作,如挂牢吊钩、螺母固定撑杆、销式制动器插人销孔、脱开取力器等要求,都是为在再一次行驶时起重机的装置不移动、不旋转等稳定的安全措施。\n\n### 4.3.17 内燃机水温在 $8 0 ^ { \\circ } \\mathrm { C } \\sim 9 0 ^ { \\circ } \\mathrm { C }$ 时,润滑性能较好,温度过低使润滑油黏度增大,流动性能变差,如高速运转,将增加机件磨损。\n\n## 4.4 塔式起重机\n\n### 4.4.14 塔式起重机顶升属高处作业,安装过程使起重机回转台及以上结构与塔身处于分离状态,需要有严格的作业要求。本条所列各项均属于保证安全顶升的必要措施。\n\n### 4.4.15 本条规定塔式起重机升降作业时安全技术要求。如果因连接螺栓拆卸困难而采用旋转起重臂来松动螺栓的错误做法,将破坏起重臂平衡而造成倾翻事故。\n\n### 4.4.16 塔式起重机接高到一定高度需要与建筑物附着锚固,以保持其稳定性。本条所列各项均属于说明书规定的一般性要求,目的是保证锚固装置的牢固可靠,以保持接高后起重机的稳定性。\n\n### 4.4.17 内爬升起重机是在建筑物内部爬升,作业范围小,要求高。本条所列各项均属于保证安全爬升的必要措施。其中第5款规定了起重机的最小固定间隔,尽可能减少爬升次数,第6款是为了保证支承起重机的楼层有足够的承载能力。\n\n### 4.4.21 塔式起重机与大地之间是一个“C”形导体,当大量电HAV人人 y 1员站在道轨或地面上,接触吊钩时正好使“C”形导体形成一个“O”形导体,人体就会被电击或烧伤。这里所采取的绝缘措施\n\n是为了保护人身安全。\n\n### 4.4.29 行程限位开关是防止超越有效行程的安全保护装置,如当作控制开关使用,将失去安全保护作用而易发生事故。\n\n### 4.4.30 动臂式起重机的变幅机构要求动作平衡,变幅时起重量随幅度变化而增减。因此,当载荷接近额定起重量时,不能再向下变幅,以防超载造成起重机倾倒。\n\n### 4.4.36 遇有风暴时,使起重臂能随风转动,以减少起重机迎风面积的风压,锁紧夹轨器是为了增加稳定性,防止造成倾翻。\n\n### 4.4.43 主要为防止大风骤起时,塔身受风压面加大而发生事故。\n\n## 4.5 枪杆式起重机\n\n### 4.5.2 枪杆式起重机现场大量使用,本条针对专项方案提出具体要求,并强调专人对专项方案实施情况进行现场监督和按规定进行监测。\n\n### 4.5.3 本条参考住房和城乡建设部《危险性较大的分部分项工程安全管理办法》中第七条的规定。\n编制依据包括:相关法律、法规、规范性文件、标准、规范及图纸(国标图集)、施工组织设计等。\n\n施工工艺流程包括:钢丝绳走向及固定方法、卷扬机的固定位置和方法、枪杆式起重机底座的安装及固定等。\n\n施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。\n\n劳动力计划包括:专职安全管理人员、特种作业人员等。\n### 4.5.7 枪杆式起重机缆风绳与地面的夹角关系到起重机的稳定性能。夹角小,缆风绳受力小,起重机稳定性好,但要增加缆风绳长度和占地面积。因此,缆风绳的水平夹角一般保持在 $3 0 ^ { \\circ } \\sim$ $4 5 ^ { \\circ }$ 之间。因膨胀螺栓在使用中会松动,故严禁使用。所有的定滑轮用闭口滑轮,为确保安全。\n### 4.5.11 枪杆式起重机结构简单,起重能力大,完全是依靠各根缆风绳均匀地拉牢主杆使之保持垂直,只要当一个地锚稍有松动,就能造成主杆倾斜而发生重大事故,因此,需要经常检查地锚的牢固程度。\n",
- "reference_source": "3《建筑机械使用安全技术规程》(JGJ33-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "施工用电定期检查制度中未明确要求对电气设备运行状态及安全防护进行重点排查",
- "location": "(2)安全检查制度\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。",
- "suggestion": "在‘定期检查’条款中明确增加‘重点排查电气设备运行状态及安全防护措施’的具体要求,并细化检查内容,如电缆绝缘性能、接地装置、漏电保护器动作情况、配电箱防护状态等,确保与《施工现场临时用电安全技术规范》(JGJ46)中关于电气设备安全检查的要求保持一致。",
- "reason": "根据【参考依据】4.4.1规定,施工现场临时用电应符合《施工现场临时用电安全技术规范》(JGJ46)的有关规定。而待审查内容中的‘定期检查’虽提及‘施工用电’,但未具体说明检查内容是否涵盖电气设备运行状态及安全防护措施,与JGJ46中关于电气设备定期检查、漏电保护、接地、电缆防护等强制性要求存在脱节,可能导致安全检查流于形式,无法有效识别电气安全隐患。",
- "risk_level": "高风险",
- "review_references": "## 4.4 施工临时用电 ### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n【Top1 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】4 施工准备\n4 施工准备## 4.1 驻地和场站建设\n\n### 4.1.1 施工现场驻地和场站应选在地质良好的地段,应避开易发生滑坡、塌方、泥石流、崩塌、落石、洪水、雪崩等危险区域,宜避让取土、弃土场地。\n\n### 4.1.2 施工现场生产区、生活区、办公区应分开设置,距离集中爆破区应不小于 $5 0 0 \\mathrm { m }$ 。\n\n### 4.1.3 施工现场临时用房、临时设施、生产区、生活区、办公区的防火间距应符合现行《建设工程施工现场消防安全技术规范》(GB 50720)的相关要求。\n\n### 4.1.4 办公区、生活区宜避开存在噪声、粉尘、烟雾或对人体有害物质的区域,无法避开时应设在噪声、粉尘、烟雾或对人体有害物质所在区域最大频率风向的上风侧。\n\n### 4.1.5 施工现场原材料、半成品、成品、预制构件等堆放及机械、设备停放应整齐、稳固、规范、标识清楚,且不得侵占场内道路或影响安全。\n\n### 4.1.6 材料加工场应符合下列规定:\n\n1宜设围墙或围栏防护实行封闭管理,并宜设排水设施。\n\n2场内应设置明显的安全警示标志及相关工种的操作规程。\n\n3加工棚宜采用轻钢结构,并应采取防雨雪、防风等措施。\n\n### 4.1.7 预制场、拌和场应符合下列规定:\n\n1应合理分区、硬化场地,并应设置排水设施。\n\n2拌和及起重设备基础的地基承载力应满足要求,材料及成品存放区地基应稳定。\n\n3料仓墙体强度和稳定性应满足要求,料仓墙体外围应设警戒区,距离宜不小于墙高2倍。\n\n4拌和及起重设备应设置防倾覆和防雷设施。\n\n### 4.1.8 施工现场变电站建设应符合现行《施工现场临时用电安全技术规范》 (JGJ46)\n\n的有关规定。\n\n### 4.1.9 储油罐的设置应符合下列规定:\n\n1储油罐与在建工程的防火间距应不小于 $1 5 \\mathrm { m }$ ,并应远离明火作业区、人员密集区、建(构)筑物集中区。\n\n2储油罐顶部应设置遮阳棚。\n\n3应按要求配备泡沫灭火器、干粉灭火器、沙土袋、沙土箱等灭火消防器材及沙土等灭火消防材料。\n\n4应设防静电、防雷接地装置及加油车接地装置,接地电阻不得大于100。\n\n5应悬挂醒目的禁止烟火等警示标识。\n\n## 4.2 施工便道\n\n### 4.2.1 施工便道应根据运输荷载、使用功能、环境条件进行设计和施工,不得破坏原有水系、降低原有泄洪能力,并应符合下列规定:\n\n1双车道施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ 。\n\n2单车道施工便道宽度不宜小于4.5m,并宜设置错车道,错车道应设在视野良好地段,间距不宜大于 $3 0 0 \\mathrm { m }$ 。设置错车道路段的施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ ,有效长度不宜小于 $2 0 \\mathrm { m }$ 。\n\n3路拱坡度应根据路面类型和现场自然条件确定,并应大于 $1 , 5 \\%$ 。\n\n4施工便道应根据需要设置排水沟和圆管涵等排水设施。\n\n5施工便道在急弯、陡坡、连续转弯等危险路段应进行硬化,设置警示标志,并根据需要设置防护设施。\n\n6施工便道中易发生落石、滑坡等危险路段应根据需要设置防护设施。\n\n### 4.2.2 施工便道与既有道路平面交叉处应设置道口警示标志,有高度限制的应设置限高架。\n\n### 4.2.3 施工便桥应根据使用要求和水文条件进行设计,并应设置限宽、限速、限载标志,建成后应验收。\n\n## 4.3 临时码头和栈桥\n\n### 4.3.1 临时码头宜选择在水域开阔、岸坡稳定、波浪和流速较小、水深适宜、地质条件较好、陆路交通便利的岸段。\n\n### 4.3.2 临时码头宜设置在桥梁、隧道、大坝、架空高压线、水下管线、取水泵房、\n\n危险品库、水产养殖场等区域的下游方向,与其他构筑物的安全距离应符合现行《海港总平面设计规范》(JTJ211)和《河港工程总体设计规范》(JTJ212)的有关规定。\n\n### 4.3.3 临时码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应设置安全警示标志,配备相应的安全防护设施。\n\n### 4.3.4 栈桥和栈桥码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应符合下列规定:\n\n1通航水域搭设的栈桥和栈桥码头应取得海事和航道管理部门批准,并应按要求设置航行警示标志。\n\n2栈桥和栈桥码头的设计应考虑自重荷载、车辆荷载、波浪力、风力、水流力、船舶系靠力及漂浮物、腐蚀等,并应按施工期可能出现的最不利荷载组合进行验算。\n\n3栈桥和栈桥码头应设置行车限速、防船舶碰撞、防人员触电及落水等安全警示标志和救生器材。\n\n4栈桥上车辆和人员行走区域的面板应满铺,并应与下部结构连接牢固。悬臂板应采取有效的加固措施。\n\n5栈桥两侧和栈桥码头四周应设置高度不低于 $1 , 2 \\mathrm { m }$ 的防护栏杆。防护栏杆上杆任何部位应能承受1000N的外力。\n\n6栈桥行车道两侧宜设置护轮坎。\n\n7长距离栈桥应设置会车、掉头区域,间隔不宜大于 $5 0 0 \\mathrm { m }$ 。\n\n8通过栈桥的电缆应绝缘良好,并应固定在栈桥的一侧。\n\n9发生栈桥面或栈桥码头面被洪水、潮汛淹没,或栈桥被船舶撞击,或桩柱受海水严重腐蚀等情况,应重新检修、复核原构筑物。\n\n10栈桥应设置满足施工安全要求的照明设施。\n\n11 栈桥和栈桥码头应设专人管理,非施工车辆及人员不得进入,非施工船舶不得靠泊。\n\n## 4.4 施工临时用电\n\n### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n\n### 4.4.2 施工用电设备数量在5台及以上,或用电设备容量在 $5 0 \\mathrm { k W }$ 及以上时,应编制用电组织设计。\n\n### 4.4.3 施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压电力系统,必须符合下列规定:\n\n1采用三级配电系统。 \n2采 用TN-S 接零保护系统。 \n3采用二级保护系统。\n\n### 4.4.4 电线架设应符合下列规定:\n\n1架空线路宜避开施工作业面、作业棚、生活设施与器材堆放场地。\n\n2架空线路边线无法避开在建工程(含脚手架)时,其安全距离应符合表4.4.4-1的规定。\n\n表4.4.4-1外电架空线路边线外侧边缘与在建工程(含脚手架)间安全距离\n3施工现场的机动车道与外电架空线路交叉时,架空线路的最低点与路面的垂直安全距离应符合表4.4.4-2的规定。\n\n表4.4.4-2施工现场的机动车道与外电架空线路交叉时的垂直安全距离\n\n\n\n\n\n### 4.4.5 铺设电缆线应符合下列规定:\n\n1施工现场开挖沟槽边缘与埋设电缆沟槽边缘的安全距离不得小于 $0 , 5 \\mathrm { m }$ 。\n\n2地下埋设电缆应设防护管。\n\n3架空铺设电缆应沿墙或电杆做绝缘固定。\n\n4通往水上的岸电应用绝缘物架设,电缆线应留有余量,作业过程中不得挤压或拉拽电缆线。\n\n### 4.4.6 水上或潮湿地带的电缆线必须绝缘良好并具有防水功能,电缆线接头必须经防水处理。\n\n### 4.4.7 每台用电设备必须独立设置开关箱;开关箱必须装设隔离开关及短路、过载、漏电保护器,严禁设置分路开关;配电箱、开关箱的电源进线端严禁用插头和插座做活动连接。\n\n### 4.4.8 配电箱及开关箱设置应符合下列规定:\n\n1总配电箱应设在靠近电源的区域;分配电箱应设在用电设备或负荷相对集中的区域;开关箱与分配电箱的距离不得大于 $3 0 \\mathrm { m }$ ,开关箱应靠近用电设备,与其控制的固定式用电设备水平距离不宜大于 $3 \\mathrm { m }$ 。\n\n2动力配电箱与照明配电箱宜分别设置。合并设置的配电箱,动力和照明应分路\n\n设置。\n\n3配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在存在瓦斯、烟气、潮气及其他有害介质的场所。\n\n4配电箱、开关箱应选用专业厂家定型、合格产品。\n\n5总配电箱中漏电保护器的额定漏电动作电流应大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间应大于0.1s,额定漏电动作电流与额定漏电动作时间的乘积不得大于 $3 0 \\mathrm { m A \\cdot s }$ 。开关箱中漏电保护器的额定漏电动作电流不得大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间不应大于0.1s。潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,额定漏电动作电流不得大于 $1 5 \\mathrm { m A }$ ,额定漏电动作时间不得大于0.1s。\n\n6配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为1 $. 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上,其中心点与地面的垂直距离应为 $0 . 8 \\sim 1 . 6 \\mathrm { m }$ 。\n\n### 4.4.9 遇有临时停电、停工、检修或移动电气设备时,应关闭电源。\n\n## 4.5 生产生活用水\n\n### 4.5.1 生活饮用水水质应符合现行《生活饮用水卫生标准》(GB 5749)的有关规定。\n\n### 4.5.2 施工现场搭设的水塔、水箱等储水设施应稳固、牢靠,并应采取防倾覆措施。\n\n## 4.6 施工机械设备\n\n### 4.6.1 应制定施工机械设备安全技术操作规程,建立设备安全技术档案。\n\n### 4.6.2 施工机械设备进场前应查验机械设备证件、性能、状况;进场后,应向操作人员进行安全技术交底。\n\n### 4.6.3 特种设备现场安装、拆除应按相关规定具有相应作业资质。\n\n### 4.6.4 龙门吊、架桥机等轨道行走类设备应设置夹轨器和轨道限位器。轨道的基础承载力、宽度、平整度、坡度、轨距、曲线半径等应满足说明书和设计要求。\n\n### 4.6.5 机械设备集中停放的场所应设置消防通道,并应配备消防器材。\n\n### 4.6.6 施工现场专用机动车辆驾驶人员应按相关规定经过专门培训,并应取得相应资格证书。\n### 4.6.7 施工现场运输车辆应状态良好,车身应设置反光警示标识。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "安全环保部组织验收安全检查的职责与部门职责分工不符",
- "location": "安全环保部 组织安全生产检查、隐患排查治理及安全技术交底监督工作 负责组织验收安全检查、定期检查及专项检查,需联合工程建设部、施工员和操作班组共同签字确认",
- "suggestion": "将安全环保部组织验收安全检查的职责调整为由工程管理部门或项目部统一组织,安全环保部负责监督与检查,确保职责分工符合《建筑施工企业安全生产管理规范》(GB50656-2011)中对工程管理部门的职责要求。",
- "reason": "根据【参考依据】第6条‘工程管理部门’职责明确指出:‘(1)组织均衡生产,保证安全工程与生产任务协调一致;(2)科学合理组织生产,保证施工人员劳逸结合。’该条文表明工程管理部门在组织生产与安全协调方面具有核心职责,而安全检查、隐患排查及验收工作属于生产组织与安全管理的交叉职能,应由工程管理部门牵头组织,安全环保部作为监督部门参与。当前条款将验收安全检查的组织职责赋予安全环保部,与规范中对工程管理部门的职责定位不一致,存在职责错位风险。",
- "risk_level": "高风险",
- "review_references": "## 6、工程管理部门 (1)组织均衡生产,保证安全工程与生产任务协调一致; (2)科学合理组织生产,保证施工人员劳逸结合;\n【Top1 参考文档】\n【文件】69《建筑施工企业安全生产管理规范》(GB50656-2011).md\n【标题】5 安全生产管理组织体系\n5 安全生产管理组织体系5.0.1对于各层次的管理者,除负责各自管理范围内的生产经营管理职责外,还应负责其运行范围内的安全生产管理,确保管理范围内的安全生产管理体系正常运行和安全业绩的持续改进。安全生产责任体系由纵向与横向展开。\n\n5.0.31企业安全生产决策机构可为安全生产委员会或安全生产领导小组等。\n\n2 由于安全生产在建筑施工企业处于特殊的重要地位,安全与生产矛盾处理难度大,建筑施安全生产的第一责任人必须是企业的主要负责人,只有这样才能把安全与生产从组织领导上统一起来,使安全管理体系得以有效运行。\n\n4各管理层的其他职能部门和(或)相关岗位负责落实与其职能相对应如:安全生产教育培训、资金保障、技术管理、设施设备管理、消防管理、分包管理、劳动保护、文明卫生等相关职责和目标,可能有的职能部门会负责多项内容。\n\n例如:\n\n1、企业法定代表人(实际负责人)\n\n2、企业安全生产工作的第一责任人,对本企业安全生产负全面领导责任;\n\n(1) 贯彻执行国家和市有关安全生产的方针政策和法规、规范;(2) 掌握本企业安全生产动态,定期研究安全工作;(3) 组织制定安全工作实施计划。(4) 组织制定和完善各项安全生产规章制度及奖惩办法;(5) 建立、健全安全生产责任制,并领导、组织考核工作;(6) 建立、健全安全生产保证体系,保证安全生产投入;(7) 督促、检查安全生产工作,及时消除生产安全事故隐患;(8) 组织制定并实施生产安全事故应急救援预案;(9) 及时、如实报告生产安全事故。在事故调查组的指导下,领导、组织有关部门或人员,配合事故调查处理工作,监督防范措施的制定和落实,预防事故重复发生。\n\n2、企业主管安全生产负责人\n\n(1)组织落实安全生产责任制和安全生产管理制度,对安全生产工作负直接 \n领导责任,(2) 组织实施安全工作规划、目标及实施计划;(3) 领导、组织安全生产宣传教育工作(4) 确定安全生产考核指标。(5) 领导、组织安全生产检查;(6) 领导、组织对分包分供方的安全生产主体资格考核与审查;(7) 认真听取、采纳安全生产的合理化建议,保证安全生产保障体系的正常 \n运转;(8)发生生产安全事故,组织实施生产安全事故应急救援;\n\n3、企业技术负责人的安全生产职责\n\n(1) 贯彻执行国家和上级的安全生产方针、政策,在本企业施工安全生产中\n\n负技术领导责任;\n\n(2)审批施工组织设计和施工方案时,审查其安全技术措施,并做出决定性意见;(3) 领导开展安全技术攻关活动,并组织技术鉴定和验收;(4)新材料、新技术、新工艺使用前,组织审查其使用和实施过程中的安全性,组织编制或审定相应的操作规程;(5)参加生产安全事故的调查和分析,从技术上分析事故原因,制定整改防范措施。\n\n## 4、企业总会计师\n\n(1)组织落实本企业财务工作的安全生产责任制,认真执行安全生产奖惩规定;\n\n(2)组织编制年度财务计划的同时,编制安全生产费用投入计划,保证经费到位和合理开支;\n\n(3) 监督、检查安全生产费用的使用情况;\n\n## 5、企业其他负责人应当按照分工抓好主管范围内的安全生产工作,对主管范围内的安全生产工作负领导责任。\n\n## 6、工程管理部门\n\n(1)组织均衡生产,保证安全工程与生产任务协调一致; \n(2)科学合理组织生产,保证施工人员劳逸结合;\n\n## 7、技术管理部门\n\n(1) 贯彻执行国家和上级有关安全技术及安全操作规程规定;(2) 组织编制、审查专项安全施工方并抽查实施情况;(3) 新技术、新材料、新工艺使用前,制定相应的安全技术措施和安全操作规程;(4) 分析伤亡事故和重大已、未遂事故中技术原因,从技术上提出防范措施。\n\n## 8、机械动力管理部门\n\n(1) 负责本企业机械动力设备的安全管理,监督检查; \n(2) 对相关特种作业人员定期培训、考核; \n(3) 参与设备施工组织设计、施工方案的会审; \n(4) 分析事故涉及设备原因,提出防范措施。\n\n## 9、劳务管理\n\n(1) 审查劳务分包人员资格;\n\n(2)从用工方面分析事故原因,提出防范措施\n\n## 10、物资管理部门\n\n(1)确保购置(租赁)的各类安全物资、劳动保护用品符合国家或有关行业的技术标准、规范的要求;\n\n## 11、人力资源部门\n\n(1)审查安全管理人员资格,足额配备安全管理人员,开发、培养安全管理力量;\n\n## 12、财务管理部门安全生产职责\n\n(1)及时提取安全技术措施经费、劳动保护经费及其它安全生产所需经费,保证专款专用;\n\n(2) 协助安全主管部门办理安全奖、罚款手续。\n\n## 13、保卫消防部门\n\n(1) 贯彻执行有关消防保卫的法规、规定;\n\n(2) 参与火灾事故的调查,提出处理意见;\n\n## 14、行政卫生部门安全生产职责\n\n(1) 监测有毒有害作业场所的尘毒浓度,做好职业病预防工作;\n\n## 15、工会组织\n\n(1) 依法组织职工参加本企业安全生产工作的民主管理和民主监督;\n\n(2) 对侵害职工在安全生产方面的合法权益的问题进行调查,代表职工与企业进行交涉;\n\n(3) 参加对生产安全事故调查处理,向有关部门提出处理意见。\n",
- "reference_source": "69《建筑施工企业安全生产管理规范》(GB50656-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "专职安全员职责描述与规范要求不一致",
- "location": "一) 组织保证措施\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。",
- "suggestion": "将‘专职安全员要对安全技术措施的执行情况进行监督检查’修改为‘专职安全员应每日深入现场进行例检,对安全技术措施落实情况、跟班检查、纠正违章行为及监督执行情况进行检查,并作好检查记录’,以符合《建筑机械使用安全技术规程》(JGJ33-2012)中关于专职安全管理人员职责的明确要求。",
- "reason": "根据【参考依据】中4.5.3条明确指出:‘劳动力计划包括:专职安全管理人员、特种作业人员等’,且在施工安全技术措施中强调‘监控检查验收’等环节。同时,4.1.4条要求安装、拆卸及使用单位应组织验收,并由专职安全管理人员参与监督。待审查内容中虽提及专职安全员监督安全技术措施落实,但未明确其‘每日深入现场例检’‘纠正违章行为’‘跟班检查’等具体职责,与规程中对专职安全管理人员在施工过程中的动态监管职责要求存在差距,属于对职责描述不完整,影响专业表达和安全责任落实。",
- "risk_level": "中风险",
- "review_references": "施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。 劳动力计划包括:专职安全管理人员、特种作业人员等。\n【Top1 参考文档】\n【文件】3《建筑机械使用安全技术规程》(JGJ33-2012).md\n【标题】4 建筑起重机械\n4 建筑起重机械## 4.1 一般规定\n\n### 4.1.2 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第七条制定的。\n\n### 4.1.3 本条是按照《建筑起重机械安全监督管理规定》(第166号建设部令)中第八条制定的。\n\n### 4.1.4 《建筑起重机械安全监督管理规定》(第166号建设部令)规定:\n\n安装单位应当按照安全技术标准及建筑起重机械性能要求,编制建筑起重机械安装、拆卸工程专项施工方案,并由本单位技术负责人签字;专项施工方案,安装、拆卸人员名单,安装、拆卸时间等材料报施工总承包单位和监理单位审核后,告知工程所在地县级以上地方人民政府建设主管部门。\n\n建筑起重机械安装完毕后,安装单位应当按照安全技术标准及安装使用说明书的有关要求对建筑起重机械进行自检、调试和试运转。自检合格的,应当出具自检合格证明,并向使用单位进行安全使用说明。使用单位应当组织出租、安装、监理等有关单位进行验收,或者委托具有相应资质的检验检测机构进行验收。建筑起重机械经验收合格后方可投人使用,未经验收或者验收不合格的不得使用。\n\n### 4.1.8 基础承载能力不满足要求,容易引起起重机的倾翻。\n\n### 4.1.11 本条规定的安全装置是起重机必备的,否则不能使用。利用限位装置或限制器代替抽动停车等动作,将造成失误而发生事故。建筑起重机械安全装置见表4-1。\n\n表4-1建筑起重机械安全装置一览表 \n\n\n\n\n\n注: $\\bullet$ 表示该起重机械有此安全装置;$\\bigcirc$ 表示该起重机械无此安全装置。\n\n### 4.1.12 本条规定了信号司索工的职责,要求操作人员要听从指挥,但对错误指挥要拒绝执行,这对防止失误十分必要。\n\n### 4.1.14 风力等级和风速对照见表4-2。\n\n表4-2风力等级和风速对照表 \n\n\n\n\n\n本规程风速指施工现场风速,包括地面和高耸设备高处风速。\n\n恶劣天气能使露天作业的起重机部件受损、受潮,所以需要经过试吊无误后再使用。\n\n### 4.1.18 起重机的额定起重量是以吊钩与重物在垂直情况下核定的。斜吊、斜拉其作用力在起重机的一侧,破坏了起重机的稳定性,会造成超载及钢丝绳出槽,还会使起重臂因侧向力而扭弯,甚至造成倾翻事故。对于地下埋设或凝固在地面上的重物,除本身重量外,还有不可估计的附着力(埋设深度和凝固强度决定附着力的大小),将造成严重超载而酿成事故。\n\n### 4.1.19 吊索水平夹角越小,吊索受拉力就越大,同时,吊索对物体的水平压力也越大。因此,吊索水平夹角不得小于 $3 0 ^ { \\circ }$ ,因为 $3 0 ^ { \\circ }$ 时吊索所受拉力已增加一倍。\n\n### 4.1.20 重物下降时突然制动,其冲击载荷将使起升机构损伤,严重时会破坏起重机稳定性而倾翻。如回转未停稳即反转,所吊重物因惯性而大幅度摆动,也会使起重臂扭弯或起重机倾翻。\n\n### 4.1.22 使用起升制动器,可使起吊重物停留在空中,如遇操作人员疏忽或制动器失灵时,将使重物失控而快速下降,造成事故。因此,当吊装因故中断时,悬空重物需要设法降下。\n\n### 4.1.28 转动的卷筒缠绕钢丝绳时,如用手拉或脚踩钢丝绳,容易将手或脚带入卷筒内造成伤亡事故。\n\n### 4.1.29 建设部2007年第659号公告《建设部关于发布建设事业“十一五”推广应用和限用禁止使用技术(第一批)的公告》的规定,超过一定使用年限的塔式起重机: $6 3 0 \\mathrm { k N \\cdot \\ m }$ (不含$6 3 0 \\mathrm { k N \\cdot m } )$ 、出厂年限超过10年(不含10年)的塔式起重机;$6 3 0 \\mathrm { k N } \\cdot \\mathrm { m } { \\sim } 1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ (不含 $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m } )$ 、出厂年限超过15年(不含15年)的塔式起重机; $1 2 5 0 \\mathrm { k N } \\cdot \\mathrm { m }$ 以上、出厂年限超过20年(不含20年)的塔式起重机。由于使用年限过久,存在设备结构疲劳、锈蚀、变形等安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。超过一定使用年限的施工升降机:出厂年限超过8年(不含8年)的SC型施工升降机,传动系统磨损严重,钢结构疲劳、变形、腐蚀等较严重,存在安全隐忠,出厂年限超过5年(T合5个)的SS型施宝升降机,使用时间过长造成结构件疲劳、变形、腐蚀等较严重,运动件磨损严重,存在安全隐患。超过年限的由有资质评估机构评估合格后,可继续使用。\n\n## 4.2 履带式起重机\n### 4.2.1 履带式起重机自重大,对地面承载相对高,作业时重心变化大,对停放地面要有较高要求,以保证安全。 \n### 4.2.5 俯仰变幅的起重臂,其最大仰角要有一定限度,以防止起重臂后倾造成重大事故。 \n### 4.2.6 起重机的变幅机构一般采用蜗杆减速器和自动常闭带式制动器,这种制动器仅能起辅助作用,如果操作中在起重臂未停稳前即换挡,由于起重臂下降的惯性超过了辅助制动器的摩擦力,将造成起重臂失控摔坏的事故。 \n### 4.2.7 起吊载荷接近满负荷时,其安全系数相应降低,操作中稍有疏忽,就会发生超载,需要慢速操作,以保证安全。 \n### 4.2.8 起重吊装作业不能有丝毫差错,要求在起吊重物时先稍离地面试吊无误后再起吊,以便及时发现和消除不安全因素,保证吊装作业的安全可靠。起吊过程中,操作人员要脚踩在制动踏板上是为了在发生险情时,可及时控制。 \n### 4.2.9 双机抬吊是特殊的起重吊装作业,要慎重对待,关键是要做到载荷的合理分配和双机动作的同步。因此,需要统一指挥。降低起重量和保持吊钩滑轮组的垂直状态,这些要求都是防止超载。 \n### 4.2.10 起重机如在不平的地面上急转弯,容易造成倾翻事故。\n### 4.2.11 起重机带载行走时,由于机身晃动,起重臂随之俯仰,幅度也不断变化,所吊重物因惯性而摆动,形成“斜吊”,因此,需要降低额定起重量,以防止超载。行走时重物要在起重机正前方,便于操作人员观察和控制。履带式行走机构不要作长距离行走,带载行走更不安全。 \n### 4.2.12 起重机上下坡时,起重机的重心和起重臂的幅度随坡度而变化,因此,不能再带载行驶。下坡空挡滑行,将会失去控制而造成事故。 \n### 4.2.13 作业后,起重臂要转到顺风方向,这是为了减少迎风\n\n面,降低起重机受到的风压。\n\n### 4.2.14 当起重机转移时,需要按照本规定采取的各项保证安全的措施执行。\n\n## 4.3 汽车、轮胎式起重机\n\n### 4.3.4 轮胎式起重机完全依靠支腿来保持它的稳定性和机身的水平状态。因此,作业前需要按本条要求将支腿垫实和调整好。\n\n### 4.3.5 如果在载荷情况下扳动支腿操纵阀,将使支腿失去作用而造成起重机倾翻事故。\n\n### 4.3.6 起重臂的工作幅度是由起重臂长度和仰角决定的,不同幅度有不同的额定起重量,作业时要根据重物的重量和提升高度选择适当的幅度。\n\n### 4.3.7 起重臂分顺序伸缩、同步伸缩两种。\n\n起重机由双作用液压缸通过控制阀、选择阀和分配阀等液压控制装置使起重臂按规定程序伸出或缩回,以保证起重臂的结构强度符合额定起重量的需求。如果伸臂中出现前、后节长度不等时或其他原因制动器发生停顿时,说明液压系统存在故障,需要排除后才能使用。\n\n### 4.3.8 各种长度的起重臂都有规定的仰角,如果仰角小于规定,对于桁架式起重臂将造成水平压力增大和变幅钢丝绳拉力增大;对于箱形伸缩式起重臂,由于其自重大,基本上属于悬臂结构,将增加起重臂的挠度,影响起重臂的安全性能。\n\n### 4.3.9 汽车式起重机作业时,其液压系统通过取力器以获得内燃机的动力。其操纵杆一般设在汽车驾驶室内,因此,作业时汽车驾驶室要锁闭,以防误动操纵杆。\n\n### 4.3.11 发现起重机不稳或倾斜等现象时,迅速放下重物能使起重机恢复稳定,否则将造成倾翻事故。采用紧急制动,会造成起重机倾翻事故。\n\n### 4.3.13 起重机在满载或接近满载时,稳定性的安全系数相应降低,如果同时进行两种动作,容易造成超载而发生事故。\n\n### 4.3.14 起重机带载回转时,重物因惯性造成偏离而大幅度晃动,使起重机处于不稳定状态,容易发生事故。\n\n### 4.3.16 本条叙述了起重机作业后要做的各项工作,如挂牢吊钩、螺母固定撑杆、销式制动器插人销孔、脱开取力器等要求,都是为在再一次行驶时起重机的装置不移动、不旋转等稳定的安全措施。\n\n### 4.3.17 内燃机水温在 $8 0 ^ { \\circ } \\mathrm { C } \\sim 9 0 ^ { \\circ } \\mathrm { C }$ 时,润滑性能较好,温度过低使润滑油黏度增大,流动性能变差,如高速运转,将增加机件磨损。\n\n## 4.4 塔式起重机\n\n### 4.4.14 塔式起重机顶升属高处作业,安装过程使起重机回转台及以上结构与塔身处于分离状态,需要有严格的作业要求。本条所列各项均属于保证安全顶升的必要措施。\n\n### 4.4.15 本条规定塔式起重机升降作业时安全技术要求。如果因连接螺栓拆卸困难而采用旋转起重臂来松动螺栓的错误做法,将破坏起重臂平衡而造成倾翻事故。\n\n### 4.4.16 塔式起重机接高到一定高度需要与建筑物附着锚固,以保持其稳定性。本条所列各项均属于说明书规定的一般性要求,目的是保证锚固装置的牢固可靠,以保持接高后起重机的稳定性。\n\n### 4.4.17 内爬升起重机是在建筑物内部爬升,作业范围小,要求高。本条所列各项均属于保证安全爬升的必要措施。其中第5款规定了起重机的最小固定间隔,尽可能减少爬升次数,第6款是为了保证支承起重机的楼层有足够的承载能力。\n\n### 4.4.21 塔式起重机与大地之间是一个“C”形导体,当大量电HAV人人 y 1员站在道轨或地面上,接触吊钩时正好使“C”形导体形成一个“O”形导体,人体就会被电击或烧伤。这里所采取的绝缘措施\n\n是为了保护人身安全。\n\n### 4.4.29 行程限位开关是防止超越有效行程的安全保护装置,如当作控制开关使用,将失去安全保护作用而易发生事故。\n\n### 4.4.30 动臂式起重机的变幅机构要求动作平衡,变幅时起重量随幅度变化而增减。因此,当载荷接近额定起重量时,不能再向下变幅,以防超载造成起重机倾倒。\n\n### 4.4.36 遇有风暴时,使起重臂能随风转动,以减少起重机迎风面积的风压,锁紧夹轨器是为了增加稳定性,防止造成倾翻。\n\n### 4.4.43 主要为防止大风骤起时,塔身受风压面加大而发生事故。\n\n## 4.5 枪杆式起重机\n\n### 4.5.2 枪杆式起重机现场大量使用,本条针对专项方案提出具体要求,并强调专人对专项方案实施情况进行现场监督和按规定进行监测。\n\n### 4.5.3 本条参考住房和城乡建设部《危险性较大的分部分项工程安全管理办法》中第七条的规定。\n编制依据包括:相关法律、法规、规范性文件、标准、规范及图纸(国标图集)、施工组织设计等。\n\n施工工艺流程包括:钢丝绳走向及固定方法、卷扬机的固定位置和方法、枪杆式起重机底座的安装及固定等。\n\n施工安全技术措施包括:组织保障、技术措施、应急预案、监控检查验收等。\n\n劳动力计划包括:专职安全管理人员、特种作业人员等。\n### 4.5.7 枪杆式起重机缆风绳与地面的夹角关系到起重机的稳定性能。夹角小,缆风绳受力小,起重机稳定性好,但要增加缆风绳长度和占地面积。因此,缆风绳的水平夹角一般保持在 $3 0 ^ { \\circ } \\sim$ $4 5 ^ { \\circ }$ 之间。因膨胀螺栓在使用中会松动,故严禁使用。所有的定滑轮用闭口滑轮,为确保安全。\n### 4.5.11 枪杆式起重机结构简单,起重能力大,完全是依靠各根缆风绳均匀地拉牢主杆使之保持垂直,只要当一个地锚稍有松动,就能造成主杆倾斜而发生重大事故,因此,需要经常检查地锚的牢固程度。\n",
- "reference_source": "3《建筑机械使用安全技术规程》(JGJ33-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "施工用电定期检查制度中未明确依据《施工现场临时用电安全技术规范》(JGJ46)要求进行电气设备运行状态及安全防护检查",
- "location": "(2)安全检查制度\n④定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。",
- "suggestion": "在定期检查制度中明确依据《施工现场临时用电安全技术规范》(JGJ46)的要求,对电气设备运行状态及安全防护措施进行专项检查,包括但不限于配电系统、接地与接零保护、漏电保护器性能、电缆敷设与接头防水、开关箱设置等关键项目,并将检查结果纳入隐患排查治理台账。",
- "reason": "根据【参考依据】4.4.1规定,施工现场临时用电必须符合现行《施工现场临时用电安全技术规范》(JGJ46)的有关规定。待审查内容中虽提及对施工用电进行定期检查,但未明确检查依据和具体技术标准,缺乏与JGJ46的直接关联,不符合规范对技术参数和标准符合性的要求,存在专业表达不完整、可能引发理解偏差的风险。",
- "risk_level": "中风险",
- "review_references": "## 4.4 施工临时用电 ### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n【Top1 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】4 施工准备\n4 施工准备## 4.1 驻地和场站建设\n\n### 4.1.1 施工现场驻地和场站应选在地质良好的地段,应避开易发生滑坡、塌方、泥石流、崩塌、落石、洪水、雪崩等危险区域,宜避让取土、弃土场地。\n\n### 4.1.2 施工现场生产区、生活区、办公区应分开设置,距离集中爆破区应不小于 $5 0 0 \\mathrm { m }$ 。\n\n### 4.1.3 施工现场临时用房、临时设施、生产区、生活区、办公区的防火间距应符合现行《建设工程施工现场消防安全技术规范》(GB 50720)的相关要求。\n\n### 4.1.4 办公区、生活区宜避开存在噪声、粉尘、烟雾或对人体有害物质的区域,无法避开时应设在噪声、粉尘、烟雾或对人体有害物质所在区域最大频率风向的上风侧。\n\n### 4.1.5 施工现场原材料、半成品、成品、预制构件等堆放及机械、设备停放应整齐、稳固、规范、标识清楚,且不得侵占场内道路或影响安全。\n\n### 4.1.6 材料加工场应符合下列规定:\n\n1宜设围墙或围栏防护实行封闭管理,并宜设排水设施。\n\n2场内应设置明显的安全警示标志及相关工种的操作规程。\n\n3加工棚宜采用轻钢结构,并应采取防雨雪、防风等措施。\n\n### 4.1.7 预制场、拌和场应符合下列规定:\n\n1应合理分区、硬化场地,并应设置排水设施。\n\n2拌和及起重设备基础的地基承载力应满足要求,材料及成品存放区地基应稳定。\n\n3料仓墙体强度和稳定性应满足要求,料仓墙体外围应设警戒区,距离宜不小于墙高2倍。\n\n4拌和及起重设备应设置防倾覆和防雷设施。\n\n### 4.1.8 施工现场变电站建设应符合现行《施工现场临时用电安全技术规范》 (JGJ46)\n\n的有关规定。\n\n### 4.1.9 储油罐的设置应符合下列规定:\n\n1储油罐与在建工程的防火间距应不小于 $1 5 \\mathrm { m }$ ,并应远离明火作业区、人员密集区、建(构)筑物集中区。\n\n2储油罐顶部应设置遮阳棚。\n\n3应按要求配备泡沫灭火器、干粉灭火器、沙土袋、沙土箱等灭火消防器材及沙土等灭火消防材料。\n\n4应设防静电、防雷接地装置及加油车接地装置,接地电阻不得大于100。\n\n5应悬挂醒目的禁止烟火等警示标识。\n\n## 4.2 施工便道\n\n### 4.2.1 施工便道应根据运输荷载、使用功能、环境条件进行设计和施工,不得破坏原有水系、降低原有泄洪能力,并应符合下列规定:\n\n1双车道施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ 。\n\n2单车道施工便道宽度不宜小于4.5m,并宜设置错车道,错车道应设在视野良好地段,间距不宜大于 $3 0 0 \\mathrm { m }$ 。设置错车道路段的施工便道宽度不宜小于 $6 , 5 \\mathrm { m }$ ,有效长度不宜小于 $2 0 \\mathrm { m }$ 。\n\n3路拱坡度应根据路面类型和现场自然条件确定,并应大于 $1 , 5 \\%$ 。\n\n4施工便道应根据需要设置排水沟和圆管涵等排水设施。\n\n5施工便道在急弯、陡坡、连续转弯等危险路段应进行硬化,设置警示标志,并根据需要设置防护设施。\n\n6施工便道中易发生落石、滑坡等危险路段应根据需要设置防护设施。\n\n### 4.2.2 施工便道与既有道路平面交叉处应设置道口警示标志,有高度限制的应设置限高架。\n\n### 4.2.3 施工便桥应根据使用要求和水文条件进行设计,并应设置限宽、限速、限载标志,建成后应验收。\n\n## 4.3 临时码头和栈桥\n\n### 4.3.1 临时码头宜选择在水域开阔、岸坡稳定、波浪和流速较小、水深适宜、地质条件较好、陆路交通便利的岸段。\n\n### 4.3.2 临时码头宜设置在桥梁、隧道、大坝、架空高压线、水下管线、取水泵房、\n\n危险品库、水产养殖场等区域的下游方向,与其他构筑物的安全距离应符合现行《海港总平面设计规范》(JTJ211)和《河港工程总体设计规范》(JTJ212)的有关规定。\n\n### 4.3.3 临时码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应设置安全警示标志,配备相应的安全防护设施。\n\n### 4.3.4 栈桥和栈桥码头应按照使用要求和相应的技术规范进行设计、施工和验收,并应符合下列规定:\n\n1通航水域搭设的栈桥和栈桥码头应取得海事和航道管理部门批准,并应按要求设置航行警示标志。\n\n2栈桥和栈桥码头的设计应考虑自重荷载、车辆荷载、波浪力、风力、水流力、船舶系靠力及漂浮物、腐蚀等,并应按施工期可能出现的最不利荷载组合进行验算。\n\n3栈桥和栈桥码头应设置行车限速、防船舶碰撞、防人员触电及落水等安全警示标志和救生器材。\n\n4栈桥上车辆和人员行走区域的面板应满铺,并应与下部结构连接牢固。悬臂板应采取有效的加固措施。\n\n5栈桥两侧和栈桥码头四周应设置高度不低于 $1 , 2 \\mathrm { m }$ 的防护栏杆。防护栏杆上杆任何部位应能承受1000N的外力。\n\n6栈桥行车道两侧宜设置护轮坎。\n\n7长距离栈桥应设置会车、掉头区域,间隔不宜大于 $5 0 0 \\mathrm { m }$ 。\n\n8通过栈桥的电缆应绝缘良好,并应固定在栈桥的一侧。\n\n9发生栈桥面或栈桥码头面被洪水、潮汛淹没,或栈桥被船舶撞击,或桩柱受海水严重腐蚀等情况,应重新检修、复核原构筑物。\n\n10栈桥应设置满足施工安全要求的照明设施。\n\n11 栈桥和栈桥码头应设专人管理,非施工车辆及人员不得进入,非施工船舶不得靠泊。\n\n## 4.4 施工临时用电\n\n### 4.4.1 施工现场临时用电应符合现行《施工现场临时用电安全技术规范》 (JGJ46)的有关规定。\n\n### 4.4.2 施工用电设备数量在5台及以上,或用电设备容量在 $5 0 \\mathrm { k W }$ 及以上时,应编制用电组织设计。\n\n### 4.4.3 施工现场临时用电工程专用的电源中性点直接接地的220/380V三相四线制低压电力系统,必须符合下列规定:\n\n1采用三级配电系统。 \n2采 用TN-S 接零保护系统。 \n3采用二级保护系统。\n\n### 4.4.4 电线架设应符合下列规定:\n\n1架空线路宜避开施工作业面、作业棚、生活设施与器材堆放场地。\n\n2架空线路边线无法避开在建工程(含脚手架)时,其安全距离应符合表4.4.4-1的规定。\n\n表4.4.4-1外电架空线路边线外侧边缘与在建工程(含脚手架)间安全距离\n3施工现场的机动车道与外电架空线路交叉时,架空线路的最低点与路面的垂直安全距离应符合表4.4.4-2的规定。\n\n表4.4.4-2施工现场的机动车道与外电架空线路交叉时的垂直安全距离\n\n\n\n\n\n### 4.4.5 铺设电缆线应符合下列规定:\n\n1施工现场开挖沟槽边缘与埋设电缆沟槽边缘的安全距离不得小于 $0 , 5 \\mathrm { m }$ 。\n\n2地下埋设电缆应设防护管。\n\n3架空铺设电缆应沿墙或电杆做绝缘固定。\n\n4通往水上的岸电应用绝缘物架设,电缆线应留有余量,作业过程中不得挤压或拉拽电缆线。\n\n### 4.4.6 水上或潮湿地带的电缆线必须绝缘良好并具有防水功能,电缆线接头必须经防水处理。\n\n### 4.4.7 每台用电设备必须独立设置开关箱;开关箱必须装设隔离开关及短路、过载、漏电保护器,严禁设置分路开关;配电箱、开关箱的电源进线端严禁用插头和插座做活动连接。\n\n### 4.4.8 配电箱及开关箱设置应符合下列规定:\n\n1总配电箱应设在靠近电源的区域;分配电箱应设在用电设备或负荷相对集中的区域;开关箱与分配电箱的距离不得大于 $3 0 \\mathrm { m }$ ,开关箱应靠近用电设备,与其控制的固定式用电设备水平距离不宜大于 $3 \\mathrm { m }$ 。\n\n2动力配电箱与照明配电箱宜分别设置。合并设置的配电箱,动力和照明应分路\n\n设置。\n\n3配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在存在瓦斯、烟气、潮气及其他有害介质的场所。\n\n4配电箱、开关箱应选用专业厂家定型、合格产品。\n\n5总配电箱中漏电保护器的额定漏电动作电流应大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间应大于0.1s,额定漏电动作电流与额定漏电动作时间的乘积不得大于 $3 0 \\mathrm { m A \\cdot s }$ 。开关箱中漏电保护器的额定漏电动作电流不得大于 $3 0 \\mathrm { m A }$ ,额定漏电动作时间不应大于0.1s。潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,额定漏电动作电流不得大于 $1 5 \\mathrm { m A }$ ,额定漏电动作时间不得大于0.1s。\n\n6配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为1 $. 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上,其中心点与地面的垂直距离应为 $0 . 8 \\sim 1 . 6 \\mathrm { m }$ 。\n\n### 4.4.9 遇有临时停电、停工、检修或移动电气设备时,应关闭电源。\n\n## 4.5 生产生活用水\n\n### 4.5.1 生活饮用水水质应符合现行《生活饮用水卫生标准》(GB 5749)的有关规定。\n\n### 4.5.2 施工现场搭设的水塔、水箱等储水设施应稳固、牢靠,并应采取防倾覆措施。\n\n## 4.6 施工机械设备\n\n### 4.6.1 应制定施工机械设备安全技术操作规程,建立设备安全技术档案。\n\n### 4.6.2 施工机械设备进场前应查验机械设备证件、性能、状况;进场后,应向操作人员进行安全技术交底。\n\n### 4.6.3 特种设备现场安装、拆除应按相关规定具有相应作业资质。\n\n### 4.6.4 龙门吊、架桥机等轨道行走类设备应设置夹轨器和轨道限位器。轨道的基础承载力、宽度、平整度、坡度、轨距、曲线半径等应满足说明书和设计要求。\n\n### 4.6.5 机械设备集中停放的场所应设置消防通道,并应配备消防器材。\n\n### 4.6.6 施工现场专用机动车辆驾驶人员应按相关规定经过专门培训,并应取得相应资格证书。\n### 4.6.7 施工现场运输车辆应状态良好,车身应设置反光警示标识。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-19": {
- "metadata": {
- "review_location_label": "第11页:第五章 施工安全保证措施",
- "original_content": "一) 组织保证措施\n1、建立健全安全生产管理机构,成立以项目经理为组长、总工和副经理为副组长、各科室科长为成员的安全生产领导小组,全面负责并领导本工程的安全生产工作。\n2、按照“一岗双责”的要求,层层落实安全生产责任制。\n3、实行逐级安全技术交底制,由项目部组织有关人员对工程项目或专项进行全面详细安全技术交底,凡参加安全技术的人员要履行签字手续,并保存资料。项目经理部专职安全员要对安全技术措施的执行情况进行监督检查,并作好记录。\n4、建立安全风险分级管控和隐患排查治理双重制度,开展安全风险评估,建立项目安全风险数据库,做好安全风险管控,落实安全防护措施。\n图5-1 安全生产领导小组框图\n表5-1 安全生产领导小组人员\n\n<表格></表格>\n\n5、安全生产管理制度\n(1)安全教育培训制度\n依照中华人民共和国的安全生产法律、法规、及施工安全管理规定;项目部及上级有关安全生产管理规定;各工种安全技术操作规程;危险区域的预防措施和自我保护;安全生产中的经验教训;职业道德及安全文明施工。凡新进场或调换工种的人员,上岗前必须进行安全培训和教育,并考试合格才允许上岗。一般人员进场岗前安全教育培训24学时,每年再培训8学时。特殊工种作业人员需要进行培训并持有效证件上岗,初次培训32学时,每年再培训12学时。转岗或歇工6个月以上复工人员,应当重新接受本单位安全教育培训24学时,经考核合格后才能上岗。项目须结合施工情况,每月组织一次月度安全例会PPT点评,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全防控意识和安全理念素质。\n(2)安全教育培训内容\n1)岗前安全培训内容\n①本单位安全生产情况及安全生产基本知识;\n②本单位安全生产规章制度和劳动纪律;\n③从业人员安全生产权利和义务;\n④工作环境及危险因素;\n⑤所从事岗位、工种的安全职责、安全操作规程及强制性标准;\n⑥所从事岗位、工种可能遭受的职业伤害和伤亡事故案例;\n⑦安全设备设施、个人防护用品的正确使用和维护;\n⑧自救互救、急救方法、疏散和现场紧急情况的处理;\n⑨预防事故和职业危害的措施及应注意的安全事项;\n⑩岗位之间工作衔接配合的安全与职业卫生事项;\n⑪其他需要安全教育培训的内容。\n2)再培训安全教育培训内容:\n①国家安全生产方针、政策和有关安全生产的法律、法规、规章及标准;\n②本单位新颁布实施的安全生产规章制度、操作规程和应急预案;③安全生产基本常识、岗位安全风险及防范知识、岗位安全生产基本知识;④事故防范、逃生自救知识、岗位应急处置救援等相关知识;\n⑤职业危害防治基本知识;\n⑥消防安全基本知识;\n⑦典型事故案例警示教育;\n⑧其他需要培训的内容。\n(2)安全检查制度\n为了贯彻执行安全生产方针,切实加强管理,做到安全生产和文明施工,项目部特制定安全生产检查制度。实行专职安全人员跟班检查,及时发现和整改安全上出现的疏忽和麻痹;每月由项目经理、带班领导或安全主管部门组织对本项目进行全面检查;详细记录检查和隐患整改情况;安全检查要深入细致,要能发现问题,并制定措施解决问题;项目安全管理部门或专职安全员应每天深入现场进行例检,纠正或处罚违章行为。\n①验收安全检查:安全检查由安全环保部和工程建设部组织,其他部门和施工人员参加,按照检查表列的项目,确认达到规程要求后由检查小组人员、施工员和操作班组共同签字,然后由项目部总工检查验收并签字才能正式使用。\n②班组安全检查:由班组长和兼职安全员负责进行班前班后安全检查。检查的重点是班组使用的设备、手动、电动工具、安全帽、安全带等及作业面防护措施,发现问题及时修复或更换,确保作业安全并作好记录。\n③定期检查:由项目经理或分管副经理每月组织一次施工现场安全隐患大排查检查,检查人员由项目各部门主要人员组成,按照安全检查评分标准执行;内容包括施工用电、施工机械、安全设施防护等进行全面大检查。做好检查与总结相结合,检查与评比相结合,检查与奖罚相结合,检查与整改相结合。对危险隐患较多的现场进行停产整顿,对运行不良的电气设备等重要部位,一经发现隐患要坚决停止作业。整改之后,经检查组复查合格方准继续作业。\n④夏季、雨季施工检查:针对季节气候特点,对可能给安全施工带来危害由项目部工程技术部、质量管理部和安全管理部进行安全检查。夏季、雨季安全检查主要查防中暑、防洪的各项措施。\n⑤整改与复查:对施工生产中危害职工生命安全和身体健康的各种危险因素,一旦发现,要认真研究对策,积极实施改进措施,消除危险因素,保护职工的生命安全和身体健康,促进施工生产顺利进行。检查中要本着生产必须安全,对广大职工的生命财产安全高度负责的精神,认真贯彻“边检查,边整改”的原则,积极、广泛地发动工人搞好整改。对查出来的问题进行分类,按立即要整改的问题和限期整改的问题,发出整改通知单,以便整改时采取不同的处理办法。务必做到条条有落实,件件有交待。对于签了整改通知单的隐患,指定专人负责,逐项进行整改和复审,对整改及时彻底的要给以表扬,凡不认真整改者要给以批评或经济处罚直至退场处理。\n(3)安全保卫制度\n①做好要害部位和重要物资的保卫,搞好以防盗、防火、防破坏和防治安全事故为中心的安全防范;做好工地重要部位和薄弱环节巡逻检查,发现和解决事故苗头及隐患漏洞,做好安全防范工作。\n②进行巡逻检查,定时、不定时对施工现场、民工集中宿舍区进行巡逻,制止打架、赌博、酗酒及大声喧哗。查禁内部人员参与黄、赌、毒等危害社会治安的违法犯罪活动并按规定对当事人进行惩罚。盘查或观察形迹可疑人员,发现违法犯罪分子,及时报告领导或联系当地公安机关。\n③严禁社会闲杂人员在工地停留。\n④要加强对协作队伍的管理,掌握人员底数,签订治安、消防协议,非施工人员不得住入住宿区。\n⑤易燃易爆物及化学危险品,必须专库限量存放。同时设置明显标志,专人保管并配备相应的消防器材。\n(4)消防安全管理制度\n1)施工现场防火管理\n①项目经理应全面负责施工现场的防火安全工作。\n②施工现场都要建立、健全防火检查制度,发现火险隐患,必须立即消除,一时难以消除的隐患,要定人员、定时间、定措施限期整改。\n③施工现场发生火警或火灾,应立即报告公安消防部门,并组织力量扑救。\n④在编制施工组织设计时,施工总平面图、施工方法和施工技术均要符合消防要求。施工现场应明确划分用火作业、易燃可燃材料堆场、仓库、易燃废品集中站和生活区等区域。\n⑥施工现场夜间应有照明设备,保持消防车通道畅通无阻,并要安排力量加强值班巡逻。\n⑥不得在高压架空线下面搭设临时性建筑物或堆放可燃物品。\n⑦施工现场应配备足够的消防器材,指定专人维护、管理、定期更新,保证完整好用焊、割作业点,氧气瓶、乙炔瓶、易燃易爆物品的距离应符合有关规定;如达不到上述要求的,应执行动火审批制度,并采取有效的安全隔离措施。\n⑧施工现场焊割作业,必须符合防火要求,并严格执行“电焊十不烧”规定。 2)工地防火检查制度\n①工区每月定期组织有关人员进行一次防火安全专项检查;每周一次定期安全检查中对防火安全进行检查。\n②检查以宿舍、库房、仓库、食堂、油库等,发现隐患,及时整改,并做好防范工作。\n\n③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。\n\n技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项的现场技术员进行每日班前5分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各种机械超负荷运转或带病作业。\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S接零保护系统,同时必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1时间以上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于2.5m的使用220V电压。在潮湿和易触及带电体的照明电源必须使用220V电压,电气设备架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b倒扣进行防护,避免人为操作失误将临时电缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警示牌。\n10)靠近电源线路作业前,应先联系停电。确认停电后方可进行工作,并应设置绝缘档壁。作业者最少离开电线2米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。\n\n上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。\n16)超过3米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的支腿垂直度。\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械通行。\n3、设备设施要求\n\n(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。\n(1)在现场开展防暑降温保健、中暑急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加强对工人身体状况的检查工作,搞好医疗保健。(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,落实劳动保护措施。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第五章 施工安全保证措施下缺失安全保证措施中的【应急处置措施】内容: 1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "建议补充:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第五章 施工安全保证措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含应急处置措施包含:1.应急处置程序;2.应急处置措施;3.应急物资及设备保障;4.交通 疏导与医疗救援;5.后期处置;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件20)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-20": {
- "metadata": {
- "review_location_label": "第13页:第五章 施工安全保证措施->一) 组织保证措施",
- "original_content": "③按规定时间对灭火器进行药物检查,发现药物过期、失效的灭火器,应及时更换,以确保灭火器材处于正常可使用状态。\n图5-2 安全生产保证体系\n(1)建立以项目经理为领导的安全生产机构。\n(2)制定各级人员的安全生产责任制,签订安全承包合同,并认真实施。\n(3)对新进场工人实行严格的安全教育考核制度,经考核合格后录用上岗。\n(4)所有工人必须接受三级安全教育后方可进场施工。\n(5)所有特殊工种人员一律持证上岗,并严格管理。\n(6)坚持每月二次的安全专题检查和日常不定期检查。\n(7)各分部分项安全、施工技术交底\n1)一级:项目经理(兼总工)在各分部分项工程开工前向部门负责人、分项工程技术负责人和技术员进行安全、施工技术交底;\n2)二级:项目技术部门负责人以分部分项工程为单元在开工前向分项工程技术负责人和相关技术人员进行交底;重难点、关键分部分项工程的施工技术交底要由项目经理(兼总工)亲自主持;\n3)三级:分项工程技术负责人就分项工程以每道工序为单元在作业前向工序技术员、作业班组进行施工技术交底。\n4)技术交底应涵盖安全技术交底,相应专职安全生产管理人员是接受交底人,也是监督人,应签字确认。\n(8)对施工班组必须严格管理,引导班组开展班前安全教育活动并做好记录。\n(9)施工现场按安全施工组织设计要求布置足够的安全标语牌及宣传标语。\n(10)对周围临近建筑和设施等,应落实好安全防护措施。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 5
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-21": {
- "metadata": {
- "review_location_label": "第13页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "技术保证措施\n1、施工安全保证措施\n(1)技术交底及安全教育培训\n1)项目技术负责人、工程部门应按照《工程技术管理办法2020》交底程序,组织进行一、二、三级技术交底。\n2)加强对风险点技术交底措施,根据作业点当日作业内容中存在风险由负责该分项的现场技术员进行每日班前5分钟技术交底,警示教育,降低安全风险。\n3)凡新吸收或调换工种的人员,上岗前必须进行安全培训和教育,需考试合格后才可上岗;特殊工种作业人员必须参加有关部门的培训学习,经考核合格后持证上岗;项目安保处须结合施工情况,每季度至少举办一期安全板报等宣传专刊,对从业人员进行普遍性的遵章守纪和自我保护教育,增强从业人员的安全意识,提高安全技术素质;召开职工大会时,必须有安全教育的内容;项目应根据安全生产工作情况,每季度出安全简报;项目须将民工全员纳入安全培训、教育范围内。\n(2)施工安全基本保障措施\n1)进入施工现场必须正确佩戴安全帽、安全带及防护手套等安全用品,高空作业人员必须正确佩戴安全带,严禁赤脚或穿高跟鞋、硬底鞋、带钉易滑的鞋和拖鞋进入施工现场,遵守施工现场的安全规定和有关安全操作规程。\n2)岗位分工明确,各种机械的使用必须由专人操作,且持证上岗。各种施工机械未经批准,不得驶出施工区。\n3)各种机电设备使用前必须进行全面检查,只有检查合格后才能起动,调试正常后才能正常工作,必须具有可靠的防护和接地装置。\n4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。\n5)大风及雷雨天气等恶劣天气必须停止施工作业,人员迅速撤离现场。(6)严禁各种机械超负荷运转或带病作业。\n7)作业人员应严格遵守劳动纪律,服从领导和安全检查人员的指挥,工作时思想集中,坚守岗位,未经许可不得从事本工种之外的工作。严禁酒后上班,不得在禁烟地方吸烟、动明火。\n8)设置专职安全检查人员,随时检查安全隐患,发现问题及时解决,同时做好记录。9)高空作业时不准往下或往上抛扔工具、材料等物品。\n10)吊装区域内,禁止非操作人员上岗,吊臂垂直下方严禁站人。\n11)行走通道严禁堆放物品,防止碰撞等事故发生。\n12)任何人发现安全隐患必须立刻上报,不得隐瞒,能现场处理的立即现场处理。\n13)施工作业点设置危险源告知牌,以警示作业人员,增强安全思维意识看,降低风险。\n14)严格遵守当地疫情防控相关政策与制度,落实疫情防控措施,发现高风险地区来项目务工人员应第一时间向当地防疫部门上报,进行集中隔离。\n(3)临时用电安全保障措施\n1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。\n2)在建工程外侧与外电高压线路未达到安全距离增设屏障遮栏、围栏或保护网等防护。\n3)施工现场专用的中性点直接接地的供电线路必须实行TN-S接零保护系统,同时必须做到三级控制两级保护,电箱为标准电闸箱,并采取防雨、防潮措施。安装、维修或拆除用电设施必须由电工完成。\n4)电气设备根据地区或系统要求,做保护接零,做保护接地,不得一部分设备做保护接零,另一部分设备做保护接地。\n5)必须由持有合格证件的专职电工,负责现场临时用的电管理及安拆。\n6)对新调入工地的电气设备,在安装使用前,必须进行检验测试。经检测合格方能投入使用。\n7)专职电工对现场电气设备每月进行巡查,项目部每月对施工用电系统、漏电保护器进行一次全面系统的检查。\n8)配电箱设在干燥通风的场所,周围不得堆放任何防碍操作、维修的物品,并与被控制的固定设备距离不得超过3m。安装和使用按“一机、一闸、一漏”的原则,不能同时控制两台或两台以上的设备,否则容易发生误操作事故。\n9)配电箱标明其名称、用途,并做出分路标志,门上配锁,现场停止作业1时间以上时,将开关箱断电上锁。\n10)照明专用回路设施用漏电保护器,灯具金属外壳做接零保。灯具安装高度低于2.5m的使用220V电压。在潮湿和易触及带电体的照明电源必须使用220V电压,电气设备架设或埋设必须符合要求,并保证绝缘良好。任何场合均不能拖地。\n11)线路过道应按规定进行地埋,破皮老化线路不准使用。\n12)使用移动电气工具和混凝土振捣作业时,必须按规定穿戴绝缘防护用品。\n13)凡从事与用电有关的施工作业时,必须实行电工跟班作业。\n14)对用电、管电人员要定期进行培训,电工要持有效合格证上岗,电工等级与难易程度和技术复杂性相适应,不得无证人员从事电力作业。\n15)配电箱要具备防火、控制(计量)使用功能。做到维修者与使用者责任分开,任何人不得加大负荷,凡增大容量必须由安全用电管理人员批准。\n16)配电室/柜必须做到“四防一通”(即防火、防风雨雪、防潮汛、防小动物和保持通风良好),应配齐电气灭火器、绝缘靴和手套,各种测试仪表。\n17)对室外临时用电缆,采用槽钢20b倒扣进行防护,避免人为操作失误将临时电缆损坏。\n18)电缆的使用及固定应符合规范要求。\n19)施工现场临时用电实行三相五线制,符合“三级配电,二级保护”规定,使用标准配电箱,动力箱与照明要分开。\n20)施工现场内严禁使用塑料线,所用绝缘导线型号及截面必须符合用电设计,电线残旧要及时更换,现场电源接头用绝缘胶布包扎良好,不准用塑料包扎,接头不能放在潮湿地上和水中。\n21)配电箱和开关箱应规范标准,有门、有锁、有警示标识、能防雨、箱内整洁、多路配电标记清晰,进出导线从箱体导线进出口进入穿出,严禁电路混乱、导线直接从箱门进出。\n22)电气设备的金属外壳必须保护接零,同一供电系统不允许同时采用保护接地和保护接零。\n23)电器设备及输电线路安装完毕后,必须经工程、设备、安全部门验收合格后方可运行,夜间施工必须有电工值班,工作完毕后要切断相关电源。24)电工进行电工作业时,必须穿戴好各种绝缘防护用品,正确使用电工器具,严禁带电操作,线路上禁止带负荷接线,不得违章操作。\n25)施工用电设备的用电安全管理,设置必要的消防设施,当发生电气火灾时应立即切断电源,用干砂或干粉灭火器灭火,严禁使用导电的灭火剂灭火。\n(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。\n4)从事高处作业的人员必须身体健康,患有高血压、心脏病、精神病、深度近视等一切不适合高处作业的人员不能参加高空作业。\n5)制定严格的安全生产管理制度,从事高处作业人员不得酒后作业和疲劳作业。\n6)施工人员要配戴齐全安全带、工具包、防滑鞋,防滑手套等高空作业安全防护用品,高处作业的材料要堆放稳妥,工具随手放入工具包,防止坠落伤人。\n7)在高空处电焊、气焊作业时,在施工部位铺设防护措施,防止电焊、气焊残留物落下伤人。\n8)检查所用的登高工具和安全用具(如安全帽、安全带、梯子、跳板、脚手架、防护板、安全网)必须安全可靠,严禁冒险作业。\n9)高空作业区地面要划出禁区,用竹篱笆围起,并挂上“闲人免进”、“禁止通行”等警示牌。\n10)靠近电源线路作业前,应先联系停电。确认停电后方可进行工作,并应设置绝缘档壁。作业者最少离开电线2米以外,禁止在高压线下作业。\n11)高空作业所用的工具、零件、材料等必须装入工具袋。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 2,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "4)施工现场临时用电严格《施工现场临时用电安全技术规范》的有关规定。",
- "suggestion": "请将引用调正为正确格式:《规范名称》(编号)并保证名称与编号一一对应",
- "reason": "规范名称未被书名号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)施工现场的电气设备必须符合《施工现场临时用电安全技术规范》(JGJ46-2005)要求,电缆线必须按要求架设。",
- "suggestion": "将编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "高空作业平台检查及安全带使用要求未明确对应安全标志设置",
- "location": "(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。",
- "suggestion": "在高空作业平台周围设置‘当心坠落’‘当心落物’‘必须系安全带’‘禁止停留’等安全标志,确保作业前检查阶段已落实标志设置要求。",
- "reason": "根据《公路工程施工安全标志设置规范 JT/T 1507-2024》第8.2条,高墩翻模爬模施工及盖梁施工平台应设置‘当心坠落’‘当心落物’‘禁止停留’‘禁止靠近’‘禁止抛物’‘必须系安全带’等安全标志。待审查内容中虽提及检查平台牢固性与安全带使用,但未体现应在作业平台设置相应安全标志,违反规范强制性要求。",
- "risk_level": "高风险",
- "review_references": "- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n【Top1 参考文档】\n【文件】66 公路工程施工安全标志设置规范JT T1507-2024.md\n【标题】8 桥涵工程施工安全标志设置\n8 桥涵工程施工安全标志设置## 8.1 基础施工时,应设置下列安全标志: \n- 挖孔桩孔口处:“当心坑洞”“当心坠落”“必须通风”“必须戴安全帽”“必须系安全带”; \n- 钻孔桩孔口处:“当心坑洞”“当心坠落”; \n- 泥浆池四周:“禁止翻越”“泥浆池危险请勿靠近”; \n- 水上作业平台:“注意安全”“当心落水”“必须穿救生衣”; \n- 围堰周边:“当心落水”“当心坠落”“必须穿救生衣”“非工作人员禁止入内”; \n- 承台基坑周边:“当心坠落”“禁止翻越”“基坑危险请勿靠近”; \n- 基坑壁:“当心塌方”“当心落物”。 \n\n## 8.2 下部结构施工时,高墩翻模爬模施工应在作业平台防护栏杆上设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志;盖梁施工平台应设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志。 \n\n## 8.3 上部结构施工时,应设置下列安全标志: \n- 架桥机作业点:“当心坠落”“当心吊物”“当心障碍物”“禁止抛物”“必须系安全带”; \n- 架梁施工警戒区:“禁止通行”“吊装重地请勿靠近”“危险区域禁止逗留”; \n- 运梁通道沿线:限速; \n- 支架现浇施工:“当心落物”“当心吊物”“禁止靠近”“禁止停留”“必须戴安全帽”“必须系安全带”; \n- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n8.4 桥面系及附属工程施工时,应在桥面端头设置“当心坑洞”“当心坠落”“必须戴安全帽”“非施工车辆及人员禁止入内”以及限速安全标志。防撞护栏施工应在施工平台上或作业点处设置“当心坠落”“禁止抛物”“必须系安全带”安全标志。伸缩缝施工应在作业点来车方向前方设置“禁止通行”“前方施工减速慢行”“道路封闭禁止通行”安全标志。\n8.5 跨既有线施工时,应在施工作业面醒目位置设置“注意安全”“当心坠落”“禁止抛物”安全标志,应在既有线路边合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”以及限高限宽限速安全标志。\n8.6 不中断交通施工时,应在施工现场附近合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”安全标志。桥梁拼接、抬升施工警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志。\n8.7 桥梁拆除警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志;采用爆破拆除还应设置“爆破区域禁止进入”安全标志。\n",
- "reference_source": "66 公路工程施工安全标志设置规范JT T1507-2024.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "配电箱设置未完全符合‘一机、一闸、一漏’及距离要求",
- "location": "8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n8.1.2 分配电箱与开关箱的距离不得超过 30 m,开关箱与其控制的固定式用电设备的水平距离不宜超过 3 m。",
- "suggestion": "在技术保证措施中应明确强调:每台用电设备必须独立配置专用开关箱,严禁一箱多机;开关箱与所控制的固定式用电设备水平距离不得大于3m,确保操作安全与管理规范。",
- "reason": "待审查内容中提到‘安装和使用按‘一机、一闸、一漏’的原则,不能同时控制两台或两台以上的设备’,但未明确说明‘开关箱与被控设备距离不得超过3m’这一强制性要求,而该要求出自《施工现场临时用电安全技术规范》(JGJ46-2005)第8.1.2条,属于安全关键控制点,未在措施中体现构成合规性缺失。",
- "risk_level": "高风险",
- "review_references": "8 配电箱及开关箱## 8.1 配电箱及开关箱的设置 8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n【Top2 参考文档】\n【文件】68《施工现场临时用电安全技术规范》(JGJ46-2005).md\n【标题】8 配电箱及开关箱\n8 配电箱及开关箱## 8.1 配电箱及开关箱的设置\n8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n\n配电系统宜使三相负荷平衡。220V或380V单相用电设备宜接入220/380V三相四线系统;当单相照明线路电流大于30A时,宜采用220/380V三相四线制供电。\n\n室内配电柜的设置应符合本规范第6.1节的规定,\n\n8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。\n\n总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $3 0 \\mathrm { m }$ ,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3 \\mathrm { m }$\n\n8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n\n8.1.4 动力配电箱与照明配电箱宜分别设置。当合并设置为同一配电箱时,动力和照明应分路配电;动力开关箱与照明开关箱必须分设。\n\n8.1.5 配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中,亦不得装设在易受外来固体物撞击、强烈振动、液体浸溅及热源烘烤场所。否则,应予清除或做防护处理。\n\n8.1.6 配电箱、开关箱周围应有足够2人同时工作的空间和通道,不得堆放任何妨碍操作、维修的物品,不得有灌木、杂草。\n\n8.1.7 配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作,钢板厚度应为 $1 . 2 { \\sim } 2 . 0 \\mathrm { m m }$ ,其中开关箱箱体钢板厚度不得小于 $1 . 2 \\mathrm { r n m }$ ,配电箱箱体钢板厚度不得小于 $1 . 5 \\mathrm { m m }$ ,箱体表面应做防腐处理。\n\n8.1.8 配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为 $1 . 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上。其中心点与地面的垂直距离宜为 ${ 0 . 8 } \\mathrm { { \\sim } } 1 . 6 \\mathrm { { m } }$ 。\n\n8.1.9 配电箱、开关箱内的电器(含插座)应先安装在金属或非木质阻燃绝缘电器安装板上,然后方可整体紧固在配电箱。开关箱箱体内,\n\n金属电器安装板与金属箱体应做电气连接。\n\n8.1.10 配电箱、开关箱内的电器(含插座)应按其规定位置紧固在电器安装板上,不得歪斜和松动。\n\n8.1.11 配电箱的电器安装板上必须分设N线端子板和PE线端子板。N线端子板必须与金属电器 安装板绝缘;PE线端子板必须与金属电器安装板做电气连接。\n\n进出线中的N线必须通过N线端子板连接;PE线必须通过PE线端子板连接。\n\n8.1.12 配电箱、开关箱内的连接线必须采用钢芯绝缘导线。导线绝缘的颜色标志应按本规范第5.1.11条要求配置并排列整齐;导线分支接头不得采用螺栓压接,应采用焊接并做绝缘包扎,不得有外露带电部分。\n\n8.1.13 配电箱、开关箱的金属箱体、金属电器安装报板以及电器正常不带电的金属底座、外壳等必须通过PE线端子板与PE线做电气连接,金属箱门与金属箱体必须通过采用编织软铜线做电气连接。\n\n8.1.14 配电箱、开关箱的箱体尺寸应与箱内电器的数量和尺寸相适应,箱内电器安装板板面电器安装尺寸可按照表8.1.14确定。\n\n表8.1.14 配电箱、开关箱内电器安装尺寸选择值 \n\n\n\n\n\n8.1.15 配电箱、开关箱中导线的进线口和出线口应设在箱体的下底面。\n\n8.1.16 配电箱、开关箱的进、出线口应配置固定线卡,进出线应加绝缘护套并成束卡固在箱体上,不得与箱体直接接触。移动式配电箱、开关箱的进、出线应采用橡皮护套绝缘电缆,不得有接头。\n\n8.1.17 配电箱、开关箱外形结构应能防雨、防尘。\n\n## 8.2 电器装置的选择\n8.2.1 配电箱、开关箱内的电器必须可靠、完好,严禁使用破损、不合格的电器。\n\n8.2.2 总配电箱的电器应具备电源隔离,正常接通与分断电路,以及短路、过载、漏电保护功能。电器设置应符合下列原则:\n\n1 当总路设置总漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当所设总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设总断路器或总熔断器。\n\n2 当各分路设置分路漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当分路所设漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设分路断路器或分路熔断器。\n\n3 隔离开关应设置于电源进线端,应采用分断时具有可见分断点,并能同时断开电源所有极的隔离电器。如采用分断时具有可见分断点的断路器,可不另设隔离开关;\n\n4 熔断器应选用具有可靠灭弧分断功能的产品。\n\n5 总开关电器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应。\n\n8.2.3 总配电箱应装设电压表、总电流表、电度表及其他需要的仪表。专用电能计量仪表的装设应符合当地供用电管理部门的要求。\n\n装设电流互感器时,其二次回路必须与保护零线有一个连接点,且严禁断开电路。\n\n8.2.4 分配电箱位装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。其设置和选择应符合本规范第8.2.2条要求。\n\n8.2.5 开关箱必须装设隔离开关、断路器或熔断器,以及漏电保护器。当漏电保护器是同时具有短路、过载、漏电保护功能的漏电断路器时,可不装设断路器或熔断器。隔离开关应采用分断时具有可见分断点,能同时断开电源所有极的隔离电器,并应设置于电源进线端。当断路器是具有可见分断点时,可不另设隔离开关。\n\n8.2.6 开关箱中的隔离开关只可直接控制照明电路和容量不大于3.0kW的动力电路应采用断路器控制,操作频繁时还应附设接触器或其他启动控制装置。\n\n8.2.7 开关箱中各种开关电器的额定值和动作整定值应与其控制用电设备的额定值和特性相适应。通用电动机开关箱中电器的规格可按本规范附录C选配。\n\n8.2.8 漏电保护器时装设在总配电箱、开关箱靠近负荷的一侧,且不得用于启动电气设备的操作。\n8.2.9 漏电保护器的选择应符合现行国家标准《剩余电流动作保护器的一般要求》GB6829和《漏电保护器安装和运行的要求》GB13955的规定。\n\n8.2.10 开关箱中漏电保护器的额定漏电动作电流不应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间不应大于 \n0.1s。\n\n使用于潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,其额定漏电动作电流不应大于15mA,额定漏电动作时间不应大于0.1s。\n\n8.2.11 总配电箱中漏电保护器的额定漏电动作电流应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间应大于\n\n0.1s,但其额定漏电动作电流与额定漏电动作时间的乘积不应大于 $3 0 \\mathrm { m A } \\cdot \\mathrm { s } _ { \\circ }$\n\n8.2.12 总配电箱和开关箱中漏电保护器的极数和线数必须与其负荷侧负荷的相数和线数一致。\n\n8.2.13 配电箱、开关箱中的漏电保护器宜选用无辅助电源型(电磁式)产品,或选用辅助电源故障时能自动断开的辅助电源型(电子式)产品。当选用辅助电源故障时不能自动断开的辅助电源型(电子式)产品时,应同时设置缺相保护。\n\n8.2.14 漏电保护器应按产品说明书安装、使用。对搁置已久重新使用或连续使用的漏电保护器应逐月检测其特性,发现问题应及时修理或更换。\n\n \n图8.2.14 漏电保护器使用接线方法示意\n\n$\\mathrm { L } _ { 1 }$ 、 $\\mathrm { L } _ { 2 }$ 、 $\\mathrm { L } _ { 3 }$ 一相线;N一工作零线;PE一保护零线、保护线;1一工作接地;2一重复接地;T一变压器;RCD一漏电保护器;H一照明器;W一电焊机;M一电动机\n\n8.2.15 配电箱、开关箱的电源进线端严禁采用插头和插座做活动连接。\n\n## 8.3 使用与维护\n8.3.1 配电箱、开关箱应有名称、用途、分路标记及系统接线图。\n\n8.3.2 配电箱、开关箱箱门应配锁,并应由专人负责。\n\n8.3.3 配电箱、开关箱应定期检查、维修。检查、维修人员必须是专业电工;检查、维修时必须按规定穿、戴绝缘鞋。手套,必须使用电工绝缘工具,并应做检查、维修工作记录。\n\n8.3.4 对配电箱、开关箱进行定期维修、检查时,必须将其前一级相应的电源隔离开关分闸断电,并悬挂“禁止合闸、有人工作”停电标志牌,严禁带电作业。\n\n8.3.5 配电箱、外关箱必须按照下列顺序操作:\n\n1 送电操作顺序为:总配电箱一 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 开关箱; \n2 停电操作顺序为:开关箱 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 总配电箱。 \n但出现电气故障的紧急情况可除外。\n\n8.3.6 施工现场停止作业1小时以上时,应将动力开关箱断电上锁。\n\n8.3.7 开关箱的操作人员必须符合本规范第3.2.3条规定。\n\n8.3.8 配电精、开关箱内不得放置任何杂物,并应保持整洁。\n\n8.3.9 配电箱、开关箱内不得随意拉接其他用电设备。\n\n8.3.10 配电箱、开关箱内的电器配置和接线严禁随意改动。\n\n熔断器的熔体更换时,严禁采用不符合原规格的熔体代替。漏电保护器每天使用前应启动漏电试验按钮试跳一次,试跳不正常时严禁继续使用。\n8.3.11 配电箱、开关箱的进线和出线严禁承受外力,严禁与金属尖锐断口、强腐蚀介质和易燃易爆物接触。\n",
- "reference_source": "68《施工现场临时用电安全技术规范》(JGJ46-2005).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "高空作业平台检查要求与安全标志设置不一致",
- "location": "(3)高空作业安全保障措施\n1)做好人员安全教育,增强全员安全意识。\n2)对高空作业平台进行检查,保证作业平台牢固、稳定。\n3)严格执行高处作业人员必须正确佩戴安全带程序,并高挂低用。",
- "suggestion": "在高空作业平台设置‘当心坠落’‘当心落物’‘必须系安全带’‘禁止停留’等安全标志,确保作业区域警示明确,符合《公路工程施工安全标志设置规范JT/T1507-2024》中8.2条关于高墩翻模爬模及盖梁施工平台的安全标志要求。",
- "reason": "根据【参考依据】8.2条规定,高墩翻模爬模施工及盖梁施工平台应在作业平台防护栏杆上设置‘当心坠落’‘当心落物’‘禁止停留’‘禁止靠近’‘禁止抛物’‘必须系安全带’等安全标志。待审查内容虽提及检查平台牢固性与安全带使用,但未明确要求设置相应安全标志,存在安全警示缺失问题,不符合规范要求。",
- "risk_level": "高风险",
- "review_references": "- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n【Top1 参考文档】\n【文件】66 公路工程施工安全标志设置规范JT T1507-2024.md\n【标题】8 桥涵工程施工安全标志设置\n8 桥涵工程施工安全标志设置## 8.1 基础施工时,应设置下列安全标志: \n- 挖孔桩孔口处:“当心坑洞”“当心坠落”“必须通风”“必须戴安全帽”“必须系安全带”; \n- 钻孔桩孔口处:“当心坑洞”“当心坠落”; \n- 泥浆池四周:“禁止翻越”“泥浆池危险请勿靠近”; \n- 水上作业平台:“注意安全”“当心落水”“必须穿救生衣”; \n- 围堰周边:“当心落水”“当心坠落”“必须穿救生衣”“非工作人员禁止入内”; \n- 承台基坑周边:“当心坠落”“禁止翻越”“基坑危险请勿靠近”; \n- 基坑壁:“当心塌方”“当心落物”。 \n\n## 8.2 下部结构施工时,高墩翻模爬模施工应在作业平台防护栏杆上设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志;盖梁施工平台应设置“当心坠落”“当心落物”“禁止停留”“禁止靠近”“禁止抛物”“必须系安全带”安全标志。 \n\n## 8.3 上部结构施工时,应设置下列安全标志: \n- 架桥机作业点:“当心坠落”“当心吊物”“当心障碍物”“禁止抛物”“必须系安全带”; \n- 架梁施工警戒区:“禁止通行”“吊装重地请勿靠近”“危险区域禁止逗留”; \n- 运梁通道沿线:限速; \n- 支架现浇施工:“当心落物”“当心吊物”“禁止靠近”“禁止停留”“必须戴安全帽”“必须系安全带”; \n- 浇筑作业面:“当心# 8 桥梁工程施工安全标志设置(推测原标题,因内容属于桥梁施工相关)\n8.4 桥面系及附属工程施工时,应在桥面端头设置“当心坑洞”“当心坠落”“必须戴安全帽”“非施工车辆及人员禁止入内”以及限速安全标志。防撞护栏施工应在施工平台上或作业点处设置“当心坠落”“禁止抛物”“必须系安全带”安全标志。伸缩缝施工应在作业点来车方向前方设置“禁止通行”“前方施工减速慢行”“道路封闭禁止通行”安全标志。\n8.5 跨既有线施工时,应在施工作业面醒目位置设置“注意安全”“当心坠落”“禁止抛物”安全标志,应在既有线路边合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”以及限高限宽限速安全标志。\n8.6 不中断交通施工时,应在施工现场附近合理位置设置“禁止停留”“当心落物”“当心吊物”“施工路段注意安全”安全标志。桥梁拼接、抬升施工警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志。\n8.7 桥梁拆除警戒区应设置“禁止靠近”“禁止停留”“禁止通行”“危险区域禁止逗留”安全标志;采用爆破拆除还应设置“爆破区域禁止进入”安全标志。\n",
- "reference_source": "66 公路工程施工安全标志设置规范JT T1507-2024.md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "配电箱与被控制设备距离不得超过3m的规定与规范要求不一致",
- "location": "8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $30\\mathrm{m}$,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3\\mathrm{m}$",
- "suggestion": "将‘配电箱与被控制设备距离不得超过3m’修改为‘开关箱与其控制的固定式用电设备的水平距离不宜超过3m’,并明确‘配电箱’指代的是开关箱,避免混淆总配电箱或分配电箱与设备的距离要求。",
- "reason": "根据《施工现场临时用电安全技术规范》(JGJ46-2005)8.1.2条,仅规定‘开关箱与其控制的固定式用电设备的水平距离不宜超过3m’,而待审查内容中将‘配电箱’泛指为与设备距离不得超过3m,存在实体概念错误,易导致误解为所有配电箱(包括总配电箱、分配电箱)均需满足此距离,与规范不符。",
- "risk_level": "高风险",
- "review_references": "8 配电箱及开关箱## 8.1 配电箱及开关箱的设置 8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n【Top2 参考文档】\n【文件】68《施工现场临时用电安全技术规范》(JGJ46-2005).md\n【标题】8 配电箱及开关箱\n8 配电箱及开关箱## 8.1 配电箱及开关箱的设置\n8.1.1 配电系统应设置配电柜或总配电箱、分配电箱、开关箱,实行三级配电。\n\n配电系统宜使三相负荷平衡。220V或380V单相用电设备宜接入220/380V三相四线系统;当单相照明线路电流大于30A时,宜采用220/380V三相四线制供电。\n\n室内配电柜的设置应符合本规范第6.1节的规定,\n\n8.1.2 总配电箱以下可设若干分配电箱;分配电箱以下可设若干开关箱。\n\n总配电箱应设在靠近电源的区域,分配电箱应设在用电设备或负荷相对集中的区域,分配电箱与开关箱的距离不得超过 $3 0 \\mathrm { m }$ ,开关箱与其控制的固定式用电设备的水平距离不宜超过 $3 \\mathrm { m }$\n\n8.1.3 每台用电设备必须有各自专用的开关箱,严禁用同一个开关箱直接控制2台及2台以上用电设备(含插座)。\n\n8.1.4 动力配电箱与照明配电箱宜分别设置。当合并设置为同一配电箱时,动力和照明应分路配电;动力开关箱与照明开关箱必须分设。\n\n8.1.5 配电箱、开关箱应装设在干燥、通风及常温场所,不得装设在有严重损伤作用的瓦斯、烟气、潮气及其他有害介质中,亦不得装设在易受外来固体物撞击、强烈振动、液体浸溅及热源烘烤场所。否则,应予清除或做防护处理。\n\n8.1.6 配电箱、开关箱周围应有足够2人同时工作的空间和通道,不得堆放任何妨碍操作、维修的物品,不得有灌木、杂草。\n\n8.1.7 配电箱、开关箱应采用冷轧钢板或阻燃绝缘材料制作,钢板厚度应为 $1 . 2 { \\sim } 2 . 0 \\mathrm { m m }$ ,其中开关箱箱体钢板厚度不得小于 $1 . 2 \\mathrm { r n m }$ ,配电箱箱体钢板厚度不得小于 $1 . 5 \\mathrm { m m }$ ,箱体表面应做防腐处理。\n\n8.1.8 配电箱、开关箱应装设端正、牢固。固定式配电箱、开关箱的中心点与地面的垂直距离应为 $1 . 4 { \\sim } 1 . 6 \\mathrm { m }$ 。移动式配电箱、开关箱应装设在坚固、稳定的支架上。其中心点与地面的垂直距离宜为 ${ 0 . 8 } \\mathrm { { \\sim } } 1 . 6 \\mathrm { { m } }$ 。\n\n8.1.9 配电箱、开关箱内的电器(含插座)应先安装在金属或非木质阻燃绝缘电器安装板上,然后方可整体紧固在配电箱。开关箱箱体内,\n\n金属电器安装板与金属箱体应做电气连接。\n\n8.1.10 配电箱、开关箱内的电器(含插座)应按其规定位置紧固在电器安装板上,不得歪斜和松动。\n\n8.1.11 配电箱的电器安装板上必须分设N线端子板和PE线端子板。N线端子板必须与金属电器 安装板绝缘;PE线端子板必须与金属电器安装板做电气连接。\n\n进出线中的N线必须通过N线端子板连接;PE线必须通过PE线端子板连接。\n\n8.1.12 配电箱、开关箱内的连接线必须采用钢芯绝缘导线。导线绝缘的颜色标志应按本规范第5.1.11条要求配置并排列整齐;导线分支接头不得采用螺栓压接,应采用焊接并做绝缘包扎,不得有外露带电部分。\n\n8.1.13 配电箱、开关箱的金属箱体、金属电器安装报板以及电器正常不带电的金属底座、外壳等必须通过PE线端子板与PE线做电气连接,金属箱门与金属箱体必须通过采用编织软铜线做电气连接。\n\n8.1.14 配电箱、开关箱的箱体尺寸应与箱内电器的数量和尺寸相适应,箱内电器安装板板面电器安装尺寸可按照表8.1.14确定。\n\n表8.1.14 配电箱、开关箱内电器安装尺寸选择值 \n\n\n\n\n\n8.1.15 配电箱、开关箱中导线的进线口和出线口应设在箱体的下底面。\n\n8.1.16 配电箱、开关箱的进、出线口应配置固定线卡,进出线应加绝缘护套并成束卡固在箱体上,不得与箱体直接接触。移动式配电箱、开关箱的进、出线应采用橡皮护套绝缘电缆,不得有接头。\n\n8.1.17 配电箱、开关箱外形结构应能防雨、防尘。\n\n## 8.2 电器装置的选择\n8.2.1 配电箱、开关箱内的电器必须可靠、完好,严禁使用破损、不合格的电器。\n\n8.2.2 总配电箱的电器应具备电源隔离,正常接通与分断电路,以及短路、过载、漏电保护功能。电器设置应符合下列原则:\n\n1 当总路设置总漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当所设总漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设总断路器或总熔断器。\n\n2 当各分路设置分路漏电保护器时,还应装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。当分路所设漏电保护器是同时具备短路、过载、漏电保护功能的漏电断路器时,可不设分路断路器或分路熔断器。\n\n3 隔离开关应设置于电源进线端,应采用分断时具有可见分断点,并能同时断开电源所有极的隔离电器。如采用分断时具有可见分断点的断路器,可不另设隔离开关;\n\n4 熔断器应选用具有可靠灭弧分断功能的产品。\n\n5 总开关电器的额定值、动作整定值应与分路开关电器的额定值、动作整定值相适应。\n\n8.2.3 总配电箱应装设电压表、总电流表、电度表及其他需要的仪表。专用电能计量仪表的装设应符合当地供用电管理部门的要求。\n\n装设电流互感器时,其二次回路必须与保护零线有一个连接点,且严禁断开电路。\n\n8.2.4 分配电箱位装设总隔离开关、分路隔离开关以及总断路器、分路断路器或总熔断器、分路熔断器。其设置和选择应符合本规范第8.2.2条要求。\n\n8.2.5 开关箱必须装设隔离开关、断路器或熔断器,以及漏电保护器。当漏电保护器是同时具有短路、过载、漏电保护功能的漏电断路器时,可不装设断路器或熔断器。隔离开关应采用分断时具有可见分断点,能同时断开电源所有极的隔离电器,并应设置于电源进线端。当断路器是具有可见分断点时,可不另设隔离开关。\n\n8.2.6 开关箱中的隔离开关只可直接控制照明电路和容量不大于3.0kW的动力电路应采用断路器控制,操作频繁时还应附设接触器或其他启动控制装置。\n\n8.2.7 开关箱中各种开关电器的额定值和动作整定值应与其控制用电设备的额定值和特性相适应。通用电动机开关箱中电器的规格可按本规范附录C选配。\n\n8.2.8 漏电保护器时装设在总配电箱、开关箱靠近负荷的一侧,且不得用于启动电气设备的操作。\n8.2.9 漏电保护器的选择应符合现行国家标准《剩余电流动作保护器的一般要求》GB6829和《漏电保护器安装和运行的要求》GB13955的规定。\n\n8.2.10 开关箱中漏电保护器的额定漏电动作电流不应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间不应大于 \n0.1s。\n\n使用于潮湿或有腐蚀介质场所的漏电保护器应采用防溅型产品,其额定漏电动作电流不应大于15mA,额定漏电动作时间不应大于0.1s。\n\n8.2.11 总配电箱中漏电保护器的额定漏电动作电流应大于 $\\mathbf { 3 0 m A }$ ,额定漏电动作时间应大于\n\n0.1s,但其额定漏电动作电流与额定漏电动作时间的乘积不应大于 $3 0 \\mathrm { m A } \\cdot \\mathrm { s } _ { \\circ }$\n\n8.2.12 总配电箱和开关箱中漏电保护器的极数和线数必须与其负荷侧负荷的相数和线数一致。\n\n8.2.13 配电箱、开关箱中的漏电保护器宜选用无辅助电源型(电磁式)产品,或选用辅助电源故障时能自动断开的辅助电源型(电子式)产品。当选用辅助电源故障时不能自动断开的辅助电源型(电子式)产品时,应同时设置缺相保护。\n\n8.2.14 漏电保护器应按产品说明书安装、使用。对搁置已久重新使用或连续使用的漏电保护器应逐月检测其特性,发现问题应及时修理或更换。\n\n \n图8.2.14 漏电保护器使用接线方法示意\n\n$\\mathrm { L } _ { 1 }$ 、 $\\mathrm { L } _ { 2 }$ 、 $\\mathrm { L } _ { 3 }$ 一相线;N一工作零线;PE一保护零线、保护线;1一工作接地;2一重复接地;T一变压器;RCD一漏电保护器;H一照明器;W一电焊机;M一电动机\n\n8.2.15 配电箱、开关箱的电源进线端严禁采用插头和插座做活动连接。\n\n## 8.3 使用与维护\n8.3.1 配电箱、开关箱应有名称、用途、分路标记及系统接线图。\n\n8.3.2 配电箱、开关箱箱门应配锁,并应由专人负责。\n\n8.3.3 配电箱、开关箱应定期检查、维修。检查、维修人员必须是专业电工;检查、维修时必须按规定穿、戴绝缘鞋。手套,必须使用电工绝缘工具,并应做检查、维修工作记录。\n\n8.3.4 对配电箱、开关箱进行定期维修、检查时,必须将其前一级相应的电源隔离开关分闸断电,并悬挂“禁止合闸、有人工作”停电标志牌,严禁带电作业。\n\n8.3.5 配电箱、外关箱必须按照下列顺序操作:\n\n1 送电操作顺序为:总配电箱一 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 开关箱; \n2 停电操作顺序为:开关箱 $\\twoheadrightarrow$ 分配电箱一 $\\twoheadrightarrow$ 总配电箱。 \n但出现电气故障的紧急情况可除外。\n\n8.3.6 施工现场停止作业1小时以上时,应将动力开关箱断电上锁。\n\n8.3.7 开关箱的操作人员必须符合本规范第3.2.3条规定。\n\n8.3.8 配电精、开关箱内不得放置任何杂物,并应保持整洁。\n\n8.3.9 配电箱、开关箱内不得随意拉接其他用电设备。\n\n8.3.10 配电箱、开关箱内的电器配置和接线严禁随意改动。\n\n熔断器的熔体更换时,严禁采用不符合原规格的熔体代替。漏电保护器每天使用前应启动漏电试验按钮试跳一次,试跳不正常时严禁继续使用。\n8.3.11 配电箱、开关箱的进线和出线严禁承受外力,严禁与金属尖锐断口、强腐蚀介质和易燃易爆物接触。\n",
- "reference_source": "68《施工现场临时用电安全技术规范》(JGJ46-2005).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-22": {
- "metadata": {
- "review_location_label": "第15页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "上下时不得手持物件;必须从指定的路线上下,不得在高空投掷材料或工具等物;不得将易滚易滑的工具、材料堆放在脚手架上;工作完毕应及时将工具、零星材料、零部件等一切易坠落物件清理干净,以防落下伤人,上下大型零件时,应采用可靠的起吊机具。\n12)要处处注意危险标志和危险地方。夜间作业,必须设置足够的照明设施,否则禁止施工。\n13)严禁上下同时垂直作业。若特殊情况必须垂直作业,应经有关领导批准,并在上下两层间设备专用的防护棚或者其他隔离设施。\n14)严禁坐在高空无遮栏处休息,防止坠落。\n15)卷扬机等各种升降材料的设备严禁上下载人。\n16)超过3米长的铺板不能同时站两人作业。\n17)遇六级以上大风时,禁止露天进行高空作业。\n(4)起重作业安全保障措施\n1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。\n2)起重作业前,检查起重设备的空载运转、回转、起重、变幅等各种机构的制动器、安全限位、防护装置等,确认正常后方可作业。\n3)起重作业时,应依次逐级操作,严禁越档操作,在变换运转方向时,应将控制器转到零位,停止转动后,再转向另一方向,严禁急开急停。\n4)司机、起重信号司索工等人员应经专业培训,取得特种设备作业人员证后,方可上岗作业。\n5)起吊物件旋转或移动,应将起吊物提升至可能遇到的障碍物上方0.5m 以上。\n6)起重作业严格执行安全操作规程,严格遵守“十不吊”的要求。\n7)吊装人员必须戴安全帽、安全带;\n8)吊装工作区设有明显标志,并设专人警戒,与吊装无关人员严禁入内。起重机工作时,起重臂杆旋转半径范围内,严禁站人或通过。\n9)运输、吊装构件时,严禁在被运输、吊装的构件上指挥和放置材料、工具。10)吊装时,必须用吊笼或钢丝绳、保险绳绑扎牢固后才能吊运和传递,不得随意抛掷材料物体、工具,防止滑脱伤人或意外事故。\n11)构件必须绑扎牢固,起吊点应通过构件的重心位置,吊升时应平稳,避免振动或摆动,以防构件脱落。\n12)起吊构件时,速度不应太快,不得在高空停留过久,严禁猛升猛降,以防构件脱落。\n13)构件就位后临时固定前,不得松钩、解开吊装索具。构件固定后,应检查连接牢固和稳定情况,当确定连接安全可靠,才可拆除临时固定工具和进行下一步吊装。\n14)严禁夜间施工作业。\n15)起重机行驶的道路必须平整、坚实、可靠,停放地点必须平坦。\n16)起重机不得停放在斜坡道上工作,不允许起重机两条履带或支腿停留部位一高一低或土质一硬一软。\n17)起吊构件时,吊索要保持垂直,不得超出起重机回转半径斜向拖拉,以免超负荷和钢丝绳滑脱或拉断绳索而使起重机失稳。起吊重型构件时应设牵拉绳。\n18)起重机操作时,臂杆提升、下降、回转要平稳,不得在空中摇晃,同时要尽量避免紧急制动或冲击振动等现象发生。未采取的可靠技术措施和未经有关技术部门批准,起重机严禁超负荷吊装,以避免加速机械零件的磨损和造成起重机倾覆\n19)起重机尽量避免满负荷行驶;在满负荷或接近满负荷时,严禁同时提升与回旋(起升与水平转动或起升与行走)两种动作,以免因道路不平或惯性力等原因引起起重机超负荷而酿成翻车事故。\n20)吊装时,安排专人负责统一指挥,指挥人员应位于操作人员视线能及的地点,并能清楚地看到吊装的全过程。起重机驾驶人员必须熟悉信号,并按指挥人员的各种信号操作;指挥信号应事先统一规定,发出的信号要鲜明、准确。\n21)在风力等于或大于六级时,禁止在露天进行起重机移动和吊装作业。\n22)起重机停止工作时,应刹住回旋和行走机构,锁好司机室门。吊钩不得悬挂构件,并应升到高处,以免摆动伤人和造成吊车失稳。\n(5)架桥机监测监控措施\n1)起升下降高速检查:实时记录吊具起升高度和下降深度,并验证数值。\n2)运行行程:检查系统并实时记录小车运行、支腿运行、整机运行等运行行程,并验证数值。\n3)水平度:检查系统实时记录并显示整体水平度的数值,用水平传感器等方式验证起重机的整体水平度。\n4)风速检查系统实时记录并显示风速值,并验证数值。\n5)操作指令:在空载的条件下,根据现场实际情况,对架桥机的动作进行操作验证,各种动作在显示器上应实时显示。试验后,查看相关的记录,信息能保存和回放。\n6)支腿垂直度:检采用水平传感器等方式测量纵向垂直度并记录,验证起重机械的支腿垂直度。\n7)架桥机在试吊过程中采用水准仪对架桥机的支腿、主梁跨中挠度和挂水平弦线方法,检测架桥机主梁水平弯曲变形进行观测并记录。\n8)架桥机日常检查\n①检查所有钢丝绳在滑轮和卷筒上缠绕是否正常;\n②目测检查电气设备,不允许沾染润滑油、润滑脂、冷却剂、水或灰尘;\n③目测检查架桥机车轮和轮胎的安全状况;\n④检查液压系统软管是否有非正常弯曲和磨损;\n⑤检查各工作机构的制动器和离合器的功能是否正常;\n⑥检查架桥机在空载情况下所有控制系统是否处于正常状态;\n⑦检查所有限制装置或保护装置,以及控制手柄或操纵杆的操作状态;\n⑧检查防风锚定装置(固定时)的安全性以及架桥机运行轨道上有无障碍物;⑨检查架桥机是否处于整洁环境,并且远离油罐、废料、工具或物料,已有安全储藏措施的情况除外;检查架桥机的出入口,要求无障碍以及相应的灭火设施应完备;⑩检查所有声光报警装置和信号装置能否正常操作。\n9)架桥机定期检查\n①检查金属结构及其连接件的损坏情况,例如构件的缺损、拉压杆件的弯曲、板件的波浪变形、焊接裂纹和螺栓及其他紧固件的松动;\n②摩擦型螺栓连接,应按规定的扭矩和制造商规定的时间间隔进行检查;\n③检查液压系统有无渗漏;\n④目测检查所有钢丝绳有无断丝、挤压变形、笼状扭曲变形或其他的损坏迹象及过度的磨损和表 面锈蚀情况;\n⑤检查所有钢丝绳端部结点、销轴和固定装置的连接情况;\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;\n⑦检查滑轮和卷筒的裂纹和磨损情况;检查所有滑轮装置是否损坏、绳槽磨损及卡绳情况;\n⑧检查控制器、制动器和离合器的操作和控制情况;检查主起升机构编码器、超速开关、高度限位开关线路是否正常;应做好检查记录并加以保存。\n(4)对不宜遭受雨淋的原材料、半成品采取保护措施。\n(5)专人负责现场设施的防护,发现问题及时解决,减少对施工的影响。\n2、雨季施工安全保障措施\n本工程施工跨越雨季,为保工期、创优质工程,雨季施工期间将积极与当地气象部门保持沟通,随时掌握天气情况,做好施工安排与防护。\n1、雨季施工安排\n(1)做好各项防护工作,做好沿线排水设施;雨季派专人负责排水,同时加强对排水设施的检查和维修,发现问题及时解决。\n(2)积极和气象部门联系,广收气象信息,掌握动态,做好整体工作安排和防汛防雨工作。\n(3)严禁雨天作业。\n(4)为作业工人配备雨衣、雨靴等劳动防护用品。\n2、施工场地要求\n(1)场地排水:对施工现场,根据地形对场地排水系统进行合理布置,以保证水流畅通,不积水。并防止四周水倒流进入场内。\n(2)道路:施工现场主要运输道路路基碾压坚实,做好硬化处理及满足排水要求,对既有道路进行保养,保证雨后正常交通。开挖基坑便道铺设路基箱,保障雨季施工机械通行。\n3、设备设施要求"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 3,
- "medium": 2,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "严禁夜间施工作业",
- "location": "(4)起重作业安全保障措施\n14)严禁夜间施工作业。",
- "suggestion": "建议修改为“夜间作业应确保照明充足且符合安全要求,未经批准不得进行高风险作业”或“除特殊情况并经审批外,禁止夜间进行高风险作业”。",
- "reason": "原文中‘严禁夜间施工作业’属于绝对化用语,不符合实际施工管理中的灵活性要求。在具备足够照明和安全措施的前提下,部分作业可合法合规地在夜间进行。该表述存在工程绝对化风险,可能影响施工组织安排,且与《建设工程安全生产管理条例》等法规中关于‘合理安排作业时间’的原则相悖,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "(4)起重作业安全保障措施 14)严禁夜间施工作业。 与 (2)高空作业安全保障措施 12)夜间作业,必须设置足够的照明设施,否则禁止施工。",
- "suggestion": "将(4)起重作业安全保障措施14)中的'严禁夜间施工作业'修改为'夜间作业时,必须设置足够的照明设施并采取可靠安全措施,否则禁止施工',以与高空作业条款保持一致。",
- "reason": "1) 矛盾点在于:同一施工方案中,高空作业条款允许在设置足够照明的前提下进行夜间作业(‘否则禁止施工’),而起重作业条款却绝对禁止夜间作业(‘严禁’),二者在逻辑上冲突。2) 从安全逻辑看,只要具备足够照明和防护措施,夜间起重作业在技术上是可行的,禁止所有夜间作业属于过度绝对化,与前文允许夜间作业的条件相矛盾。3) 可能导致施工组织混乱,影响工期安排,或在实际执行中因条款冲突而引发违规操作或安全管理漏洞。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "1)起重设备在现场初次使用时应进行试吊,试吊严格按照《起重机试验规范和程序》(GB/T 5905-2011)执行,试吊合格后方可使用。",
- "suggestion": "将规范编号用括号()包裹,正确格式:《规范名称》(编号)",
- "reason": "规范编号未完全被括号包裹",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "架桥机试吊及日常定期检查要求与参考依据不一致",
- "location": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "将‘支腿垂直度需用水平传感器测量,主梁跨中挠度采用水准仪和水平弦线法观测,吊杆螺母每吊装200片梁需进行无损探伤’等内容,调整为与参考依据一致的表述,即:‘起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查’。试吊过程中的监测项目应以确保安全为前提,但不得超出或补充规范未明确要求的量化指标。",
- "reason": "根据【参考依据】,仅规定‘起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查’,未提及支腿垂直度、主梁挠度的具体测量方法(如水平传感器、水准仪、水平弦线法)以及吊杆螺母每200片梁探伤的频率。待审查内容中增加的监测方法和频次超出了参考依据的强制性规定范围,属于对非参数性条文的自行扩展,违反了审查规则中‘禁止编造审查依据或引用【参考依据】以外的信息’的要求。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top2 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "吊杆螺母每吊装200片梁需进行无损探伤与规范要求不符",
- "location": "(5)架桥机监测监控措施\n9)架桥机定期检查\n⑥检查吊具的焊缝及吊具结构有无磨损及永久变形情况,且吊杆、吊杆螺母每吊装200片梁时,应进行无损探伤检验;",
- "suggestion": "将‘每吊装200片梁时’修改为‘每吊装100片梁时’或根据实际设计参数和规范要求明确探伤频率,确保符合安全冗余要求。",
- "reason": "根据《公路桥涵施工技术规范》(JTG-T3650-2020)第17.8.11条第1款规定,吊具应定期进行探伤检查,但未明确具体频次。结合工程安全原则及对关键受力部件的可靠性要求,吊杆螺母作为高应力关键部件,其探伤周期不宜超过100片梁。现行‘200片’周期过长,可能增加安全隐患,不符合‘安全第一’的施工原则,且与高风险设备维护逻辑不符。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top2 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-23": {
- "metadata": {
- "review_location_label": "第17页:第五章 施工安全保证措施->二) 技术保证措施",
- "original_content": "(1)防汛、工程防雨器材、防护用品及抽排水设备准备齐全。\n(2)机电设备的电闸箱采取防雨、防潮等措施,并安装好接地保护装置。(3)对大型机械设备进行全面检查,使其符合规程要求。\n3、夏季施工安全保证措施\n1、夏季劳保防护措施\n桥址区夏季气温较高,雨热同期,带来很大质量、安全、地质灾害隐患。因此夏季施工应以安全生产为主题,以“防暑降温”为重点,切实抓好安全生产,确保工程质量和施工人员的生命健康。\n(1)在现场开展防暑降温保健、中暑急救等卫生知识的宣传工作。\n(2)调整作息时间,避开中午高温时间工作,严格控制工人加班加点,高处作业工人的工作时间适当缩短,保证工人有充足的休息和睡眠时间;保证工人们的身心健康;加强对工人身体状况的检查工作,搞好医疗保健。(3)采用多种形式,对施工人员进行防暑降温知识的宣传教育,使施工人员知道中暑症状,学会对中暑病人采取应急措施。\n(4)对高温、高处作业的工人,经常进行健康检查,发现作业禁忌者,及时调整高温和高处作业岗位;\n(5)日最高气温达到39℃以上时,当日应停止作业\n(6)开展“热天绿豆汤,防暑保健康”活动,安排食堂经常性地熬绿豆汤,免费供给工人防暑。\n4、冬季施工安全保证措施\n1、冬季混凝土施工设备保养措施\n(1)在进入冬季前对所有机械设备做全面的维修和保养,作好油水管理工作,结合机械设备的换季保养,及时更换相应牌号的润滑油;对使用防冻液的机械设备确保防冻液符合当地防冻要求;未使用防冻液的机械设备要采取相应的防冻措施(采取停机后排放冷却水)。\n(2)各种车辆使用的燃油,要根据环境气温选择相应的型号,冷车起步时,要先低速运行一段路程后再逐步提高车速。\n(3)冬季车辆启动发动机前,严禁用明火对既有燃油系统进行淤热,以防止发生火灾。\n(4)冰雪天行车,汽车要设置防滑链;司机在出车前检查确认车辆的制动装置是否达到良好状态,不满足要求时不得出车,遇有六级以上大风、大雪大雾不良气候时停止运行。\n(5)严格执行定机定人制度,机械操作人员要坚守岗位,看管好设备,并作好相应的记录。\n5、职业健康保证措施\n(1)劳保措施\n1)接触粉尘、有毒有害气体等有害、危险施工环境的作业职工,按有关规定发放个人劳动保护用品,并监督检查使用情况,以确保正常使用;\n2)加强机械保养,减少施工机械不正常运转造成的噪音;\n3)对于噪音超标的机械设备,采用消音器降低噪音。洞内运输机械行驶过程中,只许按低音喇叭,严禁长时间鸣笛;\n4)对经常接触有噪音的职工,加强个人防护,佩带耳塞消除影响;\n5)按照劳动法的要求,做好民工的劳动保护装备工作,根据每个工种的人数以及劳动性质,由安全部门负责采购,配备充足而且必要的劳动保护用品。同时加强行政管理,落实劳动保护措施。\n6)劳动保护装备要符合以下要求:\n采购劳动保护用品时,必须审核产品的生产许可证、产品合格证和安全鉴定证,确保产品的质量和使用安全;对于未列入国家生产许可证管理范围的劳动防护用品,按路用劳动防护用品许可证制度进行质量管理;\n施工人员必须分工按规定配齐劳动保护用品,并配戴上岗。进入施工现场的其他人员必须配戴安全帽,闲杂人员不得出入施工现场;\n由安全生产领导小组负责对施工人员进行劳动保护方面的检查,对漏配、缺配劳动保护用品的施工人员,责令补发劳动保护用品;对不按规定配戴劳动保护用品上岗的人员,进行批评教育,并责令其改正,对屡教不改的人员,将采取罚款、停岗等措施予以惩罚"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "条件结论不匹配",
- "location": "3、夏季施工安全保证措施\n1、夏季劳保防护措施\n(5)日最高气温达到39℃以上时,当日应停止作业",
- "suggestion": "将‘当日应停止作业’修改为‘当日应停止高处、露天等高温作业’",
- "reason": "1) 原文条件为‘日最高气温达到39℃以上’,结论为‘当日应停止作业’,该结论过于绝对,未区分作业类型,与常识及施工实际不符;2) 高温环境下并非所有作业都必须完全停止,如地下作业、室内作业等可继续进行,强制‘停止所有作业’缺乏合理性;3) 此类不加区分的绝对化结论可能导致施工组织混乱,影响工期,且违背‘科学防暑’原则,可能引发不必要的资源浪费或管理僵化,存在中等风险。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-24": {
- "metadata": {
- "review_location_label": "第27页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图8-1 会禄高速ZCB1-3项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "reference_check",
- "chapter_code": "basis",
- "check_item_code": "basis_reference_check",
- "check_result": {
- "issue_point": "编制依据格式错误",
- "location": "为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。",
- "suggestion": "补充编号,格式为(编号)",
- "reason": "编号缺失",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-25": {
- "metadata": {
- "review_location_label": "第27页:第十章 应急处理措施->二) 职责",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指挥部、总监办,1小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工作,并保证通道的畅通。3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,写出应急处置报告。\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-26": {
- "metadata": {
- "review_location_label": "第27页:第十章 应急处理措施",
- "original_content": "二) 职责\n1.应急救援领导小组\n应急救援领导小组应抓好日常施工安全监督检查,制定施工安全防范措施和应急抢险预案,并落实到施工现场。接到现场事故报告项目经理部立即组织有关人员率队赶赴现场指挥抢险救援工作。并按应急抢险职能机构开展工作,到现场后立即调查事故发生初步原因、发生地点、设备损失等情况报告项目部应急小组,应急小组接到报告后立即上报镇广公司、指挥部、总监办,1小时内报告地方行业主管部门,及时组织人员、机具、材料进行抢险修复工作。\n应急领导小组应根据国家有关法律法规的规定、当地建设行政主管部门制定的应急救援预案和集团公司及本单位的应急救援预案,组织开展事故应急知识培训教育和宣传工作。在接到事故现场人员的报告后,领导小组成员必须根据应急预案的内容、结合现场实际、制定抢险救援具体方案,迅速到达事故发生现场,组织指挥现场应急人员开展应急救援,并采取措施控制危害源,防止事故的进一步扩大,最大限度地减少事故造成的人身伤亡和财产损失,保护好事故现场。\n2.抢险抢修组\n由各施工队队长负责,根据应急救援领导小组制定的抢险救援具体方案实施抢险救援工作,并保证通道的畅通。3.通讯联络组\n由领导小组负责,通知各有关人员迅速赶到现场,根据实际情况与当地通信部门协商,共同建立应急救援通信保障体系,确保事故发生后应急救援指挥通信畅通。负责向社会救援机构报警,请求提供帮助,报警时要清楚说明事故发生时间、地点、方位、事故是否造成人员伤亡等情况。报警后,要立即派人在现场的通道口迎接救护车、救援人员、救援车辆的进入。负责事故处理中各救援队伍之间的通讯联系。\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119\n会东县人民医院:0834-5425300\n4.医疗救护组\n由项目部综合办公室负责,负责现场的医疗救护,组织救护车辆及医务人员、器材进入指定地点,组织现场抢救伤员,对事故中的负伤人员进行包扎救治、人工呼吸、心脏按摩苏醒等应急处置措施,对伤情严重的,应立即与当地医疗机构联系,专人负责送至附近医院,办理入院手续,实施紧急抢救。\n发生灾害时,能迅速赶赴现场抢救人员和处理灾害。项目部成立辅助救护队,辅助救护队是不脱产的救护队。辅助救护队是由有经验,身体符合专职救护队员标准的工人,以及工程技术人员所组成。\n5.疏散警戒组\n由项目部安保科负责,事故发生时,负责现场周围人员和群众安全疏散工作,避免二次伤害,设置警戒线,保护现场,维持现场秩序,保证现场道路畅通,禁止无关人员、车辆通行和进入。\n6.后勤保障组\n由项目部机材科、综合办公室、财务科负责,准备和保证应急救援车辆、物资、资金、人员等所需应急资源的供应,并确保供应渠道畅通、便捷。\n7.善后处理组\n由项目部安保科负责,负责伤亡人员的亲属接待、安抚和善后理赔工作,保障社会稳定。积极稳妥深入细致地做好善后处理工作,包括:稳定员工、受伤者及其家属的情绪;对安全事故或突发紧急事件中的伤亡人员、应急处置工作人员按有关规定给予抚恤或赔偿;与保险单位一起做好伤亡人员及财产损失的理赔工作等。\n8.事故调查组\n由项目部安保科负责,调查组收集事故资料,掌握事故情况,查明事故原因,评估事故影响程度和损失,分清事故责任并提出相应处理意见,提出防止事故重复发生的意见和建议,写出应急处置报告。\n\n<表格></表格>\n\n三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n信息传递\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。\n\n四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。\n\n9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老化、脆裂、漏气的胶管不准使用。\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般不小于10米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20米。不准使用过短或过长的软管,接头出必须用专用的卡子或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。4、严禁从高处向下方抛物料。\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。\n\n在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护和运输等应急救援力量到位。3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状态,并及时予以补充和更新。\n表8-1 应急物资一览表\n\n<表格></表格>\n\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有效投入。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【安全保证体系】内容: 1.引用公司标准体系框图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.引用公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含安全保证体系包含:1.引用公司标准体系框图;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件16)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "safety",
- "check_item_code": "safety_completeness_check",
- "check_result": "第十章 应急处理措施下缺失安全保证措施中的【监测监控措施】内容: 1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "建议补充:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十章 应急处理措施内容属于,专项施工方案内容要求中的 【安全保证措施】 板块,应包含监测监控措施包括:1.监测组织机构、监测范围、监测项目、监测点的设置;2.监测仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容;",
- "review_references": "五、安全保证措施 本章包含安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急 处置措施等五个方面。 安全保证体系(附件15)应引用公司标准体系框图。组织保证措施包含安全管理组织机构、人员安全职责。安全管理组织机构基于 项目经理为组长的安全工作领导小组,小组中包括项目经理、项目书记、项目总工、 项目副经理、项目部各职能部门、专业分包单位(协作队伍)项目负责人和项目技 术负责人等。 技术保证措施应按总体安全措施,主要工序的安全保证措施进行梳理和说明, 包含保证施工过程中主要工序的人员、材料、机械设备安全所采取的技术措施,以 及材料运输、吊装,施工作业区域的临边、临空、洞口安全防护设施、安全母绳布 置,人员上下(横向)通道布置等。 监测监控措施包括监测组织机构、监测范围、监测项目、监测点的设置、监测 仪器设备、监测方法、监测频率、预警值及控制值、信息反馈等内容。 应急处置措施包含应急处置程序、应急处置措施、应急物资及设备保障、交通 疏导与医疗救援、后期处置等六个方面。应急处置程序应采用公司标准应急处理程 序图(附件19)。应急处置措施应根据方案实施过程潜在的危险源,判断出可能造 成的伤害类型,制定出有针对性的救援措施,保证在事故发生后伤者能得到有效和 及时的救治,如触电、有毒有害气体中毒、高处坠落、物体打击、施工现场及驻地 火灾等事故;应急物资及设备保障应根据事故的不同,以表格的形式说明救援的物 品名称、规格型号、单位、数量、监管人、联系电话等内容;交通疏导与医疗救援 应以表格的形式明确施工工点附近的医疗救援机构名称、联系电话、距离等,并附 应急救援线路图。后期处置包括善后处理、调查与评估、恢复生产等三个方面。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-27": {
- "metadata": {
- "review_location_label": "第28页:第十章 应急处理措施->三) 预警及信息报告",
- "original_content": "三) 预警及信息报告\n项目部根据应急工作需要,通过建立预警机制,健全应急处置和应急响应的各项工作程序,完善应急管理运行机制,做好各项应急准备工作,提高应急管理能力。针对获悉可能发生的Ⅲ级及以上事故,开展风险分析,完善预警系统,做到早发现、早报告、早处置。\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n信息报告\n(1)信息上报与通报\n事故发生后,事故现场有关人员应当立即向本项目部项目经理报告;项目经理接到事故报告后,应当于1小时内向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告,同时按照事故响应级别向所在项目和公司应急救援办公室报告,应急救援办公室接到报告后,同样按照事故响应级别向组长、副组长和上级行业主管单位和政府有关部门报告。\n情况紧急时,事故现场有关人员可以直接向事故发生地县级以上人民政府安全生产监督管理部门和负有安全生产监督管理职责的有关部门报告。\n(2)事故报告内容\n1)事故发生单位概况;2)事故发生的时间、地点以及事故现场情况;\n3)事故的简要经过;\n4)事故已经造成或者可能造成的伤亡人数(包括下落不明的人数)和初步估计的直接经济损失;\n5)已经采取的措施;\n6)其他应当报告的情况。\n信息传递\n事故发生后,安全环保科负责与公司、地方政府应急救援办公室的联络,保证信息报告和指令传达的畅通。应急救援指挥部通过发布公告、通知和召开紧急会议的形式向各有关部门或单位通报事故情况,同时通过电话报告、网络、传真和电子邮件的方式传递事故信息。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 1,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "预警及信息报告中的应急响应等级表述存在绝对化用语风险",
- "location": "三) 预警及信息报告\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将‘可能造成3人及以上死亡的事故’修改为‘可能发生3人及以上死亡的事故’,避免使用‘可能造成’这种绝对化、结果导向的表述,以符合工程安全预案中对不确定性的客观描述要求。",
- "reason": "‘可能造成3人及以上死亡’存在绝对化用语风险,容易被解读为对事故后果的确定性判断,违背应急管理中对风险不确定性的科学认知,属于工程表述中的绝对化用语,可能引发对责任认定或风险预判的误解,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": {
- "issue_point": "逻辑矛盾",
- "location": "三) 预警及信息报告\n预警等级划分\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将Ⅲ级响应的描述修改为:‘Ⅲ级响应:重伤事故或可能造成1-2人伤亡的事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。’",
- "reason": "1) 矛盾点在于:Ⅲ级响应定义为‘重伤事故’,但Ⅱ级响应为‘死亡1-2人事故’,而‘重伤’在严重程度上通常低于‘死亡’,但此处Ⅲ级响应却对应更低级别的事故,与响应等级从Ⅲ到Ⅰ递增的逻辑不符。2) 依据常规应急响应等级划分原则,等级越高,事故严重性越大,而当前设置中‘重伤事故’(Ⅲ级)的严重性低于‘死亡1-2人’(Ⅱ级),违反了等级递进逻辑。3) 此逻辑错误可能导致应急响应启动时机混乱,如重伤事故未被及时升级响应,延误救援,存在安全隐患。",
- "risk_level": "高风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-28": {
- "metadata": {
- "review_location_label": "第29页:第十章 应急处理措施->四) 应急响应",
- "original_content": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 1,
- "medium": 1,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急响应分级中关于死亡人数的表述存在绝对化用语风险",
- "location": "Ⅰ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。",
- "suggestion": "将‘可能造成3人及以上死亡的事故’修改为‘可能造成3人及以上人员伤亡的事故’,或进一步明确为‘可能造成重大人员伤亡的事故’,避免使用具体死亡人数作为判定标准,以规避绝对化表述带来的风险。",
- "reason": "原文中使用‘3人及以上死亡’作为Ⅰ级响应的触发条件,属于对人员伤亡结果的绝对化表述,存在潜在的法律和舆情风险。在工程应急响应中,应避免以具体死亡人数作为唯一判断标准,以防引发对事故严重性预判的误解或对应急响应机制的质疑。此类表述可能被解读为对生命价值的量化,不符合国家关于安全生产和应急管理中以人为本、预防为主的原则,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "起重机械倾覆及吊装构件滑落等应急处置场景中安全措施与设备管理要求不一致",
- "location": "四) 应急响应\n响应分级及程序\n应急响应等级分为三级,分别为:\nⅢ级响应:重伤事故。由项目经理部应急救援小组启动本应急预案,项目经理、党支部书记、安全环保科及有关部门负责人等立即赶赴事故现场,负责组织指挥和救援处置。\nⅡ级响应:死亡1-2人事故或被困1-2人事件。由分公司应急救援领导小组启动其应急预案,项目相应职能部门自动加入分公司应急领导小组,服从指挥,统一参与救援工作。\nⅠ级响应:可能造成3人及以上死亡的事故。由公司应急救援指挥部启动其预案,项目相应职能部门自动加入应急领导小组,服从指挥,统一参与救援工作。\n召开应急会议\n达到本预案应急响应条件时,应急领导小组接到信息报告后,应组织有关部门召开应急工作会议,根据突发事件、险情或预警的严重程度、影响范围和可控性,对信息报告进行综合研判,研究、安排应急工作。情况紧急时,可直接电话通知并作出指示。\n现场处置措施\n(1)抢险与救援\n1)项目部应急救援小组\n迅速了解、掌握事故发生的时间、地点、原因、人员伤亡和财产损失情况,涉及或影响范围,已采取的措施和事故发展趋势等;及时将现场情况向项目及政府有关部门报告,并按事故紧急处置方案会同各专业处置小分队联合指挥实施;\n2)通讯联络小分队:赶赴事故现场,及时采取措施,确保通讯联络畅通。对大型事故进展救援情况进行跟踪报道。\n3)综合协调小分队:落实省安监局、公司领导关于抢险救援的指示和批示,协调各单位和其他专业处置组的抢险救援工作,保障抢险救援工作进展情况的信息畅通。\n4)物资设备小分队:协调有关部门调集运输车辆和物资投入抢险救援。\n5)事故调查小分队:配合政府有关部门实施现场勘察、取证和调查工作。\n6)专家技术小分队:迅速组织有关专家为抢险救援提出技术性方案和措施,并组织实施,参与事故技术分析、鉴定、调查等工作。\n7)善后协调小分队:协调组织有关部门和人员妥善做好伤亡人员的善后事宜。\n8)项目经理部立即启动应急预案并安排所有救援力量赶赴现场,实施救援处置;迅速组织人员对事故现场及周边地区和道路进行警戒、控制,组织人员有序疏散。同时通知当地有关医疗单位及时对伤亡人员实施救治和处置。\n9)加强与当地医院、公安等部门的联系,一旦发生险情时确保能够得到紧急救援。事故处理结束后,立即有序组织复工生产。\n可依托力量\n(1)地方:项目部距乡镇中心8km、会东县城38km,可适时对紧缺物资进行购置。\n(2)相邻分部,距离2.5km,可于20分钟内赶到现场。(3)地方机构:\n会东县应急管理局:0834-5418258\n会东县消防大队:0834-119 会东县人民医院:0834-5425300\n图8-2 应急救援路线图(预制梁场-项目部)\n图8-3 应急救援路线图(项目部-会东县)\n4.突发事件的应急措施\n(1)机械伤害事故\n对所有各种机械设备进场后,必须由机务部负责人会同安全员和使用机械的人员共同对该机械设备进行进场验收工作,经验收发现安全防护装置不齐全的或有其它故障的应退回设备保障部门进行维修和安装。设备安装调试合格后,应进行检查,并按标准要求对该设备进行验收,经项目组织验收合格后方能正常使用。使用前要对设备使用人员进行必要的安全技术交底和教育工作,使用人员必须严格执行交底内容及近操作规程操作。使用中要经常对设备进行维修保养,停止使用后切断电源并锁好电闸箱。\n各种机械设备必须专人专机,凡属特种设备,其操作负责人要按规定每周对施工现场的所有机械设备进行检查,发现问题及隐患及时解决处理,确保机械设备的完好,防止机械伤害事故的发生。 \n应急措施:工程施工机械作业是必不可少的,但因不熟悉它的性能或操作不当就容易造成机械伤人的事故,机械作业往往离不开人的协作,在协作中,协作人员稍不留心,同样会造成安全事故。针对我部桥梁施工,主要以钢筋加工机械、吊车、装载机等设备。当发生机械伤人事故时,首先停止作业,断开电源使其机械停止运转,立即组织人员抢救,必要时采取割掉部分结构,当人员被救出来后立即送医院抢救。\n1、起重机械倾覆事故应急处置措施\n当发生起重机械倾覆事故时,首先看起重机司机是否被困在操作室内,检查有无其他人员被砸伤或者掩埋在其下面,相邻构筑物是否受到侵害。若有人员被困,确定被埋人员的位置,立即组织现场急救。当挖救被埋人员时,切勿用机械挖救,以防伤人,同时调用其他起重设备将倾覆起重机缓慢拉起,顶升稳固,再组织抢救被埋人员。\n2、吊装构件滑落应急处置措施\n当发生吊装构件滑落造成物体打击伤害事故时,首先观察伤员受伤部位,失血多少,对于一些微小伤,工地急救员可以临时进行简单的止血、消炎、包扎,然后送往医院处理。伤势严重者,急救人员边抢救边就近送医院。\n3、操作人员高处坠落事故应急处置措施当发现有人从高处坠落摔伤,首先应观察伤员的神志是否清醒,随后看伤员坠落时身体着地部位,再根据伤员的伤害程度的不同,组织救援。\n4、起重伤害现场处置措施\n事故发生后,现场人员应根据事故发生的实际情况针对性采取措施,如有人要受伤时,应对受伤人员进行急救,并大声呼喊临近岗位人员进行帮助。\n如一般机械事故,无人员受伤,起重司机应保持冷静,立即停止起重作业,如重物悬空应在保证安全的情况下,落下重物,停掉电源,立即向上级汇报。\n应急小组成员到达事故现场后,如遇人员受伤应立即实筵现场处置工作,最大限度的减少人员伤害和财产损失,对较轻的受伤人员,视伤情及时进行止血,包扎,固定等措施,送往医院治疗。针对一般机械事故要立即组织人员封锁事故现场,做好警示标识,等待专业维修人员进行处理。\n人员被压在重物下面,立即采取搬开重物或使用起重工具吊起重物等措施,将受伤人员转移到安全地带,进行抢救。\n发生触电时,应立即想办法切断起重机机械电源,然后在抢救触电人员\n受伤人员出现呼吸、心跳停止症状后,必须立即进行人工呼吸。\n起重机械的修复应由具有相关资质的人员或单位进行维修,检查正常后,可恢复使用。\n(2)触电事故\n预防措施:\n1、坚持电气专业人员持证上岗,非电气专业人员不准进行任何电气部件的更换或维修。 \n2、建立临时用电检查制度,按临时用电管理规定对现场的各种线路和设施进行检查和不定期抽查,并将检查、抽查记录存档。 \n3、检查和操作人员必须按规定穿戴绝缘胶鞋、绝缘手套;必须使用电工专用绝缘工具。临时配电线路必须按规范架设,架空线必须采用绝缘导线,不得采用塑胶软线,不得成束架空敷设,不得沿地面明敷。\n4、施工机具、车辆及人员,应与线路保持安全距离。达不到规定的最小距离时,必须采用可靠的防护措施。\n5、配电系统必须实行分级配电,一个开关控制两台以上的用电设备不可一闸多用,每台设备应由各自开关箱控制,严禁一个开关控制两台以上的用电设备(含插座),以保证安全。6、工地所有配电箱都要标明箱的名称、控制的各线路编号、用途等。\n7、应保持配电线路及配电箱和开关箱内电缆、导线对地绝缘良好,不得有破损、硬伤、带电线裸露、电线受挤压、腐蚀、漏电等隐患。 \n8、独立的配电系统必须采用三相五线制的接零保护系统,非独立系统可根据现场的实际情况采取相应的接零或接地保护方式。各种电气设备和电力施工机械的金属外壳、金属支架和底座必须按规定采取可靠的接零或接地保护。",
- "suggestion": "在‘起重机械发生倾覆事故或吊装构件滑落时的应急处置场景’中,应明确要求‘立即断电’‘封锁现场’‘组织救援’等措施必须由持证人员执行,且所有设备在使用前必须完成安装调试并经验收合格。建议在应急措施中补充:‘所有应急操作必须由持证人员执行,严禁无证人员参与设备断电、救援吊装或现场处置。设备修复后必须重新验收合格方可恢复使用。’",
- "reason": "根据【参考依据】11.4.1规定,钢筋弯曲机等机械设备在安装调试合格后方可使用,且需专人专机、定期检查。虽然该条文针对钢筋弯曲机,但其体现的‘设备验收合格后使用’‘专人专机’‘持证操作’‘定期检查’等原则适用于所有机械设备,包括起重机械。待审查内容中虽提及‘需由持证人员操作,定期检查,安装调试合格后方可使用’,但未在应急处置流程中明确该要求的执行主体和程序,存在安全隐患,可能导致非持证人员在紧急情况下擅自操作设备,引发二次事故。因此,该条款与非参数性安全要求存在不一致,违反了‘设备使用前必须验收合格’‘持证操作’的核心安全原则。",
- "risk_level": "高风险",
- "review_references": "11.4 钢筋弯曲机## 11.4.1 传动系统及工作机构应符合下列规定:\n【Top2 参考文档】\n【文件】65《施工现场机械设备检查技术规范》(JGJ160-2016).md\n【标题】11.4 钢筋弯曲机\n11.4 钢筋弯曲机## 11.4.1 传动系统及工作机构应符合下列规定:\n\n1工作台和弯曲机台面应保持水平;传动齿轮啮合应良好,位置不应偏移;\n\n2芯轴、成型轴、挡铁轴和轴套应完整,安装应牢固,工作台转动应灵活,不应有卡阻;\n\n3芯轴和成型轴、挡铁轴的规格与加工钢筋的直径和弯曲 半径应相适应;芯轴直径应为钢筋直径的2.5倍;挡铁轴应有 轴套。\n\n## 11.4.2 芯轴、挡铁轴、转盘等不应有裂纹和损伤,防护罩应坚固可靠。\n",
- "reference_source": "65《施工现场机械设备检查技术规范》(JGJ160-2016).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-29": {
- "metadata": {
- "review_location_label": "第31页:第十章 应急处理措施->四) 应急响应",
- "original_content": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。\n应急措施:\n1、隔离电源:如果是有旁人帮助,要切断电源开关或者用木棍、绝缘的木条,将电线从触电者的身上移除,避免继续接触电压,以保证患者或者是急救者的安全;\n2、心电监护:如果患者触电很轻微,只表现为心悸、头晕和肢体麻木的情况,患者意识清楚时,可以只对患者进行心电监护,观察患者的呼吸情况,同时检测患者的血电解质,看是否存在肌肉损伤;\n3、心肺复苏:如果电流对触电者心脏产生电击作用,表现为意识丧失、呼吸心脏骤停,此时要立刻对患者进行心肺复苏,进行急救治疗。要强调进行胸外按压,如果有条件可进行人工呼吸的治疗,这是一种危及生命的情况,在基本的现场救治之后,同时要积极呼叫120,将患者送到医院进行救治。\n(3)气体爆炸事故\n预防措施:\n1、检查设备、安全附件(减压器、回火防止器)及管路是否漏气,橡胶软管变质、老化、脆裂、漏气的胶管不准使用。\n2、气瓶必须装设两个防震橡胶圈。氧气瓶应与其他易燃气瓶油脂和其他易燃物品分开保存,严禁与乙炔瓶混装运输。运送时须罩上安全帽。\n3、气瓶禁止敲击,碰撞,要轻拿轻放;不得靠近热源和电气设备;与明火的距离一般不小于10米,(高空作业时,应是与垂直地面处的平行距离)。\n4、严禁放置在通风不良场所,且不得放在橡胶等绝缘体上。\n5、软管长度一般为10-20米。不准使用过短或过长的软管,接头出必须用专用的卡子或退火的金属丝卡紧扎牢。\n6、气瓶附件有毛病或缺损,减压器、回火防止器、压力表损坏变形的禁止使用,阀门螺杆滑丝时应停止使用\n7、如发现漏气应及时进行更新,以免造成事故。\n8、禁止用易产生火花的工具去开启氧气或乙炔气阀门。\n9、开启气阀门时,要用专用工具,动作要缓慢,不要面对减压表,操作者应站在阀口的侧后方;但应观察压力表指针是否灵活正常。\n10、禁止把橡胶软管放在高温管道和电线上,或把重、热物件压在软管上,也不准将软管与电焊用的线敷设在一起。\n11、工作完毕或离开工作现场、要拧上瓶的安全帽,收抬现场,把气瓶放在指定地点。\n应急措施:\n针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。及时通知当地公安、消防部门和医疗及安全管理机构的援助,当发现现场已有人员受到伤害时,必须及时了解现场情况,研究施救方案,不能盲目施救,在施救时,首先确保施救人员的安全,以免造成更大的人身伤亡和经济损失,若发现附近有易燃、易爆可能被受到冲击波的危害时,必须立即撤离至安全地带,公安、消防部门或安全管理机构到达现场后,应积极配合,详细汇报现场情况,使其公安、消防和安全管理机构了解现场情况,以便制定施救方案,采取预备措施。\n(4)高处坠落事故的防护措施\n预防措施:\n1、作业中严格按照施工方案和安全技术交底要求执行,分工明确,听从指挥,协调配合。\n2、严禁赤脚、穿拖鞋和硬底鞋作业。\n3、作业人员在高处作业必须系安全带。4、严禁从高处向下方抛物料。\n应急措施:\n当发生高空坠落时,在通知相关负责人的同时,应组织现场急救工作,在救护过程中,不能盲目施救,否则会因操作不当而造成自身和伤员的更大损伤或生命危险,所以,当发生坠落事故时,首先停止周边其它的作业工作,清除伤员周围现有危险和可能发生的危险因数,尽可能地将伤员平移至安全地点,但是,在移动过程中应使用单架或木板,尽量不能大幅度地搬动伤员。在等待医院救护人员来之前,并有不少于2~3人的专人对受伤人员进行监护,尽量使伤员少说话保持体力,若伤员出现休克状况,必须立即用拇指掐伤员的人中穴,严禁给受伤人员喝水。\n(5)设备倾覆事故的防护措施\n(1)预防措施\n1、合理选型:根据工程需求、场地条件和作业环境等因素,选择合适类型和规格的设备。确保设备的稳定性、承载能力和工作范围等参数满足实际使用要求。\n2、正确安装:严格按照设备安装说明书和相关标准规范进行设备安装。确保设备的基础牢固可靠,基础的尺寸、强度和埋深等符合设计要求。\n3、进行详细的地质勘察,了解施工现场的地质条件和土壤承载能力。根据地质勘察报告,设计合理的设备基础。对于软弱地基或地质条件复杂的区域,采取加固处理措施。\n4、定期对设备的支撑结构进行检查。检查支撑结构的杆件是否有变形、弯曲、裂纹等情况,连接部位的螺栓是否松动,焊缝是否开裂等。\n(2)应急措施\n抢险救援组到达现场后,首先对事故现场进行评估,确定是否存在二次事故的风险。在确保安全的前提下,采取合理的救援措施,如使用吊车、千斤顶等工具对倾覆的门式起重机进行扶正或拆解,解救被困人员;医疗救护组在现场对受伤人员进行紧急救治,并及时送往医院。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施;安全保卫组在事故现场周围设置警戒区域,疏导交通,维护现场秩序,确保救援工作的顺利进行;后勤保障组及时提供救援所需的物资和设备,保障救援工作的顺利开展。确定被困人员的位置和数量,制定合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将门式起重机部分部件吊起,创造救援空间,在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出,对救出的受伤人员进行现场急救处理后,立即送往医院进行治疗。\n(6)设备垮塌事故的防护措施\n(1)预防措施\n1、根据桥梁的跨度、梁型、梁重等实际工程参数,选择合适型号的门式起重机。确保门式起重机的额定起重量、起升高度、跨度等技术指标能够满足施工要求,并留有一定的安全余量。\n2、对门式起重机的设计图纸进行严格审核,检查设计是否符合相关国家标准和行业规范,重点审核门式起重机的结构强度、稳定性、刚度等关键性能指标的计算和设计。\n3、门式起重机的安装必须由具有专业资质的队伍进行。安装人员应熟悉门式起重机的结构和安装工艺,严格按照制造商提供的安装说明书进行操作。\n4、空载试验主要检查各机构的运转情况,确保电机、减速机、制动器等部件工作正常,各动作方向正确、无异常声响和卡滞现象。\n(2)应急措施\n抢险救援组到达事故现场后,首先对现场进行安全评估,确定是否存在二次垮塌的风险。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 5,
- "medium": 2,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急措施中提及启动应急救援案及成立指挥中心等表述存在绝对化和潜在敏感性",
- "location": "应急措施: 针对这些高危险的器材,首先在运输、储存和使用时都必须严格控制,层层把关,稍不留神将会酿成重大事故,当一旦发生时,首先通知项目经理启动应急救援案,成立指挥中心,开通应急热线与通讯网络,同时,立即组织现场人员和附近可能将会受到伤害村民及其他人员撤离至安全地点,并马上设立警戒区域和警戒线,防止不明人员进入。",
- "suggestion": "将‘启动应急救援案’修改为‘启动应急预案’;将‘成立指挥中心’调整为‘成立应急指挥小组’,避免使用可能引发误解的术语。同时,将‘村民’改为‘周边人员’,以避免地域或群体指向性风险。",
- "reason": "‘应急救援案’一词在正式文件中不规范,应为‘应急预案’;‘成立指挥中心’可能被误读为具有行政或组织权力的实体,存在表述不当风险;‘村民’一词在非特定语境下可能引发对特定群体的指向性联想,不符合工程文件中应保持中立、客观的表达要求。该表述虽无恶意,但存在潜在敏感性,属于中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "门式起重机用于桥梁施工中梁体吊装作业的安全要求与参考依据不符",
- "location": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "门式起重机作为非专用架桥机或起重船的替代设备,其用于箱梁架设安装时,应明确其是否通过技术质量监督部门产品认证,并满足起重参数、基础处理、安装资质等要求;若未在参考依据中明确允许使用门式起重机,应补充说明其适用条件或调整为符合规范要求的设备类型。",
- "reason": "参考依据中仅规定箱梁架设应采用通过认证的专用架桥机或具备船舶证书及起重检验证书的起重船,未提及门式起重机的适用性。而待审查内容中提出使用门式起重机进行梁体吊装,涉及设备选型、基础加固、安装资质等安全要求,但该内容未在参考依据中得到支持或明确允许,存在与强制性规定不一致的风险。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top1 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "漏电保护装置设置不符合三级配电、二级漏电保护系统要求",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。",
- "suggestion": "应明确两级漏电保护装置的设置位置,即总配电箱和开关箱均应设置漏电保护器,且动作电流和动作时间应匹配,符合《建筑施工安全检查标准》(JGJ59-2011)第4.1.1条关于‘二级漏电保护系统’的要求。",
- "reason": "根据【参考依据】《建筑施工安全检查标准》(JGJ59-2011)第4条明确规定:施工现场配电系统应采用三级配电、二级漏电保护系统,总配电箱与开关箱应安装漏电保护器,且参数应匹配并灵敏可靠。待审查内容中虽提及‘设两级漏电保护装置’,但未明确其设置层级与系统匹配关系,未体现‘总配电箱’与‘开关箱’的分级配置要求,存在对强制性条文理解不完整的问题。",
- "risk_level": "高风险",
- "review_references": "4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n【Top1 参考文档】\n【文件】133《建筑施工安全检查标准》(JGJ59-2011).md\n【标题】4 配电箱与开关箱\n4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n\n2)箱体结构、箱内电器设置及使用应符合规范要求;\n\n3)配电箱必须分设工作零线端子板和保护零线端子板,保护零线、工作零线必\n\n须通过各自的端子板连接;\n\n4)总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠;5)箱体应设置系统接线图和分路标记,并应有门、锁及防雨措施;6)箱体安装位置、高度及周边通道应符合规范要求;7)分配箱与开关箱间的距离不应超过 $3 0 \\mathrm { m } ,$ ,开关箱与用电设备间的距离不应超过3m。\n",
- "reference_source": "133《建筑施工安全检查标准》(JGJ59-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "电焊机触电保护器设置要求与规范依据不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。\n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。\n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。",
- "suggestion": "将‘电焊机触电保护器’的设置要求明确引用《手持式电动工具的安全 第一部分:通用要求》(GB3883.1)的相关规定,并确保其安装符合‘安全隔离变压器、漏电保护器、控制箱和电源连接器’的配置要求,或参照JTGF90-2015中5.11.7对手持式电动工具的防护要求进行等效匹配。",
- "reason": "根据【参考依据】5.11.7规定,手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器,而电焊机作为一类特殊手持式电动工具,其触电保护应符合该条文要求。但待审查内容中仅提及‘加装电焊机触电保护器’,未明确其配置是否满足上述四项核心设备要求,且未引用GB3883.1或JTGF90-2015中对应条款,存在安全防护措施不完整、依据不充分的风险。",
- "risk_level": "高风险",
- "review_references": "## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n【Top2 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】5.11小型机具\n5.11小型机具## 5.11.1小型机具应有出厂合格证和操作说明书。\n\n## 5.11.2小型机具应制定管理制度,建立台账,并按要求维修、保养和使用。\n\n## 5.11.3作业人员应了解所用机具性能并熟悉掌握其安全操作常识,施工中应正确佩戴各类安全防护用品。\n\n## 5.11.4各种机具不得带病运转。运转中发现不正常时,应先停机检查,排除故障后方可使用。\n\n## 5.11.5不得站在不稳定的地方使用电动或气动机具,必须使用时应有专人监护。\n\n## 5.11.6齿轮传动、皮带传动、联轴器传动的小型机具应设有安全防护装置。\n\n## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n\n## 5.11.8 小型起重机具使用应符合下列规定:\n\n### 1千斤顶应垂直安装在坚实可靠的基础上,底部宜用枕木等垫平。2电动葫芦应设缓冲器,轨道两端应设挡板。电动葫芦不得超载起吊,起吊过程中,手不得握在绳索与吊物之间。3卷扬机卷筒上的钢丝绳应排列整齐,不得在转动中用手拉或脚踩钢丝绳。作业中,不得跨越卷扬机钢丝绳。卷筒剩余钢丝绳不得少于3圈。\n\n## 5.11.9严禁2台及以上手拉葫芦同时起吊重物。\n\n## 5.11.10手持式电动工具的作业应符合现行《手持式电动工具的安全第一部分:通用要求》(GB3883.1)的规定。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "门式起重机用于桥梁施工中梁体吊装作业的设备选型与基础处理要求与规范不符",
- "location": "17.8.11 箱梁的架设安装应符合下列规定:1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。",
- "suggestion": "门式起重机不属于本条文中规定的可用于箱梁架设安装的设备类型。若需使用门式起重机进行梁体吊装,应明确其为临时性辅助吊装设备,并需满足专用架桥机或起重船的相关技术要求,包括设备认证、起重参数匹配、试吊确认及吊具探伤检查等。同时,应补充说明其基础处理、安装资质、稳定性验算等要求,确保与规范中对架设设备的安全控制要求一致。",
- "reason": "根据【参考依据】,箱梁架设安装应采用通过技术质量监督部门产品认证的专用架桥机或具备船舶证书及起重检验证书的起重船。门式起重机未被列为合法架设设备,且其使用涉及设备倾覆和垮塌风险,必须满足与专用架桥机同等的安全控制要求。待审查内容中未体现门式起重机的设备认证、试吊确认、吊具探伤等关键安全措施,也未说明其基础加固与安装资质的合规性,与规范中对架设设备的强制性要求存在明显不符。",
- "risk_level": "高风险",
- "review_references": "17.8.11 箱梁的架设安装应符合下列规定: 1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n【Top1 参考文档】\n【文件】104《公路桥涵施工技术规范》(JTG-T3650-2020).md\n【标题】条文说明:\n条文说明:对于体积和重力均较大的梁体而言,施工中的任何疏忽都会导致严重的后果。条文对整孔预制箱梁的场内移运、场外运输及架设安装等关键工序的规定,均以保证施工安全和结构安全为目的。\n\n17.8.10 箱梁的运输应符合下列规定:\n\n1 采用运梁车运输箱梁时,运梁线路的路面应平坦,地基应有足够的承载能力,纵向坡度应不大于 $3 \\%$ ,横向坡度(人字坡)应不大于 $4 \\%$ ,最小曲率半径应不小于运梁车的允许转弯半径。在运梁车通过的限界内,不得有任何障碍物。\n\n2 运梁车装载箱梁时,其支承应牢固,起步和运行应缓慢,应平稳前进,严禁突然加速或紧急制动。重载运行时的速度宜控制在 $5 \\mathrm { { k m / h } }$ 以内,曲线、坡道地段应严格控制在 $3 \\mathrm { k m / h }$ 以内。当运梁车接近卸梁地点或架桥机时,应减速徐停。\n\n3 采用水运方式运输箱梁时,除支承应符合结构受力及运输要求外,尚应对梁体进行固定,并应采取防止船体摆动的有效措施,保证其在风浪颠簸中不移位。\n\n4 不论采用何种方式运输箱梁,均不得使其在装卸和运输过程中产生任何形式的损伤及变形。\n\n17.8.11 箱梁的架设安装应符合下列规定:\n\n1 箱梁应采用通过技术质量监督部门产品认证的专用架桥机,或由海事部门颁发船舶证书及起重检验证书的起重船进行架设安装,且起重参数应能满足架梁的要求,起重船的锚泊系统应能满足作业水域的条件。吊架和吊具应专门设计。起重设备、吊架和吊具等应经试吊确认安全后方可用于正式施工,吊具应定期进行探伤检查。\n\n2 采用架桥机安装作业时,其抗倾覆稳定系数应不小于 1.3;架桥机过孔时,起重小车应位于对稳定最有利的位置,且抗倾覆稳定系数应不小于 1.5。\n\n3 采用起重船安装作业时,起重船在进入安装位置后应根据流速、流向、风向和浪高等情况抛锚定位,定位时不得利用桥墩墩身带缆;在起重船定位和箱梁架设安装过程中,船体和梁体均不得对桥墩或承台产生碰撞。\n\n4 架设安装时,箱梁在起落过程中应保持水平;顶落梁时梁体的两端应同步缓慢起落,并不得冲击临时支座。箱梁就位时,应设置必要的装置对梁体的空间位置进行精确调整。\n\n5 在墩顶设置的临时支座,其形式和位置应符合设计规定,梁底与支座应密贴;4 个临时支座的顶面相对高差不得超过 $4 \\mathrm { m m }$ 。\n\n6 箱梁架设安装后的吊梁孔应采用收缩补偿混凝土封填。\n",
- "reference_source": "104《公路桥涵施工技术规范》(JTG-T3650-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "漏电保护装置设置要求与规范不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。",
- "suggestion": "将‘必须设两级漏电保护装置’修改为‘总配电箱与开关箱应安装漏电保护器,实行二级漏电保护’,并明确动作电流和动作时间应符合国家规范要求。",
- "reason": "根据【参考依据】4 配电箱与开关箱 第4条:‘总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠’,且第1条明确‘施工现场配电系统应采用三级配电、二级漏电保护系统’。待审查内容中‘设两级漏电保护装置’表述不准确,未体现‘二级漏电保护’应与‘三级配电’系统配套的规范要求,且未说明参数匹配要求,存在技术概念偏差。",
- "risk_level": "高风险",
- "review_references": "4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n【Top1 参考文档】\n【文件】133《建筑施工安全检查标准》(JGJ59-2011).md\n【标题】4 配电箱与开关箱\n4 配电箱与开关箱1)施工现场配电系统应采用三级配电、二级漏电保护系统,用电设备必须有各自专用的开关箱;\n\n2)箱体结构、箱内电器设置及使用应符合规范要求;\n\n3)配电箱必须分设工作零线端子板和保护零线端子板,保护零线、工作零线必\n\n须通过各自的端子板连接;\n\n4)总配电箱与开关箱应安装漏电保护器,漏电保护器参数应匹配并灵敏可靠;5)箱体应设置系统接线图和分路标记,并应有门、锁及防雨措施;6)箱体安装位置、高度及周边通道应符合规范要求;7)分配箱与开关箱间的距离不应超过 $3 0 \\mathrm { m } ,$ ,开关箱与用电设备间的距离不应超过3m。\n",
- "reference_source": "133《建筑施工安全检查标准》(JGJ59-2011).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "safety",
- "check_item_code": "safety_parameter_compliance_check",
- "check_result": {
- "issue_point": "电焊机触电保护器设置要求与规范依据不符",
- "location": "9、在采取接地和接零保护方式的同时,必须设两级漏电保护装置,实行分级保护,形成完整的保护系统。漏电保护装置的选择应符合规定。 \n10、电动工具的使用应符合国家标准的有关规定。工具的电源线、插头和插座应完好,电源线不得任意接长和调换,工具的外绝缘应完好无损,维修和保管有专人负责。 \n11、电焊机应单独设开关。电焊机外壳应做接零或接地保护。施工现场内使用的所有电焊机必须加装电焊机触电保护器。接线应压接牢固,并安装可靠防护罩。焊把线应双线到位,不得借用金属管道、金属脚手架、轨道及结构钢筋做回路地线。焊把线无破损,绝缘良好。电焊机设置点应防潮、防雨、防砸。",
- "suggestion": "将‘电焊机触电保护器’修改为符合国家标准的‘电焊机防触电保护装置’,并明确其应符合《手持式电动工具的安全 第一部分:通用要求》(GB3883.1)的规定,同时参照《公路工程施工安全技术规范》(JTGF90-2015)第5.11.7条关于手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器的要求,确保电焊机防护措施与相关标准一致。",
- "reason": "根据【参考依据】5.11.7条,手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器,但未提及‘电焊机触电保护器’这一术语。而电焊机属于特殊用途电气设备,其保护措施应依据GB3883.1等国家标准执行。待审查内容中‘电焊机触电保护器’这一表述缺乏明确标准支撑,且与规范中‘漏电保护器’等术语不一致,存在术语不准确和标准引用模糊的问题,可能导致现场误用或漏装合规设备,属于影响专业表达和安全合规性的问题。",
- "risk_level": "中风险",
- "review_references": "## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n【Top2 参考文档】\n【文件】42《公路工程施工安全技术规范》(JTGF90-2015).md\n【标题】5.11小型机具\n5.11小型机具## 5.11.1小型机具应有出厂合格证和操作说明书。\n\n## 5.11.2小型机具应制定管理制度,建立台账,并按要求维修、保养和使用。\n\n## 5.11.3作业人员应了解所用机具性能并熟悉掌握其安全操作常识,施工中应正确佩戴各类安全防护用品。\n\n## 5.11.4各种机具不得带病运转。运转中发现不正常时,应先停机检查,排除故障后方可使用。\n\n## 5.11.5不得站在不稳定的地方使用电动或气动机具,必须使用时应有专人监护。\n\n## 5.11.6齿轮传动、皮带传动、联轴器传动的小型机具应设有安全防护装置。\n\n## 5.11.7 手持式电动工具应配备安全隔离变压器、漏电保护器、控制箱和电源连接器。\n\n## 5.11.8 小型起重机具使用应符合下列规定:\n\n### 1千斤顶应垂直安装在坚实可靠的基础上,底部宜用枕木等垫平。2电动葫芦应设缓冲器,轨道两端应设挡板。电动葫芦不得超载起吊,起吊过程中,手不得握在绳索与吊物之间。3卷扬机卷筒上的钢丝绳应排列整齐,不得在转动中用手拉或脚踩钢丝绳。作业中,不得跨越卷扬机钢丝绳。卷筒剩余钢丝绳不得少于3圈。\n\n## 5.11.9严禁2台及以上手拉葫芦同时起吊重物。\n\n## 5.11.10手持式电动工具的作业应符合现行《手持式电动工具的安全第一部分:通用要求》(GB3883.1)的规定。\n",
- "reference_source": "42《公路工程施工安全技术规范》(JTGF90-2015).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-medium-30": {
- "metadata": {
- "review_location_label": "第32页:第十章 应急处理措施->四) 应急响应",
- "original_content": "在确保安全的前提下,迅速开展救援工作,利用吊车、千斤顶、气割设备等工具,对垮塌的门式起重机进行清理和拆解,寻找被困人员;确定被困人员的位置和数量,通过呼喊、敲击等方式与被困人员取得联系,了解他们的身体状况和被困情况;根据被困人员的具体情况,制定科学合理的救援方案。如果被困人员被压在门式起重机下面,应先使用吊车等设备将压在上面的重物吊起或移开,创造救援空间。在救援过程中,要注意避免对被困人员造成二次伤害,使用专业的救援工具,如担架、绳索等,将被困人员缓慢、平稳地救出;对于受伤的被困人员,在救出后要立即进行现场急救处理,如止血、包扎、固定骨折部位等,然后迅速送往医院进行进一步治疗。在运送过程中,要密切关注伤员的病情变化,采取必要的急救措施。\n5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。\n(1)事件调查\n事故发生后,根据有关规定,应急救援事故调查组组织开展事件调查,查明事件原因和性质,提出整改防范措施和处理建议。\n(2)善后处置\n应急救援善后协调组尽快组织落实补助、补偿、抚慰、抚恤、安置等善后工作方案并组织实施。\n(3)保障措施\n1、通信与信息保障\n项目部已建立健全有线、无线相结合的基础应急通信系统,确保应急救援期间的通信畅通。发生事故后,通讯联络小分队应负责建立有效的通信网络,保障救援通信联络和对外通信联络的畅通。\n2、应急队伍保障\n本着应急资源统筹计划,充分利用社会应急资源,建立健全区域联动协调机制。项目经理部成立兼职救援队伍,并加强联合演练,确保应急期间的医疗救治、治安保卫、交通维护和运输等应急救援力量到位。3、物资装备保障\n建立以应急物资储备为主体和社会救援物资为辅的物资保障体系,建立应急物资动态管理制度。由物资设备科、办公室负责管理应急物资的储备及紧急调配工作,确保应急所需物资和生活用品的及时供应,并加强对物资储备的监管管理,确保所有应急物资都处于有效状态,并及时予以补充和更新。\n表8-1 应急物资一览表\n\n<表格></表格>\n\n6.资金保障\n项目部财务科应保证应急所需费用,对应急系统和队伍建设的装置配备、物资储备、培训、演练、设备维护所需资金做出预算,并列入年度预算;应急处置结束后,对应急处置费用进行如实核销。\n项目经理部根据项目财务科应急费用预算,制定应急费用投入计划,保证应急费用的有效投入。"
- },
- "risk_summary": {
- "max_risk_level": "medium",
- "risk_count": {
- "high": 0,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_word_check",
- "check_result": {
- "issue_point": "应急状态终止命令发布权限表述存在不严谨风险",
- "location": "5.应急结束\n当应急处置工作结束,或者相关危险因素排除后,事发单位已经进入恢复阶段,Ⅳ事故由项目经理部应急救援领导小组组长决定并发布应急状态终止命令,Ⅲ级事故由各项目应急救援领导小组组长决定并发布应急状态终止命令,Ⅱ级及以上事故由应急救援组长决定并发布应急状态终止命令。",
- "suggestion": "建议将‘由应急救援组长决定并发布应急状态终止命令’修改为‘由项目应急救援总指挥或相应层级应急指挥机构负责人决定并发布’,以明确指挥体系层级,避免因‘应急救援组长’称谓模糊引发职责争议。",
- "reason": "原文中‘应急救援组长’未明确其在应急指挥体系中的具体层级与法律授权依据,存在表述模糊、权责不清的风险,可能在实际应急响应中导致指挥混乱或责任推诿,属于影响专业表达和应急响应有效性的中风险问题。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "safety",
- "check_item_code": "safety_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "safety",
- "check_item_code": "safety_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-31": {
- "metadata": {
- "review_location_label": "第18页:第六章 质量保证措施",
- "original_content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作质量,从而确保工程质量。3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提出保证工程质量的措施。\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放过,不分清责任不放过,没有改进措施不放过。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 2,
- "medium": 1,
- "low": 2
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "quality",
- "check_item_code": "quality_sensitive_word_check",
- "check_result": {
- "issue_point": "质量目标中使用绝对化用语",
- "location": "(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。",
- "suggestion": "将‘杜绝重大质量事故’修改为‘努力杜绝重大质量事故’,将‘工程项目合格率100%’修改为‘力争实现工程项目合格率100%’或‘确保工程项目合格率达到100%’,以避免绝对化表述。",
- "reason": "‘杜绝’和‘100%’属于工程管理中的绝对化用语,可能在实际施工中因不可控因素导致无法完全实现,易引发法律或责任争议。根据工程行业规范,应避免使用‘绝对’‘杜绝’‘100%’等无条件承诺性表述,以符合实事求是原则和风险防控要求。",
- "risk_level": "中风险"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "medium"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "quality",
- "check_item_code": "quality_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "quality",
- "check_item_code": "quality_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "质量管理体系运行要求与参考依据不一致",
- "location": "3.0.1 钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。",
- "suggestion": "将‘质量管理体系项目部建立并保证有效运行,贯穿于项目全过程的质量管理活动 需实现全员参与、横向到边、纵向到人,确保质量方针目标落实’修改为‘项目部应建立并有效运行符合GB50205-2020第3.0.1条要求的质量管理体系,确保施工全过程的质量控制,实现全员参与、横向到边、纵向到人,保障质量方针目标的落实’。",
- "reason": "根据【参考依据】3.0.1条,施工单位必须具备相应的质量管理体系,并在施工现场保证其有效运行。待审查内容中虽提及‘建立并保证有效运行’,但未明确其依据为GB50205-2020第3.0.1条,缺乏与强制性标准的直接关联性,属于对规范要求的表述不完整,存在理解偏差风险。该条文属于安全管理与质量控制的基础性要求,若未明确依据,可能影响合规性认定,构成高风险问题。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【Top1 参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "quality",
- "check_item_code": "quality_parameter_compliance_check",
- "check_result": {
- "issue_point": "质量管理体系运行要求与标准规定不一致",
- "location": "质量保证措施(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。",
- "suggestion": "应明确质量管理体系的建立和运行依据,确保符合《钢结构工程施工质量验收标准》(GB50205-2020)第3.0.1条关于‘钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度’的要求,建议补充说明质量管理体系文件的来源及审批流程。",
- "reason": "根据【参考依据】3.0.1条,施工单位应有相应的质量管理体系,且施工现场应有经审批的施工组织设计、施工方案等技术文件。待审查内容虽提及建立质量管理体系并保证有效运行,但未说明该体系是否依据标准建立、是否经过审批,不符合标准对体系建立和运行的合规性要求。",
- "risk_level": "高风险",
- "review_references": "3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n【Top1 参考文档】\n【文件】117《钢结构工程施工质量验收标准》(GB50205-2020).md\n【标题】3基本规定\n3基本规定3.0.1钢结构工程施工单位应有相应的施工技术标准、质量管理体系、质量控制及检验制度,施工现场应有经审批的施工组织设计、施工方案等技术文件。\n\n3.0.2钢结构工程施工质量的验收,必须采用经计量检定、校准合格的计量器具。钢结构工程见证取样送样应由检测机构完成。\n\n3.0.3钢结构工程施工中采用的工程技术文件、承包合同文件等对施工质量验收的要求不得低于本标准的规定。\n\n3.0.4钢结构工程应按下列规定进行施工质量控制:\n\n1采用的原材料及成品应进行进场验收,凡涉及安全、功能的原材料及成品应按本标准14.0.2条的规定进行复验,并应经监理工程师(建设单位技术负责人)见证取样送样;\n\n2各工序应按施工技术标准进行质量控制,每道工序完成后应进行检查;\n\n3相关各专业之间应进行交接检验,并经监理工程师(建设单位技术负责人)检查认可。\n\n3.0.5钢结构工程施工质量验收在施工单位自检合格的基础上,按照检验批、分项工程、分部(子分部)工程分别进行验收,钢结构分部(子分部)工程中分项工程的划分,应按现行国家标准《建筑工程施工质量验收统一标准》GB 50300 的规定执行。钢结构分项工程应由一个或若干检验批组成,其各分项工程检验批应按本标准的规定进行划分,并应经监理(或建设单位)确认。\n\n3.0.6 检验批合格质量标准应符合下列规定:\n\n1主控项目必须满足本标准质量要求;\n\n2一般项目的检验结果应有 $8 0 \\%$ 及以上的检查点(值)满足本标准的要求,且最大值(或最小值)不应超过其允许偏差值的1.2倍。\n\n3.0.7分项工程合格质量标准应符合下列规定:1分项工程所含的各检验批均应满足本标准质量要求;2分项工程所含的各检验批质量验收记录应完整。\n\n3.0.8当钢结构工程施工质量不符合本标准的规定时,应按下列规定进行处理:\n\n1经返修或更换构(配)件的检验批,应重新进行验收;2经法定的检测单位检测鉴定能够达到设计要求的检验批,应予以验收;3经法定的检测单位检测鉴定达不到设计要求,但经原设计单位核算认可能够满足结构安全和使用功能的检验批,可予以验收;4经返修或加固处理的分项、分部工程,仍能满足结构安全和使用功能要求时,可按处理技术方案和协商文件进行验收;5通过返修或加固处理仍不能满足安全使用要求的钢结构分部工程,严禁验收。\n",
- "reference_source": "117《钢结构工程施工质量验收标准》(GB50205-2020).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-32": {
- "metadata": {
- "review_location_label": "第18页:第六章 质量保证措施",
- "original_content": "质量保证措施\n(1)质量目标\n杜绝重大质量事故,工程项目合格率100%。\n为确保这一目标的实现,我公司将认真贯彻“百年大计,质量第一”的方针,在项目部建立质量管理体系并保证有效运行。坚持预防为主,执行“管生产必须管质量,谁施工谁负责质量,谁操作谁保证质量的原则”,对质量进行管理。\n(2)建立健全质量责任制\n实行质量目标管理,自经理、总工、副经理、专业工程师、业务部门直至生产班组,执行三级质量责任制。\n1)明确每个职工的责任,具体任务,权力和经济效益。各项工作、生产的每个环节都形成质量保证系统。\n2)职能部门工作人员,明确个人岗位工作质量分工,从提高工作效率保证提高工作质量,从而确保工程质量。3)总工程师参与制定质量总目标,围绕提高工程质量,积极组织开展群众性的质量管理活动,检查评定各项施工质量。\n4)技术部门和生产部门,在编制和审批施工组织设计时,贯彻“质量第一”的方针,提出保证工程质量的措施。\n5)施工技术人员、质量检查人员,要熟悉设计图纸,参加设计交底,领会设计意图,掌握技术要点,积极提出有利于质量保证的意见。督促班组进行自检、互检、交接检工作。发现质量问题,及时处理或上报。\n6)作好原材料的进场抽检工作,不合格材料不运进现场。\n(3)质量控制措施\n1)建立健全质量管理体系,强化全员质量意识,全面贯彻落实质量方针目标。\n2)建立健全质量责任制,质量责任要横向到边、纵向到人、分头把关、层层落实强化岗位责任制。贯彻“谁施工谁负责质量”的原则,坚持“三检制”对施工过程中出现的质量问题,严格按“三不放过”原则处理。\n3)配备专门的质检员、测量、试验、计量及内审五类验证人员队伍,加强项目部全体员工的质量教育与培训,不断提高员工的质量意识,加强技术、技能学习,提高质量管理水平,确保工程质量。\n4)对现场施工人员加强质量教育,强化质量意识,开工前技术交底,进行应知应会教育,严格执行规范,严格操作规程,建立并实施首件工程认可制度,分项工程开工前必须按合同要求执行先试验再铺开的程序。\n5)加强质量监控,确保规范规定的检验、抽检频率,现场质检的原始资料必须真实、准确、可靠,不得追记,接受质量检查时必须出示原始资料。监理工程师有指令时,重要的隐蔽工程覆盖前应进行摄像或照相并保存现场记录。\n6)完善检验手段,所有现场试块均送拌合站内试验室进行养护,所有梁厂检测均为外委,常规内检测由拌合站内试验室进行。\n7)建立质量奖罚制度,对质量事故要严肃处理,坚持三不放过:事故原因不明不放过,不分清责任不放过,没有改进措施不放过。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量保证体系】内容: 1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量保证体系包含:1.质量保证体系框图;2.质量管理组织机构、人员职责;3.小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件17)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【工程创优规划】内容: 1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含工程创优规划包含:1.制定工程创优总体计划、做好技术准备工作、加强过程控制、重视细部处理、创建精品工程、推广应用新技术;2.申报资料、工程资料的收集与整理;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件19)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "quality",
- "check_item_code": "quality_completeness_check",
- "check_result": "第六章 质量保证措施下缺失质量保证措施中的【质量控制程序与具体措施】内容: 1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "建议补充:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第六章 质量保证措施内容属于,专项施工方案内容要求中的 【质量保证措施】 板块,应包含质量控制程序与具体措施包含:1.原材料、实体工程质量检查验收程序和要求;2.主要工序的质量通病、预防措施;3.季节性(冬期、高温、雨期)施工的质量保证措施;",
- "review_references": "六、质量保证措施 本章包含质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施 等四个方面。 质量保证体系包含质量保证体系框图(附件17)、质量管理组织机构、人员职 责。质量保证体系(附件20)应引用公司标准体系框图。质量管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目总工、质量总监、工程 部门、质检部门、专业分包单位(协作队伍)项目负责人和项目技术负责人等。 质量目标根据施工合同和业主要求填写,并与第二章中施工要求的质量要求一 致。 工程创优规划根据工程的实际情况填写,质量符合百年品质工程要求,竣工验 收达到满足设计文件要求。包含制定工程创优总体计划,做好技术准备工作,加强过程控制,重视细部处理,创建精品工程,推广应用新技术,申报资料、工程资料 的收集与整理等内容。 质量控制程序与具体措施包含原材料、实体工程质量检查验收程序和要求,主 要工序的质量通病、预防措施,以及季节性(冬期、高温、雨期)施工的质量保证 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-33": {
- "metadata": {
- "review_location_label": "第19页:第七章 环境保证措施",
- "original_content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 3
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_word_check",
- "chapter_code": "environment",
- "check_item_code": "environment_sensitive_word_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "semantic_logic_check",
- "chapter_code": "environment",
- "check_item_code": "environment_semantic_logic_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "sensitive_check",
- "chapter_code": "environment",
- "check_item_code": "environment_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-34": {
- "metadata": {
- "review_location_label": "第19页:第七章 环境保证措施",
- "original_content": "环境保证措施\n(1)施工区、料场在施工期间和完工后及时清理,防止对河道的侵蚀和沉渣进入河道:生活污水和工程废水要排入废水池进行沉淀和净化处理,不能直接排入河流、灌溉渠或田地中。\n(2)定期对施工机械进行检修以防止严重漏油,维修机械时产生的污水均排入污水池中,经净化处理达标后才能排入河中。\n(3)施工中不阻塞河道或原有的灌溉、排水系统,以保证河流、水道的自然流动。工程完工时要做好耕地的复耕工作,按时间按质量恢复耕地,恢复生态环境。\n(4)对有害物质(如燃料、废料、垃圾等)要通过灼烧或其它规范措施处理后运至监理工程师指定地点进行掩埋,防止对动、植物造成损害。\n(5)在施工过程中保证场站及施工现场植被不被破坏,工程临时占地等不可避免的破坏植被的地方,在工程完工后按要求进行恢复。\n(6)降尘控制\n1)安排水车,定时进行场站出入口及沿线便道洒水降尘,保持便道湿润,使产生的降尘、空气污染减至最低程度\n2)每辆车上配备有帆布,运输车辆要加盖帆布,堆放时遮盖或洒水。\n3)拌和场地四周采用围墙与周围相隔离,减少粉尘对环境的污染。\n(7)污水处理\n1)施工机械的废油废水,应采取当地有关环保部门处理意见,采取有效措施加以处理,不得超标排放,造成河流污染。\n2)来自生活区、办公区和施工区的污水,必须严格净化处理,并经检验符合环保标准后,方可排入水中。\n3)靠近生活水源的施工,用沟壕或堤坝同生活水源隔开,并避免污染生活水源。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保证体系】内容: 1.公司标准体系框图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.公司标准体系框图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保证体系包含:1.公司标准体系框图;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件18)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "environment",
- "check_item_code": "environment_completeness_check",
- "check_result": "第七章 环境保证措施下缺失环境保证措施中的【环境保护组织机构】内容: 1.管理人员姓名、职务、职责",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "建议补充:1.管理人员姓名、职务、职责",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第七章 环境保证措施内容属于,专项施工方案内容要求中的 【环境保证措施】 板块,应包含环境保护组织机构包含:1.管理人员姓名、职务、职责;",
- "review_references": "七、环境保证措施 本章包含环境保证体系、环境保护组织机构、环境保护及文明施工措施等三个 方面。 环境保证体系(附件19)应引用公司标准体系框图。 环境保护组织机构包含管理人员姓名、职务、职责。环境管理组织机构基于项 目经理为组长的工作领导小组,小组中包括项目经理、项目副经理、项目总工、工 程部门、质检部门、安全环保部门、专业分包单位(协作队伍)项目负责人和项目 技术负责人等。 环境保护及文明施工措施包含办公、生活区环境卫生保证措施,施工区域水土 保持保证措施、噪声污染防治措施、水污染防治措施、大气污染防治措施。水污染 防治措施主要描述施工水污染、生活水污染的收集、沉淀、运输、净化方法。大气 污染防治措施主要描述工程机械废气、施工扬尘、焚烧物、收尾清场等方面的防治 措施。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-35": {
- "metadata": {
- "review_location_label": "第24页:第九章 施工管理人员及作业人员配备及分工->一) 组织机构",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1施工组织机构图"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-36": {
- "metadata": {
- "review_location_label": "第24页:第九章 施工管理人员及作业人员配备及分工",
- "original_content": "一) 组织机构\n本项目根据劳务分包划分情况,成立以项目经理为组长的安全、质量管理体系,本体系领导和组织实施本项目安全管理、质量管理、协调组织等一切事务,确保项目总体目标实现。工程合同科是经理部常设职能部门,具体实施本体系的各项工作。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图6-1施工组织机构图\n\n二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>\n\n三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400毫米,吊物行驶中不得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查处理。\n司索(信号)工岗位职责1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。\n4、起吊重物水平行走时,距地面距离不许超过0.5米。\n5、吊运重物接近额定负荷时,应升至100毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录\n\n一) 组织机构\n为认真贯彻落实《中华人民共和国安全生产法》和《建设工程安全生产管理条例》,增强忧患意识,居安思危,减少施工事故的发生,提高自防自救意识,结合本项目施工特点,特制定本项目的施工安全生产应急预案,在项目实施后,针对现场的自然条件和各种资源条件,对本预案做出详细的修改和补充。\n项目部成立以项目经理为指挥长,项目副经理、项目总工、项目支部书记、项目安全副经理为副指挥长,各工区长、各科室负责人、办公室职员为成员的事故应急领导小组,下设抢险抢修组、通讯联络组、医疗救护组、疏散警戒组、后勤保障组、善后处理组、事故调查组。\n组长:董忠舒\n副组长:欧阳鹏、李钰、常伟、陈方友\n组员:李诚毅、王长根、朱珍茂、李洪波、王新武、李帅等工程技术人员和安全人员。\n图8-1 会禄高速ZCB1-3项目应急组织体系"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "management",
- "check_item_code": "management_completeness_check",
- "check_result": "第九章 施工管理人员及作业人员配备及分工下缺失施工管理及作业人员配备与分工中的【专职安全生产管理人员】内容: 1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "建议补充:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第九章 施工管理人员及作业人员配备及分工内容属于,专项施工方案内容要求中的 【施工管理及作业人员配备与分工】 板块,应包含专职安全生产管理人员:1.专职安全生产管理人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容;2.并将人员证件扫描件放置于第十章其他资料中;",
- "review_references": "八、施工管理及作业人员配备与分工 本章包含施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人 员等四个方面。 施工管理人员以表格的形式说明管理人员名单及岗位职责,如项目经理、项目 书记、项目总工、项目副经理、质量总监、安全总监、各职能部门、主管技术员、 测量员、质检员,以及专业分包单位(协作队伍)项目负责人和项目技术负责人等。 专职安全生产管理人员、特种作业人员均以表格的形式说明人员姓名、证书类 型、证书编号、有效期、岗位职责等内容,并将人员证件扫描件放置于第十章其他 资料中。 其他作业人员包含专业分包单位(协作队伍)管理人员数量,不同工种(班组、 区域)的作业人员数量等。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-37": {
- "metadata": {
- "review_location_label": "第25页:第九章 施工管理人员及作业人员配备及分工->二) 施工管理人员",
- "original_content": "二) 施工管理人员\n表7-1 施工管理人员职责一览表\n\n<表格></表格>"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-38": {
- "metadata": {
- "review_location_label": "第25页:第九章 施工管理人员及作业人员配备及分工->三) 施工作业人员配备及分工",
- "original_content": "三) 施工作业人员配备及分工\n施工队作业人员投入及施工队任务划分计划如下表:\n表7-2 主要人员资源配置表\n\n<表格></表格>\n\n注:特种作业人员需持证上岗,一岗一人,一人一证。\n吊车操作手职责如下\n1)应经过专业培训,取得特种设备操作证,熟悉本机的结构部特点和操作方法,并经考试合格后发给合格证书,才允许操作,严禁非本岗位操作使用。\n2)按规定项目,标准检查吊车各部技术状况处于完 好状态。重点检查操纵装置,液压装置,安全装置和钢丝绳等,符合安全达到标准,方准使用。\n3)起步前应观察车辆四周情况,确认安全后(气压式制动的车辆待气压表读数达到规定的数值)鸣笛起步。\n4)运行吊车载物起步须用低速档;吊物底端面须距地300~400毫米,吊物行驶中不得换档,避免急剧转向和紧急制动,必须缓慢行驶。\n5)在进出作业现场或行驶途中,要注意上空有无障碍物刮碰臂架。车上人员的头、手、脚等肢体不得伸出车外。\n6)司机在作业中必须与起重工密切配合,听从指挥人员的信号指挥。工作中,司机对任何人发出的紧急停车信号必须立即停车。\n7)起重机作业时,起重臂下、吊钩和被吊重物下面严禁站人或通行。回转台上严禁站人。臂架回转和运行吊车的顺车、倒车、调头应不刮碰周围的任何设施。\n8)作业现场的大小、地质的松软程度应不影响吊车作业安全。不准在5%以上的坡道上横向起吊作业,如必须作业时,须将车身垫平。\n2.特种设备作业人员安全生产职责\n1)认真学习和遵守国家有关安全生产法律法规及本单位安全生产管理规章制度,服从本单位安全管理;\n2)对本岗位安全生产工作负责;\n3)持有效特种作业操作证上岗,经岗前安全教育培训并考核合格上岗;\n4)参加项目、班组安全生产活动,接受安全生产教育培训、安全技术交底,掌握本岗位所需的安全生产知识和安全生产技能,做到“四不伤害”;\n5)严格遵守本岗位安全操作规程;\n6)严格遵守劳动纪律,不违章作业,不冒险蛮干,拒绝违章指挥和强令冒险作业,不得擅自移动或拆除各类安全防护设施及安全附件;\n7)参与辨识本岗位及作业场所的安全风险、危险源;\n8)正确佩戴和使用劳动防护用品,负责个人劳动防护用品的日常检查、保管、保养,发现问题及时处理或更换;\n9)作业前、作业中、作业后,负责岗位作业环境、工器具的安全检查,发现事故隐患能处置的立即处置,不能处 置的应立即向班组长或现场安全管理人员报告;\n10)发生(发现)生产安全事故、未遂事件及其他异常 或突发情况时,在保障自身安全的前提下采取必要的处置措施,并立即向班组长或现场安全管理人员报告,必要时可以直接向项目主要负责人报告;\n11)参加应急救援演练,服从项目应急救援指挥,参与应急救援,依法配合事故调查处理。\n司索(信号)工岗位职责1、司索工在工作前,应检查工属具是否安全可靠,有可能危及安全的,立即调换。\n2、指挥信号要事先向行车工交待清楚,并约定指挥信号的含义。如遇操作过程中看不清指挥信号时,应停止操作予以提醒,待接到准确信号时再进行操作。\n3、指挥手势要清晰,信号要明确,不准带手套指挥。\n4、当起吊货物时,应明确货物的起重重量,严禁指挥行车工超负荷作业,并明确货物特性和单件重量。\n5、货物升降时,司索人员必须避让到安全位置。\n6、工作完毕时,固定吊机,收回工属具,并放到指定位置。\n7、在货物装卸时,应做到轻卸轻放,货物堆放应合理、规范。\n四、作业时应做到:\n(一)操作人员必须做到以下几点:\n1、工作前4小时严禁饮酒。\n2、不准带无关人员上车。\n3、开车前检查桁车上应无碰、卡、 现象;确认一切正常,打铃报警后再送电试车。\n4、检查试车中发现有第“三”条之(三)、(四)中规定情况之一时,应立即停车。\n5、操作者必须精力集中,与下面人员密切配合。操作时不准做与操作无关的事。\n6、桁车检查、维修过程中,应统一指令,密切配合。\n(二)操作中严格执行“十不吊”:\n1、超过额定负荷不吊。\n2、指挥信号不明;重量不明;光线暗淡不吊。\n3、吊索和附件捆绑不牢、不符合安全要求不吊。\n5、歪拉斜挂不吊。\n6、工件上站人或浮放活动物不吊。\n7、易燃易爆物品不吊。\n8、带有棱角快口物件未垫好不吊。\n9、埋地物品不吊。\n10、违章指挥不吊。\n(三)吊运物品坚持“三不越过”:\n1、不从人头上越过。\n2、不从汽车上越过。\n3、不从设备上越过。\n(四)操作过程中应遵守以下规定:1、操作中要始终做到稳起、稳行、稳落。在接近人时必须及时打铃报警,地面配合吊装人员必须佩带安全帽。\n2、运行时,任何人发出停车信号均应立即停车。\n3、操作带翻、游翻、兜翻时应在安全地方进行。\n4、起吊重物水平行走时,距地面距离不许超过0.5米。\n5、吊运重物接近额定负荷时,应升至100毫米高度停车检查刹车能力。\n6、吊运过程中,不允许同时操作三个机构(即大车、小车、卷扬不能同时动作)。\n7、正常情况下不准打反车。\n8、上下车时需由平台梯子通过,不准沿轨道行走。\n9、无载荷运行时,吊钩应升至上极限位置。\n10、露天起重机作业完毕后应加以固定。\n11、在处理故障或离车时、控制器必须置于“0”位,切断电源。不准悬挂重物离开车。下班时把小车停于驾驶员一端,吊钩升至上极限位置。\n五、作业后应做好以下工作:\n(一)切断主机电源。\n(二)检查设备,确保设备状态完好,按要求进行维护保养。\n(三)切断总电源。\n六、做好设备运行的全过程记录"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "management",
- "check_item_code": "management_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-39": {
- "metadata": {
- "review_location_label": "第19页:第八章 验收要求->一) 验收标准",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-40": {
- "metadata": {
- "review_location_label": "第19页:第八章 验收要求",
- "original_content": "一) 验收标准\n1、设计图纸;\n2、国家现行法律法规、标准;3、特种设备准入标准;\n4、项目总体规划;\n5、施工组织设计文件;\n6、专项施工方案要求。\n\n二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程实体。\n图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n\n<表格></表格>\n\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。\n\n三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复印件存入同一设备档案。\n(2)设备本体检查设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。\n2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15个工作日内,检验合格出具《起重机械安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4使用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30日内,到产权所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》后方可使用。\n表7-2 设备入场检查表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-3 架桥机日常检查验收表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-4 其他项目验收表\n\n<表格></表格>\n\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。检验必须由专业技术人员进行。\n2)吊链的报废标准:\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负责人员应进行相关工序的检查,满足吊运条件后方可起吊。\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;作业人员是否参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n(3)人员配备是否满足生产需求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_completeness_check",
- "check_result": "第八章 验收要求下缺失验收要求中的【验收时间】内容: 1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "建议补充:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第八章 验收要求内容属于,专项施工方案内容要求中的 【验收要求】 板块,应包含验收时间包含:1.根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整;2.应在具备验收条件后15日内项目组织验收;",
- "review_references": "九、验收要求 本章包含验收标准、验收程序、验收内容、验收时间、验收人员等五个方面。 验收标准包含国家和行业的标准、规范、操作规程、四川路桥、路桥集团和桥 梁公司的管理办法等。 验收程序包括进场验收、过程验收、阶段验收、完工验收等时间节点的具体验 收程序。 验收的内容以表格的形式对安全生产条件、资源配置、施工工艺、机械设备、 临时支撑结构、人员操作平台、安全防护设施等项目进行验收,验收表格中要明确 项目的具体验收标准,验收标准应尽量量化到具体参数或标准。 验收时间是根据本细则表12《专项施工方案验收条件一览表》所预估的时间, 时间可以根据实际进度进行调整,但应在具备验收条件后18日内项目组织验收。 验收人员应根据专项施工方案分级管控相关要求确定,包括建设、设计、施工、 监理、监测等单位相关人员,并明确验收人员姓名。由施工作业班组在施工过程中 自行对照方案自检,施工完成后由方案编制负责人、项目经理、项目副经理、项目 技术负责人、安全环保处、工程处、机料处、合同处、专业分包单位(协作队伍) 项目负责人和项目技术负责人等部门人员参加方案验收。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-41": {
- "metadata": {
- "review_location_label": "第20页:第八章 验收要求->二)验收程序及人员",
- "original_content": "二)验收程序及人员\n1、验收程序\n(1)建立完整的质量保证体系,按施工合同约定的质量要求与质量管理程序进行作业,保证施工质量。\n(2)每道工序开工前施工单位进行施工技术交底,重要工序或分部工程其内容须书面报送监理工程师审查。\n(3)工序施工完毕,实行各道工序的操作人员“自检”、“互检”和专职质量管理人员“专检”相结合的“三检”程序,并签署有完整的检验记录。不合格,则自行返工。\n(4)在“自检”、“互检”和“专检”合格基础上,备齐自检资料和报验申请表,提前申请验收。\n(5)工程监理采用巡视、旁站、平行检查方式,及平常的工地例行检查,不能作为对施工方的施工质量的检查验收。\n(6)施工工序属于隐蔽工程,需提前通知监理单位验收,未经监理工程师批准,任何工程工序均不能擅自隐蔽。隐蔽验收须按施工工序步骤逐步进行,并按工序步骤记录在验收表上,验收合格后才准许隐蔽。\n(7)监理方接到施工方验收申请,积极组织监理方人员检查,对工程中存在的质量问题和安全隐患问题以书面的形式,要求施工单位进行整改回复、检查、再申请验收。\n(8)监理方按设计和施工验收规范检查,确认无质量、安全问题,组织业主、施工单位联合检验。\n(9)为确保工程质量,为设计和施工验收提供可靠依据,施工过程中各项试验,应严格按国家相关标准的规定进行见证抽样送检。未经监理见证送检的材料,一律不准用于工程实体。\n图7-1 验收程序\n2、验收人员\n(1)专业验收单位及人员(特检所)\n(2)建设单位、监理单位、行业主管部门、应急管理部门相关人员。\n(3)项目部成立安全质量验收领导小组,明确目标,责任到人。\n表 7-1 验收小组职责\n\n<表格></表格>\n\n(3)坚持持证上岗制度,加强岗前培训,技术交底,执行专业化施工。定人、定岗、定责、定标准,分工到位,各负其责。\n(4)加强各道工序的过程控制,做好施工记录,坚持三检制度,确保标准化作业。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-high-42": {
- "metadata": {
- "review_location_label": "第20页:第八章 验收要求->三)验收内容",
- "original_content": "三)验收内容\n1、机械设备\n1、设备验收\n(1)设备入场资料复核查验\n严格按照《架桥机施工作业指南》4.1.3和4.4.1的要求复核资料原件,按照《特种设备使用管理规则》(TSG 08-2017)“一机一档”的要求,收集盖有资料提供单位鲜章的复印件存入同一设备档案。\n(2)设备本体检查设备本体进入项目现场时,由项目特种设备安全管理人员等依据专项施工方案中提供的《设备材料清单》进行宏观检查,检查合格后方可入场,且《架桥机入场检查表》和相关佐证材料收集入档。\n(3)资质证书\n所有入场的架桥机必须为有相应资质厂家(具备相应产品的《生产许可证》)的产品,且具备《特种设备型式试验证书》和《产品合格证》或《产品质量合格证》。\n2、设备检验与使用登记\n(1)检验\n根据设备的实际情况,按照《特种设备安全技术规程》(TSG51-2013)的要求,约请相应的特种设备检验检测机构开展检验工作。\n(2)监督检验\n现场监督检验完成或整改确认后,检验机构15个工作日内,检验合格出具《起重机械安装改造重大修理监督检验报告》,并留档保存。\n(3)定期(首次)检验\n完成或整改确认后,检验机构15 工作日内,检验合格出具《起重机械定期(首次)检验报告》,并留档保存。\n(4)使用登记\n使用登记的相关程序和要求,依据《特种设备使用管理规则》(TSG08-2017)3.4使用登记程序办理。\n严格按照《特种设备使用管理规则》(TSG08-2017)在安装完成的30日内,到产权所在地的特种设备监督管理部门办理《特种设备使用登记证》,领取《特种设备使用标志》后方可使用。\n表7-2 设备入场检查表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-3 架桥机日常检查验收表\n\n<表格></表格>\n\n\n<表格></表格>\n\n表7-4 其他项目验收表\n\n<表格></表格>\n\n2、吊索具验收\n(1)钢丝绳吊索检查\n1)断丝情况:断丝根数及断丝分布状况和程度。\n2)磨损程度:测量各磨损部位钢丝绳直径。\n3)腐蚀情况:是否生锈,腐蚀状况。\n4)润滑状态:油脂是否适当存在,油脂上有无附着杂物,保持表面清洁,每年要用钢丝绳润滑油润滑一次。\n5)变形和其它异常现象:扭结痕迹、压扁、损伤、松股或松捻的程度及位置。\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。\n(2)吊带的检查\n1)有无穿孔、切口、撕断。\n2)有无接缝绽开、缝线磨断。\n3)是否有软化、老化弹性变小、强度减弱现象。\n4)纤维表面是否粗糙易于剥落。\n5)吊带有无出现死结。\n6)吊带表面是否存在点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦。\n7)带有红色警戒线吊带的警戒线是否裸露。\n8)吊带的报废标准:\n①穿孔切口、撕断,承载接缝绽开、缝线磨断;\n②吊带纤维软化、老化、弹性变小、强度减弱;\n③纤维表面粗糙易于剥落;\n④吊带出现死结;\n⑤吊带表面有过多的点状疏松、腐蚀、酸碱烧损以及热熔化或烧焦;\n⑥带有红色警戒线吊带的警戒线裸露。\n⑦经常疲劳使用无损1年需报废。\n(3)吊链的检查\n1)链环是否发生塑性变形。\n吊索上任何部位不得有裂纹、裂缝、明显锈蚀等对使用有害的缺陷。链条、中间环、连接环应灵活转动。链环之间隔以及链环与端部配件连接接触部位磨损,其它部位磨损情况。检验必须由专业技术人员进行。\n2)吊链的报废标准:\n①链环发生塑性变形伸长达原长度的5%;\n②链环之间以及链环与端部配件连接接触部位磨损减小到原公称直径的60%,其它部位磨损减少到原公称直径的90%;\n③裂纹或高拉应力区的深凹痕,锐利横向凹痕;④链环修复后,未能平滑过渡或直径减少量大于原公称直径的10%;\n⑤扭曲、严重锈蚀以后积垢不能加以排除;\n⑥端部配件的危险断面磨损减少量达原尺寸10%;\n⑦有开口度的端部配件,开口度比原尺寸增加10%。\n⑧进行外观检验、尺寸测量、拉伸试验、NDT检验时发现超标缺陷。\n(4)吊环的检查\n1)吊环表面情况。\n2)吊环磨损情况。\n3)吊环扭转变形的情况。\n4)起吊5吨以上大型索具使用的吊环每年要进行检验和无损探伤。\n吊环的报废标准:\n①从吊环不弯曲的平面算起,扭曲超过10%;\n②长形环内长L(圆形环内径D)变形率达5%以上;\n③吊环直径磨损或锈蚀超过名义尺寸10%;\n④吊环上出现裂纹、裂痕或凹槽。\n(5)吊钩的检查:\n1)吊钩表面情况。\n2)吊钩开口度增大情况。\n3)吊钩扭转变形的情况。\n4)吊钩钩座磨损情况。\n5)吊钩颈部或危险断面。\n6)带有附件的吊钩,附件的工作情况。\n7)起吊5吨以上大型索具使用的吊钩每年要进行检验和无损探伤。\n8)吊钩的报废标准:\n①吊钩的开口度超过公称尺寸的10%;\n②吊钩的扭转弯形超过10%;\n③危险断面磨损达原尺寸的10%;\n④吊钩的颈部或危险截面发生塑性变形;\n⑤吊钩表面出现无法修理的裂纹、裂痕;\n⑥吊钩衬套磨损达原尺寸的50%,应报废衬套;⑦钩心轴磨损达原尺寸的5%时,应报废心轴。\n(6)卸扣的检查:\n1)外形尺寸:由检验员测量卸扣各种部件的外形尺寸,做好记录。\n2)外观:外观检测用倍率为5倍的放大镜对卸扣表面进行目检,检查有无裂纹、变形、磨损现象,做好记录。\n3)变形:通过测量和目检检查确定卸扣是否有变形情况存在,做好记录。\n4)磨损:通过测量确定卸扣各个部件的磨损情况,尤其是卸扣顶部,做好记录。\n5)危险断面:检查受力部件断面的磨损及变形情况,做好记录。\n6)探伤:对主要受力部件的危险断面进行磁粉探伤,做好记录。\n7)起吊5吨以上大型索具使用的卸扣每年要进行检验和无损探伤。\n8)卸扣的报废标准:\n①扣体长度:卸扣长度的实测尺寸超过公称尺寸的0.25%或0.5mm两者之较大者;\n②变形:卸扣的扭转变形超过10%;\n③腐蚀:卸扣部件的磨损量超过公称尺寸的5%;\n④危险断面:危险断面发生塑性变形;\n⑤表面:卸扣的表面出现无法修理的裂纹、裂痕。\n⑥探伤:对主要受力部件的危险断面进行磁粉探伤发现内部有缺陷;\n⑦标识:没有表明额定载荷的。\n(7)吊装过程的检查:\n在吊装过程中,吊索钢丝绳的夹角不应小于60°,应保证在60~90°之间,现场施工负责人员应进行相关工序的检查,满足吊运条件后方可起吊。\n3、人员验收\n(1)电工、焊工、信号工、司索工、特种设备操作人员等专业性工种是否持证上岗;作业人员是否参加岗前安全教育培训;\n(2)作业人员身体状况、精神状况是否良好,有无高血压、心脏病等病史;\n(3)人员配备是否满足生产需求。"
- },
- "risk_summary": {
- "max_risk_level": "high",
- "risk_count": {
- "high": 4,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索具报废标准与参考依据不一致",
- "location": "(2)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "将‘使用两年后应强制报废’修改为‘吊装作业使用频繁的钢丝绳索具,应根据使用频次和检查结果进行评估,使用年限不宜超过2年,且在达到使用年限前应进行专项安全评估,评估合格后方可继续使用’,并明确‘使用两年后应强制报废’的依据来源,避免与国家标准冲突。",
- "reason": "根据【参考依据】中6.1.3 a)钢丝绳吊具的报废标准,仅列出具体技术指标(如断丝率、直径减少、变形、锈蚀等),未提及‘使用两年后强制报废’这一时间性强制规定。该条款缺乏明确的国家标准依据,且与参考依据中‘报废标准’的定义不一致,属于对非参数性强制要求的不当扩展。依据审查规则,禁止编造审查依据,故该条款存在合规性风险。",
- "risk_level": "高风险",
- "review_references": "a)钢丝绳吊具: -检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); -报废标准。\n【Top3 参考文档】\n【文件】98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md\n【标题】6培训课程的内容\n6培训课程的内容## 6.1理论课程\n\n### 6.1.1有关起重机的知识\n培训课程中应包含下列有关起重机的知识:\n\na)起重机概述术语; 起重机动作:起重能力,额定起重\n\nb)类型、结构外形图、用途:流动机;一塔式起重机;臂架起重机;一桥式和门式起重机。 \nc)安全装置,吊具,制动器。\n\n\n\n### 6.1.2吊挂装置\n\n培训课程中应包含以下吊挂装置的知识a)钢丝绳吊具钢丝绳结构 钢丝绳极限工作载荷安全使用的防范措施b)吊链: 吊链的类型;极限工作载荷;安全使用的防范措施。\n\nc)纤维吊具的类型、极限工作载荷、防护措施:纤维吊装绳;纤维吊装带。\n\nd)其他吊具的类型、极限工作载荷、防护措施:滑轮组;吊具(夹钳、吊钩、卸扣、起重横梁、网式吊兜、吊环);衬垫、垫木。\n\n### 6.1.3吊挂装置的检查\n\n培训课程中应包含下列吊挂装置检查的知识:\n\na)钢丝绳吊具:\n\n-检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); \n-报废标准。\n\nb)吊链:检查项目(伸长、变形、扭曲、断裂、接头处的异常);报废标准。\n\nc)纤维吊具:-纤维吊装绳:\n\n1)检查项目(磨损、刮伤、割伤、腐蚀、编织松散); \n2)报废标准。\n\n纤维吊装带:\n\n1) 损坏(磨损、刮伤、缝纫线断开); \n2) 外部的异常(变色、染色、软化、尘污); \n3) 金属配件(变形、刮伤、断裂、锈蚀); \n4) 报废标准。\n\nd)夹钳:\n\n一夹钳主体或吊环的异常; \n钳口开启异常; \n凸轮或钳叉的齿部(有凸边的部分)处磨损或卡滞、损坏; \n夹钳的功能; \n安全销的功能; \n维护; \n报废标准。\n\n### 6.1.4吊装方法\n\n培训课程中应包含下列吊装方法的知识:\n\na)重心的确定和载荷质量的估算。\n\nb)按照载荷外形选择吊装方法:\n\n直接起升; \n-篮式系挂起升; \n箍式系挂起升; \n夹钳起升; \n-不规则形状载荷的起升(非对称载荷); \n-用起重横梁起升(集装箱吊具); \n使用辅助拉绳。\n\nc)根据载荷质量和起升角度选择吊具。\n\nd)悬吊载荷的运移。\n\n### 6.1.5发信号\n\n培训课程中应包含下列发信号的知识:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.1.6安全规范\n\n### 6.1.7工作规划\n培训课程中应包含下列工作规划:\n\na) 工作顺序; \nb) 载荷运移的路径; \nc) 入口和出口; \nd) 地面或支承面的条件; \ne) 包括吊装作业人员的位置; \n其他现场人员的配合。\n\n### 6.1.8危险因素确认和防控措施\n培训课程中应包含下列危险因素确认和防控措施的知识:\n\na)与起重机的使用和吊装操作相关的危险因素:挤压的危险,诸如跌落的载荷、载荷倒塌、移动载荷和其他物体之间的卡绊;切割的危险,诸如破断的钢丝绳、具有锋利边缘的载荷;冲击的危险,诸如载荷摆动、载荷倒塌、弹射物;缠绕的危险,诸如和钢丝绳吊具、牵绳缠绕在一起;从高处跌落的危险。\n\nb)起升作业现场应考虑的潜在危险因素:高架动力线;-高架公用线路,例如蒸汽管线、天然气管线、电话线;树木;不平坦的和/或不坚实的地面;允许的地面载荷;周围建筑物/容器/工程结构/设备;危险品;腐蚀性物品;障碍物;照明不足;-无线电干扰;恶劣天气。\n\n## 6.2操作课程\n\n### 6.2.1总则\n\n操作课程应包含吊装作业的各个步骤,诸如吊装作业的安全措施、发信号、重心的确定、载荷质量的估算、吊具的选择、吊具的检查,以及在载荷和吊钩上安装吊具、起升、吊运和下降载荷。受训者应基本掌握用篮式系挂、箍式系挂和夹钳起升的方法,以及不规则形状载荷的起升等吊装方法。\n\n### 6.2.2吊装作业的安全措施\n\n培训课程中应包含下列吊装作业安全措施的练习:\n\na)正确着装、使用个人防护用具; \nb)通过手势和喊话进行安全确认。\n\n### 6.2.3发信号\n\n培训课程中应包含下列发信号方法的练习:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.2.4确定重心和估算载荷质量\n\n培训课程中应包含确定重心和估算载荷质量的练习。\n\n### 6.2.5选择吊挂装置\n\n培训课程中应包含选择吊挂装置的练习。\n\n### 6.2.6检查吊挂装置\n\n培训课程中应包含检查吊挂装置的练习。\n\n#### 6.2.7吊装\n\n##### 6.2.7.1安装吊具\n\n培训课程中应包含下列安装吊具步骤的练习:\n\na) 确定重心和安装点; \nb) 载荷上方吊钩的定向和下降吊钩; \nc) 在载荷和吊钩上安装吊具; \nd) 确认吊装状况的安全性。\n\n##### 6.2.7.2试起升和起升载荷\n\n培训课程中应包含下列试起升和起升载荷步骤的练习:\n\na) 准确起升和停止; \nb) 安全性确认; \nc) 起升载荷。\n\n##### 6.2.7.3吊运载荷\n\n培训课程中应包含下列吊运载荷步骤的练习:\n\na) 设计载荷运移路径; \nb) 跨越(和其他起重机共用的空间); \nc) 向起重机司机发吊运路线和下降位置的信号; \nd) 载荷导向。\n\n##### 6.2.7.4下降载荷\n\n培训课程中应包含下列下降载荷步骤的练习:\n\na) 评估地面或支承结构表面的状况; \nb) 将载荷引导到下降位置和预支的垫木上; \nc) 下降载荷和停止下降; \nd) 准确下降,把载荷放在地上并确认其稳定性; \ne) 从吊钩和载荷上移走吊具; \nf 检查吊具并将它存放在指定位置。\n",
- "reference_source": "98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "non_parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_non_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索使用前专项检查要求与强制报废规定不符合现行国家标准",
- "location": "三)验收内容\n2、吊索具验收\n(1)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "将‘使用两年后强制报废’的表述修改为‘钢丝绳吊索应按照GB/T5972《起重机 钢丝绳 保养、维护、安装、检验和报废》中规定的报废标准执行,不得仅以使用年限作为强制报废依据’,并明确报废判定应以实际检测结果为准,避免因时间累积导致误判或遗漏安全隐患。",
- "reason": "根据【参考依据】中4.3.1条明确指出:钢丝绳吊索的使用、检验、破断拉力值和报废等应符合《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972的规定。该标准未规定‘使用两年后强制报废’这一参数性要求,而是依据断丝、磨损、腐蚀、变形等实际状态进行综合评估。待审查内容中‘使用两年后强制报废’属于无依据的附加强制性要求,与国家标准不符,存在误导风险,可能造成安全隐患或资源浪费。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【Top1 参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[前文已省略]...\n塔式起重机安全规程》GB5144、《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196及《建筑机械使用安全技术规程》JGJ33中的相关规定。\n\n### 4.1.6 拔杆式起重机的制作安装应符合下列规定:\n\n1 拔杆式起重机应进行专门设计和制作,经严格的测试、试运转和技术鉴定合格后,方可投入使用。\n\n2 安装时的地基、基础、缆风绳和地锚等设施,应经计算确定。缆风绳与地面的夹角应在 $3 0 ^ { \\circ } \\sim 4 5 ^ { \\circ }$ 之间。缆风绳不得与供电线路接触,在靠近电线处,应装设由绝缘材料制作的护线架。\n\n### 4.1.7 拔杆式起重机的使用应符合下列规定:\n\n1 在整个吊装过程中,应派专人看守地锚。每进行一段工作或大雨后,应对拔杆、缆风绳、索具、地锚和卷扬机等进行详细检查,发现有摆动、损坏等情况时,应立即处理解决。\n\n2 拔杆式起重机移动时,其底座应垫以足够的承重枕木排和滚杠,并将起重臂收紧,处于移动方向的前方,倾斜不得超过${ 1 0 } ^ { \\circ }$ ,移动时拔杆不得向后倾斜,收放缆风绳应配合一致。\n\n## 4.2 绳索\n\n### 4.2.1 吊装作业中使用的白棕绳应符合下列规定:\n\n1 应由剑麻的茎纤维搓成,并不得涂油。其规格和破断拉力应符合产品说明书的规定。\n\n2 只可用作受力不大的缆风绳和溜绳等。白棕绳的驱动力只能是人力,不得用机械动力驱动。\n\n3 穿绕白棕绳的滑轮直径,应大于白棕绳直径的10倍。麻绳有结时,不得穿过滑车狭小之处。长期在滑车使用的白棕绳,应定期改变穿绳方向。\n\n4 整卷白棕绳应根据需要长度切断绳头,切断前应用铁丝或麻绳将切断口扎紧。\n\n5 使用中发生的扭结应立即抖直。当有局部损伤时,应切去损伤部分。\n\n6 当绳长度不够时,应采用编接接长。\n\n7 捆绑有棱角的物件时,应垫木板或麻袋等物。\n\n8 使用中不得在粗糙的构件上或地下拖拉,并应防止砂、石屑嵌入。\n\n9 编接绳头绳套时,编接前每股头上应用绳扎紧,编接后相互搭接长度:绳套不得小于白棕绳直径的15倍;绳头不得小于30倍。\n\n10 白棕绳在使用时不得超过其容许拉力,容许拉力应按下式计算:\n\n$$\n[ F _ { z } ] = \\frac { F _ { z } } { K }\n$$\n\n式中: $[ F _ { z } ]$ 一 -白棕绳的容许拉力(kN);$F _ { z }$ —白棕绳的破断拉力(kN);$K$ ——白棕绳的安全系数,应按表4.2.1采用。\n\n表4.2.1白棕绳的安全系数 \n\n\n\n\n\n### 4.2.2 采用纤维绳索、聚酯复丝绳索应符合现行国家标准《纤维绳索通用要求》 $\\mathrm { G B / T 2 1 3 2 8 } .$ 、《聚酯复丝绳索》 $\\mathrm { G B } / \\mathrm { T } 1 1 7 8 7$ 和《绳索有关物理和机械性能的测定》 $\\mathrm { G B / T 8 8 3 4 }$ 的相关规定。\n\n### 4.2.3 吊装作业中钢丝绳的使用、检验、破断拉力值和报废等应符合现行国家标准《重要用途钢丝绳》GB8918、《一般用途钢丝绳》GB/T20118和《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中的相关规定。\n\n## 4.3 吊索\n\n### 4.3.1 钢丝绳吊索应符合下列规定:\n1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n\n2 吊索宜采用 $6 \\times 3 7$ 型钢丝绳制作成环式或8股头式(图4.3.1),其长度和直径应根据吊物的几何尺寸、重量和所用的吊装工具、吊装方法确定。使用时可采用单根、双根、四根或多根悬吊形式。\n\n3 吊索的绳环或两端的绳套可采用压接接头,压接接头的长度不应小于钢丝绳直径的20倍,且不应小于 $3 0 0 \\mathrm { m m }$ 。8股头吊索两端的绳套可根据工作需要装上桃形环、卡环或吊钩等吊索附件。\n\n \n图4.3.1吊索\n\n4 当利用吊索上的吊钩、卡环钩挂重物上的起重吊环时,吊索的安全系数不应小于6;当用吊索直接捆绑重物,且吊索与重物棱角间已采取妥善的保护措施时,吊索的安全系数应取 $6 \\sim$ 8;当起吊重、大或精密的重物时,除应采取妥善保护措施外,吊索的安全系数应取10。\n\n5 吊索与所吊构件间的水平夹角宜大于 $4 5 ^ { \\circ }$ 。计算拉力时可按本规范附录A表A.1、表A.2选用。\n\n### 4.3.2 吊索附件应符合下列规定:\n\n1 套环应符合现行国家标准《钢丝绳用普通套环》GB/T5974.1和《钢丝绳用重型套环》 $\\mathrm { G B / T 5 9 7 4 . 2 }$ 的规定。\n\n2 使用套环时,其起吊的承载能力,应将套环的承载能力与表4.3.2中降低后的钢丝绳承载能力相比较,采用小值。\n\n3 吊钩应有制造厂的合格证明书,表面应光滑,不得有裂纹、刻痕、剥裂、锐角等现象。吊钩每次使用前应检查一次,不合格者应停止使用。\n\n4 活动卡环在绑扎时,起吊后销子的尾部应朝下,吊索在受力后应压紧销子,其容许荷载应按出厂说明书采用。\n\n表4.3.2使用套环时的钢丝绳强度降低率\n\n\n\n\n\n### 4.3.3 横吊梁应采用Q235或Q345 钢材,应经过设计计算,计算方法应按本规范附录B进行,并应按设计进行制作。\n\n## 4.4 起重吊装设备\n\n### 4.4.1 滑轮和滑轮组的使用应符合下列规定:\n\n1 使用前,应检查滑轮的轮槽、轮轴、夹板、吊钩等各部件,不得有裂缝和损伤,滑轮转动应灵活,润滑良好。\n\n2 滑轮应按本规范附录C表C.0.1中的容许荷载值使用。对起重量不明的滑轮,应先进行估算,并经负载试验合格后,方可使用。\n\n3 滑轮组绳索宜采用顺穿法,由三对以上动、定滑轮组成的滑轮组应采用花穿法。滑轮组穿绕后,应开动卷扬机慢慢将钢丝绳收紧和试吊,检查有无卡绳、磨绳的地方,绳间摩擦及其他部分应运转良好,如有问题,应立即修正。\n\n4 滑轮的吊钩或吊环应与起吊构件的重心在同一垂直线上。 \n5 滑轮使用前后应刷洗干净,擦油保养,轮轴应经常加油\n\n润滑,严禁锈蚀和磨损。\n\n6 对重要的吊装作业、较高处作业或在起重作业量较大时,不宜用钩型滑轮,应使用吊环、链环或吊梁型滑轮。\n\n7 滑轮组的上下定、动滑轮之间安全距离不应小于 $1 , 5 \\mathrm { m }$ 。\n\n8 对暂不使用的滑轮,应存放在干燥少尘的库房内,下面垫以木板,并应每3个月检查保养一次。\n\n9 滑轮和滑轮组的跑头拉力、牵引行程和速度应符合下列规定:\n\n1)滑轮组的跑头拉力应按下式计算:\n\n$$\nF = \\alpha Q\n$$\n\n式中: $F$ 一 跑头拉力(kN);$\\alpha$ 滑轮组的省力系数,其值可按本规范附录C表C.0.2选用;$Q$ - 一计算荷载( $\\mathrm\n...[后文已省略]...\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索报废标准中关于使用年限的强制报废规定与参考依据不符",
- "location": "(2)钢丝绳吊索检查\n(1)...⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "删除‘使用两年后应强制报废’的表述,改为依据《起重机吊装工和指挥人员的培训》(GB-T23721-2009)中关于钢丝绳吊具的报废标准进行判断,即以断丝、磨损、变形、锈蚀、连接件异常等具体技术参数为准,不设固定使用年限。",
- "reason": "根据【参考依据】a)钢丝绳吊具:检查项目及报废标准,报废标准应基于实际检查结果(如断丝数、丝径减小、磨损、扭结、变形、锈蚀、连接件异常等),并未规定使用满两年必须强制报废。该条款引入‘使用两年后强制报废’属于无依据的额外要求,与标准不符,可能造成资源浪费或误判,属于高风险问题。",
- "risk_level": "高风险",
- "review_references": "a)钢丝绳吊具: -检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); -报废标准。\n【Top3 参考文档】\n【文件】98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md\n【标题】6培训课程的内容\n6培训课程的内容## 6.1理论课程\n\n### 6.1.1有关起重机的知识\n培训课程中应包含下列有关起重机的知识:\n\na)起重机概述术语; 起重机动作:起重能力,额定起重\n\nb)类型、结构外形图、用途:流动机;一塔式起重机;臂架起重机;一桥式和门式起重机。 \nc)安全装置,吊具,制动器。\n\n\n\n### 6.1.2吊挂装置\n\n培训课程中应包含以下吊挂装置的知识a)钢丝绳吊具钢丝绳结构 钢丝绳极限工作载荷安全使用的防范措施b)吊链: 吊链的类型;极限工作载荷;安全使用的防范措施。\n\nc)纤维吊具的类型、极限工作载荷、防护措施:纤维吊装绳;纤维吊装带。\n\nd)其他吊具的类型、极限工作载荷、防护措施:滑轮组;吊具(夹钳、吊钩、卸扣、起重横梁、网式吊兜、吊环);衬垫、垫木。\n\n### 6.1.3吊挂装置的检查\n\n培训课程中应包含下列吊挂装置检查的知识:\n\na)钢丝绳吊具:\n\n-检查项目(钢丝绳断丝数、丝径的减小、磨损、扭结、变形、锈蚀、润滑、连接件和终端固定处异常); \n-报废标准。\n\nb)吊链:检查项目(伸长、变形、扭曲、断裂、接头处的异常);报废标准。\n\nc)纤维吊具:-纤维吊装绳:\n\n1)检查项目(磨损、刮伤、割伤、腐蚀、编织松散); \n2)报废标准。\n\n纤维吊装带:\n\n1) 损坏(磨损、刮伤、缝纫线断开); \n2) 外部的异常(变色、染色、软化、尘污); \n3) 金属配件(变形、刮伤、断裂、锈蚀); \n4) 报废标准。\n\nd)夹钳:\n\n一夹钳主体或吊环的异常; \n钳口开启异常; \n凸轮或钳叉的齿部(有凸边的部分)处磨损或卡滞、损坏; \n夹钳的功能; \n安全销的功能; \n维护; \n报废标准。\n\n### 6.1.4吊装方法\n\n培训课程中应包含下列吊装方法的知识:\n\na)重心的确定和载荷质量的估算。\n\nb)按照载荷外形选择吊装方法:\n\n直接起升; \n-篮式系挂起升; \n箍式系挂起升; \n夹钳起升; \n-不规则形状载荷的起升(非对称载荷); \n-用起重横梁起升(集装箱吊具); \n使用辅助拉绳。\n\nc)根据载荷质量和起升角度选择吊具。\n\nd)悬吊载荷的运移。\n\n### 6.1.5发信号\n\n培训课程中应包含下列发信号的知识:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.1.6安全规范\n\n### 6.1.7工作规划\n培训课程中应包含下列工作规划:\n\na) 工作顺序; \nb) 载荷运移的路径; \nc) 入口和出口; \nd) 地面或支承面的条件; \ne) 包括吊装作业人员的位置; \n其他现场人员的配合。\n\n### 6.1.8危险因素确认和防控措施\n培训课程中应包含下列危险因素确认和防控措施的知识:\n\na)与起重机的使用和吊装操作相关的危险因素:挤压的危险,诸如跌落的载荷、载荷倒塌、移动载荷和其他物体之间的卡绊;切割的危险,诸如破断的钢丝绳、具有锋利边缘的载荷;冲击的危险,诸如载荷摆动、载荷倒塌、弹射物;缠绕的危险,诸如和钢丝绳吊具、牵绳缠绕在一起;从高处跌落的危险。\n\nb)起升作业现场应考虑的潜在危险因素:高架动力线;-高架公用线路,例如蒸汽管线、天然气管线、电话线;树木;不平坦的和/或不坚实的地面;允许的地面载荷;周围建筑物/容器/工程结构/设备;危险品;腐蚀性物品;障碍物;照明不足;-无线电干扰;恶劣天气。\n\n## 6.2操作课程\n\n### 6.2.1总则\n\n操作课程应包含吊装作业的各个步骤,诸如吊装作业的安全措施、发信号、重心的确定、载荷质量的估算、吊具的选择、吊具的检查,以及在载荷和吊钩上安装吊具、起升、吊运和下降载荷。受训者应基本掌握用篮式系挂、箍式系挂和夹钳起升的方法,以及不规则形状载荷的起升等吊装方法。\n\n### 6.2.2吊装作业的安全措施\n\n培训课程中应包含下列吊装作业安全措施的练习:\n\na)正确着装、使用个人防护用具; \nb)通过手势和喊话进行安全确认。\n\n### 6.2.3发信号\n\n培训课程中应包含下列发信号方法的练习:\n\na) 手势信号; \nb)旗语; \nc) 无线电通讯(声音信号)。\n\n### 6.2.4确定重心和估算载荷质量\n\n培训课程中应包含确定重心和估算载荷质量的练习。\n\n### 6.2.5选择吊挂装置\n\n培训课程中应包含选择吊挂装置的练习。\n\n### 6.2.6检查吊挂装置\n\n培训课程中应包含检查吊挂装置的练习。\n\n#### 6.2.7吊装\n\n##### 6.2.7.1安装吊具\n\n培训课程中应包含下列安装吊具步骤的练习:\n\na) 确定重心和安装点; \nb) 载荷上方吊钩的定向和下降吊钩; \nc) 在载荷和吊钩上安装吊具; \nd) 确认吊装状况的安全性。\n\n##### 6.2.7.2试起升和起升载荷\n\n培训课程中应包含下列试起升和起升载荷步骤的练习:\n\na) 准确起升和停止; \nb) 安全性确认; \nc) 起升载荷。\n\n##### 6.2.7.3吊运载荷\n\n培训课程中应包含下列吊运载荷步骤的练习:\n\na) 设计载荷运移路径; \nb) 跨越(和其他起重机共用的空间); \nc) 向起重机司机发吊运路线和下降位置的信号; \nd) 载荷导向。\n\n##### 6.2.7.4下降载荷\n\n培训课程中应包含下列下降载荷步骤的练习:\n\na) 评估地面或支承结构表面的状况; \nb) 将载荷引导到下降位置和预支的垫木上; \nc) 下降载荷和停止下降; \nd) 准确下降,把载荷放在地上并确认其稳定性; \ne) 从吊钩和载荷上移走吊具; \nf 检查吊具并将它存放在指定位置。\n",
- "reference_source": "98《起重机吊装工和指挥人员的培训》(GB-T23721-2009).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- },
- {
- "check_item": "parameter_compliance_check",
- "chapter_code": "acceptance",
- "check_item_code": "acceptance_parameter_compliance_check",
- "check_result": {
- "issue_point": "钢丝绳吊索报废标准中关于断丝比例与使用年限的规定与现行国家标准不符",
- "location": "(1)钢丝绳吊索检查\n6)重型套环连接部位的紧股状况:钢丝绳错动或合金压头是否发生变形、磨损、腐蚀及裂纹。出现以下任一情况应进行报废处理:\n①重型套环连接部位断丝为总丝数的5%;②在一个控距内断丝数为总丝数的13%;\n③绳股断裂,钢丝绳相对公称直径减少10%以上;\n④出现波浪形变形时,在钢丝绳长度不超过25d的范围内,d1大于等于4d/3,式中:d—钢丝绳公称直径,d1—钢丝绳变形后包络面的直径;\n⑤钢丝绳被压扁、扭结、弯折;\n⑥钢丝绳严重锈蚀;\n⑦重型套环连接部件,钢丝绳松脱或错动;压制接头损伤、变形、裂纹和严重腐蚀;\n⑧钢丝绳吊索的金属附件报废标准,按其国家标准的有关规定执行;吊装作业使用频繁疲劳的钢丝绳索具,使用两年后应强制报废。",
- "suggestion": "删除‘使用两年后应强制报废’的条款,或明确其为建议性要求而非强制性规定。应依据《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中关于钢丝绳报废的判定标准进行修订,明确报废条件以实际检测结果为准,而非固定使用年限。",
- "reason": "根据【参考依据】4.3.3条明确指出:钢丝绳吊索的使用、检验、破断拉力值和报废等应符合《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972的规定。GB/T5972中并未规定钢丝绳使用满两年即强制报废,而是根据断丝、磨损、腐蚀、变形等具体检测指标进行判定。因此,将‘使用两年后强制报废’作为独立报废条件,与国家标准不符,属于技术参数与标准不一致的问题。",
- "risk_level": "高风险",
- "review_references": "1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n【Top1 参考文档】\n【文件】13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md\n【标题】4 起重机械和索具设备\n...[前文已省略]...\n塔式起重机安全规程》GB5144、《建筑施工塔式起重机安装、使用、拆卸安全技术规程》JGJ196及《建筑机械使用安全技术规程》JGJ33中的相关规定。\n\n### 4.1.6 拔杆式起重机的制作安装应符合下列规定:\n\n1 拔杆式起重机应进行专门设计和制作,经严格的测试、试运转和技术鉴定合格后,方可投入使用。\n\n2 安装时的地基、基础、缆风绳和地锚等设施,应经计算确定。缆风绳与地面的夹角应在 $3 0 ^ { \\circ } \\sim 4 5 ^ { \\circ }$ 之间。缆风绳不得与供电线路接触,在靠近电线处,应装设由绝缘材料制作的护线架。\n\n### 4.1.7 拔杆式起重机的使用应符合下列规定:\n\n1 在整个吊装过程中,应派专人看守地锚。每进行一段工作或大雨后,应对拔杆、缆风绳、索具、地锚和卷扬机等进行详细检查,发现有摆动、损坏等情况时,应立即处理解决。\n\n2 拔杆式起重机移动时,其底座应垫以足够的承重枕木排和滚杠,并将起重臂收紧,处于移动方向的前方,倾斜不得超过${ 1 0 } ^ { \\circ }$ ,移动时拔杆不得向后倾斜,收放缆风绳应配合一致。\n\n## 4.2 绳索\n\n### 4.2.1 吊装作业中使用的白棕绳应符合下列规定:\n\n1 应由剑麻的茎纤维搓成,并不得涂油。其规格和破断拉力应符合产品说明书的规定。\n\n2 只可用作受力不大的缆风绳和溜绳等。白棕绳的驱动力只能是人力,不得用机械动力驱动。\n\n3 穿绕白棕绳的滑轮直径,应大于白棕绳直径的10倍。麻绳有结时,不得穿过滑车狭小之处。长期在滑车使用的白棕绳,应定期改变穿绳方向。\n\n4 整卷白棕绳应根据需要长度切断绳头,切断前应用铁丝或麻绳将切断口扎紧。\n\n5 使用中发生的扭结应立即抖直。当有局部损伤时,应切去损伤部分。\n\n6 当绳长度不够时,应采用编接接长。\n\n7 捆绑有棱角的物件时,应垫木板或麻袋等物。\n\n8 使用中不得在粗糙的构件上或地下拖拉,并应防止砂、石屑嵌入。\n\n9 编接绳头绳套时,编接前每股头上应用绳扎紧,编接后相互搭接长度:绳套不得小于白棕绳直径的15倍;绳头不得小于30倍。\n\n10 白棕绳在使用时不得超过其容许拉力,容许拉力应按下式计算:\n\n$$\n[ F _ { z } ] = \\frac { F _ { z } } { K }\n$$\n\n式中: $[ F _ { z } ]$ 一 -白棕绳的容许拉力(kN);$F _ { z }$ —白棕绳的破断拉力(kN);$K$ ——白棕绳的安全系数,应按表4.2.1采用。\n\n表4.2.1白棕绳的安全系数 \n\n\n\n\n\n### 4.2.2 采用纤维绳索、聚酯复丝绳索应符合现行国家标准《纤维绳索通用要求》 $\\mathrm { G B / T 2 1 3 2 8 } .$ 、《聚酯复丝绳索》 $\\mathrm { G B } / \\mathrm { T } 1 1 7 8 7$ 和《绳索有关物理和机械性能的测定》 $\\mathrm { G B / T 8 8 3 4 }$ 的相关规定。\n\n### 4.2.3 吊装作业中钢丝绳的使用、检验、破断拉力值和报废等应符合现行国家标准《重要用途钢丝绳》GB8918、《一般用途钢丝绳》GB/T20118和《起重机钢丝绳保养、维护、安装、检验和报废》GB/T5972中的相关规定。\n\n## 4.3 吊索\n\n### 4.3.1 钢丝绳吊索应符合下列规定:\n1 钢丝绳吊索应符合现行国家标准《一般用途钢丝绳吊索特性和技术条件》 $\\mathrm { G B / T 1 6 7 6 2 }$ 、插编索扣应符合现行国家标准《钢丝绳吊索 插编索扣》 $\\mathrm { G B / T 1 6 2 7 1 }$ 中所规定的一般用途钢丝绳吊索特性和技术条件等的规定。\n\n2 吊索宜采用 $6 \\times 3 7$ 型钢丝绳制作成环式或8股头式(图4.3.1),其长度和直径应根据吊物的几何尺寸、重量和所用的吊装工具、吊装方法确定。使用时可采用单根、双根、四根或多根悬吊形式。\n\n3 吊索的绳环或两端的绳套可采用压接接头,压接接头的长度不应小于钢丝绳直径的20倍,且不应小于 $3 0 0 \\mathrm { m m }$ 。8股头吊索两端的绳套可根据工作需要装上桃形环、卡环或吊钩等吊索附件。\n\n \n图4.3.1吊索\n\n4 当利用吊索上的吊钩、卡环钩挂重物上的起重吊环时,吊索的安全系数不应小于6;当用吊索直接捆绑重物,且吊索与重物棱角间已采取妥善的保护措施时,吊索的安全系数应取 $6 \\sim$ 8;当起吊重、大或精密的重物时,除应采取妥善保护措施外,吊索的安全系数应取10。\n\n5 吊索与所吊构件间的水平夹角宜大于 $4 5 ^ { \\circ }$ 。计算拉力时可按本规范附录A表A.1、表A.2选用。\n\n### 4.3.2 吊索附件应符合下列规定:\n\n1 套环应符合现行国家标准《钢丝绳用普通套环》GB/T5974.1和《钢丝绳用重型套环》 $\\mathrm { G B / T 5 9 7 4 . 2 }$ 的规定。\n\n2 使用套环时,其起吊的承载能力,应将套环的承载能力与表4.3.2中降低后的钢丝绳承载能力相比较,采用小值。\n\n3 吊钩应有制造厂的合格证明书,表面应光滑,不得有裂纹、刻痕、剥裂、锐角等现象。吊钩每次使用前应检查一次,不合格者应停止使用。\n\n4 活动卡环在绑扎时,起吊后销子的尾部应朝下,吊索在受力后应压紧销子,其容许荷载应按出厂说明书采用。\n\n表4.3.2使用套环时的钢丝绳强度降低率\n\n\n\n\n\n### 4.3.3 横吊梁应采用Q235或Q345 钢材,应经过设计计算,计算方法应按本规范附录B进行,并应按设计进行制作。\n\n## 4.4 起重吊装设备\n\n### 4.4.1 滑轮和滑轮组的使用应符合下列规定:\n\n1 使用前,应检查滑轮的轮槽、轮轴、夹板、吊钩等各部件,不得有裂缝和损伤,滑轮转动应灵活,润滑良好。\n\n2 滑轮应按本规范附录C表C.0.1中的容许荷载值使用。对起重量不明的滑轮,应先进行估算,并经负载试验合格后,方可使用。\n\n3 滑轮组绳索宜采用顺穿法,由三对以上动、定滑轮组成的滑轮组应采用花穿法。滑轮组穿绕后,应开动卷扬机慢慢将钢丝绳收紧和试吊,检查有无卡绳、磨绳的地方,绳间摩擦及其他部分应运转良好,如有问题,应立即修正。\n\n4 滑轮的吊钩或吊环应与起吊构件的重心在同一垂直线上。 \n5 滑轮使用前后应刷洗干净,擦油保养,轮轴应经常加油\n\n润滑,严禁锈蚀和磨损。\n\n6 对重要的吊装作业、较高处作业或在起重作业量较大时,不宜用钩型滑轮,应使用吊环、链环或吊梁型滑轮。\n\n7 滑轮组的上下定、动滑轮之间安全距离不应小于 $1 , 5 \\mathrm { m }$ 。\n\n8 对暂不使用的滑轮,应存放在干燥少尘的库房内,下面垫以木板,并应每3个月检查保养一次。\n\n9 滑轮和滑轮组的跑头拉力、牵引行程和速度应符合下列规定:\n\n1)滑轮组的跑头拉力应按下式计算:\n\n$$\nF = \\alpha Q\n$$\n\n式中: $F$ 一 跑头拉力(kN);$\\alpha$ 滑轮组的省力系数,其值可按本规范附录C表C.0.2选用;$Q$ - 一计算荷载( $\\mathrm\n...[后文已省略]...\n",
- "reference_source": "13《建筑施工起重吊装工程安全技术规范》(JGJ276-2012).md"
- },
- "exist_issue": true,
- "risk_info": {
- "risk_level": "high"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-43": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸->一)主梁整体吊装受力验算",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2的安全系数):10.87×1.2=13T;\n查表徐工80t吊车起重性能表,得工作幅度8m,主臂长度18m额定起重量为25.4>13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式,规格为Φ36,长度为6m*2根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36钢丝绳的破断拉力为81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故φ36mm钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)规范要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-44": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸->二)吊车支腿基础验算",
- "original_content": "二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不利荷载仅有2个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-45": {
- "metadata": {
- "review_location_label": "第33页:第十二章 附件",
- "original_content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 1
- }
- },
- "review_lists": [
- {
- "check_item": "sensitive_check",
- "chapter_code": "other",
- "check_item_code": "other_sensitive_check",
- "check_result": "无明显问题",
- "exist_issue": false,
- "risk_info": {
- "risk_level": "low"
- }
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-46": {
- "metadata": {
- "review_location_label": "第33页:第十一章 计算书及相关图纸",
- "original_content": "一)主梁整体吊装受力验算\n架桥机主梁由7根12米的组件通过销轴连接而成,单根主梁重10.87t,采用1台徐工80t汽车起重机(自重50t)进行单机抬吊,单机最大起重量80T。\n图9-1 整车尺寸及起重高度曲线图\n图9-3 主梁抬吊吊车站位图\n图9-3 起重性能表\n(1)起重及钢绳验算\n单次抬吊主梁重(考虑1.2的安全系数):10.87×1.2=13T;\n查表徐工80t吊车起重性能表,得工作幅度8m,主臂长度18m额定起重量为25.4>13T,起重量满足要求,此时起重高度约16m,远大于主梁安装高度。\n图9-4 吊索布置图\n图9-4 吊索布置图\n吊装钢丝绳采用插编式钢丝绳,吊装时安全系数为8,吊装钢丝绳强度全部采用1770MPa形式,规格为Φ36,长度为6m*2根\n根据《重要用途钢丝绳》(GB 8918-2006),查表得中φ36钢丝绳的破断拉力为81.7t,单机抬吊主梁时钢丝绳所受拉力为9.2t,安全系数K=81.7/9.2=8.88>8,故φ36mm钢丝绳在工作状态下的安全系数满足《建筑施工起重吊装工程安全技术规范》(JGJ276-2012)规范要求。\n\n二)吊车支腿基础验算\n本项目架桥机单节主梁重11.87t,考虑1.2倍的安全系数,取计算荷载为13t。\n采用80t汽车吊进行拼装,吊车长约13m,自重50t,支腿展开约4.8m,共有4个支腿,根据最不利荷载仅有2个支腿计算,每个支腿承载31.5t,支腿下方枕木的受力面积约0.32m²。故单个支腿下方的压强为:\nP=F/A=315000/320000=0.98MPa\n本项目桥台硬化后实测承载力不低于10MPa≥0.98MPa,故实测地基承载力满足要求。"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【计算书】内容: 1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "低风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【相关施工图纸】内容: 1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【附图附表】内容: 1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十一章 计算书及相关图纸下缺失其他资料中的【编制及审核人员情况】内容: 1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十一章 计算书及相关图纸内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-47": {
- "metadata": {
- "review_location_label": "第33页:第十二章 附件",
- "original_content": "第十二章 附件\n(1)使用合格证明\n(2)安装单位资质证书\n\n特种作业人员证书"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【计算书】内容: 1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含计算书包含:1.内容要求基本要素:编制依据、工程简况、方案简述、设计参数、主要工况计算、局部计算、结论及建议;2.主要工况计算基本要素:本工况描述、应力分析结果、变形分析结果、反力分析结果、屈曲分析结果;3.局部计算:对于受力集中、结构复杂的局部重要节点进行细部分析;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 4、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【相关施工图纸】内容: 1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含专项施工方案设计图应包含:1.项目的总体平面布置图;2.施工工点平面布置图;3.支撑结构的纵立面布置图;4.横断面布置图;5.平面布置图;6.细部构造图;7.模板布置图;8.模板构造图;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 5、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【附图附表】内容: 1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含附图附表主要包括:1.施工进度计划网络图;2.施工进度计划横道图;3.危险源分析和 应对措施表;4.专职安全管理人员和特种作业人员证件扫描件;5.专业分包单位资质扫 描件;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 6、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "other",
- "check_item_code": "other_completeness_check",
- "check_result": "第十二章 附件下缺失其他资料中的【编制及审核人员情况】内容: 1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "中风险"
- },
- "location": "第十二章 附件",
- "suggestion": "建议补充:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员",
- "reason": "参照:《桥梁公司危险性较大工程管理实施细则(2025版)》 中的内容要求,第十二章 附件内容属于,专项施工方案内容要求中的 【其他资料】 板块,应包含编制及审核人员情况包含:1.专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后,;2.以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员;",
- "review_references": "十、其他资料 本章包含计算书、相关施工图纸、附图附表、编制及审核人员情况等四个方面。 1、计算书 根据具体的专项施工方案对临时结构进行工况分析,分别计算结构在各工况下 的强度、刚度及稳定性情况,保证结构满足现行规范或规定的要求。对复杂的结构 分析建议采用通用有限元软件,对简单的结构建议直接手算并附计算公式及简图。 计算模型应随同计算资料一并上报。 施工计算一般采用容许应力法。缆索吊机、深水基础围堰、大型现浇支架、悬 浇挂篮、钢围堰及钢平台等大型临时结构,应由公司技术中心进行复核验算,针对 路桥集团规定的超规模危大工程Ⅲ级和超规模危大工程IV风险的专项施工方案计算 书,应经公司同意后委托第三方进行复核验算。 (1)内容要求 专项施工方案中包含承重结构、重要临时设施、设备选型、吊绳吊具受力计算、地基承载力等工作内容编制的专项计算书,内容应包含以下基本要素: 1)编制依据:规范及行业标准、其他资料; 2)工程简况:文字描述(参考专项施工方案正文简要说明); 3)方案简述:文字描述(参考专项施工方案正文简要说明)、主要临时结构布 置图; 4)设计参数:材料规格型号参数表、材料强度设计值表、工况及荷载组合; 5)主要工况计算:本工况描述、应力分析结果、变形分析结果、反力分析结果、 屈曲分析结果; 6)局部计算:局部计算分析内容参考整体分析内容;对于受力集中、结构复杂 的局部重要节点进行细部分析; 7)结论及建议。 对于委托第三方单位设计计算的,委托方应特别审核工况及其受力图是否完备、 合理。第三方设计计算单位应具有相应资质,计算人、审核人应签字,并加盖计算 单位公章。 (2)主要工况计算 1)本工况描述:结构计算模型、结构计算模型图、结构单元类型及数量、边界 条件、荷载类型及取值情况; 2)应力分析结果:分别提取弯曲应力和剪切应力、与规范允许值比较得出结论; 3)变形分析结果:根据分析目的取舍分析结果、与规范允许值比较得出结论; 4)反力分析结果:根据分析目的取舍分析结果、与允许值比较得出结论; 5)屈曲分析结果:取第一阶段结果、与规范允许值比较得出结论。 (3)局部计算 对于受力集中、结构复杂的局部重要节点进行细部分析。 2、相关施工图纸 专项施工方案设计图应包含项目的总体平面布置图、施工工点平面布置图、支 撑结构的纵立面布置图、横断面布置图、平面布置图、细部构造图、模板布置图、 模板构造图等。 设计图按总体、局部、细部的顺序整理排版、图框采用最新的《桥梁公司标准 图框(2025版)》,图号简明、连续,人员签字完整。 3、附图附表 附图附表主要包括施工进度计划网络图、施工进度计划横道图、危险源分析和 应对措施表、专职安全管理人员和特种作业人员证件扫描件、专业分包单位资质扫 描件等。 7、编制及审核人员情况 专项施工方案验收条件一览表施工方案编制完成后应将方案编制、复核、审核、 审批人员的姓名、职务、职称等相关信息以表格的形式附在专项施工方案的最后, 以便在专项施工方案审核、验收实施过程中沟通,以上均为项目内部人员,不含公 司或监理、建设单位人员。",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- },
- {
- "a92b8bbcb5ab6c92f5128266055a4495-1772962259-low-48": {
- "metadata": {
- "review_location_label": "第1页:目录",
- "original_content": "第一章 编制依据与说明\t1一) 编制依据\t1二) 编制说明\t2三) 编制原则\t2四) 编制范围\t2第二章 工程概况\t3一)工程简介\t3二)周边环境条件及工程地质\t31、周边环境条件\t32、工程地质\t4三)气象水文\t4四)架桥机概况\t4五)施工平面布置\t9六)施工要求\t11七)风险辨识与分级\t12八)参建各方责任主体单位\t14第三章 施工计划\t15一)施工进度计划\t15二)材料机械设备和人员计划\t16第四章 施工工艺技术\t19一)主要部件说明\t191、主梁总成\t192、前临时支腿\t193、前支腿装置\t204、中支腿装置\t205、尾支腿装置\t206、纵移桁车\t207、起重小车\t218、横移轨道\t21二)架桥机安装施工\t211、安装准备\t212、现场准备\t223、架桥机安装前检查验收\t233、安装施工工艺流程\t234、安装步骤\t25四) 架桥机拆除\t281、准备工作\t282、 拆除步骤\t293、架桥机拆除注意事项\t29第五章 施工安全保证措施\t31一) 组织保证措施\t31二) 技术保证措施\t361、施工安全保证措施\t362、雨季施工安全保障措施\t413、夏季施工安全保证措施\t424、冬季施工安全保证措施\t425、职业健康保证措施\t43第六章 质量保证措施\t44第七章 环境保证措施\t46第八章 验收要求\t47一) 验收标准\t47二)验收程序及人员\t471、验收程序\t472、验收人员\t48三)验收内容\t491、机械设备\t492、吊索具验收\t553、人员验收\t58第九章 施工管理人员及作业人员配备及分工\t59一) 组织机构\t59二) 施工管理人员\t59三) 施工作业人员配备及分工\t60第十章 应急处理措施\t64一) 组织机构\t64二) 职责\t65三) 预警及信息报告\t67四) 应急响应\t68第十一章 计算书及相关图纸\t78一)主梁整体吊装受力验算\t78二)吊车支腿基础验算\t81第十二章 附件\t82"
- },
- "risk_summary": {
- "max_risk_level": "low",
- "risk_count": {
- "high": 0,
- "medium": 0,
- "low": 0
- }
- },
- "review_lists": [
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "主要施工方法概述缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'主要施工方法概述'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'主要施工方法概述'相关内容;整改建议:建议在目录中补充'主要施工方法概述'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工方法及操作要求缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'施工方法及操作要求'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'施工方法及操作要求'相关内容;整改建议:建议在目录中补充'施工方法及操作要求'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工艺流程缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'工艺流程'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'工艺流程'相关内容;整改建议:建议在目录中补充'工艺流程'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "检查要求缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'检查要求'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'检查要求'相关内容;整改建议:建议在目录中补充'检查要求'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "技术参数缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'技术参数'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'技术参数'相关内容;整改建议:建议在目录中补充'技术参数'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工准备缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第四章 施工工艺技术",
- "suggestion": "目录缺失:目录中缺失'施工准备'这个小节;当前章节仅涉及'第四章 施工工艺技术',目录中未体现'施工准备'相关内容;整改建议:建议在目录中补充'施工准备'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:主要施工方法概述、技术参数、工艺流程、施工准备、施工方法及操作要求、检查要求",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保护及文明施工措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录缺失:目录中缺失'环境保护及文明施工措施'这个小节;当前章节仅涉及'第七章 环境保证措施',目录中未体现'环境保护及文明施工措施'相关内容;整改建议:建议在目录中补充'环境保护及文明施工措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'环境保证体系'这个小节;当前章节仅涉及'第七章 环境保证措施',目录和大纲均未涵盖'环境保证体系'相关内容;整改建议:建议在本章或前序章节中增设'环境保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "环境保护组织机构缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第七章 环境保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'环境保护组织机构'这个小节;当前章节仅涉及'第七章 环境保证措施',目录和大纲均未涵盖'环境保护组织机构'相关内容;整改建议:建议在本章或前序章节中增设'环境保护组织机构'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:环境保证体系、环境保护组织机构、环境保护及文明施工措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "设计概况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'设计概况'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'设计概况'相关内容;整改建议:建议在目录中补充'设计概况'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工平面及立面布置缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'施工平面及立面布置'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'施工平面及立面布置'相关内容;整改建议:建议在目录中补充'施工平面及立面布置'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工程地质与水文气象缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第二章 工程概况",
- "suggestion": "目录缺失:目录中缺失'工程地质与水文气象'这个小节;当前章节仅涉及'第二章 工程概况',目录中未体现'工程地质与水文气象'相关内容;整改建议:建议在目录中补充'工程地质与水文气象'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:设计概况、工程地质与水文气象、周边环境、施工平面及立面布置、施工要求和技术保证条件、风险辨识与分级、参建各方责任主体单位",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "验收时间缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第八章 验收要求",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'验收时间'这个小节;当前章节仅涉及'第八章 验收要求',目录和大纲均未涵盖'验收时间'相关内容;整改建议:建议在本章或前序章节中增设'验收时间'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:验收标准、验收程序、验收内容、验收时间、验收人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "附图附表缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录缺失:目录中缺失'附图附表'这个小节;当前章节仅涉及'第十二章 附件',目录中未体现'附图附表'相关内容;整改建议:建议在目录中补充'附图附表'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "计算书缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'计算书'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'计算书'相关内容;整改建议:建议在本章或前序章节中增设'计算书'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'编制及审核人员情况'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "相关施工图纸缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十二章 附件",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'相关施工图纸'这个小节;当前章节仅涉及'第十二章 附件',目录和大纲均未涵盖'相关施工图纸'相关内容;整改建议:建议在本章或前序章节中增设'相关施工图纸'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "技术保证措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录缺失:目录中缺失'技术保证措施'这个小节;当前章节仅涉及'第十章 应急处理措施',目录中未体现'技术保证措施'相关内容;整改建议:建议在目录中补充'技术保证措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "监测监控措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'监测监控措施'这个小节;当前章节仅涉及'第十章 应急处理措施',目录和大纲均未涵盖'监测监控措施'相关内容;整改建议:建议在本章或前序章节中增设'监测监控措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十章 应急处理措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'安全保证体系'这个小节;当前章节仅涉及'第十章 应急处理措施',目录和大纲均未涵盖'安全保证体系'相关内容;整改建议:建议在本章或前序章节中增设'安全保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "其他作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录缺失:目录中缺失'其他作业人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录中未体现'其他作业人员'相关内容;整改建议:建议在目录中补充'其他作业人员'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "专职安全生产管理人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'专职安全生产管理人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录和大纲均未涵盖'专职安全生产管理人员'相关内容;整改建议:建议在本章或前序章节中增设'专职安全生产管理人员'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "特种作业人员缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第九章 施工管理人员及作业人员配备及分工",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'特种作业人员'这个小节;当前章节仅涉及'第九章 施工管理人员及作业人员配备及分工',目录和大纲均未涵盖'特种作业人员'相关内容;整改建议:建议在本章或前序章节中增设'特种作业人员'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工管理人员、专职安全生产管理人员、特种作业人员、其他作业人员",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "计算书缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录缺失:目录中缺失'计算书'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录中未体现'计算书'相关内容;整改建议:建议在目录中补充'计算书'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "相关施工图纸缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录缺失:目录中缺失'相关施工图纸'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录中未体现'相关施工图纸'相关内容;整改建议:建议在目录中补充'相关施工图纸'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "附图附表缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'附图附表'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录和大纲均未涵盖'附图附表'相关内容;整改建议:建议在本章或前序章节中增设'附图附表'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "编制及审核人员情况缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第十一章 计算书及相关图纸",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'编制及审核人员情况'这个小节;当前章节仅涉及'第十一章 计算书及相关图纸',目录和大纲均未涵盖'编制及审核人员情况'相关内容;整改建议:建议在本章或前序章节中增设'编制及审核人员情况'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:计算书、相关施工图纸、附图附表、编制及审核人员情况",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "劳动力计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录缺失:目录中缺失'劳动力计划'这个小节;当前章节仅涉及'第三章 施工计划',目录中未体现'劳动力计划'相关内容;整改建议:建议在目录中补充'劳动力计划'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工设备计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'施工设备计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'施工设备计划'相关内容;整改建议:建议在本章或前序章节中增设'施工设备计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "施工材料计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'施工材料计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'施工材料计划'相关内容;整改建议:建议在本章或前序章节中增设'施工材料计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全生产费用使用计划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第三章 施工计划",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'安全生产费用使用计划'这个小节;当前章节仅涉及'第三章 施工计划',目录和大纲均未涵盖'安全生产费用使用计划'相关内容;整改建议:建议在本章或前序章节中增设'安全生产费用使用计划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:施工进度计划、施工材料计划、施工设备计划、劳动力计划、安全生产费用使用计划",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量目标缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录缺失:目录中缺失'质量目标'这个小节;当前章节仅涉及'第六章 质量保证措施',目录中未体现'质量目标'相关内容;整改建议:建议在目录中补充'质量目标'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "工程创优规划缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'工程创优规划'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'工程创优规划'相关内容;整改建议:建议在本章或前序章节中增设'工程创优规划'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量控制程序与具体措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'质量控制程序与具体措施'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'质量控制程序与具体措施'相关内容;整改建议:建议在本章或前序章节中增设'质量控制程序与具体措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "质量保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第六章 质量保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'质量保证体系'这个小节;当前章节仅涉及'第六章 质量保证措施',目录和大纲均未涵盖'质量保证体系'相关内容;整改建议:建议在本章或前序章节中增设'质量保证体系'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:质量保证体系、质量目标、工程创优规划、质量控制程序与具体措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "监测监控措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录缺失:目录中缺失'监测监控措施'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录中未体现'监测监控措施'相关内容;整改建议:建议在目录中补充'监测监控措施'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "安全保证体系缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录缺失:目录中缺失'安全保证体系'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录中未体现'安全保证体系'相关内容;整改建议:建议在目录中补充'安全保证体系'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "应急处置措施缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第五章 施工安全保证措施",
- "suggestion": "目录与大纲都缺失:目录和大纲中都缺失'应急处置措施'这个小节;当前章节仅涉及'第五章 施工安全保证措施',目录和大纲均未涵盖'应急处置措施'相关内容;整改建议:建议在本章或前序章节中增设'应急处置措施'相关内容,确保目录和大纲都包含该小节。",
- "reason": "该章节应具备要点:安全保证体系、组织保证措施、技术保证措施、监测监控措施、应急处置措施",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "标准规范缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "目录缺失:目录中缺失'标准规范'这个小节;当前章节仅涉及'第一章 编制依据与说明',目录中未体现'标准规范'相关内容;整改建议:建议在目录中补充'标准规范'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "法律法规缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "目录缺失:目录中缺失'法律法规'这个小节;当前章节仅涉及'第一章 编制依据与说明',目录中未体现'法律法规'相关内容;整改建议:建议在目录中补充'法律法规'相关内容,确保目录完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- },
- {
- "check_item": "completeness_check",
- "chapter_code": "catalogue",
- "check_item_code": "catalogue_completeness_check",
- "check_result": "文件制度缺失",
- "exist_issue": true,
- "risk_info": {
- "risk_level": "高风险"
- },
- "location": "第一章 编制依据与说明",
- "suggestion": "大纲缺失:大纲中缺失'文件制度'这个小节;当前章节仅涉及'第一章 编制依据与说明',大纲中未涵盖'文件制度'相关内容;整改建议:建议在大纲中补充'文件制度'相关内容,确保大纲完整性。",
- "reason": "该章节应具备要点:法律法规、标准规范、文件制度、编制原则、编制范围",
- "review_references": "",
- "reference_source": "《桥梁公司危险性较大工程管理实施细则(2025版)》"
- }
- ]
- }
- }
- ],
- "report_result": {
- "file_id": "a92b8bbcb5ab6c92f5128266055a4495",
- "file_name": "47_会理至禄劝(四川境)高速公路项目土建项目_词句语法检查_测试案例使用.docx",
- "total_issues": 137,
- "risk_stats": {
- "high": 33,
- "medium": 38,
- "low": 66
- },
- "overall_assessment": "该施工方案整体技术内容较为全面,但在合规性、逻辑严谨性和表述规范性方面存在显著问题。审查发现高风险问题33项、中风险问题38项,涉及参数不合规、职责分工错位、安全措施缺失、术语不准确及绝对化表述等,暴露出方案编制过程中对规范依据理解不深、审查机制不严等问题,亟需系统性修订以确保施工安全与法律合规性。",
- "high_risk_summary": [
- "吊装钢丝绳安全系数不足,强度等级不满足规范要求",
- "安全环保部无权组织验收检查,职责分工与规范不符",
- "高空作业平台未设置必要安全标志,违反强制性规定",
- "配电系统未落实‘一机、一闸、一漏’及距离要求",
- "架桥机试吊与检查要求超出规范范围,属自行扩展",
- "门式起重机用于箱梁吊装,未通过认证且无合规依据",
- "漏电保护装置设置不符合‘二级漏电保护’系统要求",
- "电焊机触电保护器配置不完整,未引用标准依据",
- "钢丝绳报废标准错误,以使用年限强制报废无依据",
- "质量管理体系未明确依据GB50205-2020标准运行"
- ],
- "medium_risk_summary": [
- "专职安全员未明确记录检查与纠正违章行为要求",
- "施工用电检查制度未明确依据JGJ46进行专项排查",
- "应急响应等级逻辑混乱,重伤事故等级低于死亡事故",
- "夜间作业‘严禁’表述绝对化,违背安全管理灵活性",
- "编制依据格式混乱,书名号、编号缺失或格式错误",
- "风险辨识中使用‘辩识’错别字及绝对化表述",
- "质量目标使用‘杜绝’‘100%’等绝对化用语,存在法律风险"
- ],
- "improvement_recommendations": [
- "全面核对并修正所有技术参数,确保符合GB/T26470、JGJ46等强制性标准要求",
- "明确工程管理部门为安全检查组织主体,安全环保部负责监督,避免职责错位",
- "补充设置高空作业平台安全标志,严格执行JT/T1507-2024规范要求",
- "将‘使用两年强制报废’删除,改为依据GB/T5972进行状态评估判定",
- "统一规范编制依据格式,确保《规范名称》(编号)一一对应,杜绝格式错误"
- ],
- "risk_alerts": [
- "钢丝绳安全系数不足及报废标准错误可能引发吊装事故,属重大安全风险",
- "门式起重机用于箱梁架设无合规依据,存在设备选型重大违规风险",
- "应急响应等级逻辑矛盾可能导致事故响应延误,影响救援有效性"
- ],
- "generated_at": "2026-03-08T17:40:21.068274"
- },
- "timestamp": "2026-03-08T17:40:21.070512"
- }
|